Material to material transfer with inspection results

Hi,
Could you please suggest me, how to tranfer inspection results from material to material?
Thanks & Regards,
Nataraj

Hi,
once list of inspection lots are generated, the data may contain  several results as opted, incldung Start date and end date for the inspection, Plant, Processing status of the inspection lot  and Material description. from the data generated, the transfer of inspection results may be taken up as the generation of lot results are not completed till usage decision code is entered. u may try with following link
[http://help.sap.com/erp2005_ehp_04/helpdata/EN/2d/351bb1448c11d189420000e829fbbd/frameset.htm]
[http://help.sap.com/erp2005_ehp_04/helpdata/EN/2d/351bb1448c11d189420000e829fbbd/frameset.htm]
i think the link-1 will be more useful to solve ur que.
with regards,
mahesh.

Similar Messages

  • QM Material specification with inspection plan

    Hello,
    I'm trying to setup QM material spec with inspection plan and it doesn't work.
    I setup material master (With insp plant and with material spec).
    I Created a characteristic that I used in my inspection plan and maintained the characteristic in the material specification.
    When I create an inspection lot (89), the characteristic is always inserted at the end instead of redefining my specifications into the pre-defined characteristic.
    Have I missed something?
    Ghislain

    As per our business scenario for Pharmaceutical we use Inspection with attached MIC with Sampling and Sample drawing Procedure, Sampling scheme to check the Quality of RM/PM/FP, can u give me some idea regarding;
    1) Material Specificaton in Inspection plan
    2) Reference Operation set with its use.
    3) Dynamic Modification Rule
    As for pharma we do;
    1) Create MIC
    2) Create Inspection plan
    3) Attaching the MIC to an Inspection plan with sampling and sample drawing procedure
    4) Attacing an Inspection Plan to an Inspection Lot
    5) Result Recording and Usage Decision of Inspection lot for
    In Automotive and othe Process Industry how the Dynamic modification rule,reference operation set, material specification flow.
    Reply will be rewarded
    Thanks in advance its urgernt

  • Material to Material transfer with movement type 321

    Dear Experts,
    Material to material transfer with movement type 309, the system create a price difference account if price control "S"
    but we transfer material to material with movement 321 (quality ), no price didderence account is generated, system showing different document
    Exp--- Material "A" with STD price 150
    Material "B" with STD price 100
    document is created
    Material A A/c. Credit 100
    Material B A/c. Dr. 150
    My question is, the price difference where is adjusting, is finance and costing books of account will effect.
    Kindly help to solve the issue
    Thanks & Regards,

    Dear Wasim,
    321 movement is to transfer the stock of a material lying in quality to unrestricted stock.
    It's not used for material to material transfer.
    Check and revert back.
    Regards
    Mangalraj.S

  • Link of material movement with inspection type

    Hello Masters,
    I have scenario where component at shop floor will be segregated for inspection. The requirement is to do result/defect recording for those parts and if required then those parts need to be scrapped. So one way of doing that can be to move those parts to either blocked stock or QI stock (ideal option) or to specific storage location so that planning can be taken care of (if material are still in unrestricted then planning will consider those part as OK part and planning may fail). And to record result/defect we require inspection lot, which can be created by using above mentioned material movement.
    But problem is how to create inspection lot so that we can do result/defect recording for those materials and scrap those material.
    Please note that material master will have QM setup active (inspection type 01 - Goods Receipt Insp. for Purchase Order) and hence we can move material from unrestricted stock to QI stock only through QM.
    I am not sure if we should use inspection type 08 - Stock transfer inspection, as there can be many instances of material transfer within plant. And with inspection type 08 active, system will create inspection lot every time there is any material transfer.
    One way can be to create new goods movement only for this kind of transfer and new inspection type and link both together. So that when ever material is transferred using that particular goods movement, system creates inspection lot as well as material will be in QI stock. But I am not sure how this is possible or not and if yes then how this can be done.
    I know query was too long to read and I think I was clear enough to explain what the requirement is.
    It would be great if I can get some guidance from you masters at the earliest convenience as it is bit of importance.
    Thanks and regards,
    Devang

    Hi Devang,
    I guess this is Line rejection scenario. Correct me if understanding goes wrong. You have okayed the material against 01 inspection lot and UD has been given. Now you find this material defective on shop floor.
    I think the 2nd option suggested by marwadi sounds better. I suggest one more possibility, just check whether feasible.
    1.     Create quality notification Q2 type through QM01. While creating you can give references of original PO and material document, which fetch vendor name and material code automatically.
    2.     Record defects and all other required information in notification.
    3.     After this, you find an option in action box, transfer post unrestricted - >block . Click there. This will transfer the stock from unrestricted to block.
    4.     If you want planning persons should not consider this stock as OK, remove block stock from MRP stock availability check. As a result of which stock lying in block will not be considered as available stock.
    5.     From block stock you can send this material back to vendor through MIGO. Otherwise you can create return delivery from notification through action box also. Check what is feasible in your case.
    Here you need not create inspection lot, no need to use any user exit.
    Regards,
    Anand Rao

  • Problems with inspection result transfer to batch classification

    Hello ,
    I `m struggling with  the following problem: As result of UD I want to transfrer the inspection results to the batch class (evaluate the batch by the results of inspection). the correct batch class characteristic is assigned to the master inspection characteristic.
    It works fine, but only if I maintain a material specification for the material which includes the characteristics I want to get valuated automatically.
    We are using only inspection plans, we do not work with material specifications for quality inspection. In the inspection settings of the material master data only 'inspection with plan' is marked, 'material specification' we keep empty.
    I do not believe that I have to maintain the material specification in order to get results  transfered - But Am I wrong?
    If it is possible to get the results transferred without a maintained material specification - what is wrong with my settings? what do I need to change in order to get the process running well without that material specification nobody wants to maintain?
    Thanks in advance for all helpful hints.
    Kurt

    Hi
    Go to QCC0>Basic Setting>Setting at plant level--->select plant ->Inspection lot completion->Batch valuation without material spec
    check indicator.
    If you set this indicator, a link between the master inspection characteristics and the class characteristics for the batch class must exist when an inspection lot is created, for batch valuation to occur when the usage decision or inspection point valuation is made. A link within the material specification is not required.
    If you do not set this indicator, batch valuation only occurs when the usage decision or inspection point valuation is made, if a link using the material specification exists between the master inspection characteristics and the class characteristics for the batch class. In this way, you can control on a material-dependent basis whether the batch characteristics are valuated based on the inspection results.
    Regards'
    Sujit

  • Cross-client material transfer with conversion.

    Hi....
             I have a problem to solve....i am supposed to transfer material data from client 040 to 041 with conversions. I am thinking to do it by ALE. what conversions i am supposed to perform is not yet decided by project manager so as ALE is not very flexibe in certain areas...is it worthy to use ALE and what would be another way to carry out this task... please help me in this  problem...any article  or suggestion will be great help of mine....thanking you,,,,

    Hi!
    ? Strange. At least not easy. Do you speak about a development system? Maybe you just make a client copy and some hard database changes. Won't be OK, but if you just need some data for a performance test, this could do.
    Test for a migration? Try to stay as close to the final way as possible.
    You might save the outbound IDOC into a file, make some search and replace (in easy cases even in an editor) and upload the file for inbound IDOC. Also a report for file conversion can be used.
    User-exits for IDOC segment changes might be possible, but doesn't look like a good idea (one-time special rules, but coding for all the time and everywhere).
    Direct table copy is out of scope (e.g. because of internal number ranges).
    LSMW might be an option, too. As input file you could again use outbound IDOC saved as file (with conversions?). Then inbound conversion would be in a transparent and easy to maintain way.
    Hope you got some new ideas,
    regards,
    Christian

  • Material to Material Transfer with 309

    Hi all,
    I need to transfer the stock of one material to other , but the problem is both of them having different Base Unit of Measure.
    I put alternate unit of measurement in Material Master and tried to do 309, but again system is not allowing to transfer.
    Is there any other way to transfer it?
    I can't go for reversal of all GRs and Production Orders.
    Regards
    Purnesh Sharma

    Hi,
    This is a rough work around,
    01.
    As you donot want to cancel all the Gr's and PO, take approval from management ( as it hits accounting entries) and scrap the first materials or issue the material to a dummy cost center.
    Then upload the stock of second material with same quantity with 561, 501 or 552
    02. If the second material is not having stock , and not having open items , if you feel no problem in changing the Base UOM, then you can think that option also.
    Thanks & Regards,
    Sridhar.G

  • Material to Material Transfer with difference UOM

    Hi,
    In MB1B Transaction use the mvt.type 309.
    as my understanding if we want to transfer material to material ,both materials base unit should be same.
    can i transfer if the material using difference UOM ?

    Hi
    Prerequisite for Material to Material stock trasfer is that 1) Base unit of measure should be same
    2) Stock must be available in unrestricted
    U can not post 309 for materials having diff. UOM
    Vishal...

  • Why do we need material specification for transfering results to class char.

    Hi,
    Can you guys tell me why do we need to create material specification if we want to transfer quality inspection results to a batch class?
    Basically I have done the following:
    -Create Class Characteristic
    -Assign the Class Characteristic to a batch class
    -Link Class Char.  to MIC
    -Assign MIC to an Inspection Plan
    -Post GR, batch and inspection lot are created automatically
    -Record Results for inspection Lot
    -Make UD for Inspection Lot
    The result is not transferred to batch class, then I create material specification with the MIC assigned, the results can be transferred. But why?
    Best regards
    Danny

    Hello Danny,
    This is a standard program, which checks for this indicator at the time of inspection lot completion.
    F1- help gives satisfactory explanation
    Batch Valuation Possible Without Specification
    Use
    If you set this indicator, a link between the master inspection
    characteristics and the class characteristics for the batch class must exist
    when an inspection lot is created, for batch valuation to occur when the usage
    decision or inspection point valuation is made. A link within the material
    specification is not required.
    If you do not set this indicator, batch valuation only occurs when the
    usage decision or inspection point valuation is made, if a link using the
    material specification exists between the master inspection characteristics and
    the class characteristics for the batch class. In this way, you can control on a
    material-dependent basis whether the batch characteristics are valuated based on
    the inspection results.
    Amol.
    Message was edited by: Amol Manave : Main purpose is you can control whether Batch characteristics should be valuated based on results or not for particular material. If you set this indicator then batch characteristics will be valuated for all materials and in opposite case Batch characteristics will be valuated for only materials for which Material Specification exists.

  • Material to Material Transfer using Movement Type 309

    Hi,
    We have activated the material ledger.
    Issues:
    When we transfer material A to Material B using Movement Type 309 the price difference from Material A was not allocated to Material B after executing CKMLCP.
    But the another company who using the materail to material transfer, the price difference was allocated to receiving material.

    Hi,
    Please check SAP Note 167722 to able to do multi-level price determination for material transfer with using modification.
    best regards, Takashi

  • Mass material to material transfer

    Hi Expert
    i have high volume of material for which i need material to material transfer with movement 309, is this possible with any mass transaction.
    Regard
    Nabil

    Hi,
    Please note for movement 309 the base unit of measure that is stock keeping unit for sending and receiving material should be same
    and the both material should be managed in price control "V" Moving average price
    You can use LSMW , Refer few threads below
    LSMW for movement type 309
    http://www.sap-img.com/general/lsmw-steps-for-data-migration.htm
    Thanks
    Diwakar

  • Material to Material Transfer and 08 Inspection Lots

    Gang,
    I need major help.
    I have a situation where I want to do a Movement type 309 Material to Material Transfer. I have 08 Type Inspection set up on the Material. In this case I DO NOT want the Stock going into Quality. I just want it to go to Unrestricted to Unrestricted.
    In config. I deactivated the QM Active for 309 Movement under Inspection for Goods Movement. That did not seem to work.
    Any Ideas??
    Thanks so much
    -BRUCE

    1) Remove 'QM deactivation' of movement type '309' in customizing.
    It means the inspection activation for movement type '309'.
    2) Create material master-QM view and inspection setup with inspection type '08'.
    When you create the inspection setup data in QM view, you should remove the indicator 'Post to insp. stock'.
    3) When material document with movement type '309' occur, an inspection lot is created and stock is transfered to unrestriced stock.
    Regards
    Luke

  • Material to material stock transfer with batch management and scrap

    Hello
    Here i have an requirement that
    Raw Material  A maintained in Batches. Raw Material B is also maintained in batches. A and B  are used in two different finished products.A and B are with the same material properties except the size. that is  Size of  B is half of A.
    Now some times if B material is not readily available in the stores then A is cut into two halves and then material to material Transfer posting need to be carried out.
    Now while cutting A into two pieces there may be chances of scrap .so how to address the scrap in SAP.
    How to map this Scenario in SAP

    Dear,
    Would like to suggest the following: Basing on your client requirements and existing business scenarios following, not sure how far will be suits this.
    Since both materials are same except the size,
    In case of shortage of material B, material A used by cutting its size in to half.
    In this case, issue material A to production cost center as it is (i.e in its original size). Using movement type 201.
    Once transferred to production, can carry out the cutting in half and here consider the scrap and post the scrap using 551 Q movement.
    I think no need for transfer material to material in this case.
    Regards,
    Syed Hussain.

  • Report on material with inspection type

    Hi,
    is there any report which can show which material is assigned to which inspection type.
    regards
    Raj

    Dear Raj
    1 ) Make use of QA08. 
    2) Give the plant and choose in the TAB Deactivate inspection Type
    3) Maintain the inspection type 01 or 04 .
    4) Execute
    5) It will give you a list of material for which inspection types are assigned.
    you can even assign inspection type in mass through this
    hope this helps
    Regards
    Gajesh

  • Movement of Material in Quality Inspection

    Does anyone know a way to move material from one plant code to another and still keep the material in Quality Inspection, blocked or restriced. We are now having to move the material to Unrestricted in order to move it and the mateial has actually gotten to our customers as a result. We want to keep the material in a status that would not allow orders to cut against it but we can move it to other plant codes.

    thanks to everyone for your responses. However, the MB1B will not work in this case. The seniro is this. I have material at an off-site warehouse with plant code ABCD (warehouse managed). The material is in QI there. I need some of the material at the manufacturing site plant code XYZ1. I want to enter a UB transfer order (STO) and not take the material out of QI at ABCD so that the remaining material left in ABCD will remain in QI. The problem is if we have material that is off grade at ABCD and we want one unit sent to XYZ1 for testing we have to take the whole off graded lot out of QI in order to move the one unit. Since the off grade was put in unrestricted it has on occasion gotten out to a customer.
    Edited by: Renee Flatt on Feb 7, 2008 11:00 PM

Maybe you are looking for

  • Automating delivery blocks in sales orders

    Hi, We have a delivery made with ref to a sales order. The goods are third party warehouse managed.When the goods are no longer needed, a third party warehouse sends an idoc in our system. This idoc deletes the delivery in our sap system and as soon

  • VirtualBox Error with VT-x/AMD-V after suspend

    I using virtualbox_bin 2.2.0-1 from the AUR and have noticed a really annoying problem that *is not related* to the virtualbox_bin package (I think). When I suspend my Arch x86_64 box and then awaken it again,  VBox doesn't run my 64-bit guest VM and

  • Issues with %'s in Relfow

    Hi, I need assistance with adobe edge reflow. My issue is when I try to set the height of an element from pixel to percentage it disappears. For example: I make a header that is 100% width and 40 pixels height. I  switch height to percentage so it wi

  • Please tell me if I can use BitSet this way ;

    Please set me right if I'm asking this question in the wrong forum. I am trying to write an object that contains values in a BitSet into a file using ObjectOutputStream. I loose the values upon reading the object back from the file using ObjectInputS

  • Regarding BP number search and deletion

    Hi Gurus, I have some doubts in BP. 1) If I open BP and do start it only shows 100 nos max. Can I extend ti to all the bp available. 2) I had created the ord model and this org also treated as a bp master data. I deleted the ord model and deleted the