Material valuation data lock causing failure in PGI

Greetings experts,
I am running into an issue where a material valuation lock is causing deliveries to fail goods issue when PGI is triggered from the shipment. These shipments contain many deliveries and are sometimes processed in mass (VT12). This is causing issues since the operator is not immediately aware an error occurred as the shipment completes normally and all attached deliveries not containing the affected material are posted. The lock appears to be originating from MIRO during AP invoice creation.  Late exclusive block (OMJI) has been activated and set to 30 seconds however this has not eliminated the issue. This supports the MIRO theory since any other posting conflict (other PGIs) should have completed and released the lock within the 30 seconds.
Has anyone ever run into this issue before or found a work around? Custom logic to create a lock record for every material on the delivery seems excessive but may be the only way to notify the users of VT02 and MIRO that the corresponding material valuation data is already locked.
Thanks,
Dom

Hi Paresh,
Are you the person - who worked with for in Heineken? How do you do? No update from you..
We can not change the values in the material master because of that issue..
I have checked for the OSS notes.. but the issue had reassigned to FI team - they had raised it to SAP.
If we create new material, there won't be a problem at all..
Paresh - really we are all missing you..
waiting for your reply Paresh..
Thanks,
Venkatesh.S.P
Edited by: venkatesh paulraj on Mar 17, 2009 1:00 PM
Edited by: venkatesh paulraj on Mar 17, 2009 1:01 PM

Similar Messages

  • ALE/IDOC:The group data for the material CS94163AOOO is locked by ECPUSER

    Dear All,
    I have extended the idoc for MATMAS and getting -The group data for the material CS94163AOOO is locked by ECPUSER
    error on receving ( production ) server.I have written BDC in Z-function module to upload the data for extended segments after calling IDOC_INPUT_MATMAS01  function module.
    When the same scenario executed in development server the material is not getting locked and idoc is posted successfully.
    Please guide to resolve the error.
    Thanks,
    Sanjay Deshpande.
    Edited by: sanjay_123 on Nov 1, 2009 4:41 PM

    Hello,
    Can you pls try to use ENQUEUE_E_TABLE or FM specific to lock/unlock MARA table during Idoc creation.
    and put some WAIT statement before creation.
    CALL FUNCTION 'ENQUEUE_EMMARAS'
    EXPORTING
    MODE_MARA = 'S'
    MANDT = SY-MANDT
    MATNR = 'CS94163AOOO'
    X_MATNR = ' '
    _SCOPE = '2'
    *_WAIT = ' '
    _COLLECT = ' '
    EXCEPTIONS
    FOREIGN_LOCK = 1
    SYSTEM_FAILURE = 2
    OTHERS = 3
    IF sy-subrc <> 0.
    MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
    WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
    ENDIF.
    Then write code for creation of MARA
    Unlcok now like this
    CALL FUNCTION 'DEQUEUE_EMMARAS'
    EXPORTING
    MODE_MARA = 'S'
    MANDT = SY-MANDT
    MATNR = 'CS94163AOOO'
    X_MATNR = ' '
    _SCOPE = '3'
    _SYNCHRON = ' '
    _COLLECT = ' '
    ~Pramod
    Edited by: PKUPADHYAY on Nov 1, 2009 5:40 PM

  • Group Data locked for material

    Hi,
    I have an interface that failed because the "Group Data" of the material was locked.
    I am aware of "Material being locked by another user". However I don't know how the group data gets locked or what group data refers to.
    In most cases when I run the interface after some time, the material posts correctly. But I'd like to know what exactly locks group data and how I can check if it has been unlocked subsequently.
    Thanks.
    Urmila

    Hi,
      This message comes usually when you attempt to change the material using fm calls and material header MARA is locked (that is material itself is locked) by some other user .
      What you can do is to call lock fm ENQUEUE_EMMARAE
      before calling your material update logic and see whether the lock is successful. If the lock is successful then you can proceed with the update logic.
    Sri

  • How to avoid: Material data locked by another user

    Hi,
    'Material data locked by another user'
    We want to avoid this kind of situation  so that two different users can do the transactions on same material at same time.
    Regards,

    hi,
    As per SAP std. configuration its not possible...And if we the reason...then it good for a user...
    so, that once the user 1's work is not done fully user 2 can't work untill then and by this we avoid making of extra GR/IR or any of the duplicate documents...
    Regards
    Priyanka.P

  • Plant/material valuation at any key date

    Hi all,
    Requirement- I should get material valuation at a plant on any key date.This date may be at start, middle,end of the month.
    Report MB52 will give material valuation at current date not for any previous date.
    Report MC.9 will give material valuation for a week period.

    Hi,
    You cannot get this requirement fulfilled from Standard SAP.
    Try fetching the values from table MSEG, fields SALK3 and LBKUM
    Warm regards.
    Osayed Rehman
    Siemens

  • Valuation Data for Article Locked by user (xyz) while processing IDOC's

    Prior to getting these errors, we were getting Article Data locked for goods movements errors. I changed an MM config item from "Exclusively Lock" to "Late Lock" for goods movement and it helped.
    We are getting majority of these errors. Any help. SM12 does not show that the users are locking.

    Hi Agarwal
    Looks like your issue related to transaction, i hope any document is existed for this artilce like, PO, outbound delivery, or GR, are all may in Open status, which not processed completly, so its not allowing for movement of stock.
    in which transaction your facing this error
    regards
    Satish

  • Material Confirmation date in future though the material is in stock

    Dear Gurus,
    Please tell me why the system is giving the material confirmation date in future though the matl is  available in stock.
    System creating two schedule lines one for 15/10 (15 oct) and the second one with the confirmation of quantity on 22/11 (22 Nov) as I have enough stock than the required for this order. In MRP1 view of same  matl Master of same material delivery planning time is 28 days. and in MRP3 view the Replenishment lead time is 20 days.  please tell me what date system considering to shift  the confirmation date in future. the factory calender has Sat-sunday off.
    please tell me the possible reasons for confirmation date change.
    regards,
    Sandesh

    Hi ,
    Please check the  value at MM03-> Sales: General plant Tab ->Availability Check is '02'.
    u201802u2019 will consider all the u2018Individual Requirementsu2019 done before and during the creation of Sales order for the combination of respective Material & Plant.
    Even though Material stock will be visible for you at MMBe for respective plant double click on the Quantity, it will show you multiple Row with one of it will be " On Order Stock" these are the other orders for which Quantity is already confirmed but respective PGI is not yet done.
    The next schedule line date always generated based on the Factory calendar (based on Holidays/Weekly Offs if any).
    AT MD04 Tcode, based on the selection made at Material master for Availability Check you could see all the requirements related to Goods Issue Sales Orders , STO & Production Orders for Goods receipts.
    Hope this will solve your query.
    With Best Regards,
    RB.

  • USER-EXIT / ENHANCEMENT / BADI -- Material Valuation Class (MBEW-BKLAS)

    Hi,
    I m looking for any user-exit, enhancement or BADI  which is triggered while executing MIGO!!!! .
    For example, for good movement 101related to a purchase order.
    If  MIGO item (material) have batch management we have to inform the batch number (mandatory). When material document is posted system updates material master data with a new valuation type (MBEW-BWTAR) with the same name of the batch number.
    We need to inform the valuation class (MBEW-BKLAS) related to this valuation type (MBEW-BWTAR) but we don´t know where it´s possible.
    Thanks and sorry for my english!!

    Hi Orion,
    You can refer to the following user exits for MIGO:
    Exit Name           Description                                                                               
    MBCF0002            Customer function exit: Segment text in material doc. item   
    MBCF0005            Material document item for goods receipt/issue slip          
    MBCF0006            Customer function for WBS element                            
    MBCF0007            Customer function exit: Updating a reservation               
    MBCF0009            Filling the storage location field                           
    MBCF0010            Customer exit: Create reservation BAPI_RESERVATION_CREATE1   
    MBCF0011            Read from RESB and RKPF for print list in  MB26              
    MB_CF001            Customer Function Exit in the Case of Updating a Mat. Doc.   
    Hope this will help you...

  • Material valuation with respect planned price 1 in material master

    Dear All,
         The costing variant PPC1 has been used for released cost estimate. In my scenario I want to create one more variant say ZPC1 where to calculate the value of the material from the planned price 1. In this case
    1.     What should be the validity date mentioned in the material master for valuation
    2.     The variant has been configured as
    a.     Costing Type – 12 Mod Std cost Est
    i.     Price Update – No Update
    ii.     Save Parameter – With Start of Period
    iii.     Misc – Cost Sheet
    b.     Valuation Variant – 001 Planned Valuation
    i.     Material Valuation - Planned Price
    ii.     Standard Price
    c.     Date control
    i.     From Date : Start of Current Posting Period
    ii.     To Date : End of Current Posting Period
    iii.     Qty Struc Date : Current Date
    iv.     Val Date : Current Date
    d.     Qty Structure Control (As PPC1)
    3.     When I run the standard cost estimate with variant ZPC1 the system calculates the standard price of the material even when the price is mentioned in the planned price1. 
    How the variant should be created to capture the planned price for calculation when using the variant ZPC1.
    Kindly help me in this regards
    Regards
    Vasantha

    HI,
    The requirement is to execute the cost estimate quaterly for planned price 1.
    So we are planning to create separate costing variant to pick the planned price 1 of RM.
    Clinet has the Excel file with the details of RM and Price combination but the prices are not available in SAP.
    We are looking for the Mass transaction to upload the prices in Planned price 1.
    Kindly help.
    Thanks,

  • Material availability date issue

    Hello,
    I am trying to create a sales order with 100 Kg of one material listed. Unrestricted stock for this material is 780 Kg in the system. When I save the order however, material availability date shows as one day forward from the current date, i.e. tomorrow's date shows if order was made today. This affects the posting of the dispatch advise (Outbound delivery). It does not let me post the DA until I change the selection date in VL01N to a date that is the same or later than the material availability date. This is fine. What I want to know is why is the material availability date showing as one day after the order date on the sales document? If stock is on hand and we want to dispatch the same day as the order it can't be done at present. Please help.
    Regards

    Dear Khan
    Go to OVLZ, select your shipping point and check in "Pick/pack time wrkdys" whether any value is maintained.  If so, remove that and now retry.  Bcoz, for example, if 2 is given in this field, even if stock is available on the same day of order creation, system will allow to do PGI only after 2 days from the date of order created
    thanks
    G. Lakshmipathi

  • Error-valuation data does not exist.

    hello all
    during conversion of planned order to production order system giving error-valuation data for material XXXX does not exisst. what may be the reason?
    regards

    Dear,
    Did you check that notes?
    Check the Value update indicator for the Material Type in OMS2 trxn ..
    if not put tick for Qty & Value update for your plant for that Material Type..
    Also check the accounting view 1 in ur material master record.More specifically it should be with ur valuation class,valuation type.Check also the value update indicator of the material type u r using.be sure abut ur valuation type and see whether the valuation class u have maintained is proper with all the accounting settings.
    Regards,
    R.Brahmankar

  • Customer & Material Master data is not saved in SAP 4.7

    Hi All,
    We created a customer in T code XD01 and saved it. system threw a message that "customer 500001 has been saved" but when I tried to check the customer ID 500001 in XD02 and XD03, it says custoemr 500001 has not been created.
    I have checked in table KNA1, KNB1 & KNVV. No data is available in these tables.
    Same case with material master data even.
    Can anyone please tell me what could be the reason for this problem & how to fix it.
    Thanks in advance.
    JM

    Dear JM,
    Goto SNRO- Enter the number range object & click on "Change " icon.
    NR Object: DEBITOR
    Check whether any value maintained in "No. of numbers in buffer",  make it blank & re-create customer.
    It may not be exact route cause of the problem, but could be the reason .
    Test & update the forum.
    Regards,
    Reazuddin MD

  • Material Valuation History Details

    Hi All,
    I have a query on Material Valuation history table.
    In the present scenario, a Material master is created in the year 1955 & lot of Material Movements has happened for this material from 1995 to till date.
    But if I drill down for the history of this Materialu2019s valuation in  u201CMBEWHu201D table I was able to history details only from the year 1998.
    I was not able to find any history of valuation for this material between the periods 1995 u2013 1997.
    What could be the possible reason for this ?
    To capture the Valuation History, is there any settings which could have activated after 1997.
    Regards,
    Murali Mani

    MBEWH table came with 4.5 release .In earlier releases the history records were stored among the normal records in MBEW.
    See OSS note 193554

  • Material valuation IFRS

    Hello experts,
    We are working on an ECC 6.0 implementation for IAS/IFRS. Therefore, it is necessary to have two accounting ledgers (IFRS ledger and Legal ledger for the country - Chile) in order to support two different kind of material valuation (one of the ledger must have a special valuation procedure for material).
    Is it possible to manage a parallel valuation of material without material ledger?
    Thanks in advance for your help
    Regards,
    Ricardo

    Hi Swaninathan , I to do the material revluation using the inflation accounting, The legal requirement is as below, can you please have a look at it and tell me if it is possible to achieve with the standard program. I am Using J1AX and J1AZ and it doens seem to be working according to the requirement. 
    We have to inventory revaluation using this standard functionality, we don't need to change any values in the Material master , just have to post it into tax ledger for the reporting purpose.No material Ledger.
    I have three business scenarios
    1. Domestic inventory from second half of calendar Year
    Calculation: need to find the Highest value from invoice, contract or agreement document and do the following calculation
              so for example
    Product         PO date                  PO Price
    Material A     04-22-2012            $ 500
    Material A     04-22-2012            $ 480
    Material A     04-22-2012            $ 495
    Data in the MM
    Product         Units   Standard Price (CLP)          Inventory Total
    Material A     100    485                       48.500
    Adjust                                                1.500
    Total            100    500                       50.000
    just calculate the inflation using the inflation index . so just 1500 will go into tax ledger
    2. Domestic inventory from first half of calendar Year
    Product         PO date                  PO Price
    Material A     04-22-2012       $ 500
    Material A     04-22-2012       $ 480
    Material A     04-22-2012       $ 495
    Product                        Units Standard      Price (CLP)          Inventory Total
    Material A                    100                   485                       48.500
    Adjust                                                                              1.500
    Total                           100                   500                       50.000
    Infl.Adjust (1,8%-2011)                          509                            50.900
    1500(difference from total value)+900(inflation) will go into tax ledger
    SO Adjust the inventory according to the Total value of that material and take the difference and post into tax ledger. Is it Possible with the standard functionality of inventory revaluation using J1AX and J1AZ? ? Please let me know if this is possible
    3. Domestic inventory from previous year  calendar Year
    - calculation based on last years inflation.
    Please let me know if this is possible.
    Thanks & Regards
    Saurav.

  • Different material availability dates

    Hi sap gurus,
    lets say that in sales order1234....there are 5 line items.....
    Now today..1line item is complete available and 4 are not available today. i have to ship that one line item today so if i create a delvery doc, only one item would be copied .i will PGI and ship.
    Tommorw....2 line item is availbe partially, then i have to ship that partially quantity. for that i have to create different delivery document??
    Day after that...3 ,4,5 are available completly, i have to ship all of them.then i have to create another delv doc for those??
    My client has a requiment that....ship what ever (partial or full doesn't matter)that is available..
    creation of delivery document only depends on material availablity date? or anything else??

    Dear archana
    Yes this is standard process only.  Only whatever quantity is flowing in sale order "Confirmed Qty" of schedule line, for that only you will be able to do post goods issue.
    For example, as you said in a sale order there are 5 line items and if stock is available for 1st and 5th line items, in sale order if you do availability check, only for these line items, the stock quantity will flow in confirmed quantity.  Now if you generate delivery through VL01N, though all line items will flow in that only you can post goods issue for 1st and 5th line items.
    thanks
    G. Lakshmipathi

Maybe you are looking for

  • Storage spaces + Hyper-V with multiple 1GBe nics for storage?

    Hi guys! So I just got my private cloud hardware. I actually put in the order before summer, but due to firmware and certification issues on my desired SuperMicro JBODs delivery was seriously delayed. So much that I've completely forgotten my network

  • Problem in CRM_ORDER_MAINTAIN

    Dear Gurus,                   I am trying to create a service order using CRM_ORDER_MAINTAIN and CRM_ORDER_SAVE. I have observed the values from debuggin the actual order creation through CRMD_ORDER and i am passing those hardcoded values to the abov

  • Issue of specific batch material to perticular customer.

    Hi  friends Can anyone suggest how to assign the perticular Material & batch with a customer so that while issue the material to the perticular customer system should  accept that batch only. ( (System should give error if batch is different). Thanks

  • How to buy iphone 6 while im in zimbabwe(africa)

    i want to buy an iphone 6 but im not so sure if there will be any additional costs if it is to be delivered in zimbabwe(africa)

  • Is it possible to buy inDesign CS6 WITHOUT becoming a Cloud member?

    Cloud storage irritates me, I rather know where my files are, and they are not hopping around. So can I use inDesign CD6 without the Cloud? (Obviously, I'm a new user).