Hi,
does anybody of you implemeted this solution from SAP descriped in HowTo-Guide "SAP BW Unicode with an MDMP Source System"? We have an MDMP source system (4.6C) and a Unicode BW (Netweaver 2004s). I have maintained the RFC connection in BW (no logon language, set MDMP active, entered values in MDMP-language list), changed the language in job step and tried to load data but it does not work. SAP tells me that they are not willing to support this issue. Any ideas from you?
Thanks a lot for your answers!!!
Regards, Carina

Hi,
One option for this, u can enable the calander day field  for selection at edit extract structure rsa6 for the data source.
hope this help you.
assign points if useful.
regards
SSMS.

Similar Messages

  • Data load problem - BW and Source System on the same AS

    Hi experts,
    I’m starting with BW (7.0) in a sandbox environment where BW and the source system are installed on the same server (same AS). The source system is the SRM (Supplier Relationship Management) 5.0.
    BW is working on client 001 while SRM is on client 100 and I want to load data from the SRM into BW.
    I’ve configured the RFC connections and the BWREMOTE users with their corresponding profiles in both clients, added a SAP source system (named SRMCLNT100), installed SRM Business Content, replicated the data sources from this source system and everything worked fine.
    Now I want to load data from SRM (client 100) into BW (client 001) using standard data sources and extractors. To do this, I’ve created an  InfoPackage in one standard metadata data source (with data, checked through RSA3 on client 100 – source system). I’ve started the data load process, but the monitor says that “no Idocs arrived from the source system” and keeps the status yellow forever.
    Additional information:
    <u><b>BW Monitor Status:</b></u>
    Request still running
    Diagnosis
    No errors could be found. The current process has probably not finished yet.
    System Response
    The ALE inbox of the SAP BW is identical to the ALE outbox of the source system
    and/or
    the maximum wait time for this request has not yet run out
    and/or
    the batch job in the source system has not yet ended.
    Current status
    No Idocs arrived from the source system.
    <b><u>BW Monitor Details:</u></b>
    0 from 0 records
    – but there are 2 records on RSA3 for this data source
    Overall status: Missing messages or warnings
    -     Requests (messages): Everything OK
    o     Data request arranged
    o     Confirmed with: OK
    -     Extraction (messages): Missing messages
    o     Missing message: Request received
    o     Missing message: Number of sent records
    o     Missing message: Selection completed
    -     Transfer (IDocs and TRFC): Missing messages or warnings
    o     Request IDoc: sent, not arrived ; Data passed to port OK
    -     Processing (data packet): No data
    <b><u>Transactional RFC (sm58):</u></b>
    Function Module: IDOC_INBOUND_ASYNCHRONOUS
    Target System: SRMCLNT100
    Date Time: 08.03.2006 14:55:56
    Status text: No service for system SAPSRM, client 001 in Integration Directory
    Transaction ID: C8C415C718DC440F1AAC064E
    Host: srm
    Program: SAPMSSY1
    Client: 001
    Rpts: 0000
    <b><u>System Log (sm21):</u></b>
    14:55:56 DIA  000 100 BWREMOTE  D0  1 Transaction Canceled IDOC_ADAPTER 601 ( SAPSRM 001 )
    Documentation for system log message D0 1 :
    The transaction has been terminated.  This may be caused by a termination message from the application (MESSAGE Axxx) or by an error detected by the SAP System due to which it makes no sense to proceed with the transaction.  The actual reason for the termination is indicated by the T100 message and the parameters.
    Additional documentation for message IDOC_ADAPTER        601 No service for system &1, client &2 in Integration Directory No documentation exists for message ID601
    <b><u>RFC Destinations (sm59):</u></b>
    Both RFC destinations look fine, with connection and authorization tests successful.
    <b><u>RFC Users (su01):</u></b>
    BW: BWREMOTE with profile S_BI-WHM_RFC (plus SAP_ALL and SAP_NEW temporarily)
    Source System: BWREMOTE with profile S_BI-WX_RFCA (plus SAP_ALL and SAP_NEW temporarily)
    Someone could help ?
    Thanks,
    Guilherme

    Guilherme
    I didn't see any reason why it's not bringing. Are you doing full extraction or Delta. If delta extraction please check the extractor is delta enabled or not. Some times this may cause problems.
    Also check this weblog on data Load errors basic checks. it may help
    /people/siegfried.szameitat/blog/2005/07/28/data-load-errors--basic-checks
    Thanks
    Sat

  • How to Change Date Format according to the Locale/Country of Portal User

    Hi,
    In a webdynpro applicaiton, how to chage the  Date Format according to the Locale/Country of Portal User.
    Consider for INDIA: mm/dd/yyyy
    Consider for UK: yyyy/mm/dd
    So when i select the date from the Date Picker[input ui element bound to date context variable], the date format should be displayed accroding the portal users country/locale.
    Creating a simple type for every date format in the dictionary would not be the right solution.
    Please help.
    Thanks,
    Regards,
    Aditya Metukul

    Hi Aditya,
    Check out the following post in SDN and refer the
    Bertram's reply on the same topic.
    date format
    Regards,
    Shubham

  • List of Number format and Date format according to the Locales

    Hallo everyone.
    I am searching for a list or document which includes the number and date formats according to the country locales. Where can I find sort of document?
    Another question: Where can I find the all parameters of swing.properties file?

    "Date - allows the user to enter a date as a parameter. Note that the data type must also be "Date" and the format must be Java date format."
    Page 4-9, Adding Parameters and Lists of Values
    Oracle® Business Intelligence Publisher
    Report Designer's Guide
    Release 10.1.3.4
    Part No. E12187-01

  • Does migrating data erase it from the source computer?

    Does migrating data erase it from the source computer?

    no, its in both locations
    http://support.apple.com/kb/ht4889

  • How to convert date-time according to the Time Zone the client

    Urgent! Help wanted!
    I extract a date-time field (which is GMT time) from the central database but I need to convert it accordding to the TimeZone of the user and also the so-called winter time and summer time in the local. Any one has any good solution?
    Thanks.

    Use a Calendar, Timezone and Locale objects like this,
    TimeZone tz = TimeZone.getTimeZone("Germany/Berlin");
    Calendar cal = Calendar.getInstance(tz, Locale.GERMAN);
    long date = 0; // assign your central database value to this variable
    cal.setTime(new Date(date));
    Now you can use the Calendar object 'cal' to retrieve the time according to the set locale and timezone.
    These objects provide tonnes of features for finding out timezones and day light savings times. So check out the APIs as well.
    I hope this helps you out.

  • Error is data loading from 3rd party source system with DBCONNECT

    Hi,
    We have just finished an upgrade of SAP BW 3.10 to SAP NW 7.0 EHP1.
    After the upgrade, we are facing a problem with data loads from a third party Oracle source system using DBConnect.
    The connection is working OK and we can see the tables in the source system. But we cannot load the data.
    The error in the monitor is as follows:
    'Error message from the source system
    Diagnosis
    An error occurred in the source system.
    System Response
    Caller 09 contains an error message.
    Further analysis:
    The error occurred in Extractor .
    Refer to the error message.'
    But, unfortunately, the error message has no further information.
    If we look at the job log in sm37, the job finished with the following log -                                                                               
    27.10.2009 12:14:19 Job started                                                                                00           516          S 
    27.10.2009 12:14:19 Step 001 started (program RSBATCH1, variant &0000000000119, user ID RXSAHA)                    00           550          S 
    27.10.2009 12:14:23 Start InfoPackage ZPAK_4FMNJ2ZHNNXC6HT3A2TYAAFXG                                              RSM1          797          S 
    27.10.2009 12:14:24 Element NOAUTHORITYCHECK is not available in the container                                     OL           356          S 
    27.10.2009 12:14:24 InfoPackage ZPAK_4FMNJ2ZHNNXC6HT3A2TYAAFXG created request REQU_4FMXSQ6TLSK5CYLXPBOGKF31G     RSM1          796          S 
    27.10.2009 12:14:24 Job finished                                                                                00           517          S 
    In a BW 3.10 system, there is no  message related to element NOAUTHORITYCHECK. So, I am wondering if this is something new in NW 7.0.
    Thanks in advance,
    Rajib

    There will be three things to get the errors like this
    1.RFC CONNECTION FAILED
    2.CHECK THE SOURCE SYSTEM
    3.CHECK IT OUT WITH Oracle Consultants WEATHER THEY ARE FILLING UP THE LOADS.TELL THEM TO STOP
    4.CHECK I DOC PROCESSING
    5.FINALLY MEMORY ISSUES.
    6.CATCH THE DATA SOURCE FIRST CHANGE IT AND THEN ACTIVATE AND RUN THE LOAD
    7.LAST IS MEMORY ISSUE.
    and also Check the RFC connection in SM59 If  it is ok then
    check the SAP note : 692195 for authorization
    Santosh

  • Data load Error-IDoc inflow source system

    Hi Experts,
    I am trying to Extract master data from ECC to BI Datasource.I have situation where the load failed and error says Idoc Inflow source system.
    I checked in the Source system where IDOC has a status 56 and says EDI: Partner profile not available.
    I have checked for the IDOC stuck but no.
    I have even processed IDOC manually BD87.even it says status 56.
    Please advise.
    Regards,
    Koka.

    Hi Narendra,
    First check it your Source system is fine.
    Right click on your source system and choose check.
    If there is a problem.Then choose the option Restore and replicate as well.
    The try to reload the data .
    IDOc problem can be rectidied by regenerating the idoc using the restore option.
    If the above steps fails then contact your basis team for help.
    Hope this helps.
    Regards,
    Harish

  • Loading sequences into the source window...

    Hi, does anyone know if I can load a sequence into the source window in Premiere Pro and then be able to type a specific timecode into the window and have the timecode indicator go to that frame of the sequence?  This is easily achievable in Avid and FCP but haven't been able to figure it out in Premiere.

    And once you're on the correct frame in the source monitor, you can match it in the Timeline using the Reverse Match Frame command.
    To use Reverse Match Frame, follow these steps:
    Ensure that you have a clip loaded in the Source monitor.
    In the Source Monitor, place the playhead on the frame that you want to find in the Timeline.
    Select Sequence > Reverse Time Frame, or use the keyboard shortcut Shift+R. Premiere Pro moves the playhead on the Timeline to that exact frame.

  • DBMS_CHANGE_NOTIFICATION and accessing data values part of the source table

    Hi there,
    I am using DBMS_CHANGE_NOTIFICATION following the steps mentioned in this link
    http://www.oracle-base.com/articles/10g/dbms_change_notification_10gR2.php
    Everything works fine and i am able to capture the insert event on a specific table which I have set notification listener on and subsequently trigger the follow on course of activities.
    One thing I am looking for is getting the actual values used as part of the insert event happening on the source table.
    e.g.) DBMS_CHANGE_NOTIFICATION (insert operation) applied on table TEST.
    This table TEST has 2 columns (col1 varchar2(200), col2 number (10))
    Fire an insert operation. Insert into TEST values ('testing notification',201); commit;
    As part of the event I get Table (SCOTT.TEST) - Records Inserted. Rows=
    But I need to know the specific value committed to the database table as part of the insert i.e. 201 in this case. How can i capture this as part of the event notification mechanism.
    The workaround would be to query the source table as part of the notification body workflow and retrieve the most recent record but I wanted to know if this can be achieved via the regular notification event process.
    Regards,
    Regards,

    Hi
    it is exactly the way you describe. Procedures are called with privs of the owner...
    Paul

  • Raise Exception Dump when data load in to the DSO In BWD.

    Hi all,
                   When i was trying to load the data into the DSO, then it trowing the dump. Even applied the  Note 578150, but problem still persist.
    The excep"RAISE_EXCEPTION" " "
    "SAPLRSSM" or "LRSSMU55"
    "RSSM_CONVERT_ODSSID_RNRSID"tion rasied the
    the above the exception which is throwing.
    Please advise me this.
    Thanks in advance
    Regards
    amith

    Hi,
    Can you do a syntax check of the program name which is mentioned in the dump.
    Also pls take help of developer to trouble shoot this issue.
    Hope this helps

  • Data load status on the Query

    Hello,
    What are the ways can we do this ....
    When a BW user logs on to execute a query via Analyzer, Query Designer or on the Web. The BW User should be notified at the point of executing the query in some manner if there is any problems with the loading of the cube, masterdata, or any other info objects pertaining to the query. 
    In other words, the user is to be informed if the data is not valid at the point of running the query.

    Please check my reply to your other message in "BI Suite – Business Explorer" forum.
    Also, In future please try to post it in one forum. Most of the people view all the forum's post using SAP Business Intelligence view.

  • Flat file data load failed with the below error

    hi guys,
    when the scheduling load(info package) from the flat file ,got below error..
    Error 'The argument 'INR' cannot be interpreted as a number ' on assignment field /BI
    thanks

    Hi,
    It seems that the flat file and data source are not in sync.... check your flat file format and prepare it in sync with your data source.
    I guess you have an amount field followed by currency in your flat file, but in your data source currency field is not next to the amount KF or vice versa. It could also be that the KF you have defined is not of Amount type, and hence it doesn't expect the currency field.
    Hope this helps
    Godhuli

  • I can not load Google mail. It stops loading (according to the bar) just before completion. What is going on - fix it,

    look above!!!

    Hello,
    Many site issues can be caused by corrupt cookies or cache. In order to try to fix these problems, the first step is to clear both cookies and the cache.
    Note: ''This will temporarily log you out of all sites you're logged in to.''
    To clear cache and cookies do the following:
    #Go to Firefox > History > Clear recent history or (if no Firefox button is shown) go to Tools > Clear recent history.
    #Under "Time range to clear", select "Everything".
    #Now, click the arrow next to Details to toggle the Details list active.
    #From the details list, check ''Cache'' and ''Cookies'' and uncheck everything else.
    #Now click the ''Clear now'' button.
    Further information can be found in the [[Clear your cache, history and other personal information in Firefox]] article.
    Did this fix your problems? Please report back to us!
    Thank you.

  • Blur Gallery masks, would love to be able to load them as the source for the effect.

    How cool the Blur Gallery is, one of the best things Photoshop got in the last time. I see that when you use the Field Blur, you can save the mask to channels, which gives you a grayscale representation of how the effect was applied. It would be VERY cool if one could do the inverse process, have a grayscale painted mask and load it to adjust the strength of the effect instead of dropping pins. Which is not the same as mask the effect with a selection before apply it, that just mask the effect, it does not vary how much blur is applied to each pixel.
    Thanks!!!!!!

    Please post Feature Requests over at:
    Photoshop Family Customer Community

Maybe you are looking for

  • Portal runtime error in BW

    Hi, in my bw portal, i have connected same iview to different roles. in first role, i can see the iview but when i go to next role it gives portal runtime error. Portal Runtime Error An exception occurred while processing your request Exception id: 0

  • How do I convert a PDF with links to html?

    I created a JPEG in Photoshop elements 9 and then used acrobat to overlay some links on the Jpeg.  I then saved the jpeg as a PDF.   How to convert this file to HTML so I may upload it to the web with all links active and original jpeg intact?  Havin

  • Errors-Ora-01157,ORA-01110,ORA-01033

    HI all, i am unable to login into database,i will explain clearly what has happened,please help me out...my /home directory was 100%,so i was unable to login,what i have did is i have not deleted archive files but i have moved to other directory /ora

  • FOR EACH command in planning modeler

    Hi all, can anybody explain me the difference between foreach, foreach in selection,foreach in ref data. i have a requirement where i needs to copy some temporary variable in to keyfigure. my fox formula is : foreach season,brand,du. {zkf1,season,bra

  • Failed Idoc Workflow

    Hi experts, I have a requirement to send a workflow message in case an inbound Idoc failed due to a specific error. I have created the workflow and the task. I created a subtype object of IDOCORDER and my event is INPUTERROROCCURED. I also created a