MFBF and MF70 for component backflush

There is an option "component backflush" in MFBF for goods issue and there is a "post goods issue" option in MF70.
what is the difference? aren't they both the same? if yes, then what extra functionality does MF70 provide?
Thx

Dear in REM scenario there are 3 types of backflush,
1.Assembly backflush(normally GR,GI and activities are posted - 131,261 and activites are posted) or vice versa like 132,262.
2.Component backflush(normally GI alone happens - 261/262 happens)
3.Activity backflush(only the operations are posted)
Yes you can use component backflush tab to post GI after GR without using MF70(incase of GI backflush at GR posting is unchecked in OSP2)
cheers
KK
Edited by: kiran kumar on Oct 14, 2010 10:23 PM

Similar Messages

  • Table and field for RP Backflush checkbox in MFBF transaction

    Dear All,
    I am working on enhancement for transaction MFBF wherein on MFBF screen RP backflush check box is part of enhancement.
    When I do operational confirmation by keeping check for RP backflush then it save the entry.
    I can see the operation entry in AFRU but I can not see the check for RP backflush check box.
    Can anybody help me by providing the information that in which table I will get RP backflush check box entry for the MFBF operational confirmation?
    Or else provide the logic that how system find/determine that user has selected/checked the RP backflush checkbox?
    Thanks,
    Narresh

    Hello Naresh,
    The purpose of the RP backflush to confirm the operation and component is assigned to such operation (reporting point) then the components and activities gets posted and during the last reporting point generally GR happens. For RP backflush maintained mailstone confirmation in control key indicator and same control key assign to operation in routing.
    Please check this table S028, CEZP and CPZP for RP backflush information.
    I hope this information helpful to you,
    Thanks & Regards
    Umesh Mali

  • Bom for component allocation in routing

    I have created Sales order Bom. When I create normal routing and go for component allocation then system asks for Bom creation.
    Why system is not considering  sales order bom in Normal routing for component allocation?

    Hi,
    Sales order BOM will not be valid for Production. Eventhough you have created the sale BOM, the system will consider only the Production BOM. So you need to create a Production order BOM also, when you want to create a routing or production order creation.
    Regards,
    V. Suresh

  • ATP check for component materials

    Hello experts,
    The ATP check was initially designed for a kitting process. BOM Material would be kitted in the distribution center(DC) and sent to a garage. Sales orders are created with BOM materials for a garage and there is a multi- level GATP process in place. Since BOM materials do not  exist at a garage the check would be performed at a DC for components after BOM explosion. The existing configurations in R3 and APO are for a make to order process(Strategy  group of 50 for BOM's  and 40 for component).
    We are now introducing new materials for an existing material and have the need for product substitution on the sales order, if the existing material is out of stock at the DC. To enable this functionality we are having to perform an ATP check for the sales orders at the distribution center, though the sales order is   created for a garage. To improve on the response times during the ATP check our design approach, is to convert the BOM materials in the sales order to component  materials with material determination(one BOM material is tied to one component material) and performing the ATP check with components at the DC.
    While testing we are facing the following issues:
    1)Sales order placed on a garage is substituted with the DC after product substitution.  This does not occur when product substitution is carried out with BOM's.
    2)During the order create, the ATP checks for check mode u201845u2019 and business event u2018AEu2019 for a given material in a DC shows zero stock. While for the same material,location and business event AE the product availability check in APO reflects stocks available.
    Is it feasible to do ATP checks for component material in a sales order which was initially designed to work with BOM materials? Am I missing some configuration settings in either APO or R3?
    Regards,
    Anil DeSouza

    Hi Anil,
         Yes it can be done.
    1) For finished product & garage combination -
    activate RBATP in the check instructions.
    2) in the location substitution maintain 'location determination sctivity'. Here you maintain different check mode & business event -- ( this is nothing but check instruction --- in thsi you maintain 'MATP').
    Hope this anws your first qus.
    To addressing your 2nd question....follow below steps.
    1) Do ATP from sales order, get onto results screen, click on product availability & check for 'scope of check' (check control) and look for the stock types that are included. Based on this your receipts are consdiered for ATP confirmation.
    Best Regards,
    Deepthi

  • Question about sloc determination in MFBF and backflush in REM

    Dear SAPper,
    I just try to read about Repetitive Manufacturing and i came with some confused item.
    1. I try to backflush MFBF and i don;t fill the planned order, but the backflush is succedd. Something
    strange is my planned order is not decrease:(, so do i have to fill planned order number every time i backflush. Can i backflush anonymous to planned order number and the system derease the planned order automatically in FIFO manner
    2. I configure the auto sloc determination and i have set maximum number of split unlimitted.
    for example in MFBF i need 50 PC Raw Material
    My stock in SLoc 1000 is 40 PCS
    My stock in SLoc 2000 is 200 PCS
    I configure the sloc determination like this
    1. F 1000
    2. F 2000
    Nut in MFBF component always withdraw from 2000 with 50 (full quantity) although i set maximum number of split maximum
    I tried batch determination before and it split.
    Did i miss something so the system can split the quantity along sloc automatically
    Please throw a light:D
    Best regards,
    Freddy Ha

    Hi,
    1)
    Normally in the rem for backflush just u have to enter the product and qty then system will automatically reduces the planned order.
    But in situation if planned order is not reducing then please check ur REM profile in the "control data2" tab
    In this which one u have select for the planned order reduction.
    2)
    Regarding stock determination, create stock determination rule thr' T CODE:OXPS.
    Here u have to create stock determination rule first from which storage location material should be picked, depending upon the priority.
    Assign this stock determination rule in the material master or in the REM profile "Control data2 " tab.
    Then system will automatically pick the material depending upon the stock determination rule.
    Regards
    Vijay

  • Component Backflush (MFBF) - Process component list - User exit?

    We do the goods issue of the component (Mvt: 261) using the option below;
    "Component Backflush (MFBF) - Process component list". The users add the component directly in the screen entry "Process component list". But when they save, the requirement is to "add an additional packaging material internally say in a userexit or BADI".  Is it possible to add another component automatically using userexit?
    I tried the enhancements: XMRM0001 and also BADI for GOODSMVMT but no help. Any ideas? Appreciate your help. And expect a REWARD !!!! :):)
    Srini

    When I hit 'SAVE' on "Process Component list" screen, it stops at EXIT_SAPLMBARM_002. But by that time the material document is already created
    The process steps that I follow are as below:
    1) MFBF
    2) Choose radio button 'Component Backflush'
    3) Click on 'Process component list'
    4) Enter the Material 'M1', Plant and batch, Qty, Mvt: 261 and Hit enter
    5) ...... NOW ..
    6) BEGIN .. THE CUSTOM REQUIREMENT
      "When there is M1 in the list, Add automatically 'P1' material with 531  Plus 
      "When there is M1 in the list, Add automatically 'P1' material with 261  Minus
    7) END    .. THE CUSTOM REQUIREMENT
    8) So the resulting Material document (Goods Issue) will have 3 line items:
    a) M1 261
    b) P1 531
    c) P1 261
    Thank you somuch. You can call me too if you can: 813-504-7100.

  • In my Iphone 5, Nothing on my App Store is working its displaying blank (Except for Genius section). I've tried to uninstall and install itunes and all its component but still it doen't fix. Not sure if its problem with apple servers. Someone help please!

    In my Iphone 5, Nothing on my App Store is working,  its displaying blank (Except for Genius section). I've tried to uninstall and install itunes and all its component in my desktop but still it doesn't fix the app store issue. Not sure if its problem with apple servers. Someone help please!

    settigns>itunes and app store to make sure you are signed in.. If  you are, you will see your account name..... anyhow, click your account name, sign out and sign back in
    also go to to settings>general>reset and reset network settings... if that doesnt work settings>general>reset and reset all settings!
    one of those shall work. The last step would be to restore your device (apple.com/support) HT1414

  • How can I save a page and all its component parts in a single file, like IE does as an MHT - it's much easier for mailing to people where page address not available?? (as in output from an airline booking site, for example)

    how can I save a page and all its component parts in a single file, like IE does as an MHT?
    It's much easier for mailing to people where page address not available?? (as in output from an airline booking site, for example)
    It is simply too painful to have to zip everything up into a single file to send. MHT format has been available for years now from IE, and with every new FF release it's the first thing I look for. I have been using FF for years, and hate having to come out of it, over into IE |(which I even took out of startup) and key everything in again, in order to send somebody something in a convenient format that they can open with a single click.
    I can't believe this hasn't been asked before, so have you looked at it and rejected it? Have MS kept the file format secret?
    Thanks
    MG

    This is not really an answer just my comments on your question.
    I am sure I recollect efforts being made to get mhtml to work with FF.
    Probably the important thing to remember about .mhtml is that if other browsers do support it they may need addons, and may not necessarily render the content correctly/consistently.
    There are FF addons designed for archiving webpages, you could try them, but that then assumes the recipient has the same software.
    You could simply save the page from FF to your XP pc; then offline open it with and save it using IE, before then emailing using FF, and attaching the .mht or mhtml file that you have now created on your PC.
    As an alternative method, in some cases it could be worth considering taking a screen grab of the required page, then sending that to the recipient as a single email attatchment using either a bitmap or jpeg file format for instance.
    Something such as an airline booking may be designed with a print option, possibly it could be worthwile looking at sending the print file itself as an email attachment.

  • Setting up NWDI for E-Commerce 5.0 and getting" No component configured"

    Hi Experts,
    Our basis consultant recently installed NWDI. I am having trouble setting up a Track for our E-commerce development.
    If i try to save my track it gives the message "No component configured". When I try to setup my Runtime sytem and give the Development system name and  Message Server port, it gives the message " Message server could not be contacted".  Because of these errors it does not let me save any Track information.
    Domain  was not defined, so I defined a domain. But Please help in determining what other steps are still needed before i can create a track.
    Thanks in advance,
    Dips

    If anyone knows how to get a user-entered custom value from the item level to a custom java class, please let me know.
    I'm still looking into how to extend the quote and allow for the re-use of it, if all the quantity on the line item has not been exhausted.
    I can easily add a custom field to the header of a .jsp and access that user entered value by coding against the requestParser.
    Example: Parameter xxx = requestParser.getParameter("customerHeaderParm");
    But, when I add a customer parameter to the item level of the .jsp, I cannot leverage the same to code and get at the user entered value. The value comes back as null.
    The two files I am working with are as follows: orderstatusdetail.jsp and Z_DocumentStatusOrderQuotAction, which is an extension of the standard class, DocumentStatusOrderQuotAction.
    I am working with the requestParser within the ActionForward isaPerform() method of Z_DocumentStatusOrderQuotAction. I need to get to those item level values BEFORE the order is created from the quotation.

  • One pricing condition for BOM and other for individual component

    Hello SAP gurus,
    We have two pricing condition types created and assigned in the pricing procedure which has been created with reference to PR00 and condition records are maintained for both the condition types.
    But, we want only one pricing condition type to be triggered in the sales order depending on the usage of material in the sales order. As we are selling the same material individually and as well as a component in a bundle ( BOM).
    i.e, when one pricing condition for BOM component and other for individual component
    What are the configuration steps to be taken care to get this scenario?
    Thanks in advance.
    Regards,
    KB
    Edited by: K.byla on Jan 21, 2010 1:20 PM

    Hi Sagar,
    Thanks for your response.
    Yes, we are maintaining only one material. The same material is used to sell individually and also in a BOM.
    As i have mentioned earlier, whenever the material is sold individually it should pick condition type say 'YR00' and when the same material is sold as a bundle ( BOM) , it should pick condition type " YR01" in same the pricing procedure.
    For both the condition types, the condition records are maintained.
    To give the scenario details,
    A material "X" is sold individually as a single component and the same material is also used for selling bundled with other material "Y" and the bundled material as "Z"
    means, Z=X+Y
    Pricing procedure used is say ZRA000 which contains currently the price cond type YR00.
    Now for the bundle (BOM) involvement i want to use the same pricing pricing proc. and add the new cond YR01 in it so that the system will pick the cond.type YR00 when the material is sold individually and YR01 is taken as the price when the material is sold as a bundle against the item X.
    Need to know the steps for this scenario and do i need to maintain a specific requirement ? please suggest.
    BR,
    KB

  • Best MRP type and strategy to run MRP for component using PIR and forecast

    Hi Experts,
      I want to run MRP for Component parts. I need to run MRP based on Planned independent requirements and Forecast Data.
    Which is the best suited MRP type and strategy.
    Please help to share bestpractices if any. thank you.
    Rayudu

    Hi,
    is the components you are talking are Semi finished materials or Raw materials and Packing materials which are procured from vendors ???....
    It is not a good idea to maintain planning strategy for Components which are part of BOM...these materials are automatically planned when the header materials of these components are planned....
    If these components are not part of any BOM then you can try the option of using forecast based planning.. MRP type  VV and maintain the forecasting view in the material master
    You can also explore the option of consumption based planning like manual or automatic reorder point planning...
    Thanks
    Kumar

  • No system found for component and Evaluation system in the Project

    Hi Folks ,
    Im facing this problem when im trying to Execute the T-codes from Solar01 of the Transactins Tab by Selecting the Line item and clicking on Execute button. Following is the Error and there no logs for it.
    No system found for component and Evaluation system in the Project
    Even i have checked with the RFC settings and Logical components are right
    Please do suggest me - This is PRD issue . Try to do the needful .
    Thanks in Advance
    Amrita
    Edited by: Amrita Amrita on Dec 3, 2009 12:53 AM

    Hi all,
    I've had the same issue with regards to getting the error below when assigning transactions to a Blueprint business process.
    "No system found for component and Evaluation system in the Project"
    But I think I have solved it and seems pretty simple to change the system role from Evaluation System to any other that is relevant in your landscape.
    Go to transaction SOLAR01 > Click on the first level of the Project Name (Under Business Blueprint Structure) to select the Project.
    Click Business Blueprint in the Menu > System Role > Choose the relevant System Role (in my case Development)
    Click Copy
    This should replicate to all nodes and then you should be able to assign transaction to the business processes.
    Quite strange and seems simple, I checked the Solution Directory, Solar Project Admin etc etc but couldn't find the solution until this which should work.
    If not, there is a similar work around which also works.
    Go to transaction SOLAR_PROJECT_ADMIN
    System Landsacpe Tab
    Systems subtab
    Click System Role Assignment
    Remove the Evaluation System (or all those not relevant to your Project and Logical Components)
    Save Project
    Go to SOLAR01 and it should reflect it in the Blueprint.
    You can always go back to this and add the System Roles you removed and the Blueprint will reference the correct Role.
    Hope this helps everyone,
    -Rohan

  • Component backflush using Repetitive manufacturing

    Hi all
    I am using component backflush in REM to report my excess consumption of components. The mvt type used is 261 to cost collector. Lets say I do a component backflush for component C1 for qty = 100. I later realize that I entered 100 instead of 80. Is there a way that I can use the component backflush to to do a '262' of qty 20( 100-80) for component C1. In short I want to do a 262 for C1 against the cost collector.
    thanks a lot

    You can do it in MFBF with following steps
    Backflush type – component back flush
    Excess com consumption – select radio button Propose BOM acc bom. Enter zero qty here.
    Click on document neutral reversal push button
    Enter material/plant and other fields required and click on process comp list push button.
    In the next screen system will propose all the components with zero qty. Enter 20- (qty with –ve sign) and post the document. This will give component qty reversal with 262 mov type
    rajesha vittal

  • MFBF and MF47 Issue ...

    Hello Dears,
    Issue 1 : When i try to do MFBF facing the error  “Changed rem profile regarding generation of post processing records” but with help of the technical team i bypassed the error through debug and back flush the quantity, after daily scheduled batch job backflushed all remaining quantity. How to avoid this problem in future?
    Issue 2: In same material when i checked the MF47 i seen one component records. When i try to do reprocess or delete the records from MF47 i facing the same error “Changed rem profile regarding generation of post processing records” and when i checked the MD04 for this components enough stock is available and one Nproc status in MRP element for same  quantity which mention in MF47. How to i remove this records from  the MF47?
    The REM Profile has not been changed. It is the same profile that is being used for all backflushing for that plant. Other materials are able to backflush without issue on that line and the same REM Profile are assigned to them all.
    It's very high priority issue due to month end, Please help me.
    Thanks & Regards
    Umesh Mali

    Hello Dears,
    For above issue, I created one more REM profile in system. In new REM profile 'YY' we changed the "Error correction for backflushing" in tab 1(OSP2): select only cumulated postprocessing records, where exiting REM profile 'XX' in material master has both Cumulated and individual postprocessing records selected. We changed REM profile in material master and select the new REM profile 'YY'. After change REM profile in material master system allowed to do MF47 and MFBF, Nproc also removed from the MD04 screen for companets. Once completed both process, we again change the REM profile and select the exiting one REM profile 'XX' in Material master and system working fine.
    Thanks everyone for your valuable suggestion
    Thanks & Regards
    Umesh Mali

  • Issue on component backflush.

    Hi gurus,
    When i do the component backflush to the order do i  get the document with 261 movements.Is that confirmation for that document happened or not Through a component backflushing?. How can i know whether confirmation has happened or not through a material document.
    Please help me..
    Thanks.

    Hi Naveen,
    Assembly backflush for the Header material i.e. GR with movt type 101 and
    Component Backflush is for the BOM Item i.e Goods Issue with the movt type 261.
    As I had explained previously once you get a document with 261 movement means the Goods Issue happened succefully. The material document can be checked in Tcode : MB03. If assembly backflush has happened you can see the Header Material with the movt type 101.
    Hope it is clear.
    regards
    radhak mk

Maybe you are looking for

  • Itunes Wont Ope

    I give up. I had Itunes 6, I had to manually open it with a right click/openas/user/name and password and at that it wouldnt always open. I dl iTunes 7. This opens fine, but only right after you download it. Close the program or sign the computer off

  • Icons won't stay in dock

    Some icons won't stay in my dock when I drag them from the applications folder, but others will. I have tried the following without success: -gone to library/preferences and deleted com.apple.dock.plist then done a restart -gone to library/preference

  • Help Me With Creating AutoRun CD Menu

    I'm rather new to flash, I know the basics, I can do all the graphics designs and buttons. I know how to make the menu autorun, if I had one. I just don't know how to make the buttons open an .exe or .pdf file when they're in the root directory with

  • Availability of 4.0623.0.42 via FOTA (N80)

    i live in Brazil and currently i have v 4.0623.0.41 in my phone.I knew a new firmware was released, but it seems it's not in every country that it's available over-the-air.When will version 4.0623.0.42 be available via FOTA in Brazil? Ever dreamed of

  • LSMW and error handling

    Hi All, I would like to know the following details on LSMW 1. What are the steps to load data to Customer tables Kn** from xl-sheet file? 2.Can one capture the error record with error message and create a file with some details from input file. Alter