MIGO Posting problem  controlling area

hi Gurus,
In doing a migo i got the error message as below as
( Control indicators for controlling area 2681 do not exist
Message no. KI102
Diagnosis
No control indicators exist in fiscal year 2008 for controlling area 2681.
System Response
No further processing is possible without valid control indicators in the controlling area.
Procedure
Check your entries or define control indicators for controlling area 2681, fiscal year 2008 in configuration. Make sure that the fiscal year in the control indicators is a "from" fiscal year.)
please help me out
Regards
Maashish

Go to OKKP Controlling area and Select your Controlling area 2681 and Activate the same and Save.

Similar Messages

  • Posting in Controlling Area Currency

    Hi
    We have the following Scenario
    Actual Balance in WBS Elements X  is 15000.00 AUD (Object Currency) and 12000.00 USD(Controlling Area Currency)
    We have transffered the balance from X WBS Element to Y WBS Element by netting of the Object Currency to Zero.
    Resulting that the revised balance as below :
    Object Currency = 0.00 AUD
    Controlling Area Currency = 1000.00 USD.
    We like to net of the Controlling Area Currency also in WBS Element X.
    Is there any way of posting the same in Controlling Area Currency Alone.
    We want the solution urgently.
    Thanks and Regards
    Ramesh KR

    thanks for your reply.
    But there is no Tcode with Fbb0. Can you provide me the correct Tcode.

  • Posting Across Controlling Areas

    Hi,
    We have 3 Controlling Areas for 3 geographical regions. US, EU and APAC. However, now we want to move the valuated stock items from one plant in the US region to another plant in EU region. Obviously we do have some cost associated with these materails and also, some transportation costs as well. Do we know how we can get this sorted out in SAP please. SAP OSS note clearly says that the cross-controlling area posting in SAP is not supported.
    Any inputs please, always appreciated.
    Thank you,
    Subash Krishna

    Hi,
    I am not sure what you meant by that. I have 4 controlling areas linked to the same operating concern. The movement of valuated materials with their transport charges is between regions (Each region has separate controlling area). Somewhere on one OSS note we read that SAP does not support cross-controlling area posting as it is against the normal design of the SAP system. Are you saying that the derivation in CO-PA would help to get over this limitation?
    Please could you throw some more light on this issue?
    Thank you,
    Subash Krishna

  • MIGO Posting problem

    hi Sapients,
    i am running a normal MM Cycle, while in MIGO when i post the entry it show me the following Error
    ( Posting only possible in periods 2008/06 and 2008/05 in company code 2681
    Message no. M7053
    Diagnosis
    The posting date entered is not within one of the permitted posting periods (current period/previous period).
    This can be due to one of two reasons: The correct current period has not been set in the system. For the system, the first of the entered periods is the current period. At the beginning of a new period, your systems administrator must change the current period in the material master record, using the function "Shift periods". This has not yet been done. You have entered a wrong date in the field "Posting date".
    Procedure
    Check the posting date and correct it if necessary. If your input is correct, inform your systems administrator that the "period shifting" (period-end closing) process has not yet been completed. )
    Please help me out
    Regards
    Maashish

    as per your message the posting is possible for 2008/06..
    So now go to MMPV
    Enter values:
    Co code - 2681
    period : 07
    year - 2008
    First execute ...system show you the message, then again click on the execute button...then it'll execute....
    You can check the open periods in OMSY...
    Go on opening till you reach the current period 10 2008..
    THIS WILL DEFINETLY SOLVE YOUR PROBLEM..
    Regards
    Priyanka.P

  • MIGO Posting problem show material does not exist

    hi,
    in migo i am not able to process it show me the following error message :-
    (Material M11 PLN1 S11 does not exist
    Message no. M7006
    Diagnosis
    For material M11, no material master data exists in plant PLN1, storage location S11.
    Procedure
    Make sure your entries are correct.
    If your entries are correct, then storage location data does not yet exist for the material.
    Storage location data is created when you maintain the Storage view for the material or use the 'Enter Storage Locations' function in the material master menu or post the first goods receipt (provided that automatic creation of storage location data is allowed for the given plant and movement type).
    Please help me out
    Kind regard
    maashish

    Hi,
    Check Material is maintain your plant and storage location with MM03.
    Enter MM03 t-code, enter material code and press enter then check material is maintain your plant and storage location.
    If no than first maintain it with below mention detail.
    Enter MM01 - For Material Master creation.
    Enter your material M11, Plant - PLN1, Storage location - S11.
    And maintain other required detail.
    Then check with migo.
    Regards,
    Mahesh Wagh

  • Activating C&V Profile in Controlling Area Error URGENT

    Hi Experts,
    I'm having problems in activating C&V Profile. I have done all the set up in FI, CO, and PCA. They are all consistent but when i am activating it says the following errors:
    Create a results analysis version for valuation view ID01
    Version 0 in controlling area ID01 does not allow variance calculation
    Actual data already posted in controlling area ID01
    What should i do?
    Please help me.

    Hi
    Please check if you have define the version in IMG
    Controlling->General Controlling->Multiple Valuation Approaches/Transfer Prices->Basic Settings->Create Versions for Valuation Methods->
    If yes
    Then in transaction code OKG9 Check the same version if its not reflecting create the same for controlling area ID01 for (WIP)
    If the answer if helpful kindly assign points
    Thanks & Regards
    Mahesh

  • My problem is that after printing the first photo or picture, when I come to print a second, both the Colour Management and Epson Colour Controls are greyed out and showing No Colour Management

    I have recently purchased a Mac computer (updated to Maverick) to go with my Epson Stylus Photo RX500 printer which has given excellent service with my old Windows computer. However, when trying to print pictures or photos via Photoshop Elements 11, the best results I can get are using the Colour Management and Epson Colour controls in the printing options box.
    My problem is that after printing the first photo or picture, when I come to print a second, both the Colour Management and Epson Colour Controls are greyed out and showing No Colour Management, The only way I can reset the controls is to shut down the printer and computer and restart.
    Could there may be a setting somewhere that I need to adjust please?  I have been in touch with Epson and they say that the Epson Colour controls are part of the Photoshop Elements software but a post on the Adobe forum brought no results and I am unable to contact Adobe.
    <Edited by Host>

    Hello Garry. Thanks for the reply. I guess I should have used a different title from "How do I post a question?" That should come after trying to resolved the colour settings first. However, to answer your question, after experimenting with all the different settings in Photoshop Elements and Epson software, I now start with PSE11 Colour settings then click "no colour management" then after clicking Print, I choose "More Options/Colour Management/Colour Handling/Printer Manages Colour" then I choose "Page Setup/Layout/Colour Matching" which then shows Epson Colour Controls but I also choose "Layout/Colour Management" which then shows "Colour Controls/Mode" I then of course choose an Epson printer profile depending on the paper I am using. I get good results but as I said, the Colour Matching and Colour Controls are then greyed out. Hope that makes sense.

  • Posting period locked in controlling area

    Hi
    I am getting error while closing order ( posting period is locked in the controlling area xxxx for the period 11 in 2007)
    i am able to post periods up to 10
    how to rectify this
    regards\
    prasad

    Hi,
    See the tcode OB52 and OMSY
    Regards,
    Sankar

  • Company code problem in Controlling area Tcodes

    Hi All,
    We are following role based authorisation for creating roles for FI/CO module and we are seggregating roles as per the company codes.We are assigning Tcodes like KO01,KO02,KO03(Internal order) and KS01,KS02,KS03(cost center) which are connected with Controlling area in one role.We have 5 company codes and we are trying to create 5 roles with the above Tcodes for 5 different company codes.
    The problem we encountered is when we entered the Tcodes in the role, and we get to the 'Change authrisation data' option in the 'Authorisation' tab in PFCG, the system is not prompting for the Company code organisational level. Hence in this case, a user will be able to access the above mentined Tcodes for all the company codes. But we need to create a role in such a way that a user who is assigned this role is only able to access Tcode like KO01,02,03 etc for his company code only and should not be authorized to access these Tcodes for remaining 4 company codes.
    Can anybody please help me with a way to restrict these Tcodes to a particular company code in our scenario.
    Thanks and Regards,
    Abdul Khyoom A.

    Hi Ashok,
    Thanks for the response.
    Here in my case, when I insert the Tcodes related to conrolling like(KO01,KO02,KO03 etc) in a role, then I dont find any authorization objects(bukrs) which is related to the company code in the authorization genaration area in PFCG. So there is no way I can maintain values in them.
    Please suggest any alternate solution.
    Thanks and Regards,
    Abdul Khyoom A

  • Problem in Controlling Area created with 3 characters long

    Hi:
    I have a "small" problem, perhaps you could help me.
    We have created a new Controlling Area, but it is created only with 3 characters, instead of four. We have been working with no problem until me have to create a Purchase Order with some profiles. They cannot create any PO. If we go to SU53 transaction we got the message in object K_PCA. There is a blank in string Responsibility Area, and the system cannot recognize that. This string concatenate CO Area code (and a blank) and Profit Center, but keeps a blank between them.
    Do you know how to solve it? We cannot delete CO Area because we have many data created in it.
    Thanks in advance.
    Best regards.

    Hi:
    I have to try it, but it does not work. In SU53 I have this message:
    The following authorization object was checked:
    =================
    Objeto K_PCA      EC-PCA: Responsibility Area, Profit Centrer
    Área de responsabilidad CO-OM
               PCGLAB0101         
    Available authorizations for the object in the master record:                                                                               
    Object   K_PCA      EC-PCA: Responsibility Area, Profit Center 
    Área de responsabilidad CO-OM    
              PCGLA B0101
    ============
    There is a blank PCGLA B0101, and not in PCGLAB0101.
    I need to delete it in master record or add it in authorization object.
    Does anybody how I can change it?
    Thanks in advance.
    Regards.

  • Controlling area already used for org. unit problem

    Hi people,
    can you please help me with one problem, my customer is upgrading SAP HR from 4.6 to 6.0 and now we are testing QAS system.
    When I create new or. unit in PPOME, I have Cost-centre inherited from the org.unit above, but when I want to put another Cost-centre it gives me the next error "Controlling area HR01 already used for organizational unit XXXXXXXX".
    The same procedure worksin PRD system which is on version 4. 6. Could you please help me what is wrong because i am not able to change cost centre in the QAS system.
    Thank you.
    Romano
    Edited by: Romano Cinotti on Oct 13, 2009 11:25 AM

    Hi,
    To which object u are going to change the cost center i.e, position, job, org.unit.
    If you are changing the cost center to position, If it is not allowing to change the cost center then u have to check the parameters:
    May be u already assigned cost center
    May be u already assigned cost center to ur org, unit, which u assigned to ur position. If u already assigned diffrent cost center to ur org.unit, you may not change the cost center to ur position or job.
    Regards
    Devi.

  • Allowing trasaction currency post to the Controlling area

    Hi All,
    My Exisiting Configuration is as follows:
    local curr: MYR
    CO AR CURR: MYR (ALL OTHER COMPANY CODES ARE ASSIGND TO THE CO AREA)
    OBJECT CURR:MYR,
    NOW WE ARE RESETTING THE COMPANY CODE, AND CHANGE CONFIGURATION  AS FOLLOWS
    LOCAL CURR  : USD
    SEC PARAL CURR: MYR (HARD CURRENCY)
    CO AR CURR  : MYR
    BUT THE OBJECT CURRENCY IS MYR,WHEN I POST THE TRANSACTION IN USD THE "ERROR COMES UP OBJECT CURRENCY MAINTAINED IN MYR"
    IF I WAN TO MAKE THE CONTROLLING AREA TO ALLOW THE TRANSACTION CURRENCY WHAT IS THE SETTING TO BE MADE,(THE SYSTEM IS IN PRODUCTION)
    YOUR INPUT NEEDED ON THIS ........
    REGARDS
    RAJ

    Hi,
    Go to maintain controlling area. Double click it then in assignment control maintain " cross - company-code cost accounting. Then try to give controlling area currency as 20.
    Now you try to post the document in USD. If it does not happen...no other clue...
    That is why at the time of original implementation among many things Currency type & currency also to be discussed and frozen out.
    Regards,
    Velumani

  • Problem in credit control area

    Hi Gurus,
    We  have configured credit control area using Static Credit check.
    We have assigned the same to order type and delivery type also.
    While creating sales order, even though the total value is crossing the credit limit which is set in FD32. the system is not prompting any error.
    Please suggest, where we could have gone wrong..
    Sridhar.P

    Hi gupta,
    you need to check the following in customizing settings.
    Credit checks can run at different times during order processing.
    For delivery creation, you can additionally specify whether the automatic credit check occurs at the time of delivery creation and/or goods issue.
    In this menu option, you specify the sales document types for which a credit check should be carried out. Here, delivery types can be controlled separately and specifically at the time of goods issue.
    At the same time, you specify the system responses if credit checks are set. The system can respond in the following ways:
    •     Warning message
    The document can be saved.
    •     Error message
    The document cannot be saved.
    •     Setting a delivery block (credit status)
    The document can be saved. However a block is automatically set in the credit status.
    Actions
    1. Define for each sales document type whether a credit check should be carried out. Enter "D" if an automatic check should be carried out.
    2. Specify a credit group.
    3. Specify a credit group for the delivery type for which you want to carry out a credit check.
    4. Specify a goods issue credit group for the delivery type for which
    Reward points.
    Regards
    Manoj

  • Problem in Crdit control Area

    Dear Team,
    We have an issue with credit control .
    We have as same customer for which is common for 2 countries (example spain and Italy).
    Italy has the credit limit  20000 EUR and Spain has the credit lime 150000 EUR
    In the FD32 screen Status table business is changing the Credit representative group for credit management  from Spain to Italy but the value in the credit limt (Credit limit data) is not changing its showing the value 150000 (its not changin).
    How can set this , we have to set manuval of some other way? please advice.
    And second question is
    In the Central Data tab (Maximum permintted credit limits)
    what are the values we should set for the customer italy.
    Total Amount  --- ?
    Individul amount ---?
    Please guids us how can we do these settings.
    Thanks & Regards,
    MK.

    Hi MK,
    For ur first question: You cannot have mutiple credit limits for the same customer based on country wise, unless u have more than one credit control areas. For this issue, you have to create country specific credit control areas only. By doing this, you can define multiple credit limits for the same customer.  
    For the 2nd Q: Again in the central data tab, the Total Amont represents the Total credit limit of this particular customer across all the credit contrl areas (if u have more than one credi contrl ares(say,Italy & Spain) for this same customer).
    Indiv. Amt represents the Credit limit of this customer on a particular cre.contrl area (say, either Italy or spain).
    Reg,
    JJ

  • MIGO-Capturing problem-Item is not available for Excise invoice,deselect th

    Hi Gurus
    while doing MIGO and part 1 posting am getting following error
    MIGO-Capturing problem-Item is not available for Excise invoice,deselect the item
    kindly help in this
    Maruthi

    hi
    check all settings in J1ID
    or
    in po did u got ur all values correctly for excise cess and hcess
    if yes then check ur vendor excise details in j1id
    if above setting are done properly then check ur CIN setting in spro>log gen>tax on goods movement >india>account determination >specify excise acct as per transaction/specify G/L acct as per transaction
    regards
    kunal

Maybe you are looking for

  • Receiver FTPS (Explicit) channel giving error while writing files.

    Hi All, We are facing an issue while using FTPS for writing a file to a partner location. Since this is the first time we are using FTPS, we went through some blogs and notes to configure the same, but still facing problems. Listed below are the step

  • Help making a paint program in Flash

    So, all this basically does so far is create a few colored squares on the stage and let me draw in black. I'm trying to get it to let me trace() some incremental value onRelease of the different colors but I can't seem to get it to work. Can someone

  • Process Flow Execution via PL-SQL

    Hi Experts, I am trying to execute the Process Flow, however i am unable to execute it via pl-sql method. I followed the method as described in the below link: http://docs.oracle.com/cd/B31080_01/doc/owb.102/b28225/api_4sqlforjobs.htm#BABBHEHI Exampl

  • Firefox freezes webpage & same in private browsing too ????? help

    One webpage when advanced to the next page freezes Firefox (not responding) in exiting session. Tried deleting cookies & history, safe mode, Chrome & private browsing in Firefox to no avail. The only one that works is IE inprivate browsing. What else

  • FI INVOICE POSTING

    Problem 1: For Billwise detail. Example: We are Rasing invoice of Rs 1000/- (F-22) againsts this Invoice we are receiving amount of Rs 600/- as a partial amount. Again We received Rs. 300/- as againsts Invoice of Rs. 1000/- . So Invoive Amount Rs. 10