Migrate Exchange 2010 to Exchange 2013, Need to defined win 7 users logon to Exchange 2010 & Win 8.1 users logon to Exchange 2013

Hi,
My organization have few win 7 and windows 8.1 clients. Now I want to migrate exchange server 2010 to 2013. And I don't want to remove exchange 2010 from the organization. Because I want to connect win 7 client through exchange 2010 and windows 8.1 user
connect to exchange 2013. Is there any way to define the win 7 users to connect to exchange 2010 and Windows 8.1 users to connect to exchange 2013?
Md. Ramin Hossain

The client connections are proxied to the mailbox servers that hold the mailbox.
You would need to have 2010 MBX servers with the mailboxes for the XP users, and 2013 MBX servers holding the mailboxes for the 7 users. And of course, the appropriate CAS servers.
Realistically, you need to migrate away from Windows XP. It is no longer supported.

Similar Messages

  • I have an iphone 5 with ios 6. I am trying to setup a new exchange email account. I need the backslash but it is not available. I can find it on other apps but not when trying to set up the mail account. (it is not on the  keyboard)

    I have an iphone 4s with ios 6. I am trying to setup a new exchange email account. I need the back slash but it does not show up on the keyboard. I know it is supposed to be on the +key (and is for other apps) but for some reason it is not available when setting up an email account. Is this on purpose or am I doing something wrong?

    I can tell you that with Sprint their coverage area isn't as good as Verizon or AT&T.
    Are you sending these imessage while on wifi or cellular data?  Also your husband would need to be in a good coverage area.
    Usually when imessage is unavailable it will send it as a text.  Does your husband receive your imessage as a text?

  • Need free OST viewer tool to help to view OST files without connecting to MS Exchange Server and MS Outlook.

    Need free OST viewer tool to help to view OST files without connecting to MS Exchange Server and MS Outlook.

    Hi Howard,
    As I know, Microsoft does not provide any kind of inbuilt tool or free software to only view OST file, even without the connectivity with exchange server (Offline).
    Try SysTools OST Viewer freeware which helps you to view all OST file save at your system in an easy way, whether you want to see the attachments or other items of OST file.
    Note: This is a free inbuilt utility, but try it on your own risk as I am not much aware about it and its working. But this tool sounds good according to your requirement and hopefully it would give you 100% satisfaction.
    Thanks
    Clark Kent

  • Outlook client not connecting when a user is moved from 2010 to 2013

    Dear all,
    we are exchange 2010 SP3 we migrate to exchange server 2013 sp1 cu7 all the mailbox migrated cannot connect to outlook client
    howver, user on 2010 cannot redirect from exchange 2013 to 2010. 
    jibmud

    Greetings!  Just want to make sure I understand.  You are saying that user mailboxes migrated to Exchange 2013 cannot connect?  When you say Exchange 2010 users cannot connect to Exchange 2010 via 2013, how are they doing that?  OWA? 
    What does Outlook connection status indicate?
    How are your 2010 clients connecting and have all records been updated to point to Exchange 2013 servers?  Do you happen to be using Outlook Anywhere internally?
    Not sure if it applies to your environment but you may want to check this out:
    http://blogs.technet.com/b/exchange/archive/2013/05/23/ambiguous-urls-and-their-effect-on-exchange-2010-to-exchange-2013-migrations.aspx

  • Migrate the MOSS application that having custom site defination to SP 2013.

    Hi All,
    I need to migrate a SharePoint 2007 application that uses the custom site definition in to SP 2013. I believe custom site definition is no more supported in SP 2013. Can anyone please suggest me what should be the approach for migration?
    Regards Restless Spirit

    Hi Restless,
    According to your description, my understanding is that you want to migrate SharePoint 2007 application to SharePoint 2013.
    You cannot upgrade directly from the server products in the Office 2007 release to SharePoint 2013. The changes between versions are too great, and the hardware requirements differ so much between versions that a direct upgrade is not possible or supported.
    However, you can perform a series of database-attach upgrades to first upgrade your content to SharePoint 2010 Products and then to SharePoint 2013. More information, please refer to
    it.
    Or, you can use a third party to migrate SharePoint 2007 to SharePoint 2013.
    Here are some similar posts for your reference:
    http://social.technet.microsoft.com/Forums/sharepoint/en-US/e9542ff4-7812-4e41-9a31-1fe8966c2988/moss-2007-to-sharepoint-2013-migration?forum=sharepointgeneral
    http://social.msdn.microsoft.com/Forums/sharepoint/en-US/da49e742-5e38-4b13-9dee-84b2bb4a5cef/migrating-custom-site-definitions-from-moss-2007-to-sharepoint-2010?forum=sharepointdevelopmentprevious
    http://sharepointpromag.com/blog/migrating-sharepoint-2007-sharepoint-2013-part-1
    http://sharepointpromag.com/blog/migrating-sharepoint-2007-sharepoint-2013-part-2
    I hope this helps.
    Thanks,
    Wendy
    Forum Support
    Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Subscriber Support, contact
    [email protected]
    Wendy Li
    TechNet Community Support

  • Can someone lay out exactly what the certificate for UM/Lync 2013 needs to be?

    Ok, so I spent 480 minutes on my cell phone dealing with this same problem with MS a few weeks ago and they fixed it without telling me exactly what was wrong.  I'm doing another Lync 2013 install and still can't get it to talk to UM.
    I need to know the following:
    Does the cert for the Exchange 2013 UM services need to be issued from the CA or do I use one of the existing Exchange certs?
    What does the subject name need to be?
    What needs to be included in the SANs?
    After the cert is created, do any changes need to be made to the Lync server, or is the cert simply assigned to the UM roles via Exchange Admin Center, restart UM services, and it works?

    You can issue the cert from an internal CA or use a self signed cert as long as it's trusted by Lync.
    The subject name should be the server's FQDN.
    Nothing else really needs to be a SAN unless you're assigning this cert to a service outside of UM, for example if you needed it to also have a webmail.domain.com or autodiscover.domain.com for the CAS role.
    Your best bet is to just let the Exchange certificate wizard create it for you, and nothing really needs to change on the Lync server side, but when you bring the services up you might want to do it during off hours.  I've seen an issue where for the
    UM server takes a moment longer to get up to speed and rejects calls sent at it for 15 or so minutes.  But, it should just work. 
    Please remember, if you see a post that helped you please click "Vote As Helpful" and if it answered your question please click "Mark As Answer".
    SWC Unified Communications

  • Project Server 2013 reporting database change in Schema from Project Server 2010

    I have a current Project Server 2010 implementation, I am planning to migrate to Project Online.
    We have Customized Reports that consume from the PS 2010 Reporting DB.
    Are there differences in the Reporting DB schema  between PS 2010 and Project Online?
    My Question is: if we migrated to Project Online, will the reports crash?
    Another question is that, is PS 2013 Reporting DB schema the same as Project Online?

    Hi Atia,
    IN project server 2013 we have only one database instead of 4, it means draft, archive, published and reporting with in one database.Project Server 2013 reporting database schema tool that can be downloaded.
    http://blogs.msdn.com/b/project_programmability/archive/2013/01/28/project-server-2013-reporting-database-rdb-schema-reference.aspx
    There are differences in reporting of on-premises vs. Project Online
    The Project Server 2013 reporting schema includes three new tables, 27 new views, and a total of 33 tables and views that include new fields.
    Answer-1 : Yes there are some differences between PS 2010 and project Online.
    Answer-2 : Reports will crash as In Project Online you have to use ODATA to create report. You can not query project online data for reporting directly you have to have use ODATA. 
    http://msdn.microsoft.com/en-us/library/jj163015.aspx
    Answer-3 : NO, PS 2013 Schema and Project online Schema is different. 
    kirtesh

  • InfoPath 2013 customized forms no longer working after linking Sharepoint 2010 list to MS Access 2013 database

    Hello,
    I am having trouble with my infopath form now that I have linked my Sharepoint list to an Access database.  
    Background:  I created a simple SharePoint list and a few workflows to have users submit requests for changes to my organization's EMR system and have those requests be approved by the appropriate manager/department.  I used
    InfoPath to customize my form so that it would hide/show different portions depending on what the user selected.  The form has 3 views: NewItem, EditItem, ViewItem. 
    Issue: The form and workflows were working great until I linked my SharePoint list to an access database so that I could run queries and reports using that information. Now when I click "Add New Item" on my Sharepoint site,
    the correct form opens but the fields do not allow me to input any data and some of the formatting for the form has changed (ie: the text boxe fields are no longer centered.  I opened the form in InfoPath and it displays perfectly fine in there but
    not once it's published to the site) . 
    The only way that I've been able to input new data is using Datasheet view in SharePoint.  
    Is there a way to fix this issue?  I really need to be able to have the customized forms for users to fill out the information since most users are not familiar enough with SharePoint to expect them to be able to use Datasheet view to submit their requests. 
    Again, I'm using InfoPath 2013, Access 2013 & SharePoint Server 2010
    If the issue cannot be fixed, how can I disconnect or unlink my SharePoint list from the Access database because when I cliecked on "delete list" from inside Access, a warning popped up stating that it will also delete the list off of SharePoint
    as well.  If I can get the list back to the state it was in before linking to Access then I'll be happy enough to export it excel and then importh the excel file to Access as a work around for reporting purposes since I don't have to run the reports that
    often. 
    Any insight would be very helpful!!

    Hi Bostic,
    I tested the same scenario per your post in my environment, however the InfoPath form was not affected if I used the list as external data in Access database.
    The issue may be due to the browser you used.
    I recommend to verify the things below:
    Change another browser to see how it works.
    Add the site to the trusted zone and add to compatibility settings in Internet Explorer.
    Test with a new list to narrow down the issue scope.
    As a workaround, you can save the list as a template including content, and then create a new list based on this template.
    Learn how to Save a SharePoint List Template:
    http://www.fpweb.net/sharepoint-2010/tutorials/content/save-list-template/#
    Best regards.
    Thanks
    Victoria Xia
    TechNet Community Support

  • Sharepoint 2013 site having NTML Crawl issue while crawling Sharepoint 2010 sites having FBA authentication

    Hi,
    We have Sharepoint 2013 search center site which is claim based with NTLM authentication set. we have Sharepoint 2010 farm also running which are FBA authenticated.
    While crawling Sharepoint 2010 sites having FBA authentication from SP 2013 search center having NTLM auth. it does not give proper result.
    Can you please help me what can be done here?
    Thanks,
    Prashant

    Hi Prashant,
    According to your description, my understanding is that the search cannot work correctly when crawling the SharePoint site which is form-based authentication.
    Per my knowledge, the crawl component requires NTLM to access content. At least one zone must be configured to use NTLM authentication. If NTLM authentication is not configured on the default zone, the crawl component can use a different
    zone that is configured to use NTLM authentication.
    However, if crawling a non-default zone of the web application, URLs of results will always be relative to the non-default zone that was crawled for queries from any zone, and this can cause unexpected or problematic behavior.
    I recommend to make sure that the default zone of the SharePoint 2010 web application to use NTLM authentication.
    More references:
    http://technet.microsoft.com/en-us/library/dn535606(v=office.15).aspx
    http://technet.microsoft.com/en-us/library/cc262350.aspx#planzone
    Best regards.
    Thanks
    Victoria Xia
    TechNet Community Support

  • Can i exchange my iphone 4s with iphone 5.i had purchased in september 2012. now i want iphone 5. can i exchange it from apple store?

    can i exchange my iphone 4s with iphone 5.i had purchased in september 2012. now i want iphone 5. can i exchange it from apple store?

    Apple doesn't do exchanges. Sell your 4S & use the proceeds to purchase an iPhone 5.

  • Macbook air 2013 needs power button pressed for 10 seconds before it turns on?

    macbook air 2013 needs power button pressed for 10 seconds before it turns on? also I've tried resting PRAM but when i press the 4 buttons before the start up screen it never restarts again? please help!

    Reset SMC.     http://support.apple.com/kb/HT3964
    Choose the method for:
    "Resetting SMC on portables with a battery you should not remove on your own".
    If this does not help, contact Apple.
    Genius Bar reservation:
    http://www.apple.com/retail/geniusbar/
    Best.

  • One user unable to login to OWA - error :" The user name or password that you entered is not valid. Try entering it again." exchange 2007 SP3

    Hello Guys,
    exchange 2007 SP3
    windows 2008 r2 
    we have one user who unable to login to owa with error -"The user name or password that you entered is not valid. Try entering it again."
    we checked mailbox feature in EMC and owa is enable 
    checked adsiedit - looks good
    we checked allow inheritance - checked
    we reset the password and try to login to owa from exchange server , no luck
    user can login to her computer and outlook without any issue
    we also moved her mailbox to another server 
    user facing the same issue from office and VPN 
    any suggestion ?
    Thanks
    Sandip
    sandip

    Hello Lynn
    thanks for the reply. but I already checked that and allow inheritance already checked .
    when user unable to access webmail with error "The user name or password that you entered is not valid"
    will it generate any event id on exchange server or domain controller ?
    in our case we have mailbox and CAS on different servers 
    any suggestion .
    Regards 
    Sandip
    sandip

  • How can I set the workgroup templates file location in Office 2013 to point at a folder stored on Sharepoint (2010/2013)?

    Hi All,
    Been doing quite a bit of research on this but drawn nothing but blanks or alternative suggestions, none of which are viable.
    So the outline of the issue:
    Deploying Office 2013 suite to organisation and wanting to have custom templates available for users to choose from, but want those templates to be centrally stored and managed on a SharePoint site. 
    In Word 2013, for example, when you create a new document, you are presented with a page to choose from 'Featured' templates (or blank document)
    So, if you wanted to have custom corporate templates, you could modify the file location for work group templates, thus creating a Custom Office Templates folder locally on your PC. 
    Great. This means when you select 'New' in Word 2013 you can pick from the 'Featured' templates, or the 'Personal' templates area.
    However, I have a collection of test corporate templates (for Word, Excel, PowerPoint etc). These are stored on a SharePoint site internally. 
    If I try to modify the work group templates location in Word 2013 to point towards my SharePoint site (or any HTTP address for that matter) it won't work.
    I know that I could point it towards a Network Share location instead, but I don't want to do that. 
    Is there any way of getting it to point towards a SharePoint site, any way of modifying it? Or perhaps an even better solution that I could use? 
    Any help, thoughts or ideas would be massively appreciated! And forgive me if any of my logic is off, but it does seem like this should be a straight forward thing to do given that Office and SharePoint are both developed by Microsoft and you
    would like to think they would inherently have better links!
    NOTE: Going to Office 365 is also not an option either!
    Eagerly awaiting an answer from someone incredibly clever!

    Hi Tony, 
    Thanks for your response but this is not what I was looking for. 
    Those articles relate to setting a default template in a SharePoint document or form library.
    I will try to be more concise.
    What I want is:
    (1) For users to be able to load MS Word 2013 on their laptops/desktops (connected to corporate Wireless/LAN)
    (2) Once they have opened MS Word 2013, I want them to be able to choose a template from the welcome screen. (There are MS Word Defaults like 'Blank Document' or 'Cover Letter' etc)
    I want to add a second tab which is called 'Personal' or 'Corporate'.
    (3) MS Word 2013 allows you to create custom WORD templates and save them locally on your machine (either in the default location for templates, or a user-specified custom location (e.g. My Documents, Desktop etc).
    (4) In advanced settings, there is an option to modify file locations. This is where you can point MS Word 2013 towards the folder (locally) that contains the personal templates that you have designed which you want to use.
    (5) QUESTION: Is there a way to have lots of corporate WORD templates (perhaps one for Marketing, Sales, Procurement, Project etc) - Basically LOTS of different templates all stored in one location on SHAREPOINT, or in a SharePoint document
    library. THEN... once those templates (documents) are stored on SharePoint,
    IS THERE A WAY to go back into the advanced settings within MS WORD 2013 and modify the file location for templates so that it points towards the SharePoint document library? 
    I want all the templates to open in MS Word 2013, not within a browser, and I don't want users to have to go to SharePoint to find a template, I want it to be integrated into their local MS Word 2013 so they can choose a corporate template the moment they
    load up MS Word 2013.
    When I have tried to modify the custom file location for templates, I can only set it to an address locally on my machine, or a network address (mapped network drive). 
    However, I do not want the templates to be stored on a shared network folder, I want them to be in a SharePoint Document Library. 
    The issue I have found is that I cannot enter a SharePoint Library URL as my file location, nor can I enter any HTTP address. 
    IS THERE A WAY AROUND THIS? 

  • Saving Error in Project Server 2013, Need Help!

    Hey All,
    I am running into issues with a Projects saving from Project Pro 2013 to our Project Server 2013 Farm.
    It is strange, when someone tries to save a project out of Project Pro 2013 to Project Server, it will run through the "Synchronizing Data to the Server", and then bombs out with error
    Job Type: Save
    Error ID:9000(0x2328)
    The project could not be saved to the server, Etc..
    My understanding is that this is a generic save error that could mean many things.
    In the ULS logs under "Active Cache Save" , I am getting:
    "Cancelling correlation 1339927b-e9e5-e311-941d-00155d2bc10d as save is an overwrite or resubmit"
    What is strange at this point is if I check the project back in, and re-open/re-checkout the project, and try to save again, it is successful in saving.
    Just a few details about the environment:
    Project Server Version: 2013 RTM (In the process of upgrading)
    SharePoint Version: 2013 RTM (In the process of upgrading)
    Project Structure: One Master Project with all other projects being subprojects of the master
    Published Status: All Published
    SQL Version: SQL Server 2012 SP1
    User Count: About 5 currently
    Deployment: 1 WFE, 1 APP Server, 1 SQL Server
    It is just odd, as it seems to be completely random. We have tried clearing caches out to see if that resolves it but it did not. It is just odd that it takes two saves for it to actually work correctly, and is problematic as the many times they are saving
    from the master and it bombs out there.
    I am not sure how it could be an issue as it is usually just a single user working on the individual subprojects.
    Maybe it is an issue in the RTM? I couldn't find any info in any of the CU's or SP's that addresses this directly
    Has anyone seen this, or have any suggestions?
    MS Support has not been any help at all.
    Thanks all

    I have heard of issues with Master and Sub-Projects and both being published to Project Server, as a rule it is a feature I learnt to avoid as a result of bad experiences with earlier versions of Project Server.
    Whilst this will not resolve the issue you have encountered the following suggestion may help you avoid pain in the future and leverages the potential of Project Server to represent common attributes for projects.
    Typically a Master/Sub Project environment is intended to reflect projects that are commonly aligned - it is not unusual for a Master Project to represent a programme and for there to be multiple sub-projects forming the programme - there can be programme
    level events that have multiple predecessors from multiple sub-projects. 
    Rather than create a master and sub-project situation I would suggest looking to define two Enterprise Custom Project fields to assist with such situations. The first being a Project Field called Programme that has a look up table with a list of current
    programmes you can select from. The second Project Field would be a Programme Status Field  with an associated lookup table with 3 values, Master, Sub-Project, Standalone.
    You can have a project represent the Master (Programme) project and open it and all sub-projects in the programme (albeit this would have to be a one by one action to begin with). With all the projects open go and open a New Window in Project Professional
    and elect to include all the open projects in the new window - this will create a new project with all the selected projects showing as
    "embedded objects" and then create dependencies from sub-projects to programme level events in the Master Project (I would suggest what I call
    "one way traffic" when creating "cross project dependencies" to avoid further headaches). Close the project, you will be prompted to save changes which you should do but do not save the new window
    "container" project. The dependencies across the projects will persist - in each project you will be able to see external successors - tasks in the master project. In the master project you will be able to see external predecessors.
    In PWA you can create Project Centre Programme views that filter to exclude projects that ARE Standalone and group them by Programme and sort by Programme Status Field - this will ensure that the "Master" sits at the top of the pile for each programme grouping.
    Just a suggestion - I hope the issue you have encountered is resolved soon.
    Dominic Moss | MAPM Microsoft Certified Technology Specialist | Our Newsletter:
    PM News Project Server Specialists
    Project Server PRIME | Twitter:
    @Twitter | Facebook:
    @Facebook | Linkedin:
    Wellingtone

  • Just got a mac air and started using it. after getting it set up i migrated files from my old pc.  i did not realize that the files migrated to a different user account.  how do i delete this user account and not lose the migrated files which i need

    I just got a mac air and set it up and started using. after getting famiiar with it i migrated my files from my old pc. i did not realise that the files migrated to a new user account.  how do i delete this user account but not lose the migrated files?

    Mac 101: File Sharing
    Mac OS X 10.7 Help: Transfer files between two Mac computers
    Mac OS X 10.7 Help: Set up a Windows computer to share files with Mac users
    Mac OS X 10.7 Help: Use iDisk to share files
    Mac OS X: Sharing your files with non-Apple computers
    How to share a Mac's files with a PC and vice versa.

Maybe you are looking for

  • 17" Macbook Pro battery died (mid 2010 model)

    About a year old, the main battery died.  Cycle count is 207.  Since this is a non-user replaceable item I had to buy a new computer to aviod being without for a week.  (no local apple store) Buy a replacement computer. Return mine for repair after r

  • Quicktime wont install..help!

    My itunes wont work and seen in other threads that this is due to my quicktime not been installed properly. I have tried uninstalling current versions, reinstalling seperately and as with itunes and every way possible but the exe. install file just c

  • UMELoginException: PASSWORD_EXPIRED

    Dear experts, I am facing problem while log-in to the Visual admin using the user "administrator" in our protal inastalled system. Following is the error: #1.5^H#00151778AF8C005B0000011000003CD20004730A14D9C060#1252387043523#com.sap.engine.services.s

  • Send value from control block item to parameter in report

    hi can I dont watch at runtime report the paper parameter form to input value for it but instead of it take value or values to parameter or parameters if the report had more than one... if I can make it please tell me how ?

  • Help about DI 7.3

    I get started to work on DI 7.3. I have configured CM service. Then do I have to create a track like CMS? When I 'm putting DC under sorce control,  got error. I have role SAP_DI_ADMINISTRATOR & SAP_DTR_DEVELOPER. Unable to create remote path 'ws/Tra