Mile stone billing: Excise invoice
Hi,
We are doing milestone billing.
In sales order,There is one line item with complete project name & in pricing all excise duty n sales taxes a
are applicable.
I can do the Delivery for this line Item.
and I can generate bills for mile stone mentioned in sales order. which contain only prices for that mile
stone no Excise duty n Taxes are applicable because that already mentioned in Sales order's item line.
My question What about excise duties for the delivery I am doing?
because as per Stnd system will noy do billing for that delivery if we do that also then double amount bills w
will get generate.
In this case of milestone How to take care of Excise dutie & How to create Excise invoice in J1IIN.
Pls give your expert experience .
Regards,
Akshay
Dear Friend,
When you are doing a Milestone billing, I hope you will be creating multiple deliveries and multiple billings, And i think each billing will have a different excise duties charged. so you are suppose to create multiple excise invoice according to your invoices.
Regards,
Sudhir
Similar Messages
-
Mile stone billing with Down payment clearing
Hi,
Urgent help needed.
I need to set up mile stone billing plan at item level with down payment getting automatically offset with Invoice
ie,
I have 10% down payment (FAZ).
And mile stone invoicing of 40% and 60% each.
I have raised down payment request and the incoming payment is posted.
Now, when I raise the invoices, I want the down payment received auotomatically deducted from the invoice amount and shown as separate line item in the invoice. What settings need to be done?
ie, if 10000 EUR is the total amount, down payment is 1000 EUR.
My first invoice should show 4000 - 400 = 3600 EUR due from the cutomer and second invoice shud have 6000-600=5400 EUR due.
The item category is ZTAO
I have maintained the following settings:
1. Condition type AZWR in the pricing procedure with requirement as 2 (item with pricing) and the calculation formula 48
2. Copy control set up for Order type TA with billing type FAZ for the item category ZTAO with Copying requirement 20
3. Copy control set up for Order type TA with billing type F2 for the item category ZTAO with Copying requirement 23
But the invoice is not showing the down payment amount. Can any one tell me what is that I am missing? This is in ECC6.0
Thank You,
Resmi.Yes, Shripad thats the problem I faced too.. unfortunately didnt get any solution so far.. and I had been focussing on some other area off late..
Any one who come across a solution, pls mail us!!
Thanks,
Resmi. -
Mile stone billing & down payment
i want to configure mile stone billing and down payment i was configured in the sales order milestone billing is working and the downpayment amount is also comming after raising downpayment invoice it was showing errror document is blocked i was checked there is no block how to do this problem please specify. and also specify the whole process of milestone billing & downpayment process.
Regards,
Kishore.Dear Kishore
Milestones needs confirmation of an activities to invoice that milestone. Else the block will be there. You can manually release the block
Path -- VA02 (double click on item) Billing plan tab, block you can see 02 will be there. Remove it & save the sales order. Then bill it
Thanks
Deepu Pillai -
Mile stone billing for service contract
Hi gurus,
can you help me for the following:
i want to configure mile stone billing for service contract in my client business process,
can any one send me the complete configuration process steps for mile stone billing.
I'll reward you full marks,
Thanks in advance
nitchelHiya...
Billing Plan for Milestone Billing
Milestone billing means distributing the total amount to be billed over multiple billing
dates in the billing plan.
As each milestone is successfully reached, the customer is billed either a percentage of
the entire project cost or simply a pre-defined amount.
During sales order processing, the system determines from the item category whether a
billing plan is required and, if so, which type of plan
The type of billing plan that is determined at this point is set up in Customizing and
cannot be changed in the sales document.
Billing plans for periodic billing and milestone billing plans for project-related milestone
billing have different overview screens so that you can enter data relevant to your
processing.
For example, for milestone billing, you must be able to enter data to identify the
individual milestones.
IMG configuration requires :-
1. Maintain billing plan types for milestone billing in OVBO.
2. Define date description in SM30 - V_TVTB.
3. Maintain Date Category for Billing Plan Type IN OVBJ.
4. Allocate date category in SM30 - V_TFPLA_TY.
5. Maintain date proposal for Billing Plan Type in OVBM.
6. Assign Billing Plan Type to Sales Documents Type in OVBP.
7. Assign Billing Plan Type to Item Categories in OVBR.
8. Define rules for determining the date in OVBS.
Milestone billing is typically used for billing projects, such as plant engineering and
construction projects. Such projects often include a series of milestones that mark the
completion of different stages of the work. In the SAP R/3 System, milestones are defined
in a network along with planned and actual dates for the completion of work. The milestones
are also assigned to the billing dates in the billing plan.
Each milestone-related billing date is blocked for processing until the Project System
confirms that the milestone is completed.
Delivery-relevant order items for which a milestone billing plan applies are billed on the
basis of the requested delivery quantity and not on the total of the confirmed quantities.
The connection between the project and the sales document item is made in the individual
schedule lines of the item. Each schedule item can be assigned to a network in a project.
To display the project-related data for a schedule line, proceed as follows:
In one of the overview screens of the sales document, select
1. Item -> Schedule lines.
2. Mark the schedule line and select Procurement details.
The following figure shows an example of milestone billing where only the Contract have
been billed :
Order Item Turbine 100,000
Billing Plan
Billing date Description % Value Billing Block Milestone Billing Status
01-10-94 Contract 10 10,000 - x x
01-03-95 Assembly 30 30,000 x x
01-04-95 Maintenance 30 30,000 x x
01-05-95 Acceptance 30 30,000 x x
01-06-95 Final invoice .. .. x
Network/Activities
Milestone Estimate Actual
Assembly 01-03-95 01-03-95
Maintenance 01-04-95
Acceptance 01-05-95
For each billing date in a milestone billing plan, you can specify whether the billing
date is:
1. fixed
2. always updated with the actual date of the milestone
3. updated with the actual date of the milestone, if the date is earlier than the
planned billing date for the date
Keep Sapping
Regards -
How to conf mile stone billing for contract sales
Dear Gurus,
I want to config sales of Residential flats through contract with mile stone billing.could u pls send the conf steps reg this senario.
Steps
1.Contract agreement
2.sales order
3.Mile stone billing.
These r the 3 steps in this process.I hope better solns from u.
Regards
RamsDear rams,
Milestone billing : Normaly used in projects , means, payment released as work progreses .
Goto *VOV8* and select your order type and click on details , Goto Billing , keep billing plan type as 01 , (if billing plan not available , create u2013 Goto VOB0 and create an new billing plant for milestone billing ).
Then create sales order u2013 Goto header -- Billing --- billing plan --- plan your billing date and Define date description , % of billing and billing type .
Now, system will allow you to make the billing as per your plan
saravanan -
once u raise the sales order, how you will do milestone billing (this is for order related billing) billing will be done reference to with slaes order numbers so help me how we will do mile stone billing.
Dear Emmanuel,
Please read the link on milestone billing-
http://help.sap.com/saphelp_46c/helpdata/en/31/03953401024735e10000009b38f83b/frameset.htm
Regds
MM -
Mile stone billing plan - issue
Hi sap experts
i have a probleme in creating mile stone billing plan. in MS Bill plant if my billplan exceeds my order quantity system is accepting without showing any error message or bloking the billing. i.e if my plan exceeds more than 100 % system should block the bill without creating but in my case system is allowing.
Kindly Advisehi
goto delivery item category TAO in tcode OVLP and maintain "check overdelivery" field as "B"
hope this helps you in solving
regards
prashanth -
Excise Duty not updating in Billing & Excise Invoice
Dear SAP Guru,
Kindly help me to solve 2 issue as mention below :
1. Excise duty is not flowing in my billing document when i am creating commercial invoice. Also in my excise, I am getting excise duty 0.
2. When i am creating commercial invoice, the net amount is showing me in dollars but at the time of creating excise invoice it should show me in Rs? Which is not happening.
Please guide me what are the setting i have to check to fix my problem
Thanks in advance.
Also kindly send me the CIN Configuration along with the snap shot to my email id : [email protected]
Thanks & Regards,
Rajan> Dear Lakshmipati,
>
> Plant has been specified in the SO but still excise
> duty is not flowing to my document.
>
> Thanks
>
> Rajan
Dear Rajan
You can check in the following
1) In J1ID, select "<i>Excise Tax Rate</i>" and ensure that for the chapter ID, you have maintained 16%
2) In J1ID, select "<i>Excise Indicator for Plant</i>" and ensure that for the combination of Company Code and Plant, "1" is maintained on the extreme right side.
3) In material master, select "<i>Sales: sales org.1</i>" and ensure that "<b>1</b>" is maintained for "<i>Tax Category - JTX1</i>".
Thanks
G. Lakshmipathi -
BOM with mile stone billing (order related)
Hi Gurus,
Can any body tell me soln for the following scenario.
Order type OR
Material BOM Material(header)
Item cat Taq &TAE
Billing type 01(mile stone)
Requirenent Order related billing as per mile stone.
Regards
RamsYes, Shripad thats the problem I faced too.. unfortunately didnt get any solution so far.. and I had been focussing on some other area off late..
Any one who come across a solution, pls mail us!!
Thanks,
Resmi. -
Hi SD Guru's,
I created the Mile Stone Sales Order. With 2 line items. Eash Line Items Having 7 mile stones.
When i conform first line item 3 mile stones. When i rase the bill System Showing 3 line items in the bill.
But I want single line item in the bill. Where do i control.Pls Guide me.
Thanks
SriramHi Srinath,
All Billing Dates are same.But System Taking Diff Line items in the billing.
I am not useing any of the following :
payment terms
--> Foreign trade data
--> Payee Inco terms
--> Payer
System Where it control for diff lie items.
Thanks
Sriram
Hi sriram
As each line item is having 7milestones then make sure that the billing date should be same.You might have maintained separated billing dates for three billing items that is the reason it is showing 3 items dates
Because of the following parameters billing split will take place
--> Check the Billing date
--> payment terms
--> Foreign trade data
--> Payee Inco terms
--> Payer
Regards
Srinath -
Cancellation billing & excise invoice
is it possible to cancel billing automatically when excise invoice is cancelled & or excise invoice to get cancelled when billing is cancelled
Hi
in excise group the field excise invoice during billing, if you activated this after saving the billling document excise invoice will be created, now try for cancellation process, let us know it will work or not
as of my knowledge it will work for invoice and proforma invoice
regards
srini -
Goods Issue reversed without cancelling Bill & Excise Invoice
Dear..........
One of my end user has reversed the goods issue and deleted the line item also in case of Stock Transport Order. The billing document and Excise document is as it is there. Delivery document is also there but line item is deleted. Is there a way to restructure the scenario so that the document flow could be stream lined.**
Thanks in Advance.
Indranil Chatterjee.Hii
First of all check whether billing line item is referenced from your delivery or not, As per my understanding if PGI have been done and delivery line item status is complete it became gray and do not allow to delete the line item. If the same is not referenced and PGI have not done then u can delete the same.
I know there is an loop hole in standard SAP where it allow to cancel commercial invoice without canceling excise invoice.
for the same i have develop the logic which may be useful in your case.
1) For the given Exit EXIT_SAPLV60A_002 an Enhancement V60A0001 is assigned and in this
INCLUDE ZXV60AU01 is used to develop the Logic.
2) Based on the input entered in the VF-11 transaction we will check if corresponding records exist in J_1IEXCHDR table and if records found we will move these records to an internal table i_exerinv .
3) If no records fetched into internal table we will allow the transaction to execute.
4) If records fetched in to the internal table then if Status is other than the B or D or R then also we will allow the transaction.
Hope it will help u
thanks and regards
Shambhu Sarkar -
Mile stone billing with partial quantity.
Hi,
We are facing problem in the milestone billing. we have scenario where we have payment terms (Ex: 10% advance, 70% on delivery, 10% on installation and remaining 10% on completion) with the materials having multiple quantity. Delivery will be in partial, so except the advance invoice all the remaining invoice require change in the billing quantity before billing, but in the system billing quantity showing in gray mode. After delivery also remaining (10% installation) also will be on different quantity i.e. actually installed at the site.
As per the law invoicing has to be done with in the 14 days of the installation of the work, once the installation over for partial quantity we required to do the invoice irrespective of the delivered quantity.
In the system if we do the invoice for the total quantity at the time advance after that we are unable to change the invoice quantity in the subsequent invoices.
Please suggest us how to make enable the billing quantity field in case of milestone billing.
Ex: let us say sales order is created for qty 10 with the value of 1,00,000.00 as payment terms as follows.
10% Advance, 70% on delivery, 10% on installation, 10% final completion.
First we have raised the 10% advance invoice using 1st milestone with the total quantity.
When we deliver, we deliver only partial quantity i.e. qty. 5, so we have to create the invoice for (50,000-5,000) Rs 45,000. But when we create the second invoice we are unable to change the billing quantity. Same way when we create the third invoice after installation we may have to bill for qty. 3 if only 3 machines are installed out of 5 delivered, so again we require the quantity change.
Regards,
Upendra
+919824795543hi
Milestone billing means distributing the total amount to be billed over multiple billing dates in the billing plan.
As each milestone is successfully reached, the customer is billed either a percentage of the entire project cost or simply a pre-defined amount.
During sales order processing, the system determines from the item category whether a billing plan is required and, if so, which type of plan
The type of billing plan that is determined at this point is set up in Customizing and cannot be changed in the sales document.
Billing plans for periodic billing and milestone billing plans for project-related milestone billing have different overview screens so that you can enter data relevant to your
processing.
For example, for milestone billing, you must be able to enter data to identify the individual milestones.
IMG configuration requires :-
1. Maintain billing plan types for milestone billing in OVBO.
2. Define date description in SM30 - V_TVTB.
3. Maintain Date Category for Billing Plan Type IN OVBJ.
4. Allocate date category in SM30 - V_TFPLA_TY.
5. Maintain date proposal for Billing Plan Type in OVBM.
6. Assign Billing Plan Type to Sales Documents Type in OVBP.
7. Assign Billing Plan Type to Item Categories in OVBR.
8. Define rules for determining the date in OVBS.
Milestone billing is typically used for billing projects, such as plant engineering and construction projects. Such projects often include a series of milestones that mark the completion of different stages of the work. In the SAP R/3 System, milestones are defined
in a network along with planned and actual dates for the completion of work. The milestones are also assigned to the billing dates in the billing plan.
Each milestone-related billing date is blocked for processing until the Project System confirms that the milestone is completed.
Delivery-relevant order items for which a milestone billing plan applies are billed on the basis of the requested delivery quantity and not on the total of the confirmed quantities.
Reward if USeful
Thanx & Rerards.
Naren.. -
Hi all . how to configure periodic billing and mile stone billing ..
hi gurus
could someone please tell me the process of defining periodic billing and milestone billing for a customer or group of customers and how do we show the deficit in the accounts .. how to do the config for the periodic and milestone billing ..
thankyou very much in advance
bjHi,
Billing Plan for Milestone Billing
Milestone billing means distributing the total amount to be billed over multiple billing
dates in the billing plan.
As each milestone is successfully reached, the customer is billed either a percentage of
the entire project cost or simply a pre-defined amount.
During sales order processing, the system determines from the item category whether a
billing plan is required and, if so, which type of plan
The type of billing plan that is determined at this point is set up in Customizing and
cannot be changed in the sales document.
Billing plans for periodic billing and milestone billing plans for project-related milestone
billing have different overview screens so that you can enter data relevant to your
processing.
For example, for milestone billing, you must be able to enter data to identify the
individual milestones.
IMG configuration requires :-
1. Maintain billing plan types for milestone billing in OVBO.
2. Define date description in SM30 - V_TVTB.
3. Maintain Date Category for Billing Plan Type IN OVBJ.
4. Allocate date category in SM30 - V_TFPLA_TY.
5. Maintain date proposal for Billing Plan Type in OVBM.
6. Assign Billing Plan Type to Sales Documents Type in OVBP.
7. Assign Billing Plan Type to Item Categories in OVBR.
8. Define rules for determining the date in OVBS.
Milestone billing is typically used for billing projects, such as plant engineering and
construction projects. Such projects often include a series of milestones that mark the
completion of different stages of the work. In the SAP R/3 System, milestones are defined
in a network along with planned and actual dates for the completion of work. The milestones
are also assigned to the billing dates in the billing plan.
Each milestone-related billing date is blocked for processing until the Project System
confirms that the milestone is completed.
Delivery-relevant order items for which a milestone billing plan applies are billed on the
basis of the requested delivery quantity and not on the total of the confirmed quantities.
The connection between the project and the sales document item is made in the individual
schedule lines of the item. Each schedule item can be assigned to a network in a project.
To display the project-related data for a schedule line, proceed as follows:
In one of the overview screens of the sales document, select
1. Item -> Schedule lines.
2. Mark the schedule line and select Procurement details.
The following figure shows an example of milestone billing where only the Contract have
been billed :
Order Item Turbine 100,000
Billing Plan
Billing date Description % Value Billing Block Milestone Billing Status
01-10-94 Contract 10 10,000 - x x
01-03-95 Assembly 30 30,000 x x
01-04-95 Maintenance 30 30,000 x x
01-05-95 Acceptance 30 30,000 x x
01-06-95 Final invoice .. .. x
Network/Activities
Milestone Estimate Actual
Assembly 01-03-95 01-03-95
Maintenance 01-04-95
Acceptance 01-05-95
For each billing date in a milestone billing plan, you can specify whether the billing
date is:
1. fixed
2. always updated with the actual date of the milestone
3. updated with the actual date of the milestone, if the date is earlier than the
planned billing date for the date
Regards,
Pankaj -
Excise Invoice for Milestone billing
We have configured mile stone billing.
30% - Downpayment
40% - Delivery
30%- Closing invoice.
Currently system is calculating excise and taxes at each step (CST & VAT)
Our problem is how to creat single excise invoice at delivery time ( excise should be calculated on PR00 basic price in sales order at delivery against billing)
Regards
Sachin KadamOur MTO Process is as below
VA21 - Quotation
VA01 - Sales order wrt to quotation
VF04 - Create invoice, print down payment request and send to customer
F-29 -Post customer down payment
Production process ---> Sales order stock is available.
VL01N - Delivery
VA02 - Delete billing blocks
VF04 - Create invoice, print payment request and send to customer
F-28 - Post milestone invoice
Billing plan deatails as below
19.01.2010 0009 Down payment 30.00 573.89 INR
18.02.2010 YB01 Delivery 40.00 765.18 INR 02
20.03.2010 0008 Closing Invoi 1,147.77 INR 02
Regards
Sachin
Maybe you are looking for
-
Download fees for a single folio using a professional edition
Hey guys, we are releasing a free monthly online magazine in the coming month, at first we considered the single edition option because of its 0$ download fees. the down side was that it wouldn't allow us to be available in the android market or on t
-
How to see all of TitledBorder?
I've got a JPanel with a TitledBorder, but the contents of the panel are narrower than the title in the border and the title gets truncated. I note that the "minimum width" of the JPanel is set to the "minimum width" of the TitledBorder, which the do
-
Hey all, I am having a difficult time with this one, any help would be appreciated. I have a table with 4 fields: ID,MAIN,TIME,SPD it would look something like this ROWID,ID, MAIN, TIME, SPD 1, AA, 01, 1, 45 2, AA, 02, 1, 44 3, AA, 02, 2, 33 4, AA, 0
-
Snap-In failed to initialize error in SAP NW7 ABAP trail version.,
i am getting the "Snap-In failed to initialize "error in SAP NW7 ABAP trail version.. What could be the issue and the probable solution??
-
I have a system form that I'd like to use to be able to select sales orders. The form can be found through Sales A/R -> Delivery -> Sales Order button and is called "List of Sales Orders" with an ID of 10016. The only way I've managed to load it up i