Move Timeline Playhead to next Video Clip - Ignoring Audio Clips?

I'm colour correcting and want to move the playhead quickly to each video clip.
I wondered if there's any way to get the playhead to ignore audio clips and simply jump to the next video clip?

I think the American expression is DOH!!!
What an eejut.
+(I think it's my age)!!!+
I'm going to lie down in a darkened room.
Andy
+(Thanks Bob).+

Similar Messages

  • How to split video and extracted audio clip at same time?

    I imported 10 min of DV from my Sony HC96 camcorder to iMovie 6.
    I selected a video clip and split it using cmd-T but the extracted audio clip below it did not split. How can I split both the video and underlying audio clip so I can drag the edge of the new video clip for editing by direct trimming and keep the audio dialogue in sync. I have already gotten the clip volume levels right in the extracted audio.
    This seems pretty basic editing but I must be missing something.
    thanks, ralph
    1.67 GHz 17" PB, PowerMac Dual 2.5 & 23" Cinema Display   Mac OS X (10.4.8)   Airport Extreme Base Station and Airport Express

    Thanks, Sue. Let me see that I have this right. I split the video then the audio. I then selected and trimmed the video to the remove the 10-15 seconds I wanted to remove. To keep the dialogue in sync with the speaker's lips, I then selected and trimmed the audio to the same time as I trimmed the video. Then I dragged the audio clip back up to the new start of the trimmed video clip. I did this and the dialogue and lips seem to be in sync.
    I guess originally I had looked for a solution where I cut both clips at the same time and trimming one trimmed the other. But now I see I just need to do them separately. Thanks for the help, Sue!
    ralph
    Hi Ralph:
    You can't do both at the same time, but you can do
    them one right after the other. Highlight the audio
    and split it after you split the video and be sure to
    keep the playhead in the same position.
    Sue
    1.67 GHz 17" PB, PowerMac Dual 2.5 & 23" Cinema Display   Mac OS X (10.4.8)   Airport Extreme Base Station and Airport Express

  • When I move video clip, my audio clips (unlinked) split ??

    I have separate video and audio clips on the timeline (they are not linked).  When I try to move a video clip (or multiple clips at one time), before I let go of the mouse, the audio clip(s) below the video split, so that they are before and after the moved video clip.  They are not linked together.  How do I move a video clip without affecting anything else?
    Thanks.

    This might be helpful from some of my old notes. The ripple behavior can be overcome by the use of the CTRL
    button. However it depends on whether you press CTRL before or after you start moving the clip. When moving clips
    around in the timeline there are 4 basic types of movement Lift, Extract, Insert and Overlay:
    The first two, Lift and Extract have to do with how the clip is moved OUT of it's current position. To see what I
    mean, hover your mouse over a clip in the timeline, then press and release the CTRL key while watching the status
    text string in the lower left of the application window, you'll see that holding CTRL before clicking and dragging
    triggers the extract behavior (which tells the timeline that there is a gap being created that should be closed)
    but clicking and dragging with no CTRL modifier allows the Lift behavior (which tells the TL to ignore the gap)
    The second two, Insert and Overlay have to do with how the clip is placed IN to it's new position, that is,
    whether it is Overlaid over exisitng footage without any ripple movement or Inserted within the existing footage,
    causing any following media (including that on other tracks) to be rippled forward.
    Since there is no way to lock down tracks in PE, you must always be mindful of what this default rippling behavior
    is doing to overlapping media on other tracks.

  • How can I match sound quality between video clips and audio clips?

    Hi guys,
    First of all let me say that I enjoy using the latest Media Encoder. However, as a novice, I have two related problems.
    1.I am recording video to use with PowerPoint slides in Adobe Captivate. I am encoding the video with best quality FLV. This produces very good video,
          but with a degraded audio track, even though I had filtered the audio in soundbooth. The post encoding sounds like it did before Soundbooth corrections.
    2. Some of the video recording has been set cut into audio clips to be used as background narration behind PowerPoint. The logic behind this is: that if both are
          recorded at the same time, the voice quality should match.
    This is far from the outcome. I have tried MP3 for the audio which of course produced the best sound- but is entirely unlike the rest of the video. I have also encoded the audio with Windows Waveform preset figuring that since the soundbooth edit was a .wav file, that there should be a reasonable match. Wrong again!
    So, the audio quality of all clips is poor, and the difference between the encoded video clips, and the audio encoded clips spoils the otherwise professional result in Captivate.
    Please help, all of you experts.

    Thank you.
    OS Windows 7 x 64; 3.2 MHz; 2 TB; 12 GB Ram-9GB ram allocated to Adobe.
    My process is this:
    1. The whole video and audio narration material is shot in one continuous video sesseion.
    2. The microphone is only mono, but the camera is set to stereo. Noone can work out how to change the camera to mono.
    3. In Premiere Pro 5, I select render and replace in SoundBooth.
    4. In Soundbooth, I choose Add Multichannels.
    5. In Multichannels, I delete the unwanted noisy channel, and any other unused channels.
    6. With the remaining mono channel, I then select Export and Save As option, then Stereo.
    7. Next I edit the stereo channels as needed.
    8. The imported stereo won't automatically update in Premiere Pro, so in PPR I import the new edited stereo track.
    9. I test this track in PPR, to check that it is playing R & L channels. It is. OK.
    10 On the timeline, I proceed to cut apart this single stereo wavelength .
    11.These clips are saved as Video, or Audio subclips.
    12 From the video subclips, I export to Media Encoder, and choose either FLV4 match attributes (High Q). This I modify to custom 2 pass (Custom save).
         The summary says that this is saved to MP3 Stereo.
    13. I import this into Captivate 5, but the Video outcome is Left channel only. I have tested this on Media Player/Real Player where it is also L channel only.
    14. I export my Audio subclips to Media player, and select MP3 option and this summary also reports stereo. The Audio outcome is stereo, when played in any player and in Captivate 5.
    I cannot understand how a single, continuous track edited uniformly in Soundbooth to stereo, can produce different outcomes in Media player.
    I would so appreciate a solution to this problem, because, in the Captivate 5 e-learning production, the switch between stereo audio (behind PowerPoints), and l. channel video is distracting. Naturally, the l. channel only is a thin sound. It is as if it had never been edited in SoundBooth at all.

  • Toggling between video clips (not audio clips) in the timeline

    Hi,
    I was wondering if there is a solution to this small inconvenience I am experiencing in FCP 5. When I have snapping enabled, and press the down arrow key, the playhead jumps to the next audio or video clip in the timeline. I am trying to find out if there is a way to jump between video clips only.
    Thank you
    -Peter

    Thanks,
    Do you know if there is a way to make the up/down arrows snap to only the video cuts on the video clips in the highest video tracks in the timeline? Thanks.

  • Paste over at playhead to insert video while retaining audio not working

    I am trying to paste "extra" video over my bad video, using the cross dissolve transition between the original and the pasted, and then back to the original video. All this time, I am seeking to have the original audio playing. I have followed the iMovie help directions as to copying the video piece I want to splice in (about 10 seconds long), then selecting the segment of video and audio to past over (9seconds long) and choosing under the advanced menu the paste over at playhead command.
    The audio gets screwed up, with pieces not syncing properly. I am using high definition audio/video from a jvc hd camera.
    The file I'm working on is about 1 hour long, and I am using an Intel Mac Pro (1 yr. old) with upgraded memory (the paste over at playhead command does work pretty quickly).
    The first time this happenned I had extracted the audio, but it happens even on a virgin file without the audio extracted. I've now reinput the virgin footage 3 times as the files are corrupted.
    Plus, sometimes the cross dissolve doesn't work. And sometimes the paste over at playhead command just doesn't work, especially if I am trying to add two consecutive "extra" segments of between 10 and 20 seconds. Any ideas? My project requires probably 50 of these pasted video segments as it is a concert with many camera moves (only one camera) which I had hoped to cover with the "extra" video.

    Ignore or remove the square character and the question mark at the end, then it takes you to this thread:
    http://discussions.apple.com/thread.jspa?messageID=2335104
    P.S: Sorry; I have no trouble with Paste over at Playhead, so can't advise.. and am going to have a little holiday.. byeee!

  • Jumpy Video over imported audio clips on time line.

    I have faltering or jumpy video occurring only where I have imported music. this has never happened before. It happens on all music even aiff.
    I need help, cant finish last DVD in a sequence of five.

    Hi Lowstone and welcome!
    Are any of those audio files imported from iTunes?
    That would produce the symptoms you mention if the tracks were copy protected (Get Info in the file menu will tell you).
    The workaround is to burn those tracks to a CD, re-import them from that CD into iTunes, save them as AIFF files, and import them into iMovie when they should work fine.

  • Can you clip MP3 audio clip with QT Pro 7?

    Hi:
    That's my question! TIA for any suggestions.

    I have .mp3 music files in my itunes, but need to convert them to .aiff files. I was told from someone that this conversion can be done in the Pro version.
    Why bother? You say the files are already in iTunes. Why not just use iTunes to convert them? Simply set your "Import Setting" preference to the "AIFF encoder" and you can then use the iTunes "Advanced" menu option to convert single or multiple selected files to AIFF.

  • ? about "Lock Audio Clip at Playhead"

    I've always thought that the purpose of this feature is to make sure that audio and video clips that need to stay synced together in fact do.
    Well, I just added a short video clip to my timeline--in the middle of the movie--and it moved all the video clips to the right a bit, as it should--but not the audio clips, which were locked to their respective video!
    How could this happen?

    Hi folks.
    Since we last posted, I have discovered something new about the misbehaving audio lock. Happily, I learned that it does work for me - most of the time. I can select the audio, choose "Lock..." and if I get a yellow pushpin on both the video and audio tracks, then they are properly locked together.
    Here's the catch. Sometimes I select the audio, choose "Lock..." and the yellow pushpin only appears on the video track. In that case, they are not locked, and adding video before that pin will lose the sync with the improperly locked audio track. Also, I haven't found a way to get that single pushpin to go away. I can place the playhead there and choose "Lock..." again, but that has no effect (no toggle off and on). I can select a new place in the same audio clip and choose "Lock..." but the pin doesn't move. The only workaround I have found is to move a bit past the defective pin, do a "Split video at playhead" to create a new video track, and then select a spot in the audio clip to lock with the new video clip. The new clip will get the correct double pushpins, and the audio is really locked.
    Here is a screen shot of this behavior. Notice that I have several locked audio clips, and I have not placed the locks on the first frame of the video clips. You can see a defective single pushpin on the video associated with audio clip #23. I couldn't remove that pin, so I split the video clip and was able to lock down audio clip #24. (Note: the gaps in the video are intentional - when I had to change tapes. I'll fill them in with some photos, so I have to make sure that I won't lose sync.)
    What do you think about that?
    Regards.

  • Connecting audio clips with Q-key not working

    I cannot properly connect an audio clip to a storyline clip using the Q-key.  It positions the clip at the play head, and it shows a connection to the storyline clip, but when I move the storyline clip the audio clip does not move with it.  If I drag the audio clip to the storyline, it works properly.  And if I connect a video clip using the Q-key everything works properly.  Is there a Gotcha with audio clips and the Q-key that I'm missing?  Or perhaps a known bug?  I couldn't find anything about it.

    Where is the playhead positioned when you hit the Q key? It looks like somehow the playhead is parked at the last frame of the outgoing clip - and if so, then the program is working as it should.
    What happens if you move the playhead one frame to the right using the right arrow key and then hit Q?
    Does it work then?
    Also: do you have skimming turned on? And where is the skimmer? The position of the skimmer takes precedence over the playhead if skimming is on.
    One other thing you might try: press the closing bracket key "]" to select the left edge of the incoming clip.
    If all these fail, then you may need to trash preferences (there are four, not just two, files to trash; it may be easier to use Preference Manager to handle this).

  • SUPERBUG? Transitions / Unbalanced Between Clips & Unsync Audio HELP! 2006

    I have been able to reproduce this SUPERBUG every time.
    I have split the audio track from the video clips to solve the bugs in iMovie that many have listed here in the forums. Also, it was a live music performance that I added other clips in the middle to compensate for shakey camera and bad shots.
    All was fine till I started adding a 'simple' "Cross Dissolve" transition.
    Both clips in the transition would not be evenly balanced in the cross dissolve, and would un-sync the audio if it was locked in place or not.
    If you center the play head in the middle of the croos dissolve and delete it, you can see how much it is off from where the clips join.
    This is the WORST case scenerio, since the only way to use transitions would be to place them, and the re align the live video with the audio clips, and then there is blank black clips EVERYWHERE!
    My last problem was the new Slick 8 Plug-In Stabilizer which still doesn't work in iMovie 6 ( Gee Three says it's on the way ) ... and now this?
    Who is programming at Apple these days?
    They better get some real talent there quick .. I'm furious.
    Has anyone else figure this out .. or is there some trick I don't get?
    Help

    "..Both clips in the transition would not be evenly balanced in the cross dissolve, and would un-sync the audio if it was locked in place or not.."
    Applying any transition in iMovie (..except 'Overlap'..) will "un-sync the audio", because any transition lays the tail of the first clip OVER the head of the following clip to merge them both, one into the other. This shortens the overall running time of the two clips - and anything else which follows - by the total duration of the transition.
    It's always best to practise with a few clips, or another "test" project, first ..just to see what the effects will be before starting a major project, and then you can test the effect of adding a transition. Same with doing a bit of woodwork, or stain removal: it's always best to do a test first, and see what the result is ..then you know how to apply that to the 'real thing'.
    All that you have to do is to allow some extra length to the tail of the first clip, and to the head of the following clip, to match the duration of the transition you want to use. This is easy to do if you're dropping in a "cutaway" shot to replace some shaky footage, for example.
    So if you want to use a one second Cross Dissolve, say, (..that's 30 frames in NTSC American video, or 25 frames in European PAL video..) then leave an extra 30 frames (..25 frames for PAL..) at the end of the first clip, and an extra 30 (.. or 25..) frames at the head of the next clip, for this second to be "eaten away" by the transition. Your underlying music will then still be in sync after the transition has been applied.
    "..Who is programming at Apple these days?.." ..This is the way that iMovie has worked since Version 1. It isn't a "bug", but simply the way that editing works in this easy-to-use "consumer" (..i.e; amateur..) editing program.
    "..the clips that where split EXACTLY at the playhead ( and audio extracted from the video ) return as one frame away from each other.." ..If you do a few tests, you'll see what happens to the frame count where clips are split and re-joined. I've an NTSC project here (..I'm in the UK and usually work in PAL..) which is a single clip with a total running time of 27:10. If I split the single clip at 02:00 ..i.e; exactly 2 seconds.. and the second clip lasts 25:10, then when I recombine them the total running time becomes, once again, 27:10. If I split them at 01:29, then the second clip becomes 25:11 long, and if I delete the split, they revert to a single clip of 27:10 ..i.e; no frames lost.
    However, American (NTSC) video is slightly odd in that its real frame rate is 29.97 frames per second, so every minute or two a couple of "imaginary" frames are lost - not really lost, but the frame count simply jumps - to try to "round things up" to 30 frames per second again. This is called "drop frame time code". No frames are actually dropped ..the numbers are just "rounded up" now and again.
    So if your frame count seems slightly off ..don't worry about it.
    This is the way that video editing works.
    In the "professional" editing programs (Final Cut Express and Pro), the program tries to find extra frames on the ends, or beginnings, of clips, so that those excess frames can be "eaten up" by transitions, and total clip length remains the same. But that relies upon more footage being available than you're actually working with ..so someone new to those programs might ask "Why do I have to import more footage than I need?"
    Just practise with it a bit, and you'll soon see that it works OK ..just leave extra frames on the ends of clips to allow for the footage which gets used up in the Cross Dissolves, or whichever transitions you use.

  • Join audio clips?

    I have two audio clips butting each other and want to combine them into one. Is there a way to do this?
    The reason is because I want to link the video to the audio clips, and I am only able to link it with one or the other audio, but not both.

    Have you tried with a nested sequence ? I'm not sure it solves your problem, but if you collect all audio and video clips you want to "link" into a new sequence, then you can edit (nest) this new sequence within the main one as if it were a single clip. To open it in the viewer alt-double click it in the timeline.
    Piero

  • Breaking apart a compound audio clip...

    ,,,removes all the video clips attached to it. What to do?

    Compount audio track and video clips
    After audio clip broken apart

  • Shortcut key to move the playhead to an in-point on the timeline?

    Hi just made the switch from FCP 7. Is there a shortcut key to move the playhead to an inpoint on the timeline? In FCP it is the right arrow.
    Tiny little problem but makes all the difference in terms of speeding up the edit.
    Thanks
    Josie

    Here's a full list of the ones that come with the program. You can customize many of them as you wist also ... instructions at the bottom of the page.
    https://helpx.adobe.com/premiere-pro/using/default-keyboard-shortcuts-cc.html
    To go to the next/previous clip from "on" the timeline is up/down arrows ... if that's what you wanted.
    Neil

  • Moving Video & Audio Clips on Timeline

    How can I move all video and audio clips on the timeline together? I can select and move all video clips, or all audio clips, but I can't find a way to move everything together. Moving separately will put audio and video out of sync.
    Thanks.

    Lock the audio to the Playhead first (Advanced menu).
    But you should be able to select both video and audio clips together using the usual shift key.

Maybe you are looking for

  • Error building project using kXML2 - "Class loading error: Wrong name"

    Hi, I'm testing the XML-Parser KXML2 and downloaded the latest package, but the minimal version (kxml2-min.zip). I put this file into the directory "%j2mewtk%\apps\KxmlTest\lib" and wrote the lines import org.kxml2.io.*; import org.xmlpull.v1.*; When

  • How to change plant in sales order???

    I have made a sales order which created a purchase requisition. A purchase order has been made with reference to the purchase requisition. No goods reciept has been made yet. I want to change the plant and the storage location in the Purchase order,

  • Debugging the webdynpro abap application from portal.

    I  developed a  WebDynpro  application and integrated in portal. I have to catch some portal events.For that i have written some code in my application. I tried to debug the application from portal  by using all the available break-point types.but we

  • Transfer tables from sql server 2008 to oracle 11g

    Hi , I have to transfer 2-3 tables (5 Lacs records each) from sql server 2008 to oracle Ent. 11g (platform Linux) i have to upload data with some conditions. not allowed to install oracle client on sql server for link server. i can get data in csv fi

  • WorkFlow Tutorials with Screen Shot

    HI Experts, Can anyone send WorkFlow Tutorials with Screen Shots??..My email id is <REMOVED BY MODERATOR>.. Full points will be rewarded for this immediate help..Thanks.. Edited by: Alvaro Tejada Galindo on Jun 6, 2008 1:52 PM