Moving to material only product costing

Hi
We are moving from the regular product costing to the material only costing.
Any leads as to the design and config overview for this.
Thanks

Hello,
I hope these links help:
http://www.sap-topjobs.com/SpecialPP/ProductcostingECC6.pdf
http://www.scribd.com/doc/7151646/Product-Costing
http://help.sap.com/saphelp_46c/helpdata/en/ad/f32c7dd435d1118b3f0060b03ca329/content.htm
Regards,
Lucas

Similar Messages

  • Please maintain  the master data for material during product cost collector

    hi
    i get a error
    please maintain  the master data for material during product cost collector
    please guide me
    regards
    leo

    Hi Leo,
    Can you elaborate your issue, like when did you get the error exactly?
    If it is the error you got while creating Product Cost Collector, then this is not the right Forum to post.
    Please post your question in the 'ERP Manufacturing (PP)' forum
    Regards,
    Manimaran M

  • Material Master (Material Ledger- Product cost actual costing)

    When I create a material in MM01 and no Standard price is set the columns "Company code currency" y "Profit valuation" are disabled.
    The only column available is the one corresponding to company code currency. The field "Price unit" starts with the number of 1000 and this information is not copied to the other price unit fields unless you introduce a value in the Standar price - Company code currency field.
    Does any one knows a user exit that can modify this values (Price unit - Group Currency and Price unit - Profit valuation) ?
    Kind Regards

    Hi
    1. It is not  mondatory to activate Material ledger to create Product Cost collector.
    2  It is not  mondatory to create product cost collector if we actovate Material Ledger.
    Material ledger Activation
    1. In OMX1 activate ML and price determination 3 for production plants and 2 for sales depo plants (if need)
    2 In. OMX3 assign ML type standard
    3. Configure dynamic price changes : assign price release  1
    4. Assign material update structure to a valuation area
    5. Activate actual costing indicator and assign  2     Activity update relevant to price determination
    PCC:
    1.In KKF6N,enter the material,plant and select create button and select the order type as
    RM01, radio button selected for production version and assign the production version here
    2.Save the PCC for preliminary costing
    3. PCC integrates with PP module in production version selection
    Regards
    Dev

  • I want full study material of Product costing

    HI
    gurus
    plz send me P.Costing full study material.
    Thank you

    Hi Vani,
    REGIO->
    Region (State, Province, County)
    Definition
    In some countries, the region forms part of the address. The meaning depends on the country.
    The automatic address formatting function prints the region in addresses in the USA, Canada, Italy, Brazil or Australia, and the county in Great Britain.
    For more information, see the examples in the documentation on the Address Layout Key.
    Examples
    Meaning of the regional code in ...
      Australia       ->  Province
      Brazil          ->  State
      Canada          ->  Province
      Germany         ->  State
      Great Britain   ->  County
      Italy           ->  Province
      Japan           ->  Prefecture
      Switzerland     ->  Canton
      USA             ->  State
    OPEN se11 and open the table kna1 and open the data element regio. then click on documentation button on top rigth for more info.
    regards,
    kartik

  • CO02. Product Cost by Order.

    Hi All.,
    When i am doing the Product cost by order for PP Production Order through CO02, it is giving the details of Itemization of cost for only Raw Materials.
    Then what about the Production Costs...or at this level.......cant we get the cost of production, production overheads....and also the material overhead.
    Please provide information to clarify this doubt....
    Thanks

    Hi Arun.,
    Thx for your reply, but what i am asking is different frrom the actual cost line items.
    At the order level, when we are checking costs....only Raw material costs are picking, then what about the other costs like
             Material Overheads,
            Production Costs & Overheads.......
    Thanks......

  • Standard Product Costing help needed

    Hello SAP Gurus,
    To cost a manufactured product, my company does the following:
    Raw material cost+ labor hours* labor rate+ overhead+subcontracting charges (if done)
    overhead = labor hours* overhead rate
    Please guide me as to how I should configure the overhead cost elements, costing sheet and other configurations.
    I have read up the material on product costing but am finding it difficult to do the settings in my scenario.
    Please help me. Its very urgent.
    I will award the points immediately.
    Thanks,
    Eilzaa

    Elizaa,
    For this you need to define Costing Sheet.
    You need Base --- On which Overhead need to applied
                   Overhead Key -- how much percentage/value of overhead need to be applied
                   Credit key ---  Offsetting crediting Cost Element and Cost Center
    Suppose you want to Apply $20 overhead on every 1Hr Labor then .
    Assume you have 2 Activity types with respective allocation Cost Element 91000 and 91001
    Overhead Cost Element is 94000 and overhead Cost Center is 1000
    Your calculation Base is B00 --- with values 91000 to 91001
    Your Overhead Key is Quantity Base overhead key O00 -- with Actual overhead and planned overhead of $10 per 1 HR
    Your Credit Key is C01 --  94000 with 1000
    Thus, if there is 1.5 Hrs of labor hrs (Activity1 and Activity2)  are performed then system will calculate 20+10 = $30 Overhead and will credit 94000 with 1000 Cost Center and Debit the Production order.
    So total cost in this example will be
    Raw material Cost + Labor Cost based on Activity Prices + $30 Overhead Costs
    Thanks
    Sivaram

  • Product Costing using Moving Average Price of FERT & HALB

    Dear Experts,
    My client wants to use Product Costing functionality by using Moving Average Price instead of Standard Price on Finished Goods & Semi Finished Goods and as per my understanding, SAP recommends to use Standard Price on FERT &  HALB.
    I know if we use moving average price instead of standard price than there will be no concept of variances. Can anyone tell me more about what are the pros and cons of using moving average price instead of standard price in Product Costing?
    Thanks in advance.
    Regards,
    Zain Bashir

    Hi Zain
    Let's take an example
    You have V for Mat A
    You create 3 Prod orders in a month
    Order 1 - Qty 10 - variance 100
    Same for Order 2 and 3..
    At month end, you sold 20 pieces and 10 is in stock..
    When you settle order 1, system will compare order qty and stock.. It will match I.e. 10 = 10... Hence variance of 100 will be posted on stock
    Same will happen for Order 2 and 3... Ideally, only 100 should have posted on stock... but in this case 300 of variance will be posted on stock...
    This is what the note mentioned by Arturo tells, but not so clearly
    Hope this helps
    Br. Ajay M

  • Standard or Moving Average Material Cost

    If we have PO price / costs plus shipping costs....can we use these to calculate the product cost whether standard or moving average?
    Thanks in advance
    Message was edited by:
            Satish A Kumar

    The Moving Average Price (MAP value) = Total Valuated Stock value / Total stock quantity.
    At any point of time, If you do a Goods receipt for a Purchase Order, the MAP value is re-calculated at the price at which the goods are inwarded.Thus the MAP value is subject to changes from time to time.
    The standard price is however unaffected by this.
    The Product costing,therefore, for materials with price type "V" is linked to the MAP value of material. Where as for materials with Price type "S" - i.e standard price, the product costing is not affected.

  • Flow material product cost to sales order cost and no explosion of structur

    Hello,
    We have a business requirement - Business is currently performing product costing at material on monthly basis using quantity structure (with help of avaiable bom and routings). Material costing nicely gives the cost with clear split of material cost, labour cost, external cost etc. Then at sales order level we want to do the preliminary sales order costing. The reason for sales order planned costing is, we are performing result analysis revenue based by comparing planned cost. Business is saying, we already calculated the material cost, labour cost at the product level and same should be as it is transferred to the sales order planned cost and we just want to add the overheads.
    The cost already calculated should directly pass to sales order and the order should not explode the BOMs again or try to find activity prices from routings. Then with the already available values of material, labour costs, system should only add the overheads via costing sheet.
    The cost compenent structure exploded in material should be passed to sales order and not just the total cost.
    There are several reasons I believe sap should not allow this behaviour. I seek your inputs to validate the same.

    THIS SHOULD BE POSSIBLE WITH "TRANSFER STRATEGIES" - TCODE OKKM.
    GO BY THE BELOW GIVEN PATH AND TRY.
    READ IMG DOCUMENTATION FIRST, THEN TRY.

  • Production costs for material with price control V

    Dear all,
    Can anyone pls tell me, how will the costing occur for a material produced in-house and having price control 'V' ? I am not able to see the target costs.
    Also kindly tell me the settings to be done in CO, like target cost version, valuation variant, costing variant, etc.
    Thank you,
    Shrenik

    Rather than giving my own versions I have compiled here SAP inputs. Pl let me know if you require any clarifications:
    Costing variant has the following components:
    <b>Define Costing Types
    Define Valuation Variants
    Define Date Control
    Define Quantity Structure Control
    Define Transfer Strategy
    Define Reference Variants</b>
    <u>Costing type:</u>
    In the costing type, you define the purpose of a material cost estimate by specifying, for example, which field in the material master record the costing results can be transferred to:
    Update Cost Estimate
    Standard price Standard cost estimate (01)
    Tax-based price Inventory cost estimate
    Commercial price Inventory cost estimate
    Price other than std price Modified standard cost estimate or
    current cost estimate
    No update Any cost estimate
    Define Valuation Variants:
    Define Valuation Variants
    Here you create a valuation variant containing the parameters required for valuation of a cost estimate.
    You also specify which costing sheet should be used to calculate overhead.
    Valuation Strategies
    Material valuation
    Here you define the sequence in which the system searches for prices from the accounting view or costing view of the material master record to valuate materials. You can also access prices from purchasing info records and condition types.
    For material cost estimates, you also specify whether additive costs can be added to the selected price.
    With configurable/configured material components and with procurement alternatives, the sequence defined here is ignored if the strategy "price from purchasing info record" was selected, in which case that strategy is always executed first. For more information, refer to the SAP Library in the component Product Cost Planning under Raw Material Costing or Mixed Costing.
    Activity Types / Processes
    Here you define the sequence in which the system searches for prices in activity type planning or actual activity price calculation in Cost Center Accounting or Activity-Based Costing to valuate the utilized activity types and business processes.
    You also specify which plan/actual version is used.
    Subcontracting
    Here you define the sequence in which the system searches for prices in the purchasing info record. In purchasing, quota arrangements are used to create a mixed price for materials that are manufactured with external vendors with parts provided by the customer. You can specify whether the quota of the individual vendors that are entered in the source list for the material to be processed should be determined through the planned quota arrangement or the actual quota arrangement.
    External processing
    Here you define the sequence in which the system searches for prices in the purchasing info record or routing operation for valuation of the external activities.
    Strategy Sequence
    You define the individual valuation methods for the valuation variant as strategy sequences. For the valuation of the material components you define a strategy sequence that reads the fields of the material master record in a particular sequence such as:
    1. Planned price 1
    2. Standard price
    3. Moving price
    The first price that is not zero is used to valuate the material component.
    Target versions:
    Target cost versions  are used in the following ways:
    In variance calculation:
    To control which variance (total variance, production variances or planning variance) is calculated
    To valuate unplanned scrap( scrap variance)
    Unplanned scrap is valuated in the period-end closing activities when the variances are calculated. You can specify in a valuation variant for WIP and scrap which cost estimate you want to use to calculate the target costs for the valuation of unplanned scrap. You assign the valuation variant to target cost version 0 if you want to include it in the valuation of scrap.
    When you are using a cost object hierarchy with active distribution, you use the target cost version to control which cost estimate the system uses to calculate the target costs, which are used as the basis for determining equivalences for actual cost distribution.
    The actual costs collected at the level of the hierarchy are distributed across the orders in accordance with these equivalences. This distribution is proportional to the target costs for the cost element under which the actual costs are written. Actual costs for material costs are distributed in proportion to the target costs for the origin group, such as for the material, if you have entered an origin group in the costing view of the material master record and have set the indicator Material origin, for example.
    If no target costs were calculated under this cost element, enter a cost element group in the target cost version. The actual costs are distributed in proportion to the target costs for this cost element group. This cost element group should be complete. If costs were updated under a cost element that is not in this cost element group, no distribution is possible.
    You can calculate equivalences on the basis of SAP standard target cost versions 0, 1 and 3.
    The standard system supplies the following target cost versions:
    Target cost version 0 ( total variance)
    The amount of the total variance generates a posting in Financial Accounting during settlement.
    For this version, select actual costs as the control costs and standard cost estimate as the target costs.
    Target cost version 1 ( production variance)
    For this version you choose actual costs as the control costs and planned costs as the target costs.
    Target cost version 2( planning variance)
    With target cost version 2, the costs from the preliminary order cost estimate are interpreted as control costs.
    For this version, select planned costs as the control costs and current cost estimate as the target costs. You cannot calculate planning variances for the product cost collector.
    Target cost version 3 (production variance of the period)
    You compare the planned costs of the period calculated on the basis of an alternative material cost estimate (such as a modified standard cost estimate) with the actual costs of the period on the basis of the yield delivered to stock in the period.
    The base quantity for variance calculation is the yield.
    For this version, you choose the actual costs as the control costs and the alternative material cost estimate as the target costs. To determine the alternative material cost estimate, enter a costing variant and choose a costing version.
    The target cost version specifies which data is to be compared. The target cost version also specifies which variance variant is used and therefore which variance catagories are calculated. You can define a different target cost version for each controlling area

  • Old material overwritten by new material code in Product cost collector

    Hi SAP Gurus,
    How can I work around if a product cost collector with material XXX has been overwritten by a new material YYY when creating the KKF6N.
    Both material code having the same plant, same orde type,same production version but just different material code.
    When saving the preliminary costing for the product cost collector for material YYY, the system prompted me the order number 700022 which is already existing and created for material XXX.
    By right, this shd not be happened but indeed it did.
    Now when displaying the report S_ALR_87013127 - Order Selection, the report showed the new material YYY was created with order number 700022 but the content of the data was for old material XXX.
    Now my problem is how can I get back the product cost collector for material XXX as the original order number 700022 was meant for material XXX and not mat YYY.
    And also when executing backflush (MFBF) for old material XXX, the error msg prompted as 'content of order 700022: Mat YYY transferred to interface (IMSEG):Mat XXX due to this I can't backflush material XXX.
    Really appreciate your expertise on this urgently.
    many thanks!

    problem due to system bug, have to log to OSS for help.

  • Material Ledger,Revaluation Production Cost Center ,Standard Cost

    Hi, I have a problem with  revaluation of production cost centers.
    Firstly,  production cost center expenses are settled via activity types onto the production order at the end of the period. However,  CKMLCP revaluate cost centers after the settlement because of using standard price. So cost centers at the end of the period have some amount.
    As a result we can not find  actual price for production orders.
    If I use standard cost in order to consume on cost centers, material ledger revaluates again this cost centers. I dont want this condition. Because this cost center is settled to other cost object before closing.  
    Thanks.
    Message was edited by:
            Ergul Taslacioglu

    Hi
    Go to the following path in SPRO:
    Controlling -> Product Cost Controlling -> Actual Costing/Material Ledger -> Actual Costing -> Activate Actual  Costing. Double-click on "Actiavte Actual Costing" and change the indicator from "2" to "1".

  • Costing Report summarized production cost by Finished Goods Material

    Dear Expert,
    I am looking for a report that can summarized the production cost in production order by Finished Goods Material Number.
    or a report that can show me the cost components incurred related to a Finished Goods Material.
    Can any expert enlighten me? please help.
    Thanks a lot.

    Hi
    I would recommend the product drilldown reports in KKO0...
    For this you will have to do settings in OKN0 (Asisgn a Cost Comp Structure and specify the Product Group)
    After this, execute KKRV to collect the summarized data and then you can use KKO0 reports
    It gives cost of production as per the Cost Comp Str and also the product no, product group, Prod Order etc
    Regards
    Ajay M

  • How the raw material cost is picked in product cost in case of split materi

    how the raw material cost is picked in product cost in case of split material in BOM

    Hi
    In case of Std cost (CK11N), the planned price or MAP that you enter in the Parent accounting View will be considered for the cost calcualtoin purpose
    Parent view means the view which is above the 2 or more valuation types which consists of avg value of all other val types
    Ajay M

  • Product costing configuration material   and study material

    Hi all,
    Can any one pass me the Product costing configuration material and study material email id is [email protected]
    thanks in advance
    Regards
    vijay
    Edited by: vijay matlani on May 11, 2008 11:17 AM

    hi
    Product costing documentation
    http://www.sap-topjobs.com/SpecialPP/746.html
    nagesh

Maybe you are looking for

  • Search Help is not  working in PCUI

    Hi All, We are working on CRM 5.0 we have given Seach help for City depend upon Region This search help is working in SAP-GUI System but it is not working on PCUI Screen And showing No entry found, plz help me... i ll give reward points for helpful a

  • How much it will cost me to repair my ipad 2 broken screen

    how much it wiil cost me to repair my ipad2 broken screen

  • SMC user creation failed

    Recently I insalled Solaris 10 and after fresh installation tried to create my user account. Logging as root and trying to create new user through SMC was not successful. SMC shown me error message and in log viewer I saw error log entry which doesn'

  • EPCF Client Side Eventing

    Hello, I have been working on some EPCF client side eventing examples. I found the example by Dr. Ron Hendrickx at the following URL. https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sapportals.km.docs/documents/a1-8-4/iview client side eve

  • I lost my iMac

    Hello, I lost my iMac. CAN you tell me how to lock my computer? iMac (27 pouces, fin 2009) Numéro de série : W8******5PJ Thank you <Edited By Host>