Hi Gurus,
We are procuring same material from two different vendors for two different plants  with same manufacturer. Internal material number is assigned with manufacturer part profile and manufacturer part no in the material master. I have created the MPN material and assigned it to my internal material number in the AMPL list and same MPN material is assigned to different vendors with different plants.
To do the negative test, if I create a PO for the MPN material with a vendor who is not assigned in the AMPL list , I am not getting any error. I have activated 'AMPL management" in my manufacturer part profile.
What did I wrong?
Appreciate your reply.
SS

Hi
I have debugged  the function with my ABAP person, it seems that the system is never checking the vendor or manufacturer in the AMPL table(MP01) instead it only checks the MPN material relation to the internal material.
The only check in the PO is when you enter the internal material number, system will give you error saying enter your MPN material number which is inturn linked with your source list as we have mentioned  MPN material number in the source list and marked the vendor as fixed source.
But I could manually create a PO with MPN material number and different vendor and the system is giving a warning message "different source of supply is the fixed source for this date" (Message 06 727) but it will be a total violation of AMPL concept.
Have you guys ever tested this functionality with other vendors and got the error?
Thanks,
SS

Similar Messages

  • Want to get notified during a mpn material creation if that exist

    Hello there ,
    when i'm creating a new mpn material i want to get warned or get a message or any type of notification if that Mpn material is exist .So how can i do this possible plz let me know.
    Neon

    kk

  • MPN Material Field in Goods Receipt for Purchase Order

    Hi,
    I have created PO for MPN material "MFG-A" for IM material " 123". ( ECC 6.0)
    Already the material "123" is maintained with other MPN material "MFG-B"
    The have checked the " MPN Change" check box in the respective Mfg Part profile( IMG: OMPN) 
    While I am doing goods receipt, the MPN material field is in display mode.
    But in other system the field is in change mode.
    Default the system will show "MFG-A" as the MPN material is maintained in PO.
    But I need to  change the MPN materail at the time of GR.
    I would like to change the MPN material from "MFG-A" to "MFG-B" while doing GR time.
    kindly guide me what are the settings required to change MPN Material Field in Goods Receipt.
    Thanks in Advance,
    Kumar.

    Hi,
    I have maintained all the settings.
    But the issue was, I have not put the field "MPN material" (GOITEM-EMATN) as input field in field selection group in Inventory management.( it was in display mode )
    Once I have changed to input option, I can able to change the MPN material while GR.
    Regards,
    Kumar

  • Sales BOM - Delivery Quantity check during post goods issue

    I am working on a problem in my company.  We are running ECC6.0 ehp 4.  We are using standard ERLA functionality with sales bom (5) for product kits.  Delivery manager has requested that we investigate a system check during delivery post goods issue.  THe problem is that when shipper processes delivery, if they have to backorder they update pick and delivery quanity on the TAE item.  They should also update TAQ delivery quantity, so that backorder amount is correct.  If they make data entry error, backorder quantity is incorrect.  The delivery manager has tried a number of attempts to re-train and correct mistakes.  He is now asking that SAP issue a hard error if TAQ and TAE delivery item quantities are not the same.
    I have searched on SAP Notes, Forms, and Google and do not see solution.  I know that at delviery item category there is a minimum qty check for the item category.  I've not found a user exit or configuration point that checks quanities.  Does anyone know of out of the box solution?  Or where would I put in custom user exit?
    Test Case
    Create Standard Order
    Enter Material with Sales BOM
    ITEM A     Qty 10
    BOM explodes with Item categories
    ITEM A     TAQ parent
    ITEM B     TAE child
    Create Delivery
    Delivery has item categories TAQ and TAE
    TAE is pickable, TAQ no pick
    Process TAE
         Pick quantity of 5 items
         Change delivery quantity to 5 items
         Forget to change TAQ delivery quantity
         Pack 5 items
    Post Goods Issue the delivery.
    Is there are requirement/routine than can be run at time of PGI that checks TAQ delivery quantity is the same as TAE delivery quantity.  If quanities are not the same, show hard error and message do not allow PGI to complete.
    Thank you
    Tony Romain

    I tried setting that field in the sale order this morning.  By defaulting it to "C"; I was able to get warning message for TAE line.  I was able to post goods with TAE and TAQ, being different quantities.  I need the check to determine if TAE and TAQ delivery quantity are different.  Using this fields seems to be line specific.  Thanks for the suggestion.  I now know what that field does to the delivery.
    I rewarded points.
    Thanks,
    Tony

  • Hard Check During Delivery Creation

    Hello Experts,
    Need your advice. I am stuck up in a enhancement issue during delivery creation. i am working for passenger vehicle company.
    Back ground Info.
    the company procures chassis from vendor & builds bus body over it. there are various types of chassis & each is uniquely identified in SAP by Material No. & also mentioned in BOM created for bus. when chassis is received , equipment is created using T-code IE01. After this one more equipment is created for bus which is called BBD Serial No. The equipment for BBD serial no holds chassis serial no. My issue is at the time of creation of delivery using T-code VL01N the user puts the BBD Serial No manually in a dialog box provided, This BBD Serial No is not capturing in the importing structure IT_XLIPS of BADI "LE_SHP_DELIVERY_PROC" Method "Delivery_Final_Check".
    I have to put a check during delivery creation for consumption of Chassis , if the Chassis is consumed during production phase a Mat Doc will be generated with movement Type 261. As such we don't knew the Mat Doc for Chassis Serial no Consumed during prod phase. so to derive chassis no in the BADI against which we have to check for it's consumption. The user provide BBD Serial no in a standard dialog box in VL01N.
    Can we use Field Exit for this or any other BADI Should work.
    Best Regards
    Priyesh Shah

    Hi Priyesh,
    Below steps may help you to get the value of the standard dialog box provided in the screen.
    1. Find the field name of the standard dialog box provided in the the screen for BBD Serial no.
    2. Implement below code in the BAdI "LE_SHP_DELIVERY_PROC" method.
    FIELD-SYMBOLS: <fs> TYPE BBDFIELDTYPE.
    ASSIGN ('(SAPMV50A)BBDFIELDNAME') TO <fs>.
    Now the field symbol <fs> will hold the value passed in the dialog box.
    Please try and let me know if it is working or not.
    Thanks
    Gangadhar

  • MPN Material Issue.

    Hi Friends,
                                       I have created a material and assigned MPN profile in it. I have created 2 MPN materials according to the vendor. Now I have created PR and then 2 PO's according to the vendor. Now I have received the materials. Now
    1.where can I see the Material stock according to the MPN material not according to the Internal Material?
    2. I want to issue the material according to the MPN material ( not with internal Member). So what configuration, I have to do? so that system wiill accept the MPN Material for issue?
    Please reply..
    Regards,

    Dear,
    Pls. Check.
    MMBE displys the total stock of that material in the given plant level. However when u use MB5B u can see that 3 accounting doccuments created with same number also displaying the quantity of each MPN material ordered.
    Check in MB03 for the respective document, there you can see your MPN material stocks posted.
    Have a look: Re: Stock for MPN
    Regards,
    Syed Hussain.

  • Change of material master during transfer between SRM and R/3

    Hi,
    I have a question for modifying material master data between R/3 and SRM.
    I would like to know if it is possible to change the material number during the transfer. The reason is:
    I have 2 R/3 backends and 1 SRM system. The material codes in the 2 R/3 systems are different but some materials having different numbers in R/3 are referring to the same material. I want to see such materials with the same material number. Is it possible to do this with Middleware plus some interruption in between? The "translation" should be bi-directional.
    Thanks

    Hi,
      No probs if the field is not replicated.No idea how to bring that through replication though.
      Coming to the Product Search...Although the number of such materials is less...You will have to modify the Product search which will take care of the  display of other products as well.
      The Std product search(<b>bbph_product</b>) uses the the search help exit "<b>BBP_F4IF_SHLP_EXIT_PRODUCT_GEN</b>".So you need to replace this one with your custom FM.
      In your custom FM,you will have to check for the HARMINIZED code field for all such materials and accordingly while selecting the Material select the HARMONIZED code as the Material number and in the Product search display that HARMONIZED code as the "PRODUCT ID". Also,you  will have to develop RFC enabled FM which will actually fetch all the Materials from the BAckend at runtime. Also are you displaying the Product List Plantwise?
      Pls give me ur mail ID where i can mail you the  sample code.
    BR,
    Disha.
    Pls reward points for helpful answers.

  • Control availability check during release of production order

    friends,
    Can you guys help me find the user exit/BADI which will allow me to control the release of production order after the availability check is complete.
    In detail, the scenario is that : based on a flag on material master, I should be able to ignore this product's availability during release. I cannot change the availability check to "KP" ( No check) as this product can be sold seperately. So what I thought was that if I get to control the availability check during production order release I would be able to ignore this product before check or may be after check and before the status change.
    I found PPCO0021 exit and function module EXIT_SAPLCOZR_003 which is actually intended for release control for automatic batch determination. I am not sure if I can use this.
    Please let me know if you guys have any idea.
    Thanks
    Prod_Planner

    Let me rephrase the scenario :
    I have a production order for a product P1 which consumes raw materials R1 and R2. R1 is supplied by a nearby vendor every 1 hour to my plant so I do not need to worry about the availability of it when releasing the order but R2 availability should be taken into consideration. So, function 1 or 2 in OPJK will not work (as release need to be stopped if R2 not available) hence I will be using 3. If I use 3, R1 availability is also considered hence the whole order is not released. I will maintain a flag on material master so if R1 has flag, I need to ignore R1's availability but still considering R2.
    As mentioned, I found PPCO---21 which could help me but need your help to understand if there is any other way.
    Thanks
    Prod_Planner

  • MPN Material - Source list not included issue

    Hi,
    I am trying to create a purchase order for a material which has a MPN material # specified in the source list. When I create the purchase order, I get the error "Source not included in list despite source list requirement".
    I do not get the error when I remove the MPN material # from the source list.
    I looked at MM03 for MPN material # and it looked correct.
    Please help.
    Nicky

    Hi
    There are 2 settings for source list requirment mandatory at PO.
    1) Material Master record > Purchasing view
    2) IMG>MM>Purchasing>Source list>Define at plant level
    if the setting is active then you have maintain the source list for that particular material.
    if the above setting are not there and still you are getting error then you have to check if any enhancements done .
    Hope it helps
    Karthik
    Edited by: Karthik on Jun 28, 2011 9:56 AM

  • Maintain MARM entries for MPN material

    Dear All,
    We have a requirement of maintaining the Alt. UOM for the MPN material in the MARM table by deleteing the existing entries & overwrite the UOM from Parent material through LSMW.  But the issue is basic data view is not supported in the MPN material, so we are not able to add or delete the MARM entries for MPN material
    Has someone come across this issue earlier, or if someone can suggest any clue would be quite helpful.
    Regards,
    Pankaj

    Dear,
    Check these links which explains in detail:
    http://www.sap-img.com/materials/maintain-relation-between-alternatives-materials.htm
    http://help.sap.com/saphelp_di471/helpdata/en/75/ee15e055c811d189900000e8322d00/content.htm
    Regards,
    Syed Hussain.

  • MPN Material with excise

    Dear All SAP Gurus,
    I am purchasing MPN material with exicse duties , but while capturing invoice following error is coming,
    Please check excise base for the item is zero !
    Message no. 4F121
    Please sugget me solution
    Thanks in advance
    Mahesh

    Hai,
    Maintain MPN materail codes in J1ID.
    Regards,
    BSK

  • Availability Check during Sales Order and Inventory Adjustment

    Hi, I have a small doubt here regarding the availability check during the sales order creation. When a sales order is placed, the availability check is performed. If the material is available, then a confirmed sales order is recorded and sales order note is placed to the customer. If the material is not available, then a transfer of requirments is passed to MM for that material. Am I clear upto this point ? Apart from this, I have another confusion, when a customer places a sales order and it is confirmed, then are the stocks from the inventory get reduced that time itself ? Or the ordered stock is moved to restricted stock and while doing the PGI in delivery the actual stock is reduced from the inventory. Please confirm. Also add your knowledge here if you feel so. Thanks.

    Hi,
      The stock will not get reduce from the inventory till PGI is done.However, with respect to the availabillity check, we can control the system to take into consideration of the open orders and open delivery.If the system considers the open order of 5 quantity and the user create a order for 5 quantity for which stock available is 5.Then the system will give as no stock available while PGI even though if the stock are avaialble.
    Regards,
    Nithin.

  • Availability check during production order creation - Missing parts details

    Hai Gurus,
    I have one problem during Availability check when converting Planned order to production order.
    1) A- is the finished material, which has A1 to A7 components.
    2) A2 is the procured item with safety stock and it has safety stock also.
    3) When sale order is created , the material A2 is reserved against the planned order for finished material - A.
    4) so when availability is checked during planned order stage , system says no missing parts, when planned order
         is converted to production order system says missing parts for component A2, which is stock and reserved against
         planned order
    5) Checking rule for Production order is maintained as follows,
         a) Include safety stock.
         b) Include reservation.
         c) Include sales requirement
         d) Include deliveries.
         e) Include dependent reservations.(x)
         f) Include production orders.(X)
         g) Check release for stock transport orders only.( A)
    So now i don't know where I went wrong , so that the system could consider the safety stock of Component A2 which is in stock and already reserved against planned order and it does not show missing parts when planned order is checked.
    Waiting for your positive feed back.
    Regards,
    Sekar chand

    Dear,
    What checking rule you have maintained for planned order.???
    As what i can understand by your question that you have maintained to check reservation only in production order not in planned order. Or one important thing mostly people configure to reserve material only after release or creation of production order. Are you reserving material at planned order stage.?
    Check these things. you will automatically find the answer. Hope it will help you. Revert back for more clarification.
    Regards,
    Alok Tiwari

  • Availability check during process order creation

    Hi all,
    can anyone tell me significance of availability check during creation /change of process order?? ( in terms of business)
    how is the usual processs?

    Hi,
    Availability check for a material is carried out only if the material is
    1. A stock item
    2. Not a phantom item
    3. Not a bulk material.
    This can be carried out
    1. during order creation
    2. during order release
    3. when a created order is saved
    Availability check can be triggered either manually or automatically.
    For this we need to define in checking control(opjk)
    First define a checking group(ovz2) and checking rule and this
    must be assigned to checking scope.(opjj)
    In the checking scope(opjj) we should define
    1. which Mrp elements are to be considered during check
    2. which inventory categories are to be taken into account
    3. whether Replinishment lead time is to be taken into account or not
    4. whether check is also to be carried at storage location level.
    This checking rule must be linked to checking control(opjk)in which you can say
    1.No availability check for the material
    2.Availability check when saving the order
    3.What type of check is to be carried
    whether ATP CHECK or Check against PIR quantities
    4. Whether order should be released or not if there is
    any missing parts.
    The checking group is assigned to material master MRP3 view.Please check whether checking gorup is assigned to all the components in the BOM.
    Regards,
    nandha

  • Check during Excise Invoice J1IIN

    Check during Excise Invoice J1IIN
    While using J1IIN transaction for excise i want to check the posting date entered by the user with the
    actual GI date during PGI ... so i try to find badi or user exit called when we click  form billing and enter billing doc and posting date in J1IIN transaction , but i could not find any enhancement ,  please suggest me any badi/userexit or what shud i do apply this check.
    The check is that excise posting date shud note be greater than actual PGI date .
    Ankesh

    Hi Ankesh,
    You can use this function module - J_1I7_USEREXIT_EXCISE_BEF_SAVE

Maybe you are looking for

  • Cannot open db

    Hi When I try to open db the followıng error is returned startup mount; fized size ... variable size ... database buffers ... redo buffers ... database mounted ORA-03113:end of file on communication channel Here is the alert log: Instance terminated

  • Quad: end-of-day: shut down or sleep?

    Hello. Took delivery ten days ago of top-end Quad with 8GB ram and Apple 30-inch display. WHAT a configuration. (Had been working on a 17-inch G4 laptop for 3 years, which had become my desktop machine, in fact. Needn't tell you what a quantum leap i

  • Soft screeching sound on Muvo V200 when backlight is on

    Um, anyone pls help me... I just bought my Muvo V200 and the first time I on it, there's a soft screeching and disturbing sound.. But when the backlight off, the sound disappears.. When i press a button, the backlight ons and the same screeching soun

  • Nine key not working on macbook pro 2008

    Trying to figure out if anone has solved the "Nine" key disfunction. It was intermitent for a while and now I get nada. Any help would be great. I have tried all the reboots and safe mode start-ups. I'm using Lion 10.7.3

  • Cons and pros of these models

    I have nokia 6300 and i like it but it has some problems for which i will change my phone because of these problems am thinking about these models please tell me the cons and pros of any if you have it (the most imp things to me is the sound (loud or