Hi All,
         Could you please guide me to understand the following issue:
MRP control parameter setting- Scheduling has two options 1 & 2.
Option "1 " states "Basic dates will be determined for planned orders"
Option "2" states "Lead time scheduling and capacity planning"
Here is my issue-:
                   If I use option "1" what are all the DATES will be considerd to schedule planned orders ?
                   If I use option "2" what are all the DATES will be considered to schedule planned orders ?
Thanks in Advance

Hi,
Option "1 " states "Basic dates will be determined for planned orders"
The order basic dates are determined from the in-house production time in the material master and used as production dates.
Option "2" states "Lead time scheduling and capacity planning"
lead time scheduling is carried out. The production dates are calculated from the floats in the scheduling margin key of the material master and the individual operation times in the routing.
Thanks,
Rajanikanth

Similar Messages

  • Mrp control parameter- neupl

    Hi, pls advise is it necessary to use newpl control parameter to run the mrp first time in any plant after cutover activities updation? incase if we run with netch, what will happen? any problem will arise. pls guide.

    Dear
    NEUPL  PROCESSING INDICATOR MEANS  RUNNING MRP IN TOTAL PLANNING HORIZON .
    During Go Live time  or  the frist time you should choose this Process Indicator -NEUPL,2,1,3,3,2 in MD02/MD03/md01.If you choose NEUPL , then even there is new material created or if there is no in planning file  entry , MRP will consider them during planning run  as well carry out the net requirement calcualtion .
    Othewise , you may have to re-run for the fresh entry  or may missed out some of them items
    hope it is clear .
    Regards
    JH

  • Planning delivery schedule - Call control Parameter

    Hi,
    In the scheduling Agreements at the Item level there is a tab Call Control Parameter and if we maintain Planning delivery Instruction there will be a extra tab appearing in the item level Planning Delivery schedule. If we give the Planning instructions the Schedules in the Forecase delivery we can she the split quantities in the Planning delivery Schedules.
    My questions:
    1.Whether from this Planning delivery we can create delivery
    2.Whether we have to Maintain any thing in JIT delivery.
    3.Whether Planning delivery is only to pass the requirement so that we can see that in MD04.
    4.Whether the Schedule line in the Planning delivery is also copied to the JIT delivery(if so were can we maintain that setting)
    5.While the delivery is created from the scheduling agreement only the forcast as a whole is appearing   in the delivery and we cannot see the delivery happening according to the Planning delivery schedules.
    Thanks & Regards,
    Kannan M

    Tocde: VOZP
    Path: SD->sales->sales doc->sch.agr.with del.sch.-> maintain PDS instruction
    chidambaram

  • MRP Control Parameters

    Hi All,
    Pl. let me know where we define the MRP Control Parameters that gets displayed ,when we execute MRP(MD02), like
    Create purchase req
    1. purchase requisitions
    2.purchase requisitions in opening period
    3.planned orders
    etc.
    Normally we select these parameters while execution only.
    I want to know where these parameters are defined.
    best regards,
    Kumar.

    Hi kumaran
    As Mr.Prashob said these are internal SAP setting. like this many settings are there. For example order type category is 10 for prod order. This also you cannot change, This will execute many functions internally in SAP.
    If you want to set the indicators with respect to MRP group. you can ssign in MRP group setting.
    Regards
    J. Saravan

  • MRP Control parameters(MD02)-Regarding.

    Hi,
    Can anyone explain me what values(MRP control parameters)should i use for MRP run.
    For Eg for an 1.Inhouse produced material(FERT),
                        2.For externally procured (HALB) materials,
                        3.For Sub-Contracted items,etc
    So that i'm getting proper planned orders or Purchase requistions.
    what's the meaning for "Purchase Req.in opening Period"what's the meaning for opening period.
    Thanks & Regards
    Raj.S

    For all materials type you can run withfollowing control parameters from MD02.
    1) Processing key: NETCH
    2) Create purchase requisations: Keep 1...by doing this for F parts MRP creates PR and for all E parts MRP creates Planned orders...This will work according to procurement type. If you keep 3 "created planned orders: then MRP created only Planned orders..no PR will be created.
    3) Create scheule lines: Keep 3...if schedule lines are mainatin then scheudle lines will be created..otherwise no impact.
    4) Create MRp list: 1... to see the MRp results.
    5) Planning Mode: 1..This is better to improve the system performance . if you new data eevrytime then keep planning mode 3.
    6) scheduling type: 1...Basis dates scheduling if you are not working with capacity planning.
    If you are maintaining scheudle margin key in MRp2 view with opening period for example 10 days and in MRP control parameters :create PR in opening period" then MRP creates PRs only in the opening periods of the schsdule margin key if the opening dates of the PRs are falls within these 10 days. Otherwise MRP creates planned orders..later you can convert these Planned orders into PRs.
    If helpful rewards your points.
    Regards
    TAJUDDIN

  • What is control parameter for commmunication with the BW system

    May I know what is control parameter that should be configured/assigned for commmunication with the BW system?

    Hi,
    goto transaction sbiw->general settings->maintain control parameters for data transfer.
    On the fields you get a good help via F1.
    regards
    Siggi

  • CTM Control Parameter SSTOCK_MODE

    Hello All,
    We are running CTM with control parameter SSTOCK_MODE with value 1:X, value 2: blank. in this way ctm plans only for safety stock demand, not normal demand.
    However, when we do this, CTM does not see available supply already created and it creates production plan again.  Is there anyone who had the same problem or who can help on that?
    Thanks and regards,
    Jenny

    Hi,
    Why does CTM create an excess of supply when I use the safety stock method?
    Answer:
    The standard safety stock method uses a second run to fulfil the requirements for the safety stock. CTM checks the inventory profile and as soon as there is a need it creates a virtual demand for the second run. With this method CTM creates demands at a certain point of time to maintain safety stock level irrespective of the orders created further down the timeline. Consequently you can get an excess of supply, especially when lotsize settings are being considered.
    For example you can face a situation with no stock at the beginning of
    the planning period and then several big forecasts at the end.
    In this case CTM creates a demand for the safety stock without taking
    into account the following forecasts (which have been supplied in the first run).
    In order to mitigate the creation of excess of supply you can use the control parameter SSTOCK_MODE:
    SSTOCK_MODE
    Do not use in SCM 5.0 or higher. Instead use in CTM profile ->
    Supplies with 'Build Up Safety Stock'
    Do not plan Demands indicator  = SSTOCK_MODE Value1 = X.
    Consider Supply Shortage indicator = SSTOCK_MODE Value2 = X and 1 and 2 Stock is Available indicator = SSTOCK_MODE Value2 = 0 and 2.
    Release APO 3.0A (SP20+) APO 3.10 SCM 4.0 SCM 4.1
    Parameter used in Safety Stock Run (ABAP)
    Parameter has to be set by User
    Value 1 = "", X (Parameter active also if Value 1 not set)
    Value 2 = 0, 1 (previously X) or 2
    Description: Demands and Safety Stock fulfilment can be done in the same CTM run. Applied only if safety stock rebuild active.
    If Value 1 is set the order selection of the normal run is performed but the planning of normal demands is skipped. The safety stock run is performed as usual.
    In the safety stock run, CTM creates virtual demands to trigger building up to the desired safety stock level.
    If Value 2 = 1 or 2 the net calculation of the inventory also takes into account the backlog of normal demands. By default, the safety stock run doesn't take into account the backlog of normal demands, which is determined by the unpegged quantity.
    If value 2 = 0 or 2 , available stock is not blocked for safety stock requirement of the same location product, but is visible to dependent requirements during planning. However stock with a pegging relation is not available and remains untouched.
    The combination of both values can be used to plan normal demands and safety stock in one run. This allows avoiding interval planning in case of time-dependent safety stock. This setting is only suitable if safety stock is considered exclusively for finished products because normal demand counts up against decreasing safety stock level. In this case parameters SSTOCK_EARLYFRAME and SSTOCK_LATEFRAME should be applied.
    Go through the above detail, it may help you.
    Thanks,
    Dipankar

  • MRP keeps pushing delivery schedules out, refusing to firm them (ME33L)

    I hope someone has seen something like this before and can let us know where to look.  MRP keeps pushing our delivery schedules out even though it is recommending that they be rescheduled in.  What we'd like to happen is for MRP to leave these schedules alone so that they would move inside the time fence and be firmed automatically.  Here is what is happening:
    Part X, MRP type P1, firming type 1, MRP group blank.  Planning time fence 05/07/2007, available quantity -20.
    Three schedule lines exist for 05/07/2007, two for 10 and another for 30.
    MRP will run tonight.  Processing Key = NEUPL, purch req = 2, sched lines = 3, MRP list = 1, planning mode = 2, scheduling = 2
    Tomorrow, the planning time fence will be at 05/08/2007 and the three schedule lines will move out to 05/08/2007.  The won't move inside the planning time fence and firm up.  They SHOULD BE 05/07/2006 and firmed!
    We originally thought that we may have to create a release with ME84 before these would firm, but it made no difference.  They still won't firm unless someone manually changes the date on each and every schedule line.
    Does anyone know what we can change or run to get these schedules to firm up instead of having them pushed out continually?

    Hello Randy,
    thanks for the update. I didnt remenber this customizing indicator when posting.
    Still wondering why planning matters here. I think it should have the same result for all planning modes. Of course planning mode 3 in general should be avoided for performance reasons.
    For interested observers I attach the description for this setting in MRP customizing.
    Regards, Martin
    Indicator: Only Firm Transmitted Schedule Lines
    In this step, you can set an indicator which is used to set only those schedule lines that have been transferred to the vendor.
    You can firm schedule lines within the planning time fence (in the same way as planned orders or purchase requisitions) according to the master schedule item firming logic. The planning time fence is a number of days that is calculated into the future starting from the current date. Therefore, the last date of the planning time fence changes every day.
    In the firming logic, existing schedule lines are also firmed as soon as they move into the planning time fence.
    Schedule lines that lie outside the planning time fence and whose quantity is adjusted in the planning run due to a change of the requirements quantity are firmed with the new quantity as soon as the schedule lines move into the planning time fence.
    The schedule lines are transferred to the vendor for the amount recorded in the stock/requirements list at the time of the data transfer.
    If you only want to firm the schedule lines in the planning time fence that have been checked and transferred to the vendor, you can use the indicator, Only firm transmitted schedule lines. By selecting this indicator, the system only firms the schedule lines that have been sent to the vendor.
    For schedule lines whose quantity has changed and which have moved into the planning time fence, the following occurs if this indicator has been set: if the MRP controller/purchaser does not confirm the procurement plan by sending the changed quantities to the vendor, the schedule line quantities that were sent to the vendor in the previous data transfer are firmed within the planning time fence. This guarantees that the system cannot firm any quantities that have not been checked. It also means that the vondor does not receive any messages for unchecked schedule line quantities.
    Activities
    Define the indicator per MRP group and allocate this MRP group to the materials for which this indicator is to be valid.
    Further notes
    The message transfer is a purchasing function. You can find it in the purchasing menu, Outline agreement -> Scheduling agreement -> Messages -> Print/transmit.

  • How do you increase the voicemail volume on an iPhone 4s ( Verizon ). The phone volume is fine. It is when I retrieve voicemails. Even the speakerphone is faint. I have adjusted the side volume buttons and the volume control in settings.What am I missing?

    How do I increase the voicemail volume on an iPhone 4s ( Verizon )? The phone volume is fine. I have adjusted both side volume buttons as well as the volume control in settings.

    Number one - that person has given you false information...the Apple store genius bar supports all Apple products whether in or out of warranty.  Checking is free, service on an out of warranty item is not free.
    Try a reboot by holding both the power and home buttons until the apple logo appears, ignore the red slider if that appears.
    Since you show that you have iOS 7.0.3 you might want to update that iOS to 7.0.4...plug the iPhone in so you are on a solid power source, then while on a WiFi go to Settings > General > Software Update and update to 7.0.4.

  • Audigy 2 ZS Platinum Software Issue: Volume Control, Speaker Settings, Equalizer, C

    I installed my ZS Platinum back in December, everything worked fine for 2 months, then I started to hit trouble.
    First, the driver began hanging when I took my headphones in/out, resulting in no sound from either output. I updated the drivers and this problem went away.
    Then, I was gaming and all the sound stopped working. Reboots did nothing, so I tried to reinstall the drivers. This is how the problems began. The first time I uninstalled all my creative stuff, downloaded the newest drivers, and installed that. I didn't realize that I couldn't download all the bells and whistles off the drivers page.
    So, I unistalled those drivers, and used my CD to install the drivers and MediaSource. I encountered the PLXcore.plx error during install and every time I booted Windows. Also, none of the extra applications (Volume Control, Speaker Settings, Graphic Equalizer, CMSS) would run. I uninstalled, reinstalled and tried again.
    This is where I am now. I chose not to install MediaSource this time. Again, I encountered the PLXcore.plx error during install, but I'm not receiving the error when Windows boots (because I didn't install MediaSource?). But still, most of the little applications don't run. I see the Volume Control icon in my task bar, and if I press the mute button on the keyboard the symbol changes, but when I click on the icon, nothing happens. "Creative Volume Con..." flashes on the taskbar, and a 0px by 0px white box appears above the task bar. If I click anywhere else, they disappear. The Graphic Equalizer, Speaker Settings, and CMSS dialog do the same thing when opened. THX Console does not.
    Also, the on screen display for volume no longer pops up. Is this part of MediaSource? Should I install MediaSource even if I don't plan to use it's
    Running XP SP2 on an AMD X2 4200+ with the Audigy 2 ZS Platinum.
    EDIT: Thought I'd add in another problem I have:
    I usally run my DISH reciever's sound through my computer through the Auxillary 2 RCA connections on my front panel. When I boot World of Warcraft or Warcraft III (Both Blizzard games), the sound through this connection becomes very tinny and reverby. If I alt+tab out of the game, adjust the speaker setting (5. -> Headphones -> 5.) the issue goes away. But each time I start one of these games, the problem returns. Any ideas? Known problem?Message Edited by Cuttlefish on 03--200703:9 PM

    I'm sorry I can't help but I have the exact same problem. I have no Speaker, EAX or graphic eq settings. No telling what else don't work. I have tryied 0 different ways of removing and loading it back with any and all updats and without and no success. I hope someone here can help us.

  • I want to change the settings (brightness, contrast, gamma) for my internal cam on Macbook pro. I find having to but a third party software (iglasses, webcam settings) to control basic settings as unnecessary and exploitative. Does anyone have a solution?

    I want to change the settings (brightness, contrast, gamma) for my internal cam on Macbook pro. I find having to but a third party software (iglasses, webcam settings) to control basic settings as unnecessary and exploitative. Does anyone have a solution?

    It is not about payment of $19.95 (Igalsses) or $7.99(webcam settings). This is a very basic setting that should be available in the system settings. The automatic setting of the internal cam does not work great on low lighting as everyone is aware.
    i am just amazed how users take in lying down and suggest solutions such as paying for a 3rd party paid app or improving the lighting in your room.

  • How can we handle table control parameter in lsmw

    hi guru,
    please tell me  how can we handle table control parameter in lsmw.
    thanks & regards
    subhasis.

    Hi,
    we  create table control program (module pool) this program use in LSMW,
    we mention the transaction code ,write ur  table control program name.
    This is use full for u
    Reguards,
    lakshmi

  • Inbound Idoc - control record settings

    Hi,
    we have a JDBC to Idoc scenario. We get data from JDBC interface (outbound), map some fields and send it to a receiver SAP system as an Idoc (inbound). We did a similar scenario before and PI filled out automatically the control record settings. So in our mapping to the idoc XML format the must fieds in the control records are set to constant="pi dummy entry".
    It worked for the former scenario well. For this new scenario it doesn't! When i monitor the payload, SNDPOR as example is set with our dummy value of the mapping ("pi dummy entry").
    specials:
    - CC checkbox "Apply Control Values from Payload" is NOT set!
    - The destination SAP Business System is configured as a Party in Integration Directory (not such configurations in SLD)
    - We use PI 7.0
    Any suggestions?
    Thanks in advance
    Michael

    Hi Michael,
    >>So the control record will not be send. I was expecting, that PI the control record data according to the configuration fills. Maybe this is a wrong assumption.
    Yes you need to disable the control record in message mapping, because you want PI to make it at run time based on the configuration done in PI.  So apart from disabling it you need to do some more settings.
    If you have used parties in SAP PI, then select the
    1.Apply control records in IDOC communication channel
    2. Update the Identifier tab in the IDoc receiver channel with the correct information for sender/receiver
    now when you see the IDoc Outbound (in SOap Header) then you will see the correct sender and receiver details.
    Regards
    Suraj

  • ESYU: R12 - OM 화면에서 Item LOV를 control 하는 parameter나 Profile?

    Purpose
    R12의 Sales Order find 화면의 Item LOV를 control 하는 parameter나
    Profile은 무엇인지 알아본다.
    Solution
    R12에서는 System Parameter에 있는 'Item Validation Org' 값이 Item LOV
    값을 control 한다.
    Navigation:
    1. Using Order Management Super User responsibility
    2. Setup > System Parameters > Values
    For example:
    -. 만일 Find Window에 Operating Unit가 명기되어 있다면,
    명기된 Operating Unit에 default로 묶인 Item Validation Org의 item을
    기본으로 하는 item을 Item LOV는 보여준다.
    -. 만일 Find Window에 Operating Unit이 명기되어 있지 않다면,
    Item LOV는 default Operating Unit(MO: Default Operating Unit)과 묶인
    Item Validation Org를 기본으로 한 item을 보여준다.
    같은 logic이 또한 Multi-Org Concurrent Program pararmeter window의 Item
    LOV에도 적용된다.
    Reference
    Note 393724.1

  • Is EC-PCA Controlling Area Settings configured as new GL function/Classic?

    Hi guyz,
    I need to configured Profit Center Local Currency in order to execute Profit Center Standard Report.
    As far as I know, in Classic Profit Center Accounting, I configure it at EC-PCA Maintain Controlling Area Settings at SPRO.
    Where can I configure it in the *new GL - PCA*?
    Need your help asap...Thanking you

    it's classic, so it's no need to configure it.
    The new PCA report is using Financial Statement:Actual/Actual in the new GL report (sap easy access: new GL-information system-cash flow-general).

Maybe you are looking for

  • InDesign crushes every time I try to import grayscale tiff files

    This didn't happen before. I'm scanning some files with photoshop through WIA, then save them as grayscale tiffs. When I create a document (24 page print document A4 2 columns) or open an existing to make changes I can't import those newly created fi

  • Error Message from hardware test

    Hi, I just recently bought a 1 gb PC2700 SODIMM 200 PIN DDR ram (EDGE TECH) and installed it in my 12"powerbook (1.5Ghz) to replace the original 256mb chip in there. However, I got several application crashes and decided to run a hardware test and I

  • How do I get new tab to open to google search? It used to!

    New tabs had started opening to Yahoo. Stopped using Mozillauntil Chrome started annoying me. Got rid of Yahoo search page by disabling freezenet but now when I click on the + sign to open a new tab, I get a blank page. I used to click on the + sign

  • Call cffunction in cfc file

    Hi, I have a cfm file and cfc file and want to implement some checking function in cfc file like following: In cfm file, I use javascript to call cfc function where result is a cfdiv tag in cfm file: 1) ColdFusion.navigate( 'cfc/control.cfc?method=ch

  • Classnotfoundexception weblogic.servlet.internal.session.WebLogicSPIFactory

    hi all, it seems that there is not any error in classpath but while deploying the application it says:classnot found exception:weblogic.servlet.internal.session.WebLogicSPIFactory. i have a shared library for this WebLogicSPIFactory class.moreover i