hello Guru's
In our case Requirements are created in 2 ways
Case 1:
1)     Sales Orders are created at Plant level with schedule line category CP
2)     Sales Orders are created at Depot level
In the above mentioned 2 cases the requirements are taken as inputs and the process is carried at plant level 
Step 1: Automated MDO3.
Sales Orders are created if there is short fall of the Quantity at the Depot and Plant Sales Orders are raised against the plant for which the requirements are generated and MRP run is carried out at Single Item single level.
Step 2:
For the results of the step1 are then transferred and Production orders are created for the planned Orders.
The issues is whenever there is change in confirmed quantity or change in confirmed  date the requirements are considered again as inputs and the multiple production orders are getting generated for the single requirement
Actually we dont want this to have multiple production orders
regards

Hi,
Can you let us know the strategy group used for this material ? If i understood the query correctly, each time there is a change in the sales order (i.e. increase in qty), there is a triggering of new planned orders to meet that demand.
Regards,
Vivek

Similar Messages

  • Product valuation for Sales order with itemizations

    Hi experts,
       I'm trying to find a data source which extracts Product valuation for sales order, and which is important, with itemizations. This is for the KMAT material. I tried 0CO_ACT_* and 0CO_PC_PCP_* but found no proper one.
       The closest one is 0CO_PC_PCP_03 but which only extracts normal material instead of KMAT.
       Points will awarded.
    B'R
    Aaron

    I found it.
    0CO_PC_01
    Cost Object Controlling: Plan/Actual Data

  • Planned material price in case of production order for sales order (MTO)

    Hi,
    In case of production orders created for sales order, the planned price for a component (BOM) material gets picked as per following:-
    1. If there is no entry in EBEW for the component (that is, there is no previous GR for the component) for that sales order, then plan price is picked up on the basis of planned costing variant.
    2. In case there is an entry for the component in EBEW (there has been a previous GR for the component with reference to the sale order) then the plan price for the component is taken from the EBEW table (first GR price) and system ignores the costing variant.
    The above is as per my observation. Please validate if this is correct or not.
    The requirement is that even if there has been a previous GR for the component (there is an existing entry in EBEW) the system should take the plan price on the basis of costing variant and not from the EBEW table.
    How can this be achieved? Is there a user exit that can force the system to read the costing variant before looking into the EBEW table?
    BR
    Abhi

    Hi Ajay,
    Yes i had considered it but I'm not sure If it will help.
    Because the main problem here is that system is ignoring the costing variant itself and instead picking the price from EBEW table. So changing the costing variant (validation variant) may not help.
    Moreover i don't want to valuate with my own strategy. I want the plan price to be equal to standard price of material from material master. Basically MBEW instead of EBEW.
    Any clues?
    BR
    Abhi

  • Multiple Production ordersfor one sales order.

    Hi Gurus,
    We have a typical MTO scenario where depending on the requirement, a planned order is converted in to production order using MD04 or using CO08.
    But when both are done, system is not throwing any error message or information message that the production order is already raised. Instead both the production orders are raised and in MD04 for one sales order we can find 2 production orders. i.e the required quantity is doubled. Even system is accepting the confirmation of these production orders.
    In this case an end user can raise any number of production orders for one sales order using CO08.
    Kindly suggest me any settings which could restrict the raise of multiple production orders for one sales order.
    Thanks in Advance.
    Warm Rgds,
    Ganapathi Varma

    Hy Ganpathi,
    CO08 is manual Creation , so it is difficult to put such a control.Why you are not using sales order ---> Plan order --- >Production order means proper channel of MRP?
    Pls try to control it by using Following User Exits.
    - PPCO0006 Enhancement to predefine fields in order header
    - PPCO0021    Enhancement for Order Release
    But I this type of control creates problem when you really required new prod Order due to Malfunction or any other problem earlier order gets stuck up (less yield to complete the sales order)
    Regards,
    Dhaval

  • Production order for sales order

    Hello friends
    I need information about if there is a way limiting the created production orders for a sales order.
    Let me explain what my problem is:
    For a sales order item with quantity 100, I can create  unlimited production order with higher quantities and this cause problems.
    Users may create unnecessary production orders and this caused reproduction of an order item.
    In standart, is/are there any customizings/configurations (and how I can active this/these control(s)) or user exits to control which sales order item is converted to production order?
    Thanks in advance.

    Nurullah,
    Users do not convert Sales orders into Production orders. They may convert planned orders into production orders.  They may also create Production orders outright.
    Anyhow, your requirement can obviously be met ONLY in an MTO environment.  There is an enhancement PPCO0001 which can probably be tortured into meeting your requirement.
    In most companies, planners are made responsible for properly planning their products.  Most planners I know routinely review MD06 to see if there are any production orders that should be cancelled/deleted.
    Rgds,
    DB49

  • Production order for sales order - wrong plant

    this was accidental and is there a way to prevent?
    sales order 123 exists for plant 100
    someone in plant 200 created a legitmate RWMO (rework) production order for plant 200, but entered sales order 123.  he only needed the production order in 200 for various parts not related to sales order 123 or plant 100.
    is there a way to prevent this from happening? 
    sales order plant and production order plant should always match.

    yes, but telling people to follow directions does not prevent typos/mistakes.
    i'll try to make it clearer.  is there an authorization object to prevent someone in plant 200 sales org 2000 from creating a PrdOrd for their plant (200) with a sales order that is for sales org 1000?  plant 200 prdords should only be for sales org 2000 sales orders.  this would be the true way to avoid the mistake.

  • Replacement order for sales order stock

    Hi gurus,
    I'm trying to supply a replacement order with reference to another order that has sales order stock (E).
    I can't supply the replacement order because of the stock is assigned to the original order.
    Is it possible to do?
    Best regards.

    Yes, Possible if you set reason for rejection to original sales order line items  to remove the stock requirement in stock requirements list in order to make availabality of stock for replacement order. if you are rising the replacement order based on the original order is not supposed deliver. So cancel the requirements by entering  reason for rejection for original sales order line items and rise the replacement order or if have already rised run GATP to replacement of stock requirements in md04 and
    schedulines will be generated based on availabality of stock.
    OR
    Please precise your scnerio ie; Replacement orders are return orders if you rise return order based on the orginal order stock
    requirement doesnot shows in  stock requirement  list (md04 ) because PGI has been done. Based on the customer complaints on qty deliverd return order will be rised. if return order is rised, it transfers the requirements to stock requirements list. So md04 allot the stock for those which Orders are placed first (FIFO) 
    Thanks & Regards,
    RAMESH

  • SERVICE ORDER for SALES ORDER quantity

    Hi gurus,
    i have the next problem.
    I have a sales order item that trigger a service order (CS). The problem is when i enter quantity 10 in sales order.
    It appear this message:
    "Due to technical reasons, you can only create one service order for a sales order item at the moment in service processing."
    Can I do a sales order with quantity 10 pieces and the service order with 10.????
    It's possible to customize that funtionality??
    Only one ???
    Thanks very much

    Nobody can help me???
    Please.
    Thanks

  • Defaulting the Sotrage location for all the line items in my sales order

    Hi,
    I have a scenario to default the storage location automatically in my sales order for all the line items. It is not going to change for a particular sales org. Dist. channel & Division combination. Can you pls. suggest me a solution for this.
    Thanks
    Ghanesh.

    Hi,
       You can default the storage location by using the below user exit
    Storage location
    Auto determination of storage location as u2018XXXXu2019 for sales order
    Include - MV45AFZB
    Form - USEREXIT_SOURCE_DETERMINATION
    IF (VBAK-AUART = 'XXXX' and VBAK-VKORG = 'XXXX' and VBAK-VTWEG = 'XX').
    VBAP-LGORT   = 'ABCD'.
    Regards,
    Gopal.
    Edited by: Gopalakrishnan S on Feb 25, 2010 7:35 AM

  • Delivery doc creation for a selected line item of the Sales order

    Hi folks,
        Can any one help me in how to create a delivery order for a selected line item of the Sales order.My requirement is the request comes from the web browser where a sales document and details of the items are shown the user select one line item and request for delivery create of that particular SO doc.I have used couple of FM to create delivery but the delivery create is depend on the schedule line dates so iam unable to figure out where exactly i can distinguish between the line items.
    Example:
    SO:- 11193645
    Line item -1 has 2 schedule line 06/11
                                     06/13
    Line iteam-2 has 1 schedule line 06/12
    so if i try to create Delivery doc for date 06/12
    it creates partially for line 1 and line 2.
    but my requirement is i wanted to create SO for only line item 1 as i wanted to process Del Doc for only line item 1.
    If you have any idea please help me.

    hi ,
    You can develop a customised FM to process the Idoc data .
    1. Read the Idoc data into internal table for the line items which need to be delivered .
    2. Run BDC for transaction 'VL01N' ( delivery creation ) through which  eliminate the line items which are not in internal table and save the delivery document
    Note : Because in VL01N , you specify the sales document with respect to which you want to perform delivery hence automatically all items are copied to the delivery document .
    During BDC recording , select items by " MOVING TO TOP"
    and then deleting the selected item
    If you face problem in BDC recording , i can help u that too .

  • ADDDITIVE COST FOR PRODUCT COST BY SALES ORDER SCENARIO.

    Dear friends,
    We are using costing for sales order & we have maintained the costing variant under the path IMG> Controlling> Product Cost Controlling> cost object controlling> Product cost by sales order >premliminary costing & order based costing>product costing for sales order costing>Costing variant for Product costing >Check costing variant for product costing.
    Under this we have maintained the Costing variant, Now we need to have Additive cost. But didnt found the tab in the costing variant where as when we check in T.code OKKN which is a part of Product cost planning we can find the Additive cost tab.
    How to run addtive costing run for Product cost by sales order scenario & please guide me with one example.
    Or else is there any configuration where we can assign standard costing variant PPC1 instead of Costing variant SOC1 ( which is a costing variant of Product cost by sales order.
    Please guide me
    regards,
    Sandeep

    Hi Sandeep,
    You may please try using Unit Costing for Sale Order.
    It is over an above the sale order costing you have done. So in case you want to post any additional known cost, you may do the unit costing for the sale order after the sale order costing.
    Trust this helps

  • Product costing valuated sales order stock

    Hi all,
    We are in complex mfg & currently re-vamping all the ERP SAP instances ( totalling 13 company codes into one single)
    All 13 units( who use NON Valuated scenarios for cost object controlling) wil use valuated sales orders & projects. The old 13 companies will be trated as profit centers with transfer pricing functionality ( Multiple valuations)
    My issue is to get a product cost for sales order in <b>profit center view</b> ( plan cost) exactly same as to the marked standard cost itemisation of the FERT material.
    We mark & release the std cost in Jan & the client wants to have the same itemisation of the cost ( with same values) even if they create a sales order in 2nd or 3rd or last quarter. ( As you might be knowing that the sales order wil always cal;culate the values as per the current qty structure date. In Std SAP date control, there is nothing which allows us to cost exactly the same cost estimate as marked & released in JAn)
    Could somebody pls give pointers as how to get this sales order plan cost itemisation exactly equal to prevously marked & released itemisation ?
    We use the Std costing variant ( Costing Type = Profit center valuation) with Std date control.
    Thanks in advance to all of you,
    Warm Regards
    Dhiraj

    Hi,
    If the sales order stock is valuated, you have immediate access to its value in Financial Accounting. The assigned accounts are debited and credited as a result of the valuated goods movements. From the viewpoint of MRP, the sales order stock is available for the sales order only.
    If the sales order stock is not valuated, it is managed via a cost collector. The system does not carry out invoice verification postings for goods movements, and you cannot obtain an overview of how the stock is valuated until the end of the settlement period in Controlling.
    Valuated sales order stocks have the following advantages:
    The full costs are available at each manufacturing level.
    All goods movements are immediately reflected in Financial Accounting
    Assign points if helpful
    Regards,
    Saurabh

  • Outbound IDOC BW to R/3 for sales order information

    Hello everybody,
    is there someone, who has any experience with transferring data (sales order data) <b>from BW to R/3</b> via IDOC.
    The customer has already implemented an EDI interface for R/3 via IDOC for generating sales orders. This IDOC interface should be used also for transferring BW data to R/3. So BAPI and flatfile interface BW-R/3 is not favored!
    Is there any good documentation how to proceed which can be provided to me?
    In particular i am interested how to create a function module to fill an IDOC structure from a standard data base table in BW (ODS table), how to create new message types etc.
    Thanks in advance
    Gunnar

    Is it possible in general?
    Yes, theoretically at least.
    You do not have SAP standard IDOCs (ORDERS*) for Sales Orders, neither is the functions or message types etc available on BW system. This would mean you will have to create custom idocs/message-type/process-code and configuration setup. In addition, if you are going to read data from a cube (to create the orders), it is going to be a slow and painful work.
    Another option, if you do have to create sales order IDOCs, would be to extract order data from BW to a , say Infospoke file, on BW. You can process this file in R/3 system to create/post a sales order idoc. This would help as the necessary components (eg sales order IDOC) are available there already. If you need help on that (creating sales order IDOC or BAPI posting, from a file), ABAP forum would be more helpful.

  • Particular sales order of the same line item hv created multiple production

    sir,
    I am having a problem in MD04. A particular sales order of the same line item hv created multiple production order.and continously planning is going on... I didn't get why it happens.
    Will u please suggest me what should i do in this case?
    Regards
    Meenu

    Hello sir,
    yes, ofcourse, for the finished material have the BOM with some semifinished productes which are to be produced .
    In co02 , we can go through the collective production order.
    One more thing is that, in the multiple production order date(scheduling date) shows in forward(future dates).
    For ex:09-05-2010.
    Regards
    Meenu

  • Add text for sales order to A/R line items

    Hello Experts:
    Does anybody know of a way to add the field VBRP-ARKTX (Short text for sales order item) to the A/R line item display (FBL5N

    HI,
    Please explore the option of using a USER-EXIT at the time of creation of Accounting Document from the Billing document. Looks like the field you are interested in is not automatically transferred from the billing interface to the accounting interface.
    Regards

Maybe you are looking for

  • I am trying to open a file in pdf form and I keep getting "there was

    I am trying to open a file in pdf form and I keep getting ...there was a problem reading this document....any suggestions???

  • Failed to open design mode for .mxml document

    Hi, I have recently installed flash builder 4 plugin to eclipse galilo. I am working on a project which uses flex SDK. Using eclipse flash perspective when try to open a .MXML file, the design tab is throwing an error message on the screen "An unknow

  • Remittance Advice Form

    Hi Experts, I want to develop one Remittance Advice form. So i want to know is there any standard form for Remittance advice. And also please let me know what is meant by "Remittance Advice". Thanks & Regards, Ramana

  • Noise in Firewire capturing

    Hi there! We are using Flash Media Live Encoder 2.5, trying to capture directly FLV files from a DV camera, trough a firewire connection for both video and audio. On the contrary to what we have read in these forums, everything is working properly wi

  • Differents mandants in one system

    Hi experts, I'm trying to send messages from one R3 (WAS 6.2) system to another WAS 6.4 system, I've created two mandants on this last system (100,300) When I send one message to mandant 100 everythings is ok but when I send this message changing the