Multiple project architecture over one landscape.

Dear SolMan GURUS.
I ma facing the following issue. Aou customer want to create multiple project anvironment over one landscape (one ERP system). The project will be created accordint the the existing SAP modules (MM, SD, PP... etc.). But how can be the transports managed when for example several projects have their PRD transports planned on the same time. For example 12 PM. Will this work. I read, that you can use Cross System Object Locking. Or is there any other way. How we can solve this problem? Thank you for your reply.
Best regards,
Petr

We have used different way...

Similar Messages

  • How can i copy multiple projects that reference one event without having to duplicate the event over and over for each project?

    Each project has compound and regular media in them, and every time i attempt to duplicate the projects and have them reference one event on the new drive the rest of my media shows up missing and will not reconect. Wondering if anyone has had to tackle this problem. I have a limited amount of space on my Drobo thunderbolt drives and need to optomize it. Thank you

    So i called apple and after a few hours on the phone and them taking control of my computer they pretty much told me they had never seen this before and were sorry they couldnt assist in any way. The long explination is that i work for a company that films their footage in one long take and then sends it to me to cut into segments, i then have to copy these small edits which are all in different projects and the one large event over to a new hard drive to give to a guy to put titles on and then send back to the company. when i do this copy of project final cut X forces me to also duplicate the event leaving me with "event" (fcp1) and so on depending on how many projects there are. When i dont duplicate event and project together the whole project shows up as missing media and final cut X does not recognize that the original footage is being lost and therefor i am not even given the oportunity to reconect media. I have tried all conventional ways of copying and transfering and have an extensive background in editing and have never come across this, but then again this is final cut X and something that i try and stray away from if i have a choice in systems.
    to answer Tony im using copy project and event because it is the only option that works (copy project and used media works as well but only creates more confusion with having to rename files) I would prefer to be able to just copy the first project and event and then be able to source the rest of the project files from the first event i copied over.

  • Multiple projects in n+1 landscape

    Hello Experts,
    We have a specific requirement to complete 3 projects in a stipulated time frame.
    Requirement explained with the help of an example
    -     Three projects to be completed in 12 months
    Project 1  P1  Go live date 3rd Month
    Project 2  P2  Go live date 7th Month
    Project 3  P3  Go live date 8th Month
    -     All projects have no shared workbench or customizing objects.
    -     Projects donu2019t have any shared objects with the existing production support and client wants all projects to be in the existing production system. Introducing a new production instance is not an option.
    -     Start data for all 3 projects is 1st month.
    -     Existing landscape has
    DV1  Development
    QS1  Quality
    PR1  Production
    -     Intention is to introduce a n+1 system landscape and start the project 1.
    Catch -     However with this concept P1, P2 and P3 cannot be started at the same time.
    Approach to handle the scenario:
    Introduce
    One development system  DV2
    Two quality systems  QS2 and QS3
    Three transport groups  P1GRP and P2GRP , SUPGRP
    All transports released to P1GRP from DV2 will only go to QS1
    All transports released to P2GRP from DV2 will only go to QS2
    All production support changes keyed in to DV2 released to SUPGRP will goto both QS1 and QS2.
    This way production support changes can be tested along with the new projects and go lives can be staggered.
    Question that a basis person would ask at this juncture:
    If the project go lives are staggered and all of them are mutually exclusive, why isnu2019t project 1 and 2 done in production support path?
    Issue:
    o          Go live dates for projects may slip.
    o     At some stage in the project 1 or project 2 some of objects may be shared causing issues with the production support.
    Help required :
    Has anyone come across such a situation in their porject ?
    Would products like CTS+ in combination with CHRAM help to achieve this?
    Any other recommendations?
    Thanks in advance.
    Thanks,
    Rohit.

    Hi,
    As per my experience, you can have a separate landscape (DEV, QA, Mock Production system). These all three systems will be replica of corresponding system in your Live environment. So, you can do your development and testing here. So, as soon as go-live comes near you can transport all your change request to your live environment during cutover time. As a result your live environment will not be effected because of your future projects.
    Thanks
    Sunny

  • Create multiple project files or one?

    I am working on a feature length film which has 48 sequences with subclips and rough cuts created in Prelude. Now I want to start bringing this footage into Premiere for editing, but I am wondering is there benefits or drawbacks to creating a Premiere project for each sequence then merging them all together in one master project file after finished working on each sequence?
    I'm trying to determine which way would be the easiest to keep things organized and not so overwhelming. Has anyone done this before?

    I never worked on a long project...but for a short test of cs3 , using dailies as source material, I came up with a process that worked pretty good for me.. and it might help you a little bit...dont know.
    it's kinda complicated.
    this example is one part of a scene...well, 2 scenes really, but I didn't have the dailies for all the material shot... so it's hard to explain... mostly I had all of the first part of the stuff you see here and then only part of the rooftop stuff...
    The rooftop stuff I made b&w with a overlay to pretend it was a cheap video cop camera..and used static to make cuts cause I saw crew, other cameras, etc... and had to cut.
    was basically 3 alexa on process trailer and 4 alexa on roof.
    This is what I did for scenes ( basically for the beginning of working on the overall material and then whittling it down to usable stuff )
    I dont use source monitor at all.. in out points.. I put everything in the primary timeline levels..and just cut out the slates and dumb stuff nobody would ever use...cut / delete .
    Then I start scrubbing through and pick out what I think will tell the story and move it UP from the original levels. That gives me a quick easy way to see what was " used" as opposed to what the original stuff ( bulk ) is.
    I don't rename the files or bins as I do that... I create a 'new' sequence and move all the raised stuff into THAT sequence ...and butt it together ...which is now becoming a rough cut...the new sequence ( not what you see here above which is the first bulk of what I got to work with ).  But I dont do that new sequence on a single vid layer cause I do my own fades and stuff on multiple layers and want that option... so I butt them together on several vid levels ( like 3 or whatever in this case )....
    I want the option of overlaying stuff and doing my own cross dissolves at my own 'pace' if need be....not the auto stuff and then the playing with corrections and extra frames etc ...
    As I scrub through the 1st roughcut I notice " Oh, I just cut from one person talking to another person talking, but the background was moving in one take, and not in the next "... which looks stupid.. so I have to go BACK to the original stuff and find a portion of a camera angle and take ...that gives me a moving background ....
    This starts to get really retarded...cause now you're making cuts you don't really WANT to make, but HAVE to make....
    Since I was using dailies and you're using prelude I guess there's a big difference. But I might use a part of one take and part of another take of the same scene and the same "coverage" if with multiple cameras ... so I don't think I would like splitting stuff up onto takes that are good or bad ...unless obviously the whole thing is bad from the get go... like someone fell down or their wig flew off their head or something...

  • Multiple projects combined into one .exe file

    Hi there.
    I'm new to Captivate and have a task that is just daunting to
    me. I have a very lengthy CBT which I do not want to build using a
    menu, but rather a continuous string of lessons that prints a
    certificate of completion at the end. I am faced with several large
    file sizes that will not fit in one project (I've kept each project
    less than 55 slides & cleaned up the unused library items).
    However, I need to publish to only one .exe file, and it doesn't
    seem like daisy chain-ing fits my requirement (for just one .exe
    file). Is this even possible, and how do I do this in Captivate3?
    (My Flash skills are nil.)
    Thanks in advance for your reply.

    Welcome to our community, Georgia
    Sorry, but there is no way to consolidate all the files into
    a single file unless you combine them into a huge gnarly project.
    The only option that would seem to make sense is to daisy-chain
    them together, but it seems you have precluded this.
    Cheers... Rick

  • Accessing Multiple Project Files in Robohelp

    In Robohelp 8, do I have the ability to open multiple projects rather than one?
    Thanks

    Or you can double click the XPJ file in Windows Explorer. The project will always open in a new instance of RoboHelp.
    See www.grainge.org for RoboHelp and Authoring tips
    @petergrainge

  • Do I make multiple videos in one project or make multiple projects??

    I am going to make at least three music videos for a local band for their web site. Do I make all three in one project and can i encode them for YouTube separately or do i do all three in totally separate projects??? It seems like once i have all the footage and audio loaded in a project and do one video to upload to YouTube then to do another video i have to load all that raw footage and audio all over again for the next video and then for the third video.... seems like once all that is loaded into a project i could just separate the videos for a few seconds and do another and then another, but how then to send them to YouTube separately???
    Or if i do all three in separate projects how can i combine them into one project to export in DVD quality for the band to use for promo???

    Personally, I would break the Project into three, discrete Projects, but you do have a point about the Importing of the Assets.
    You can certainly do this with one Project, and then Export/Share segments of it with the WAB (Work Area Bar). Here is a look at the WAB from an earlier version of PrE:
    As I do not upload to YouTube, I cannot tell you if you can use the WAB, when you do the direct Export/Upload. You may have to do an Export/Share for the individual segments, and then manually Upload each. Others can shed more light on this aspect.
    Good luck,
    Hunt

  • Multiple projects in one web role using Azure cloud?

    How to run One webrole with multiple projects using azure?
    In my solution One WCF service and ane website i want run both on one solution,
    How to run both in one domain?
    anilbabu

    Thanks for replying,
    I want to this type of output,
    In my project one solution two projects(one website and one WCF service)
    what i am asking is 
    this type 
    running both projects single service
    http://postimg.org/image/oijwkbn7h/
    After
    i a hosting into azure that url's like this
    How can i get this type of output
    EX: http://multliplehos.cloudapp.net/ 
    Service url: http://multliplehos.cloudapp.net/Service1.svc
    anilbabu

  • Use of MS Project Management 2010 to Manage Multiple projects over a given time period

    Is there some information (article/s) I can research about using MS Project Management 2010 for managing multiple projects over a given time period? I'm being asked by a potential client to take a job as a Program Manager to manage five projects all
    at once. Each of the projects has it's own MS Project Management software, project leader, and project team. An overall project plan has to be put together to manage this large project. There are some dependencies with these projects inorder to complete
    on a specific date.
    Thanks

    SSCDML --
    In order to manage this program of five projects using Microsoft Project 2010, I would recommend you do the following:
    Create a shared resource pool file containing the resources in all five projects.
    Connect each of the five projects as sharing files with the shared resource pool file to share the resources.
    Create a master project for the program containing each of the five projects as subprojects.
    In the master project, set cross-project links as needed to show dependencies between projects.
    Hope this helps.
    Dale A. Howard [MVP]

  • Topics in multiple projects in RoboHelp 8 are getting crossed over

    I have multiple projects I imported/upgraded into RoboHelp 8.  Initially when in each project, all topics are correct.  But after importing second and subsequent projects, when I go back to the first project, it shows the topics from the last project??  What's going on?  I've tried searching to see if this has happened to others, but do not see anything of the like... Any help would be appreciated...

    Hi all
    Perhaps it will help if we take a moment to understand a bit of the evolution of RoboHelp.
    Pull your chairs a bit closer and I'll tell you a story. In earlier years RoboHelp projects were managed by the .MPJ file. Because the MPJ file kept track of all project aspects, it was possible to store as many different projects as you like in the same main folder. This was nice from the aspect of sharing content. You could set things up so that you had common topics and images across multiple projects. If any of them changed, you changed them in any project and they changed for ALL projects using them. Of course this meant you had to recompile or re-generate each project if they changed, but the change actually only occurred once.
    Now along comes X5 with a new file structure. XML format. This meant some changes. Unfortunately some changes that effectively blew this manner of working totally out of the water. You may wonder why. Well, it's because while each project is mostly unique, some of the underlying files are rather generically named. For example, you have the ProjectName.XPJ, which is specific to each project, but that XPJ references generic files with APJ (Anaheim ProJect) file extensions. Files such as rhskins.apj, rjsnippet.apj and so on.
    My guess as to what has happened here is that with only one instance of these files able to be in a single folder, whoever saved last wins.
    What you have ahead of you is the following task.
    You need to split the projects into separate folders so that each project is in its own folder.
    THEN you upgrade each project.
    You should probably begin by restoring from the backup you made prior to attempting the upgrade.
    You, ummm, DID make one, didn't you?
    Cheers all... Rick
    Helpful and Handy Links
    RoboHelp Wish Form/Bug Reporting Form
    Begin learning RoboHelp HTML 7 or 8 within the day - $24.95!
    Adobe Certified RoboHelp HTML Training
    SorcerStone Blog
    RoboHelp eBooks

  • Pros & Cons of having multiple web applications under one EAR project

    Could anybody let me know what are the advantages and disadvantages of having multiple web applications under one single EAR project?

    Either this is homework, in which case, do it yourself, or you already think you have some pros for doing this. Share with us

  • How can a Multiple Projects in P6 can be linked to One Project in Unifier

    Hello Team,
    Can anyone help me with some solution to link Multiple Projects in P6 to a One Project in Unifier
    Regards,
    Avinash

    Hi Avinash,
    Hope you well.
    Not sure if this is answering your question correctly but you can set each P6 schedule to link to a specific Unifier schedule sheet in a Unifier project. You can have a number of schedule sheets in a Unifier project however only one schedule sheet can be the master schedule sheet.
    Hope this helps.

  • Re-allocating Actual Costs and Actual Work from one project to multiple projects

    My company would like to track costs in one project and then re-allocate those costs to multiple projects.  Example: An end user would submit a timesheet against a task named 'Analysis' for Project A.  Once accepted and published, the
    costs for those hours would be subtracted from Project A and 60% of those costs would be transferred to the 'Analysis' task for Project X and 40% of the costs for those hours would be transferred to Project Y. 
    We believe we can accomplish this through reporting, but before we go this route, we wanted to make sure there was not a logical, supported way in MS Project Server to complete these actions.  Could a script be developed to accomplish this?
    Thank you!
    Tasha

    Out of the box Project and Project Server do not support this. However with VBA anything is possible. You could also use PSI to work directly with project data in teh Server db but that would take much longer to develop. Check you can do what you want
    in VBA then you can use the result to spec the server version afterwards.
    Rod Gill
    Author of the one and only Project VBA Book
    www.project-systems.co.nz

  • Making multiple projects into one SCORM

    I have made multiple Captivate 5 projects that need to transform into one SCORM Module on my moodle LMS website, and count as one SCORM Quiz/Test. I've tried to even load multiple projects in one zip, but it failed to jump to the other projects when I had them all linked together leaving only this: "loading..." when I click the button to open project on the SCORM package. Please Help... Thanks...

    I'm assuming here that your questions are related to the fields in the Quiz Preferences in Captivate.
    The Objective ID is the same for all reporting elements in a given module. The Interaction ID Prefix just helps to distinguish which particular module your question data came from if you happen to be viewing it on drilldown inside your LMS.  As long as it's not the same prefix as for other modules, it should be fine.
    In the Multi-SCORM Packager dialog, the information you add to the fields will be written to the imsmanifest.xml file for the overall package:
    Identifier is to provide an ID for your course that will be unique in your LMS. This will also be used to generate the filename of the final zip file.
    Title is the name of the course.
    Description may or may not be required by your LMS.  Test and see.  In some LMSs this info gets displayed to the user when viewing a synopsis of the course.
    Version is the version of the package.  I actually use the date reversed for my versioning (20110520a) with a letter on the end in case I output more than one version on a given day.
    Duration is important to add. Some LMSs won't regard your package as compliant without this.
    Subject is not something I've generally worried about, but it doesn't hurt to put a brief phrase on what the course topic material is about (e.g. Health and Safety)

  • Deploy One Ear file for Multiples Projects

    Hi,
    I work with JDeveloper 9.0.3 and BC4J+UIXML+Jsp Pages and I organize my application in multiple projects, each one contain BC4J and UIXML programs.
    I have a problem in deploy my application with JDeveloper Deploy Profiles because I can't deploy multiples projects in on .ear or .war files.
    Today in development time, i build or rebuild my project and copy all executable files in manual mode to Oracle 9ias OC4J directory, into a deploy of one project, but i think that proccess is not correctly.
    What i need to do ?
    thanks.
    Danilo

    In order to include other projects in the EAR, you need to create deployment profiles (WAR,Jar..)in each project which will archive the contents of the project.
    After that you need to create an EAR deployment profile and edit the properties to include other deployment profiles created earlier.
    raghu
    JDev Team

Maybe you are looking for