Need of hostname change on existing endeca host

Hi All,
I have installed all endeca core packages (Mdex6.2.1, Platform6.1.1, Workbench2.1,..) and a pipeline on one of linux box. Now, there is a need of hostname change. Hope it does not break any  existing platform and pipeline. Is there any document related?
What i can think of on endeca perspective are,
     Hostname change on environment.properties
     URL change on pipeline esp file
     Change eac central server hostname on workbench
     URL change on Preview app setting on workbench
Is there anything else I need to consider?
any comments are more than welcome.
Thanks,

Take a look at support KB: How to Change IP addresses or host names for Endeca Hosts (Doc ID 1532056.1).

Similar Messages

  • Hostname change - db_connect failed, unknown host name, Return Code 000256

    check SAP Note 403708 - Changing an IP address and make sure there are no space, special characters in the hostname.

    Hi Simon
    Run Config Tool and change DB connection settings there in Secure Store. Update admin/host & jdbc/Url properties wherever you find the old host name. Then save the changes and restart the cluster.
    BR, Sergei

  • Still need help with changing hostname on Solaris 10

    Hello.
    I have some difficulties with changing host name of my computer.
    It is DHCP Client.
    AS I understand there are the following steps that I have to do:
    1. Edit the /etc/default/dhcpagent file and change the line that reads the following:
    #REQUEST_HOSTNAME=no
    to
    REQUEST_HOSTNAME=no
    2. There are two empty /etc/hostname files: hostname and hostname6.
    Do I have just to put there hostname?
    3. /etc/hosts has what I need to change.
    4. I was unable to find /etc/nodename. Do I have to create it? What properties should contain this file?
    5. hostname <new hostname>
    In previous time when I tried to change host name with Management Console my system crashed, I changed: /etc/hosts, but it didn't work.
    Thank you.

    Hello.
    Using DHCP you may really have problems changing the hostname.
    The fact is: The DNS server may assign your machine a host name which has nothing to do with the host name you sent to the DHCP server. Depending on the server (typically DHCP and DNS server are the same machine) nothing will really work. (This is the case with my configuration where the servers are located on a DSL router.)
    I solved the problem the following way:
    * I created two host names (MyMachine and MyMachineNet) in the /etc/hosts file (Solaris 10 and newer: /etc/inet/ipnodes must be changed, too.)
    * "MyMachine" is 127.0.0.1 (localhost):
    127.0.0.1 localhost MyMachine
    192.168.178.100 MyMachineNet* I assigned the name "MyMachineNet" to the network interface in /etc/hostname.networkcard.
    * I use DHCP
    The computer name (in /etc/nodename) is "MyMachine". Some programs (e.g. Gnome !) establish a TCP/IP connection to "MyMachine" instead of "localhost" (I do not understand why). These programs are now satisfied because the host name "MyMachine" represents 127.0.0.1 (localhost).
    I know that there is a switch that tells Solaris to take the machine name from DHCP/DNS instead of /etc/nodename. Unfortunately I forgot where it is.
    Martin

  • If hostnames need to be changed in cluster?

    Hello -
    I have a cluster in a test, and we need to get the hostnames of the boxes changed. How can this be handled without a full deinstallation? Would nodes have to be removed, then added back into the cluster?
    Thanks,
    Mike

    Hi Mike
    Yes seems so see that FAQ on RAC on Metalink Note 220970.1 RAC Frequently Asked Questions:
    Can I change the public hostname in my Oracle Database 10g Cluster using Oracle Clusterware?
    Hostname changes are not supported in Oracle Clusterware (CRS), unless you want to perform a deletenode followed by a new addnode operation.
    The hostname is used to store among other things the flag files and CRS stack will not start if hostname is changed.

  • Need to change IP address and host name on a ORACLE 10g RAC setup.

    Hi Forum,
    I have a task to change the IP address, host name and host related details for the ORACLE 10g RAC 2 node setup. So Can anyone tell me the procedure to do the same on both the nodes.
    Regards
    Prakash

    change IP Address Public + VIP + Interconnect
    http://surachartopun.com/2007/01/i-want-to-change-ip-address-on-oracle.html
    change VIP name
    http://surachartopun.com/2009/01/change-vip-hostname-on-oracle-rac.html
    If you'd like to change HOSTNAME... Metalink (NOTE:220970.1)
    Can I change the public hostname in my Oracle Database 10g Cluster using Oracle Clusterware?
    Hostname changes are not supported in Oracle Clusterware (CRS), unless you want to perform a deletenode followed by a new addnode operation.
    The hostname is used to store among other things the flag files and Oracle Clusterware stack will not start if hostname is changed.
    Changing the Private Interconnect
    o Change of the IP Address: change the IP address in the hosts file and/or DNS and make sure that ASM and the database also use the same interconnect
    o Change of the private node name used by Oracle Clusterware: requires a reinstall of Oracle Clusterware
    So, Public or Private hostnames can only be changed by removing/adding nodes, or reinstalling Oracle Clusterware. VIP Hostnames can be changed
    But you can read this idea (reinstall CRS)
    http://www.pythian.com/news/482/changing-hostnames-in-oracle-rac
    http://surachartopun.com/2008/12/change-hostnames-oracle-rac.html
    Edited by: Surachart Opun (HunterX) on Oct 25, 2009 10:58 PM

  • Hostname change option in Willy Enterprise Manager

    Hi,
         We are facing one problem during configuration of Introscope agent with
    Wily enterprise manager (In Solution Manager 7.1).
    Scenario:
    Wily EM installed on Solution Manager Server (unxa0275) but introscope
    agents for managed system are not able to connect to the EM in solution
    manager.
    Issue:
    There are 2 host name for (unxs0275 and unxa0275) for solution manager
    server. Unxa0275 is the actual host name and unxs0275 is the virtual
    host name for the same server (solution Manager).
    When I installed EM (Enterprise manager) on solution manager server it
    get installed with host name as unxa0275 and that is not accessible by
    the other server ( managed system).
    Option:
    1.Is it possible to change the Wily EM host after installation? If yes
    then where I need to make changes.
    2.Or weather I need to install the EM again? And then in that case how
    to set the host variable so the installation
    script u201C./introscope7.1solaris.SAPEndUser.binu201D will take the host name
    unxs0275 rather then unxa0275.
    I need to change the hostname from Unxa0275 to UnxS0275??During the Installation of EM hostname option is not coming.Please guide me.

    Hi,
    you can change to hostname of wily introscope enterprise manager within the solution manager to a virtual hostname as follow:
    call SICF an activate Service WD_SISE_ADMIN
    call transaction SOLMAN_SETUP_ADMIN
    Choose Generic Storage Admin UI
    Configurtaion ID: EM_CONFIG_ID-EM_CONFIG_ID
    change values CLIENT_HOST, EM_FQN, EM_IP, LMDB_SERVEERNAME, SERVERNAME, SERVER_HOST --> save and check the new values in SOLMAN_SETUP -> Basic Configuration --> Configure CA Wily Introscope (virtual host should now be displayed)
    afterwards you have to supply all managed systems with the new configuration Managed System Configuration
    Enter System Parameter (Check Introscope Host "edit and save")
    Configure Automatically (Run "Introscope Host Adapter" and "Byte Code Adapter Installation")
    Regards, Christoph

  • How to change an Existing  Purchase Requisition Document in MM.

    Hi Folks,
    I want to write a program to change a existing  Purchase Requisition in MM.
    I found two BAPI's BAPI_PR_CHANGE and BAPI_REQUISITION_CHANGE , which could be used to change PR document in  ECC.
    I have following question:
    1) why we have two seprate BAPI's for changing PR.
    2) Do we need to use both BAPI's to change PR, depending on what value we are trying to change.
    3) Is it optional to use any of these two BAPI's
    Or do we have any other way to implement this PR change process.( Bcoz of when i tried to debug standard PR change process, none of these two BAPI's has been called)
    Which FM or method is called when, we try to change and save PR document manually.
    I would appriciate, if some one has any sample code to implement this PR change process.
    Regards
    PG
    Edited by: PG on Aug 23, 2010 3:10 PM

    >
    PG wrote:
    > I have following question:
    > 1) why we have two seprate BAPI's for changing PR.
    BAPI_REQUISITION_CHANGE is the older BAPI, the one based on the older ERP transaction (ME5x family), while BAPI_PR_CHANGE is the newest one, referring to the "recent" Enjoy transaction (ME5xN family).
    They both satisfy you task probably, but if you can chose, I'd go for BAPI_PR_CHANGE.
    >
    PG wrote:
    > 2) Do we need to use both BAPI's to change PR, depending on what value we are trying to change.
    > 3) Is it optional to use any of these two BAPI's
    You can use the first or the second one, it's indifferent. The newest one will also trigger user exits from ME5xN family. Which transactions are used by the users on the ERP? Choose with regards to the transactions used during the normal activity.
    >
    PG wrote:
    > Or do we have any other way to implement this PR change process.( Bcoz of when i tried to debug standard PR change process, none of these two BAPI's has been called)
    Normal PR change operativity doesn't use BAPI. BAPIs are used to create/modify docs from "external" systems (it's not properly true, but let assume it), they provide a simple interface to populate with PR data and the process of creation/modification will trigger every check/userexit already defined for the standard transactions on the ERP.
    In example, suppose that in ME51N you defined a custom check in a specific userexit which don't allow an user to create a material item which have odd quantity (odd example, I know ). Then using BAPI_PR_CREATE you will not be able to create a PR with items with odd quantity, because the same check will be executed.

  • How to change an existing BOMGroup with ABAP

    Hi!
    Is there a way to change an existing BOMGroup? I found the BAPI "BAPI_MATERIAL_BOM_GROUP_CREATE" which is ok to create BOMGroups. But I couldn't find a BAPI to change them. If this is not possible, is there a way to delete a BOMGroup and create it again with the new values? I can delete a BOMGroup within the SAPGui by deleting all BOMs attached to it. To do this by code, I need a way to get/find all attached BOMs of the BOMGroup and then delete them one by one... Then I can create the BOMGroup again.
    Thanks,
    Konrad

    Hi Konrad,
    There are no BAPI's available but you can acheive using other function modules:
    To do changes using change number
    CS_CL_P_BOM_MASS_CHANGE                 
    CS_CL_S_BOM_CHANGE                              
    CS_CL_S_BOM_CHANGE_COMPLETE                                                                               
    To delete BOM      
    C162_BOM_DELETE  
    To create/change the BOM using the Category
    CS_OV_BOM_EDIT                
    Thanks
    Lakshman

  • Infotype screen headers needs to be changed for all the infotypes

    Hi Guys,
    This would be for a global implementation question.
    For the US for a particular region, the screen header needs to be changed for all the infotypes.
    The existing field (in the infotype header) is Employee Group which needs to be replaced with employment status.
    The know how to change the headers but my question is STAT2 exists in IT 0000 but does not exist in 0001, 0002 0007.........etc
    When i go to Table T588J to add an entry , Screen Header 42......,
    I get an error " No Field STAT2 exists for infotype 0001"
    No field STAT2 exists for infotype 0001.
    Message no. PG811
    Diagnosis
    No STAT2 field exists for infotype 0001.
    Procedure
    Please contact your system administrator.
    Procedure for System Administration
    In Customizing, determine the incorrect entry in Personnel
    Administration in the Header structure per infotype view, step " Determine infotype header and correct it
    I would like to have some inputs from you guys ..... Any Suggessions...
    Thanks,
    Aastha

    Hi Aastha,
    Correct me if I am wrong.
    First you need to maintain the header in T588J.
    Screen header of an infotype is defined in view V_582A_B. We can define one screen header for employee and another for applicant in view V_T588I. The header modifier selected from view V_T588I has a definition in table T588J, which finally gets shown on the screen.
    Depending on the transaction class (A = Personnel Administration, B = Recruitment) and the country grouping, a header modifier is assigned to the infotype header in the u201CHeader Modificationu201D view V_T588I.
    For example like
    Screen Header / Tr. Class / Header modifier
    00                    /        A      /  60
    In the view u201CHeader Structure per Infotypeu201D (V_582A_B), a header has been assigned to every infotype. It also determines whether the data is valid from the system date or the start date of the infotype record
    Hope this is useful.
    Regards
    RK

  • Want to change my existing Release strategy for - PR, PO & Service Entry

    Hallow Experts ,
    Here i have a requirement to change the existing Release strategy for Purchase Requisitions, Purchase Order and Service Entry sheet. Already There are unreleased Purchase Requisitions and Purchase Orders in Production system with the existing Release strategy.
    1. My Query is Before making change in Existing release strategy, should I need to release all PR and PO with unreleased status.
    2. In PO scenario is like this, we have 4 purchacing groups and 4 document types(ZLOC,ZIMP,ZSER,NB) in release strategy, we need to add one more purchasing group that is to be aplicable to my  service PO(ZSER) only . so should I need to creat another stretegy for the same, or I can add in the same strategy
    thanks in advance.
    regards
    vb

    Dear Vikrant,
    1. My Query is Before making change in Existing release strategy, should I need to release all PR and PO with unreleased status.
    Sol:  Not  Required but , doing it is recomandaed
    2. In PO scenario is like this, we have 4 purchacing groups and 4 document types(ZLOC,ZIMP,ZSER,NB) in release strategy, we need to add one more purchasing group that is to be aplicable to my service PO(ZSER) only . so should I need to creat another stretegy for the same, or I can add in the same strategy
    thanks in advance.
    Sol: No Only thing you have to  do is that   go to your class 32 and   chek what is the charaterstic define for the purchasing group  copy it
    2 Now go to  Tr.code: CT04, give that charaterstic and go to change mode and give the additional Purchasing group there, and save it
    3 Now go to Release strategy where you want to add that Purchasing group, go to classification tab and tik that new purchase group ,  that  group will now in fact of release Strategy

  • How to change the fully qualified host name

    Hi,
    how can I change the fully qualiied host name?
    Regards
    Marc

    Hi Michal,
    I'm doing the FlightSeatAvailabilityCheck-Scenarion of the demo example and get an error. To get more details about the error I had a look in the XI Runtime Workbench. There I can see, that the wrong url is called (without the hostname) and  that the access is forbidden (403). Therefore I want to change the fully qualified host name. I knew that I have to change icm/host_name_full but I don't know where I can do it (which transaction)?
    Regards
    Marc

  • Change of existing sales order (WCEM 3.0 SP1)

    Hi all,
    does anyone of developed the feature to change a existing sales order?
    Any hint to do it the best way?
    Thanks in advance,
    Meikel

    Hi Meikel,
    personally i haven't modified the sales order, but i did something in relationship to service orders. Both types are transaction documents in kind of the same but both using a different transaction type-id.
    Within WCEM the GenIL Layer has been integrated, which kind of gives you the chance to create, read & modify those transaction documents.  The java interfaces which SAP has build is calling behind the scene the corresponding ABAP RFC function - should be the same as the WebUI does. This function is used for the e-service integration and should provide you what you need.
    Just another hint: Not sure if my change request has been applied, but take a closer look into the toString() output of the GenIL (container) objects. When i was initially using it, the toString returned the string representation from the current object up to the root (excluding the child elements). Unfortunately this made it tought to understand the current status of the document. If my change request was applied, then you should get the output of current objects including all child elements recursively - if not, then just overwrite the toString() and generate a XML like output. That will safe you a lots of time to understand what is actually happening and within a short timeframe you  can implement your logic.
    Cheers,
    Andreas

  • Changes to existing Reports,Dictionary objects when we migrate DataBase to SAP HANA

    Hi Experts,
               Can you please let me know the changes that effect to existing ABAP Dictionary objects, Reports, MPP etc... that we build by using ABAP if we migrate our underlying database to SAP HANA from any RDBMS.
                           Thanks in advance.
    Regards,
    Sandeep Rajanala

    Dear Sandeep Rajanala,
    In general the existing ABAP code(reports, classes, module pool programs, function modules etc) runs on SAP HANA as before and the existing dictionary objects like tables, views, DDIC types and structures continues to exist and work as before after migration.
    However if the existing ABAP Code relies on the technical specifics of the old database , ABAP Code changes might be necessary(which is the case for any database migration ).
    For example,
    Your ABAP code uses a feature that is specific to the old database and not in the SQL standard and therefore not in Open SQL(consumed via Native SQL using EXEC SQL or ADBC interface)
    You have ABAP code that relies on unspecified undocumented implementation behaviour of the old database
    the above cases may need minor code changes in ABAP during HANA migration inorder to ensure that your ABAP Code runs with functional correctness after migration.
    The SAP note 1785057 gives guidelines on migrating the existing ABAP Custom Code for HANA.
    Additionally we have several code inspector checks to find the ABAP code that requires changes and you can find details about these check in SAP note 1912445.
    In addition you can find an elaborate guide for transitioning custom ABAP code to HANA here which has a dedicated section on required and recommended adaptations during custom code migration.
    You can also find the recording of the SAP Teched 2013  hands on session which focuses completely on ABAP Custom Code migration aspects for HANA here
    Hope this answers your question and gives you some pointers on how you could prepare your ABAP for migrating to HANA.
    Please revert back if you have further questions.
    Best Regards
    Sundar.

  • Dev-client not letting change the existing record in PA30

    Hello Experts!!
           I don’t know I have to ask this question here . I have created ALE link between our DEV system and QA system for our dry run .Two days before Basis team copy the data from PRD to Dev and also in Qa6 to make them in sink. When user is changing data in DEv6. They are getting an error message ,the is maintained in Dev_100. its not changing the existing record .Can some body explain me what’s happening here .
    Cheers
    Usman

    Hi Usman .
              you’ll say " here he comes again " . Any way you need to run <u><b>tr.BDLS</b></u> , It basically change the system name in SCC4 and also update the tables which kept the system name and after that you’ll be able to change the existing record in the system .
             hope this’ll give you the solution .Don’t forget to award points
    Thanks
    Saquib khan

  • Track new roles / change in existing roles

    Hi,
    I have a requirement to track the creation of new role OR changes to existing role in the system. In either case I have to send an email to the group of people.
    I tried to find the enhancements but found nothing useful.
    Basically, I need to find how can I track the even for creation / change of a role...
    Please help me out to find the solution for this...
    Thanks,
    Gagan Chodhry

    Hi Atish,
    Thanks for the reply...
    No, I tried to find the enhancements, but could not get the one I need...
    I found couple of things more like transaction PFAC_CHG / PFAC_INS for change or create role, but not sure how  exactly to use these... if these are the correct one to be used....
    Thanks,
    Gagan Chodhry

Maybe you are looking for

  • Advice on Creating Pedal Steel Guitar Instrument

    Hi, everyone. I am looking for some advice on creating an authentic Pedal Steel Guitar software instrument. I have all 4 Jam Packs, so would have access to any existing Guitar software instrument. I've played with the Jazz Chorus Electric, Twangy Ele

  • Photoshop does not work properly

    we purchased Adobe elemnets 13, but it was for students.  The store hard downloaded it and said we had to put personal info in but then we saw it was for students and we are not.  We returned it and they gave us the standard Photoshop but it does not

  • Configuring user profiles

    How do I configure a user account so the he has access to only one directory and can only read the files in that directory. In other words when he logs in he should automatically be dumped into the specified directory and not have the permissions to

  • Opening RAW files from Lumix DMC FZ1000

    Hi Everyone, I've just bought a Lumix DMC FZ1000 bridge camera as well as PSE 12 in the hope that I could continue to use PSE to process my RAW files. When I try to open the .RW2 files though I get the message that the format isn't supported. Does an

  • Please read question of carefully how to perform in SQLplus10g (dont give ans for 11g or previous release)

    There is table called department Depno  Employee_id  salary 101         E12             1000 101         E13             1000 101         E14             3000 101         E15             5000 102         E16             4000 102         E17