No Addon Product Version allowed for transaction

Hello Gurus,
we want to update some of our ERP 6.0 Systems. All of it have implemented EHP4.
But if we check for packages with MOpz, we get the following error:
No Addon Product Version allowed for transaction: EHP4 FOR SAP ERP 6.0 / NW7.01
SolMan is at version 701 SP24.
We use the Lanscape Verificartion Tool and it lights green for all systems.
The following notes for LV are implemented.
1484609
1485671
1501586
1506251
1506730
1510273
1511818
1516332
1517258
1525078
1528030
We have read http://wiki.sdn.sap.com/wiki/display/SM/TroubleshootingofMaintenance+Optimizer
For the systems we chosed ERP 6.0 + EHP4 FOR SAP ERP 6.0 / NW7.01 as active product versions
Has someone a suggestion whats the problem?
regards
Chris

Hi,
Check SAP 1505281 - No Addon Product Version allowed for transaction: EHP4 FOR SAP ERP 6.0 / NW7.01 for your problem.
Thanks
Sunny

Similar Messages

  • HT1444 I am using Mac os x 10.5.8  does this version allow for an upgrade to mountain Lion

    I am currently using mac os x 10.5.8   Does this version allow for an upgrade to Mountain Lion?

      Snow Leopard Purchase
    If you are unsure exactly what year your Mac is, check the model number.
    Model Numbers
    You also might want to check application compatability since PowerPC applications aren't supported.
    Application Compatibility
    If you can't upgrade to Mountain Lion, here are the requirements for Lion.
    Computer Compatibility - Lion
    If you have applications that you want to use that aren't compatible, you can retain Snow Leopard and create a new partition to install Mountain Lion on.

  • Wrong production version picked for planned order in ecc after CIF

    Dear experts,
    I am new to apo and was working on Cif of transactional data to ecc after planning run in Apo.
    we have active integration model and all the master data cifed in apo.
    we are cifing ppds ppm which is converted into snp ppm.
    The scenario is:
    We have a product FG100 at Loc1. For this product we have five alternate PPM's in APO.
    When we do SNP planning run, for some planned order it picked alternate 4 or 5 as source of supply. Which is alright.
    The problem is when we see the same planned order in ECC it shows source of supply as alternate 1. i.e. planned order in apo with alternate 4 and planned order in ecc with alternate 1.
    Is this the expected behaviour, or there is some configuration setting for this. We want that it shows the same source of supply in ecc as in SNP planned order.
    Best regards,
    AKS

    Hi Vikas/Nandkumar,
    thanks for the response, in my case the issue is that I have got two production versions in ECC. One production version is used for planning in CTM while the other version should not be considered in APO CTM for planning.
    The productionj version which I am not using for planning, I can manually attach the version in ECC to the planned order and the planned order should get CIFed to APO with the source of supply and resource details.
    Vikas after executing the report also the source of supply is not getting displayed in the planned order.
    Is their a solution by which i can achieve the above results.
    Thanks,
    Sanjog

  • Tabs: previous versions allowed for saving all tabs in a bookmark folder. The new tab groups do not behave this way. How can I save permanent set of tabs as a group that is available later, like the folder of bookmars was?

    tabs: previous versions of firefox allowed for saving all tabs with a group name, so you could open them all again later at your convenience. The new firefox 4.0.1 has a new tab feature, but the tab groups do not seem to persist once you shut down, and are not saved as a folder in your bookmarks. What am I missing? How can I do what I want (save permanent set of tabs as a group that is available later, like the folder of bookmarks was)? Thanks

    Right click one of the tabs, the "Bookmark all tabs..." option.
    Does it do what you want?

  • Production version with status " locked for any use" being considered

    Dear All,
    while creating integration model for PDS , materials with production version locked for any use are being considered. Can any body put some light on it.
    My requirement is that in creation of integration model it should not take production version which are locked for use.
    Regards
    Arun Negi

    Check OSS Note 854561 - PDS does not recognize any locked production version in R/3
    "Symptom
    If a production version is locked in the R/3 System, this change is not transferred to the related production data structure (PDS) in APO. The PDS is therefore still used as a source in APO in the plan explosion. This causes errors during planning and results in terminations when an order is converted and subsequently transferred to the R/3 system."
    https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=854561
    Manish
    Edited by: Manish Kumar Rathi on Oct 10, 2008 11:46 AM

  • Can the next version please allow for the line height to be zero in a text box? I can only go down to .01?

    I want to create a flipping calendar. I had this brilliant idea of putting each date 01 02 03, etc in one text box, with a hard return in between, and then set the line height to zero. Then set the type to appear one paragraph at a time. It would eliminate 20 animation steps. It worked beautifully except that I can't get the line height to set to zero. It will only go to .01. Bleh!
    So please, Can the next version allow for the line height to be zero in a text box?
    Also, separate timelines would be nice instead of one long string so it would be easier to have more than one animation happening at once.
    Just a thought.
    PS - I also noticed it would be nice to have the option of having the first line in a text box dissappear or dissolve or flip out before the next one comes in, rather than just each building in on top of each other.

    In these forums you are just talking to users, not developers. To provide your feedback, in Keynote go to Keynote Menu>Provide Keynote Feedback and send your request that way.

  • Delete Production Version - Error

    Hi
    When I try to delete the production version, System wont allow to delete it and following message log is created -
    Argument  not contained in table T437s
    Deleting Production Version 0001 for material XXXXXXXXXX is not possible
    I checked table T437s and there is not entry for that matierla and plant combination. Also there is NO PCC created yet
    REgards,
    Lokesh

    Dear Lokesh,
    Check these links,
    Re: Delete Production version
    Re: production version
    Regards
    Mangalraj.S

  • No Automatic Dispatching Of Planned Order to new Production Version

    Dear Sir,
    When rescheduling an operation from one line to another, the system
    checks whether a production version exists for the material to be
    produced that contains the new production line as the preferred work
    center. If such a production version is found, this version is taken
    over into the planned order. The planned order is scheduled again based
    on the production version.
    The second function allows you to automatically search for an
    alternative work center in the case of a capacity overload of a work
    center, and to dispatch the operations to it. The predefined
    prioritization of the alternative work centers is considered in this
    case.
    The indicator Reschedule with production version must be set in the
    strategy profile.
    My issue is sytem does not making automatic Dispatch to the second
    Production version for the material at the time of insufficient capacity
    Best Regards
    Rami Abd El Fattah Mohamed,PPQM Functional & Technical Application
    Consultant

    In the dispatching control u can remove operation date check indicator and regarding the termination indicator SAP help says"
    "if you have not set this indicator then dispatching is not terminated but carried out without taking the production version into account. That means that the planned order is scheduled with the old standard values and the formulas from the new work center and dispatched to the new line."
    Please check if it works now.
    thanks

  • MRP Run with production version.

    Hi Experts;
    I am working as a member of a SAP implementation supporting team. The client wants to run MRP with alternative BOM, not with the 1st BOM. As a solution for the requirement i created production versions and assigned to MD61 schedule line tab. It is working properly.
    But the user maintain some quantity as a safety stock for finished materials also. To cover the safety stock requirement, system create planned orders with the 1st BOM, not the production version.Already i have maintained the selection method "3" in material master.
    Is it possible to cover safety stock with alternative BOM.
    Please help..
    Thanks,
    Malka

    Hello Malka,
    For your issue,,
    As per other expert suggested you can block the first production version but if in future you want use first production then,,
    In these case you maintain production version in many way
    Ex.
    1.  Lot size .(if production version using for specific lot)
        Maintain the Lot for both production version, so Production version 1 lot completed system take       second production version.
    2. Production version validity date (If production version using for specific period )
        In this case after completion of 1. Production version period system take second one
    3. Manually selection of production version (If multiple production version and all have same condition)
        Whenever you convert the planned order to production order, one pop up come and ask for                manually selection for Production version, for this you go to OPL8 and select the Manually                production version
    I hope this information cover your all requirement, No need to go with quota arrangement
    Still you want know about the Quota arrangement, Please create new thread so other expert also provide their view
    Regards
    Umesh Mali

  • Acrobat.exe product version question

    Hi
    Does anyone know of a link in Adobe where it shows every product version number for all acrobat.exe they have produced?
    Basically i just want to be able to see which version of the file is a professional and standard version. (Based on the file product number).
    eg. Acrobat.exe product number 8.1.0.2007051100 is a professional version.
    Thanks
    DM

    I think there is a list, but the problem is it may vary based on the source and version as I recall a comment before. Anyway, the fastest way of getting the information is still probably to run the program, using one with Pro and one with Std. Sorry that I can't be more helpful, but the last time I saw a question about these numbers the answer was rather mixed and indicated it varied with the source of the product and several other factors. I don't really know more.

  • Costing and Production Version

    I am doing a costing run for material that has more than one production version defined for it. I want the costing run to pick up by default a prod version that we want to use for costing. However, it does not pick that up by default and instead we have to manually assign it in CK11n. Is there any way to make that Production Version default in the costing run. Please let me know. Thank you

    Hi,
    You can maintain the default Production version in Material Master - Costing1 View, under Quantity Structure section.
    Hope this helps... Reward your points,
    Regards,
    Prasobh

  • Selecting New Production version while Splitting a Production Order

    Hi SAP Gurus,
    Is there any option of selecting a New Production Version for a split Production Order?
    I have a production Order with three operations 10.20 and 30. This production Order is curently using the Production Version 001. Now , i have split the production order at Operation 30 and want to select new production Version 002 for the same.
    Can you please let me know if this is possible?

    Hi Sandeep,
       If you don't mind can you please let me know for what purpose you want to assign a new production version to production order after splitting at operation 30?
       To quickly recap, Production version is used if you have alternative BOM or alternative routings for a material. Based on Production Version that you have assigned in Material Master - MRP screen, your Routing and BOM details are selected.
        So how is this Production Version 002 different from Production Version 001 - is it in terms of routing or bom?
      With Best Regards,
    Srinivas

  • Production version selection according to explosion date

    Hello
    In customizing for MRP (OPPQ), parameters for BOM explosion / routing selection is 3 (BOM explosion number/order start date).
    In MRP4 view of material master, selection method for BOM explosion is 2 (Selection by production version).
    No MRP group is assigned.
    I have 3 production versions : one for 2014, one for 2015, one for 2016 :
    I use a BOM explosion number with fixed key date 1st December 2015 :
    When manually creating a planned order with dates in 2014 and explosion number EXP_1215 (fixed key date 1st December 2015), Production Version PV1 is selected (valid for 2014), but no routing is selected because explosion date is BOM explosion number, and in PV1 there is no valid routing in 2015 :
    Is it possible to select production version according to explosion date, and not order dates ?

    Hi Tristan
    The following modification note can be used to influence the selection of production version on planned orders:
    351773 - Selection of production versions for planned order
    Alternatively, you can create your own logic using BAdI MD_MODIFY_PRODVERS.
    BR
    Caetano

  • Capaity levelling and production version

    Dear SAPper,
    I curious about somecases in levelling.
    My client got 8 machine work center and they aware of capacity
    I create eight produciton version.
    MRP always put new planned order to first production order.
    After that my client would like to do capacity levelling.
    The problem is although they assign to other machine but the production version is not change
    leaving inconsistency of production version and new work center after capacity levelling
    is there any way we can capacity levelling considering produciton version too?
    Please kindly help.
    Best regards,
    Freddy Ha

    Dear Freddy,
    1.The system always picks up the first production version as a default,if more than one more production
    version exists for the same lot size,validity dates.
    2.Either you have to lock the production versions so that the system picks up the open production
    version or maintain different validity dates or Lot size.
    3.I'm not sure whether the system considers the prod version also during capacity leveling.
    check this link,
    http://help.sap.com/saphelperp60_sp/helpdata/en/1a/f2f33419ec8d44e10000009b38f844/frameset.htm_
    Regards
    Mangalraj.S

  • Production Version C223

    What would be the easiest way to have the system show all Production Version's (C223) and their respective Route (CA01) relationship?
    I want to make sure that all Production Version entries for ALL MATERIAL NUMBERS in the system coincide with the Routes that are turned on (status 4).
    What method do you suggest I use to locate these?

    Dear Lucas,
    Goto C223,enter the plant and press enter the system displays all the production versions available.
    Now select all the entries and click on consistency check (test) button to identify whether the
    production version is ok or not and then click on system in the top menu->list->save--->local file and
    you can check the details.
    otherwise you have to download the datas from the table MKAL or check whether C252 can help you.
    Regards
    Mangalraj.S

Maybe you are looking for

  • What does the little circle with a line in it mean when in edit mode? how can I get rid of it?

    What does a little circle with a line in it mean when I am trying to edit? how do I get rid of it?

  • Conncurrent request error.

    Hi My user is facing below error,in concurrent request.all users running fine with same report.please help me Apps-11.5.10.2 db-10g os-hpunix XML_REPORTS_XENVIRONMENT is : /u01/app/apdpilot/applmgr/product/8.0.6/guicommon6/tk60/admin/Tk2Motif_UTF8.rg

  • Emptying all users' temp folders

    Hello everyone           Right now we're having problem with low disk space on Terminal Server. Actually we have applications which help us to get rid of all temp files easily, I mean without going to C:\Users\USERNAME\AppData\Local\Temp and deleting

  • Example scripts at adobe exchange?

    The CS6 scripting guide says: For more examples from Adobe and from other After Effects users, visit Adobe Exchange at http:// www.adobe.com/go/exchange/, and choose the Scripts category in the Adobe After Effects section. But, the site seems to be d

  • How to manage the uitableviewcell after being scrolled?

    Hi all. I manipulated the cell of the table view to be a custom one, which will be expanded(from height=50 to height=100) on selection and will be srinked to original(from height=100 to height=50) on second click or deselction. Now my problem is that