Selecting New Production version while Splitting a Production Order

Hi SAP Gurus,
Is there any option of selecting a New Production Version for a split Production Order?
I have a production Order with three operations 10.20 and 30. This production Order is curently using the Production Version 001. Now , i have split the production order at Operation 30 and want to select new production Version 002 for the same.
Can you please let me know if this is possible?

Hi Sandeep,
   If you don't mind can you please let me know for what purpose you want to assign a new production version to production order after splitting at operation 30?
   To quickly recap, Production version is used if you have alternative BOM or alternative routings for a material. Based on Production Version that you have assigned in Material Master - MRP screen, your Routing and BOM details are selected.
    So how is this Production Version 002 different from Production Version 001 - is it in terms of routing or bom?
  With Best Regards,
Srinivas

Similar Messages

  • Change Production version during creation of Process Order COR1

    Hi,
    Scenario:
    Based on the entered Material, Plant and Order type system need to trigger a popup asking the user to select the Production Version. This should happen before clicking on SAVE button, so that all the values will be populated correctly based on the changed VERID.
    I did not find a user exit that enables to change the Production Version (VERID) value. So I thought of displaying the popup in the user exit EXIT_SAPLCOZF_003 which will be triggered before initial screen appears, export the selected value and pass it to a User Exit or BADI where VERID can be changed. But cannot find a user exit to do it.
    Please help me find a User Exit or BADI to change the Production Version during creation of Process Order using COR1 transaction before clicking on SAVE button.
    Thanks,
    Manoj.

    Hi Manoj,
    So - almost four years later - I saw your post and I saw myself in the very same situation as you did...
    I found a solution for those who wants to change the production version of the production order from the sales order creation: create an enhancement in the function module 'MD_VERSION_SELECTION' and you are good to go.

  • Production Version Not Reflecting in Production Order

    Hi Experts,
    I have a query, I have made alternative BOM and second Production Version of a FG Today. Production Version is very much Ok (Green). I have clearly mentioned Alternative BOM 2 in alternative bom.
    When creating production order thru CO01, production version is not coming in Co01. Message is coming " No valid production version is found for this material".
    Kindly confirm me what mistakes I have done.
    Regards
    GR
    Edited by: G R on Dec 18, 2008 9:48 AM

    Dear G R,
    1.Check whether your prod.version has been locked and what value have you maintained in MRP4 view
    BOM selection method.check whether has it got the value 02.
    2.Also in OPL8 - under planning tab select the option for manual selection of production version.
    check and revert back.
    3.Also check the validity dates.Also your production order start date.
    Regards
    Mangalraj.S

  • Co- Product Error while creating a production order

    Hi,
    While performing the Co-Products Approtionment at the time of creation of Production order..
    we are facing a problem regarding cost apportionment I have crated a Source Structure and the cost element is assigned to that Source Structure but still iam facing this issue
    kindly help me out.
    the error msg is
    Debit with cost element 9460404 cannot be settled.
    Message no. KD549
    Diagnosis
    Costs/revenues exist for cost/revenue element 9460404.  This cost/revenue element was given source assignment 40 in the source structure (-> settlement rule for sender -> parameters).  However, there is no distribution rule with settlement type FUL for this source assignment or the total of the percentages for the rules is less than 100.
    Note:
    Full settlement settles all the costs and revenues which have occurred up to the settlement period and have not already been settled. In the case of periodic settlement, you can configure the settlement profile so that all the costs occurring in the settlement period are settled, or if an amount less than 100% can be settled.
    Procedure
    Maintain the distribution rules for source assignment 40 and settlement type FUL or use periodic settlement to settle less than 100%.  Change the settlement profile for the sender as necessary.
    Change settlement profile
    Note:
    Cost and revenue elements receive source assignment " " if you have not entered a source structure in the settlement rule parameters.

    Hi Krishna Murthy I went through the note but i couldnt recive a big help from that note.
    I will explain the step by step process that i have done.
    I am attaching the Screen shots of the issue.
    1. For co-products I have created a source structure and Sec. Cost Elements were assigned in the source structure.
    2. The source structure was assigned in the Material Master for co-products equally distrubuting the amount between 2 materials.
    3. When we are trying to create a production order the error was displayed but the costs was getting calculated properly.
    4. When I was settling the production order the same error was getting displayed.
    I have tried various methods to resolve it.
    1. I have created a periodic settlement rule and tried to settle but it didnt work
    2. I have assigned the source structure in the settlement profile this also didnt work.

  • Downloading a new trial version while already having an old version

    Can I download a new version trial without my old version being damaged, replaced or in any way messed up? Will I just have two icons (LR 6 and LR 3)?

    DNGs contain the camera profile so an older LR version can process raws that are too new otherwise; however, the adjustments to do to the DNGs in LR 5 would not generally be understood by LR3.
    You probably need to get the DNG Converter to work with your raw files and then process the DNGs in the older LR version.
    If you have tried to convert the raws to DNGs using the DNG Converter and it didn’t work, the most likely issue is when specifying the source folder you need to be selecting (single-clicking) on the folder name where the raw files reside, rather than opening (double-clicking on) the folder.
    Your idea to use LR 5 to process the images is risky if LR 6 isn’t released before the LR 5 30-day trial period expires.

  • Selecting wrong WBS element while preparing the Purchase Order

    Hi Gurus
    We want to check the data while end user input it in the system.
    While preparing the the PO in the sysetm we input the plant id,storage location and WBS element.
    End user may select wrong WBS element of project under with plant. I want to prevent it.
    How can I prevent end user for selecting wrong WBS element under plant and storage location.
    Atul Kulkarni

    HI,
    You need to some developement...create Z table and maintain  the entries with the cobinations in what way you want to restrict and call the same in the PO.
    Hope it will works.
    Kuber

  • How to select the production versions for MTO?

    Hi PP Experts,
    In our scenario we have two production versions and also we are in MTO strategy. While creating the sales order is there any option to select the production version (i.e.) before planning for that corresponding sales order I have to choose the production versions.
    Example:
    Material u2013 A  -
    sale order u2013 666001 u2013Prod version - 0001
    Material u2013 A --- sale order u2013 666002 u2013 prod version - 0002
    How to map the above scenario?
    Thanks in advance.
    Regards,
    Vimal

    In our scenario we have two production versions and also we are in MTO strategy. While creating the sales order is there any option to select the production version (i.e.) before planning for that corresponding sales order I have to choose the production versions.
    If the Production version selection is based on Lot size means No problem.
    If both the Production version is same lot size, system will select the first PV only in MRP
    In STD SAP, we can't Give Production Version  in sale order level,
    If you want after MRP run , U can assign Production version in plan order or in production order Manually

  • Automactic Selection of production Version

    Hi.
    I have created a material "A"
    I maintained in material master's MRP4 view selection method "2"
    I have created two production version with same validity period & same lot size "0001" & "0002"
    I maintained in order type dependent parameter's masterdata tab in production version column "Automatic production version selection"
    Now when i am going to create a process order system is selection production version "0001".
    But I want automatic selection of production version "0002".
    What setting shall I do?
    Regards
    Vivek

    Dear Vivek,
    I maintained in order type dependent parameter's masterdata tab in production version column "Automatic production version selection"
    In order type dependent parameters maintain as manual selection
    Then system will raise an pop-up to select production version while creating prodiuction order
    The above setting is only useful while creating manual production order
    If you are converting plan order to production order then above setting will not play any role
    System will default take 1st PV
    All you can do is you can change manually in plan order
    Or if you want system to take automatically in MRP then you need to lock 1st PV
    Also refer my reply from this thread
    [Alternative BOM selection|Using customer to determine what BOM to use in Production order (tx:CO41);
    Regards
    Madhu

  • Subcontracting (Multiple Vendors Involved) and Production Version's

    Hello all,
    I would like to know more about this stuff. So do share your valuable thoughts.
    I was trying out a sub contracting scenario with multiple Vendors and Production Versions involved. The production version is designated in such a way that lot size/quantity of the requirement determines which of the available version's to be taken into consideration whilst generating procurement proposal via MRP.
    #1. Production Version:
    5 Version's of the BOM are assigned to various lot sizes.
    #2. I had 5 different info records created for the material-Vendor combination. Each one of them were assigned with a Prod version to it.
    Sample:
    #3. Post these settings i had a MRP run executed. Well !!! the results were different off-course. I neither did see the procurement proposals classified based on the prod version nor the first prod version assigned to the procurement proposals ( i meant i had a different prod version(version 4) assigned to the procurement proposals generated).  
    Questions:
    #1. Well the first thing that did strike my mind was how could i get the source list work for such scenario's ? I guess i can't go with quota arrangement coz which would split the procurement proposals into many halves and assign's it accordingly to the vendor.
    #2. How come production version 4 given the top priority here ?
    Source List state:
                             a. I had an item (tried the others as well) checked with fixed vendor indicator but the info record of the material-vendor combination had a different Prod. Version in it (well not PR4, i can guarantee you on that)
                             b. I had nothing marked with fixed vendor indicator. Results post MRP still did pick the same prod version (Version 4).
    #3. Last but not the least how can i get this thing to work ?
    Please do help out.
    PS: MRP 4 selection Method: 2 - Selection by Prod.Version
    Regards,
    Rahul

    Hello Rajen,
    Well as per your comment "
    Regarding the splitting, Not Always.
    There are two types of quota arrangement - Allocation quota and splitting quota."
    so meaning that allocation quota doesn't split the procurement proposal is it ? If so how are they assigned to vendors ? any other criteria being used up here
    Anyhow i had a new lot size method created with the splitting quota field unchecked. So how do i proceed from here ? meaning that how should i manage my quota file to not have my procurement proposals split ?
    Please do help out.
    Regards,
    Rahul

  • MRP Run with production version.

    Hi Experts;
    I am working as a member of a SAP implementation supporting team. The client wants to run MRP with alternative BOM, not with the 1st BOM. As a solution for the requirement i created production versions and assigned to MD61 schedule line tab. It is working properly.
    But the user maintain some quantity as a safety stock for finished materials also. To cover the safety stock requirement, system create planned orders with the 1st BOM, not the production version.Already i have maintained the selection method "3" in material master.
    Is it possible to cover safety stock with alternative BOM.
    Please help..
    Thanks,
    Malka

    Hello Malka,
    For your issue,,
    As per other expert suggested you can block the first production version but if in future you want use first production then,,
    In these case you maintain production version in many way
    Ex.
    1.  Lot size .(if production version using for specific lot)
        Maintain the Lot for both production version, so Production version 1 lot completed system take       second production version.
    2. Production version validity date (If production version using for specific period )
        In this case after completion of 1. Production version period system take second one
    3. Manually selection of production version (If multiple production version and all have same condition)
        Whenever you convert the planned order to production order, one pop up come and ask for                manually selection for Production version, for this you go to OPL8 and select the Manually                production version
    I hope this information cover your all requirement, No need to go with quota arrangement
    Still you want know about the Quota arrangement, Please create new thread so other expert also provide their view
    Regards
    Umesh Mali

  • Product version

    Hi,
    I am in mid of solution manager upgrade and need to download the target stack again but the product version Solution Manager 7.02 is not reflecting in creation of new transaction through dswp. Please help.
    Regards,
    Mridul

    Hello Mridul,
    Do you mean in SMSY under change product assignment?
    When you want to add the installed product version, but the downloaded product is not in the drop down list?
    If this is what you mean, then you need to check the box "Free Product/Select Product Version" , then whjen you click the product drop down list, the product version should be there and selectable.
    If you mean't something else can you please provide more details?
    Regards,
    Paul

  • Regarding the KEY DATE OF PRODUCTION VERSION

    Dear Guru's
    Client facing a issue like :
    They have master recipe which was created on say example: 01.01.2001 and they had changed "activity type" activity time" later on date for particular Production version P001.  & obviously Production version Valid from date is on  01.01.2001.
    But if he check the key date of particular version(P001), it shows the same date as 01.01.2001 & it will show only the recipe which was created on 01.01.2001.
    It is not showing any other changes which we did after 01.01.2001
    While transferring to APO, system is picking the Production version (P001) based on the key date 01.01.2001 & they are not getting the changes in that recipe while creating the order
    How can we resolve this issue Plz help.
    Thanks & Regards,
    Arvind S

    Thanks Krishnan,
    But when I createa  new formular variable, I have lots of options for varaibles.
    So, in the formula screen.
    Formula variables->New Formula variable - > Edit
    Then
    Processing by ->Replacement path ->ref characteristic date
    Then, on the replacement path tab:
    Replace variable with ->variable.
    Click on the box to search available variables to replace, and I have lots of options e.g.
    Current fiscal year (single value entry, mandatory)
    Approver
    Base budget
    etc.
    but not "key date of the query". It is not there?
    Any more help gratefully appreciated.

  • Use of production versions

    Dear Masters,
    I have two BOM's for one material.I have created production versions for the same.
    1.I want to create two production orders using two BOM's? How to create ?
    Also how we can use the production versions at the time of creting production orders using MD02 & MD04?We have Make To Stock strategy.
    Thanks & Regards,
    Ram Kulkarni

    Hi Ram,
    if u create production order by manullay, u can select production version manuulay by doing following settings.
    1. Goto OPL8 define production selection = Manual selection for your ordre type/plant combination
    2. Define Bom selection  method =   2 or 3  by production version.
    while creating production order(Co01) system will ask u to select production version
    For MRP run,
    system always select first  valid production version by default. Here u can define lotsize to select production version. And another way is u can define Quta arragement inthat u can define percentage quota for each production version.
    while creating production order from planned order (MD04) system will copy the production version from the planned order.
    regards
    pradeep

  • Uploading production version

    Dear Gurus,
    Suppose i want to add new production version to all the materials in a plant whose masterdata has aleady been uploaded,watz the procedure for that.
    First i want to create alternate BOM for all the materials and then i have 2 create pdn for all the materials.
    Can u plz brief me how 2 create BOM and then production version for all the existing materials together.
    Prasanth

    hi
    you can view the old bom to create new alternative bom. After looking the old bom, just try to creat a bom for same finished product. The system will promt u that already a bom exist. Choose, alternative bom as 2 and continue. Same way try to create routings also. Dont forget to note the group no. once the routing is saved.
    After completing all the boms, go to mm02 for the finished product and open the mrp4 view. Click on production version and creat as many versions as u like.
    Give prd. version as p001, p002 ...........and so on.
    After creating the production version double click on production version line. select the lot size your type of production e.g. rate based etc., group and group counter.
    Select the alternate bom and bom and click on check.
    If the report says task list exists and bom exists continue and save. other wise check the data.
    Hope this is useful and pl reward.
    Nanduri

  • REM Product cost collectors and Production version

    Hi All,
    Can some one pls let me know
    What are the product cost collectors in REM and how to create the product cost collectors ?
    What is the production version and the difference between production version and controlling version?
    Thanks & Regards,
    Bujji

    Dear Bujji,
    A product cost collector is a cost object in Product Cost by Period that collects the periodic actual costs incurred in the production of a material. It can be created in txn KKF6N.
    [Product Cosr Collector|http://help.sap.com/saphelp_47x200/helpdata/EN/08/77ba810a1611d3a6b900104b55d538/frameset.htm]
    [Product Cost Collectors: Collective Entry for Repetitive Manufacturing |http://help.sap.com/saphelp_47x200/helpdata/EN/08/77ba810a1611d3a6b900104b55d538/frameset.htm]
    A production version determines the various production techniques that can be used to produce a material. It defines the following information:
    Alternative BOM for a BOM explosion
    Task list type, task list group, and group counter for assignment to task lists
    Lot-size restrictions and period of validity
    A material can have one or more production versions.
    It can be defined in the Material Master (txn MM02) in one of the following views:
    MRP 4
    Work Scheduling
    Costing 1
    The costing version is a different issue. It is a costing parameter and is used to save several cost estimates for the same material, with the same costing variant and the same costing date (e.g. in oder to cost the material several times with minor changes without creating new costing variants).
    BR,
    Antje