No option for system creation in system landscape.

Hello all,
           I have the super admin role and i have checked the permission for applications in Syst Admin -> Permission ->Applications, it shows " owner " but still i am not getting the option for system creation when i go to Sys Admin->Sys Conf->Sys landscape->
It is only showing the option to create folders, change ID and Refresh. Earlier I used to get the option and i have created some "Systems" but now niether i can create nor i can open the existing system objects.
Thanks,
Neil

Hi,
Try by assigning administrator role for the user. it will work.
If not come again.

Similar Messages

  • Where is the option for system updates in the update center

    Hi, I want to check if lollipop is available for my phone. So I went to software updates in the About Phone section, but I don't see the option to check for system updates. Why?
    My Z3 compact
    Android version: 4.4.4
    Build number: 23.0.1.A.5.77
    Solved!
    Go to Solution.

    @poorav Could you send me a private message with the IMEI-number of your Z3 Compact and I can look closer into this:
    http://support.sonymobile.com/global-en/xperiaz3compact/userguide/IMEI-number/
     - Official Sony Xperia Support Staff
    If you're new to our forums make sure that you have read our Discussion guidelines.
    If you want to get in touch with the local support team for your country please visit our contact page.

  • Solman configration for system landscape having virtual buffers

    Hi All,
      We are having a system landscape with virtual buffers in the TMS.TMS transport path look like this
      *Dev ->  Virtual Buffer -> Quality -> Virtual Buffer -> Production*
      We need to configure ChaRM for this landscape. We are able to get virtual system details in Solman and created the project. But ChaRM is failing while we try to import the transport requests to Quality.
    Can you please guide us to configure solman for this landscape.
    Thanks in Advance,
    Shaju

    hi,
    if the goal is to have a better control of what is going to QA
    the move to the QA happens anyway in 2 steps
    you might want to control the release in your development (via solman). In this case just control the action "test transport"
    you might want to control the import in QA. In this cas you manually import in QA
    I don't see the added value to have an extra virtual system
    SOLMAn will support your process with real system.  You can send to a virtual system why not (we are using this technique for other reason), but it is a dead end
    TMS won't support your landscape scheme because the move of a transport to the next system is related to the import from the previous system.  If it is a virtual buffer you won't have the possibility to import it virtually.
    Unless a Guru knows a magic trick I am convinced a virtual path won't work in our case.
    I hope my explanations were enough to explain the constrains we have
    best regards

  • Sound Blaster PCI Express - No option for AUDIO CREATION mode.

    I need help. ?I purchased another computer from Dell, with a Sound Blaster board just as I have done with three other computers. ?This makes four.
    I ordered it with the Sound Blaster board because of the THREE MODES, Entertainment Mode, Gaming Mode, and Audio Creation Mode. ?The Audio Creation mode is really what I want because it allows to add reverb.
    So when I get this latest Dell with the Sound Blaster card it is a
    Sound Blaster X-Fi Xtreme Audio PCI Express
    The Volume control does not show the three modes. GAMING, ENTERTAINMENT, and AUDIO Creation. ?It only shows the ENTERTAINMENT mode.
    So I thought perhaps those were enhancements that had to be installed from the Creative Sound Blaster CD that Dell provides. ?I put the CD in the dri've, and it goes into install mode and then when you start the install it says do you want to add additional software to which I answer YES.
    Then it says install your CD in the CD dri've, which of course it is already in there. ?The CD looks funky. ?No scratches, it is new, but it has an uncharacteristic distortion on the data side so it is probably bad.
    I download the drivers off the Creative site and it says, you have a newer version already installed on your computer.
    I have called Dell 5 times over the course of 2.5 hours being disconnected all 5 times after speaking to people with extremely thick accents that know as much about computers as I know about brain surgery.
    BOTTOM LINE
    1.Does the Sound Blaster X-Fi Xtreme Audio PCI Express have the ability to support the three modes: ?Entertainment, Gaming, and AUDIO CREATION.
    If so, how do I get it to workHow do I get a new CD
    2. If this card does not support the three modes, what card doesThe Sound Blaster cards in my other three Dells all support these three modes.
    Thanks!
    Doc from Las Vegas

    No the Xtreme Audio doesn't not support the three modes, it only has Entertainment mode. Any X-Fi card that is not a Xtreme Audio does support the three modes.

  • Initialisation option for source system in schedular tab

    What initialisation option for system in schedular tab signifies? Does it acts as pointer and points to the last record loaded in cube or ods?

    Hi....
    Welcome to SDN..........
    Initialisation option for source system in schedular tab........
    shows to you all the init you made for a specific datasource/sourcesystem...if you find a row here, it means that the init channel is active and you can load delta for that specific flow.....
    Initialization may with data transfer or without Data Transfer.......If you do with data transfer it will set the init flag............as well as it will fetch the data from set up table...........if you do without data transfer it will only set the init flag.....it will not fetch any records.........As soon as this init flag get set.......delta queue will get generated in the source system........after that any changes or new records will go to the delta queue.............So initialization load will be followed by delta load......
    When you have to reinit, first of all you have to delete this row and then request a new initial load, otherwise the system cannot allow to perform a new init (with overlapping condition) if you don't deete the previous one....
    Hope this helps
    Regards,
    Debjani.......

  • MySAP HR system landscape

    Hi
    Please provide the following help for installation
    1. What would be the mySAP HR system landscape
    2. What would be the component of mySAP HR
    3. Does it containts ABAP & JAVA engine both
    4. How many servers are required for this
    Any guide line documents , pl send
    Regards
    Vimal Pathak

    Hi Vimal
    customer specific system landscapes for an application as large as SAP ERP depend on many factors. It is thus not possible to give you "the" SAP ERP - Human Capital Management System landscape, without knowing which functions this HCM Landscape should support, where, in which languages.... (i.e. for some processes a pure SAP ECC System is sufficient, for others, you need a portal and Process integration as well)
    For this reasons, the already mentioned SAP ERP 6.0 Master Guide takes a planning-support-approach. It discusses four different "typical" reference system landscapes (Minimal System Landscape,..... Individual/ Distributed Landscape), and extends them to different possible example landscapes, to show you how to plan your own landscape.
    The example system landscape for HCM shown there assumes, that you intend to install the complete scope, and that you need firewalls, because this HCM landscape should support external recruiting scenarios as well.
    Closeley related to the planning process for system landscapes is the process component list (service.sap.com/scl), where you find information about which SAP ERP process needs which software component, and is available in which countries/ languages.
    regards,
    Andreas R

  • Options for message type SLFN

    We are trying to extend the usage of Solman Service Desk  for other IT related issues also
    for this the real challange I feel is the number of options available in the drop down while raising the ticket to choose from
    1. System/IBase
    2.Component
    of their choice and if it is possible to add more selectables options for System base and component which are helpful in addressing other day to day IT issues.

    Hello,
    About the Ibase,  you may create either new ibase components in IB52, or you can create a new custom product and assign systems to the custom products in SMSY, then the Ibase of the new systems will be created automatically.
    About the new software components, I have seen that issue adressed here in this forum a few days ago. I suggest that you do some searches, I am sorry but I don't know right now what's the table that you have to modify in order to have more software components.
    Anyway, if you create the messages through CRMD_ORDER, you need not assign a software component to the message. This may be feasible for scenarios where you route the messages to the teams based on other fields (perhaps the 'subject' field  would work)
    Best regards,
    Miguel Ariñ

  • Transport target for business system not found in System Landscape Director

    Folks,
    We have new installed new PI 7.1 system and importing interfaces from the OLD XI 3.0 system in to new PID 7.1 system.
    We are getting following error when we try to import an interfaces in to new PID system:
    Import failed because of business system transfer object
    Communication component XID_FileSystem: Obligatory
    transport target for business system XID_FileSystem not found in
    System Landscape Directory
    We are yet to install PIQ system.
    All the interfaces in the old XID system have transport target of XIQ system.  I removed the  transport taget for the interface, but transport target is still showing in the Business system under transport target head.
    How can we overcome this issue as we will not have PIQ system atleast for two weeks.
    Thanks in advance,
    Regards
    Chandu

    Hi,
    You need to maintain Transport Groups and target for business systems while SLD transports between your XI system and PI 7.1
    Illustrated with DEv & PRD here.
    Procedure:
    1) Call Integration Builder screen on DEV Server with http://hostname:J2ee Port/rep
    2) Call SLD (System Landscape Directory) Component from the Integration builder
    Save all the Following .zip files on the Local Desktop
    3) Select the Software Component & say Export that you want to Export from DEV
    Server to Production server and which is going to use in the IR of XI
    4) Also Select the Product of the above SWC and say Export
    5) Select the Technical Systems (TS of XI & TS of the SAP R/3) and say Export
    6) Select the Business System(s) & say Export; those are associated with above Exported
    Technical systems.
    In Production Server
    1) Logon to the SLD of the Production Server.
    2) Create a Technical System and Business system which points to the Production SAP R/3
    3) Go to Administration TAB in the main page of SLD
    4) Select the Import option to Import the SWC , PRD, TS,& BS which we Exported Earlier in DEV Server
    5) Click on Browse and select the .zip files that is to Import into Production Server,
    Which were stored on the local desktop at the time of DEV Server Export
    And say Import Selected File Option
    By this we exported and imported the SLD Objects
    Now we have to create transport groups and transport targets in the Production server of SLD
    Creation of Transport Groups
    Edit GroupsGroup1) Select the Business systems 
    2) Click on New Group and give the name of the group as DEV_group & select the
    Corresponding Development serveru2019s integration Server
    3) Similar way create another group for Production serveru2019s business system as
    PRD_group and select the Production serveru2019s integration Server
    Creation of transport targets
    This is to Define which business systems in two different groups correspond to each other
    1) Select each Business system in the SLD and select transport TAB---click on
    Add/Change Target and select its corresponding target business system.
    For Example:
    If you select the business system of Production XI server means
    In the target you have to select group as DEVGROUP and the business system of Development XI server.
    Like this do the same for other business systems also
    Ex:
    BS_PRD_Integration Server----
    BS_DEV_Inetration Server
    How to create Transport Groups & transport Targets
    http://help.sap.com/saphelp_nw04/helpdata/en/ef/a21e3e0987760be10000000a114084/content.htm
    Regards
    Seshagiri

  • Track for 4 system landscape

    Hi,
    Our system landscape including Dev, Stress,QA and Production systems and we want to define runtime systems for a track by defining four systems. So, that we can transport our Software Component from DEV > Stress > Test > Production.
    In NWDI there are only three options to add runtime systems (DEV/Test/Prod) for single track.
    Can any one please tell me, if there is some option to define our fourth system as runtime system for same track?
    Thanks & Regards
    Srinivas.

    Hi Kenny,
    wow, don't bring the hard stuff out.
    To answer the question:
    With the so-called "track connections" you can design your transport landscape in any possible way. No matter if you have two, three, four or twenty NW AS Java that need to be covered.
    For info regarding track connections have a look at http://help.sap.com/saphelp_nw70/helpdata/EN/13/602b27f6fb41b4a9eb4f72eabb9832/frameset.htm.
    Best regards,
    Timo

  • 5 system landscape for MDM?

    We are in the process to layout infrastructure for release 2 of our transformation project for ECC, MDM, PI, BODS. We are debating on possible solutions
    1) typical 5 system landscape like below.
    DEV->QA->PRD
    DEV2->QA2
    DEV2, QA2 are project landscape and others are maintenance landscape. After project testing, changes from QA2 will be moved to DEV, QA, PRD
    2) dual landscape
    Here, layout is same as option 1 but for go live changes will be moved directly from QA2 to PRD.
    I like to know what are the pros/cons of each approach.

    Hi Subin,
    The first approach is a lot easier to manage and involves lesser risks.
    Also as Vag rightly points that in case of different Vendors co-ordination is also an important point to consider before designing such a landscape.
    We too used the first approach and once our major change was done,we merged the systems which in your case are DEV2 and QA2.This was a much cleaner approach.
    Thanks,
    Ravi

  • APO - Basic settings for setting up the system landscape

    Hi,
    I have a, hopefully small, issue regarding setting up the system landscape for our APO - R/3 environment.
    In our test system in R/3 I need to specify the APO release, which is not a problem. The issue I have in R/3 is when I try to save the new setting. The system asks for a workbench request even if the test system has been "opened" by the Basis resource.
    I would like to avoid creating a workbench request as we are using an external tool ( HP PPM ) for transport management and I believe I will get into trouble since this workbench request should not be transported further into our production environment. As I have understood from our APO experts the settings must be maintained per R/3 system (development - test/quality - production) as it is pointing to corresponding systems in the APO landscape.
    The question is, does anyone know how we can maintain these settings without any workbench request being created?
    This is perhaps not a APO question, but I'm not sure in what other forum I should post it.
    Thanks for any feedback
    Br,
    Lars

    Lars,
    I have difficulty envisioning any situation when you would wish to make any transportable change (workbench or otherwise) in a test system.  The normal path would be to transport the change from the dev system into the test system.  I am unfamiliar with the third party software (HP PPM) about which you speak.  However, the standard controls currently used in your transport process (third party or otherwise) should limit which transports do and which transports do not get moved into your prod system.
    I can think of several ways to approach this problem.  I think you should consult with your supervisor before attempting such changes, to ensure that you are complying with all policies and procedures that exist for your company.  In my company, this type of exception would require creation of special change management docs, and appropriate signoffs by management.
    You are right this is not an APO question, it is a Basis question.  For advice on the technical aspect of your question, try one of the Basis forums.  Pick the one that is for the DBM you are using.
    http://forums.sdn.sap.com/index.jspa?categoryID=1#34
    Best Regards,
    DB49

  • Is there a way to configure NTFS file system on an NSS 324 SmartStorage unit. So far I can setup ext 3 or ext 4 but no option for NTFS

    Is there a way to configure NTFS file system on an NSS 324 SmartStorage unit. So far I can setup ext 3 or ext 4 but no option for NTFS. This unit should be joining a Windows Server 2008 R2 network and needs to be shared with all users. This unit will replace a File server running Win 2003 SP2.
    Message was edited by: Hermann Koster
    Thank you very much for your reply. The idea is to decommission the Windows file server which is running Windows Server 2003 SP2 operating system but is not running as a DC but just a member server. All this server is doing is providing file server services so my idea is to replace it with the NSS 324 box. My only concern is that when my NSS joins the domain all my users would be able to see and access network shares transparently, the same way they saw the former W2003 file server. After I transferred the data from File server I will use the same for NSS that was used for file server as well as same IP address and folders path as before.
    Any suggestions or advice?
    Once again thank you very much for your reply.
    Cheers,

    The internal HDDs must be formatted in either EXT3 or EXT4 file system because NSS uses Linux OS.  This is mainly because the RAM designed to fit with the customized Linux OS's size.
    You can connect to an external HDD via a  USB or eSATA port. The external HDD's file system can be NTFS, FAT32, AFT or EXT3/4 to be recognized for read/write. You can connect a 2TB USB/eSATA drive connec to the NSS via USB port to format your HDD for NTFS, AFT, FAT32, or EXT3/4 partition.
    You can join the NSS to a Windows domainr so all domain users to access NSS. You cannot replace the NSS for the Windows 2003 SP2 server. They are two different products and do different jobs. Windows server is features sets server while the NSS is the files/data server.
    Hope that helps!!

  • Receiving Error : Please set the Receivables system options for this operating unit and ensure that the MO: Operating Unit profile option is correctly set with an operating unit that is set up in Receivables. while trying to create a new Customer.

    Hi All,
    We have set up a new Operating Unit in Oracle Apps. Now when I am trying to create a new Customer in that Operating Unit, I am receiving following error:
    ERROR MESSAGE:-Please set the Receivables system options for this operating unit and ensure that the MO: Operating Unit profile option is correctly set with an operating unit that is set up in Receivables.
    We do have MO: Operating Unit and MO: Default Operating Unit set properly at Responsibility level for the Responsibility through which I am accessing this form.
    Your help is appreciated!
    Thanks in advance,
    SKA

    You can refer this thread and check your MO operating unit is set or not https://community.oracle.com/message/3937028 thanks

  • Setting Up the System Landscape for ESS

    Hello Experts,
    I am implementing ESS in portal.
    I am in step of defining systems in portal for ESS/MSS.
    Below is link I am following from help.sap.com
    [Link|http://help.sap.com/erp2005_ehp_04/helpdata/en/5b/76a6d7fd3a4e91bfb422405bf3e04d/frameset.htm]
    In above link it is mentioned that we have to define following systems :
    SAP_WebDynpro_XSS
    SAP_ECC_HumanResources
    SAP_ECC_Travel
    SAP_ITS_XSS
    SAP_BSP_EREC
    Additionaly according to below Article in SDN :
    [Link|http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/21eb036a-0a01-0010-25a3-b2224432640a?quicklink=index&overridelayout=true]
    Following additional systems must be created :
    SAP_ITS_EBU Looks similar to SAP_ITS_XSS above 
    SAP_R3_Financials
    Now the basis person in my project has handed over to me following systems :
    SAP_BSP_EREC
    SAP_ITS_FND Name mismatch as FND is used in place of XSS or EBU
    SAP_R3_Financials
    SAP_WebDynpro_ESS Name mismatch as ESS is used in place of XSS
    Now below two systems are altogether missing as per first link on help.sap.com
    SAP_ECC_HumanResources
    SAP_ECC_Travel
    Please explain if it requires to be corrected or name mismatch and missing ststems would do.
    Thanking you in anticipation.

    All the above names that you are referring to are not necessarily separate systems.
    These are system aliases for a system object created in your portal via System Administration - System landscape.
    So, if you have HR and Finance on the same backend server, then you need only one system with the related system aliases.
    You will need SAP_BSP_EREC only if you are planning on using E-recruitment.
    Similarly, you will need SAP_ITS_XSS  only if you are planning on using any ITS applications.
    It is pretty straight forward to change/correct the names of your system aliases instead of changing the usage of these aliases every where else.
    SAP_ECC_HumanResources is absolutely necessary.
    SAP_ECC_Travel is required if you are planning on using travel and expense related applications.
    Also, note that SAP_WebDynpro_XSS should be the alias of the system where your webdynpro applications are deployed (typically the same portal server)
    - Shanti

  • Please, 1. Please set the Receivables system options for this operating

    hi
    please i have this error:
    1. Please set the Receivables system options for this operating unit and ensure that the MO: Operating Unit profile option is correctly set with an operating unit that is set up in Receivables.
    can some one help me!
    thinks

    think you a lot mister.
    i am not the administrator of the base, our base administrator is not here for the moment, i have just the count apps and sqplus to change parameters.
    and the request :
    select fnd_profile.value('SO_ORGANIZATION_ID') from dual ;
    gives as result : 101!
    think you for all!.
    Message was edited by:
    brahim37

Maybe you are looking for

  • A question in the query

    Hi, i would lke to display 2 rows and 2 columns in the query. 2 rows: material nr and year 2 columns: Total amount for whole year and a quarter of this year eg.      material nr    year      amount for 2010    amount for 4. quarter 2010            00

  • Adding a tab on to Activity Overview Screen in CJ20N

    Hi Experts, I have to add a new tab may be called as ' PRICING' on activity overview screen right next to Purch. TAB Basically, when we select an activity in CJ20N and click on material component, where we actually put in the material number, requirm

  • Opening file with PE6 for Mac

    Probably a silly question: In Bridge, how do I change the "Open With" default setting from "Preview" to "Photoshop Elements 6"? I've checked in Preferences for both PE6 and Bridge, but there doesn't seem to be a way to change that. When I double-clic

  • Transition from 10g client to 11g client causing locks

    Currently our middleware is using the System.Data.Oracle objects with the 10g client install and we've recently started converting to an 11g database and upgrading our client software.  However, during high loads we're seeing concurrency problems wit

  • NPD - no edit authorization in Activity's routing requirements TAB

    Hello, I set up all activity templates with several steps and several functional areas per step. It means each functional area is the owner of a specific step. These areas should be responsible for completing all assigned tasks within their step BUT