No req is getting generated with VB
Dear PP gurus,
I have a finished Production FG01 for which SF01 and SF02 are the assemblies required . In SF01 there is a raw material RM01
and in SF02 there is another raw material RM02.
In the MRP views of
RM01 ,: i have mentioned MRP type VB (consumption based planning) , lot size (EX) and a reorder point is defined 10 and a safety stock is 5 . At present there isno stock .
when i run MRP for FG01 ,
there is no requirement is getting generated for RM01
whereease if i change the MRP type to PD , THE SYSTEM is giving the requirment
i think i have missed some configuration setting for consumption based planning .
could you please help me ?
Thanks And regards
Hi,
The following method is adopted by the system to caluculate the Net Requirements while MRP run
1) The system then calculates the net requirements. The system compares the available stock at plant level (including safety stock) plus the firmed receipts that have already been planned (purchase orders, production orders, firmed purchase requisitions and so on) with the reorder point. If the sum of the stock plus receipts is less than the reorder point, a
material shortage exists.
2) The system then calculates the procurement quantity according to the lot-sizing procedure defined in the material master.
For reorder point planning, the system supports the Fixed lot size and Replenish up to maximum stock level lot-sizing procedures. You can also use period or optimum lot-sizing procedures for reorder point materials. In this case, you must calculate future requirements using the forecasting functions. The forecast values are then interpreted as requirements.
3) The system then schedules the procurement proposal, that is, the system calculates the dates on which the purchase order has to be sent, or when production has to begin and the date on which the vendor has to deliver the goods or by which roduction has to have the goods ready.
Pavan
Similar Messages
-
.css and .swf files are getting generated with Ibot email
Hi Team,
I have an Ibot which use to run on daily basis which contains graph and normal table views, .css and .swf files are getting generated and attached with Ibot email to the users. I'm facing this issue from last two days. Earlier there was no such attachments sent to the users.
Could anybody let me know what might be the reason for that?any inputs?
-
Salary statement not getting generated after Upgrade
Hi all,
We have recently Upgraded to NW 7.4 SP6 from 7.01 SP9 . we are using two standard ESS applications for HR i.e Leave Request and Salary statement.
Leave Request application is working fine but salary statement is not getting generated with an error message.
The ESS /MSS Components installed are as follows.
BP_ERP5***
1000.1.0.18.0.20100828050255
BP_ERP5COM
1000.1.0.19.0.20110829150538
BP_ERP5ESS
1000.1.41.11.0.20120402111759
BP_ERP5MSS
1000.1.51.7.0.20130923050751
SAPPCUI_GP
1000.633.0.1.0.20120427113021
SAP_ESS
1000.633.0.1.1.20120802180711
SAP_MSS
1000.630.0.1.0.20120427113023
while generating the salary statement we get the following errorSearch OSS note for those cubes. This should be a known SAP issue. We too had similar issue (though i dont remember now which statistic cube it was) and got resolved after next upgrade.
Abhijit -
We explored using sbRIO for our project, for different reasons we ended up going with a different embedded solution . We are currently evaluating the LabVIEW C Generator to convert some of the core analysis routines from LabVIEW to C so the team that will be creating the embedded solution don't have to re-implement them from scratch.
Before converting our code, I followed the instructions given in the "Getting Started with the NI LabVIEW C Generator" manual to create a static library created inCygwin using GNU Compiler Collection (GCC).
I managed to compile the code, but when I type "run GCD.exe" in the Cygwin console, I just see the window flash with no time to see if the result is correct or not. I modified the main.c cde to add a getchar(), but the window still just flashes and now I am left with the GCD process still running and have to kill it using Windows Task Manager.
Has anyone else got this example to run? I am sure I am missing an obvious setting or step, please help me.
More details below.
Thanks,
Fab
Here is a video showing the steps I followed
If you don't want/can't see the video. Here are some screenshots of what I have done so far:
GratestCommonDivisor.lvproj C Generation build specs Information:
C Function prototype definition:
I copied Makefile located at: C:\Program Files (x86)\National Instruments\LabVIEW 2011\examples\CGenerator\Tutorial\Cygwin
and replaced both Makefile and Makefile.cygwin in the directory where the C code was generated
I also copied main.c from the same location and replaced the one generated
Here is the snapshot of the results after executing "make GCD.exe"
Then to run it I just type
I see a window open and close really quickly and I never see the result. I have tried adding the getchar() line to the main.c file, but still I don't get to see the results.
Certified LabVIEW Architect * Certified Professional Instructor * LabVIEW ChampionHi Kevin,
I hope you had a good Thanksgiving. I am attaching a zip file with the LabVIEW project, my build specification and my version of "Greatest Common Divisor.vi", which should be the same as the one that you have that ships with the LabVIEW C Generator, but just in case. I am also attaching a zip file with the C files generated by the LabVIEW C Generator.
You can also see the video I posted earlier with the steps I followed. I hope you are able to point out where I went wrong.
Thanks,
Fab
Certified LabVIEW Architect * Certified Professional Instructor * LabVIEW Champion
Attachments:
GreatestCommonDivisor.zip 8 KB
CGen Files.zip 71 KB -
I never used LabView but need to generate a RS-233 serial output string that contains an IRIG timestamp based on a contact closure. Is LabView an appropriate tool to do this? How much does it cost to get started with the product?
Labview isn't cheap, but it would certainly allow you to build a program (set of vi's - virtual instruments) that would do what you describe. Where would the timecode information come from? Your vi, or program, would: Start up, initialize the serial port, loop until a trigger happened, read the timecode (from where?), output that timecode out the serial port in a loop until you pressed the stop button. There is a free evaluation of Labview software available from NI - the base product itself runs about $995.
- Dave -
Get generated rows by Spry with jQuery
i have a spry region like this
<table class="widget-elenco">
<tr spry:repeat="pv" spry:even="even" spry:odd="odd">
<td>{soggetto_id}</td>
<td>{codice_fiscale}</td>
<td>{partita_iva}</td>
</tr>
</table>
the problem: i cant' get the generated rows by spry:repeat with jquery
i try with an observer, something like this
var myObserver = function(nType, notifier, data){
if (nType == 'onPostLoad') {
$(function(){
$('table.widget-elenco tr').each(function() {
doSomething()
ds.addObserver(myObserver);
but this not woks :-/
i can to change "onPostLoad" to "onPreLoad" or "onDataChanged"
without solutions :-/
any idea?
many thanks!
Robhi gramps :-)
thanks for your reply!
here:
http://qubica.in/manager/soggetti/index.cfm
simple: i would "remove" the anti-estetic "onmouseover/onmouser" function added on a single <tr> for replace with a jquery function:
$(function(){
$('table.widget-elenco tbody tr').mouseover(function() {
$(this).addClass('ui-state-highlight');
}).mouseout(function() {
$(this).removeClass('ui-state-highlight');
yes, this is not a so important problem... :-) but, in general, the *REAL* question is "how do i get generated rows... using jQuery selector?"
something lijke this:
$(function(){
$('ELEMENTS-IN-SPRY-REGION').each(function() {
doSomethings();
thanks!
Rob -
For Times New Roman font in Windows server 2012 R2 (Standard), crystal 9/10 report in pdf format is not getting generated. When we change the font for specific report like Arial, Calibri , Cambria then pdf report getting created.
In Windows 2008 R2, same application worked fine to generate pdf report for TimesNewRoman font and there is no change done in the application which is being used in Windows 2012 R2 server.Ok, thanks for the reply. You need to contact support or a forum for the Crystal software. Third party products don't usually include Adobe technology, they have their own software. When you contact them, you may want to expand "unable to generate" to give any specific symptoms including any error messages.
-
Wrong query is getting generated in WHERE NOT EXISTS with group by clause
Query is getting generated wrongly in where not exists section when i use group by function.Please prvoide me any clue to over come the problem.
/* DETECTION_STRATEGY = NOT_EXISTS */
INSERT /*+ APPEND */ INTO STG_ETL.I$_DCMT_TIMEZONE_LOOKUP
TZ_OFFSET,
ADT_CRT_DT,
ADT_UPDT_DT,
IND_UPDATE
SELECT * FROM (
SELECT
to_number(KOFAX.RECEIVED_TZ) TZ_OFFSET,
min(sysdate) ADT_CRT_DT,
min(sysdate) ADT_UPDT_DT,
'I' IND_UPDATE
FROM ESTG.FLAT_FIL_DMS_KOFAX KOFAX
WHERE (1=1)
And (KOFAX.LD_DT = ( select MAX(LD_DT) from ESTG.FLAT_FIL_DMS_KOFAX INNER
where INNER.ENGAGEMENT=KOFAX.ENGAGEMENT
and INNER.KOFAX_FILE_NM = KOFAX.KOFAX_FILE_NM
AND INNER.IM_CUST_ID = KOFAX.IM_CUST_ID
and INNER.BATCH_ID=KOFAX.BATCH_ID)
AND
(TO_DATE(KOFAX.LD_DT)>=TO_DATE(SUBSTR('#WAREHOUSE.P_EDW_LAST_RUN',1,10),'YYYY-MM-DD'))
And (substr(KOFAX.RECEIVED_TZ,1,1) <> '+')
Group By to_number(KOFAX.RECEIVED_TZ)
) S
WHERE NOT EXISTS (
SELECT 'X'
FROM EDW.DCMT_TIMEZONE_LOOKUP T
WHERE T.TZ_OFFSET = S.TZ_OFFSET AND
)Easiest fix for you would be to change the detection_strategy on the IKM from NOT_EXISTS to either :
MINUS
-- Try this out, it should work, it will give the same data through the equiverlant steps.
NONE
-- This will load all incoming data into your I$ table, there will be more rows to crunch in the following 'Flag Rows for Update' step, it might give incorrect results potentially - you will have to test it.
So try MINUS first, failing that, see if NONE gives you what you want in your target.
Are you inserting only new data or updating existing data? -
Purchase Requisition not getting generated in APO
Hi,
I am facing an issue in APO. Once I confirm a sales order, I have to run the Product Heuristic in APO to generate the purchase requisition through rrp3. The problem is the purchase requisition is getting generated without the PR number. The line does not show the number and also the purchase req is not reflecting in ECC. Please refer the screenshot. Kindly help me with this.
Thanks & Regards,
Raja SHi Guys,
Sorry for the delayed response. Now got another issue. My CIF model for a Sales Order is not getting activated. I also cleared the queue in APO through /sapapo/cq and then start running the CIF. But it runs for a long period.
What could be the other possible issues with CIF model activation?
I am getting a message box like the below when try to activate the CIF. I keep ignoring the message and trying to run the CIF. But still I am unable to resolve. Kindly help
After resolving this only, I can go for the above mentioned issue. I sincerely thank all your support.
Regards
Raja S -
After MRP planned orders are not getting generated?
HI,
Our bussiness is make to stock and repetetive manufacturing.
We have a prob in running MRP, i enter the demand in MD61 on day basis and after running MRP for some materials all planned orders getting generated wrt to demand but for some materials only some planned orders getting generated means it's not taking full demand ex i have material A and paln is 1000 for 10days i entered demand in MD61 for 10days 100 each and if B material is having same 1000 demand so i enter 100 each then i run MRP and the out put is im getting 10planned orders with 100 each qty for A material where as for material B im not getting full 10 orders only 2 or 3 with 100 each what could be the reason ?
Thanks
KK
Edited by: kiran kumar on Mar 23, 2010 10:19 AM
Edited by: kiran kumar on Mar 23, 2010 10:20 AMDear Kiran,
As your saying it is Make to Stock, system will consider Availble stock in Net Req. Calculation
what is startegy mainatined for A & B
if you go with Strategy 11 then system will not consider the stock & Creates the requirements
Regards
Madhu -
Purchase requisition not getting generated in MD04
Hi,
if i have my material with MRP type VB & my ROL is 10. Now if my stock at present is 0.74KG & if i do the MRP run with MD02 then my purchase requisition is getting generated.now i delete the purchase req & try it with MD01 for the whole plant but the same does not happen when i do the MRP run with MD01. my purshase requistion for the same material never gets generated. can anyone tell me what m i missing. following parameters are maintained by me in MD01 & MD02
Processing key NETCH
Create purchase req. 1
Delivery schedules 3
Create MRP list 1
Planning mode 3
Scheduling 1HI,
Check below threads,
[MDAB - Planning file entries |MDAB - Planning file entries;
[How to use T-code: MDAB and MDRE|How to use T-code: MDAB and MDRE;
Regards,
Dhaval -
Transportation lane KEY not getting generated in the table
Transportation lane KEY not getting generated in the table
Hi folks,
The issue is like this :
We have a weekly workorders upload program from legacy systems to SAP-APO. The legacy planners send a .CSV file containing material-wise workroders. A customised zee program picks these quantities & writes them in Prod.planned keyfigures in SNP planning book. This process is done for the manufacturing locations only.
Lately workorders for two particular material M1 & M2 had failed to get upload. It gives the error 'NO VALID SOURCE OF SUPPLY COULD BE FOUND' in its Job log. We did some debugging & found that for successful materials the TRPID is getting generated in the table /SAPAPO/V_TRPROD whereas this TRPID is missing for M1 & M2. Why this is happening is our main concern. We tried deleting the PPM & creating this again, assuming that the PPMID is the precursor for generating this TRPID, but this yielded no results.
____ for successful upload______________
se16 --> /SAPAPO/V_TRPROD
Version = 000
LOCTO = LOCID KEY for manufacturing location
MATID = MATID KEY of successfully loaded workorder
Enter
This gives the following results
TRPID = TRPID KEY
LOCFR = LOCID KEY for manufacturing location
LOCTO = LOCID KEY for manufacturing location
MATID = MATID KEY for successfully loaded workorder
( This seems a self-lane, i.e both TO & FROM location are same)
____ for unsuccessful upload________
se16 --> /SAPAPO/V_TRPROD
Version = 000
LOCTO = LOCID KEY for manufacturing location
MATID = MATID KEY for unsuccessfully loaded workorder
Enter
This gives the following results
Error = No Table entries found for specified KEYS
We are perplexed why this TRPID is not getting generated for these two particular material M1 & M2?
We have deleted their PPM & re-created them to cross-check if the PPMID KEY is the trigger for generating the TRPID key. This didn't work!
Please let us know in case someone faced a similar issue.
Many Thanks.
Kumar
Edited by: Blue Lotus on Jun 9, 2011 2:44 PMYes Anand.
We deleted the PPM & created it again, which didn't work.
Later on we deleted the product itself from APO & re-CIFed it from R3 & then re-created the PPM.
The PPMID which was missing earlier is now getting created! However no luck with the TRPID.
Why this TRPID is not getting generated in our only concern
Regards
Kumar -
Invoice getting generated for 103 MT not for 105 during ERS
Hi Experts,
I am facing one problem ,our client follows 103- 105 Mvt procedure for GR.
the requirement is to create automatic invoice through MRRL for movement type 105 but instead zero value invoice is getting generated for 103 MVT
Please suggest.
Regards.Hi,
Does 105 is performed for your PO .
Before running MRRL.
Does GR based IV and ERS indicators are ticked in PO?
Do also check the below KBA it may help you.
1543167 - Invoice is posted with zero amount in T-code MRRL -
The report l runs very night and gets ended with error
Dear all,
I am facing a problem in solution manger. There is an report (Program/Command RDSMOPSOL_MONIREFRESH ) will runs very night and get ended with error and there is Run-time error "MESSAGE_TYPE_X".
Please suggest how to solve the problem.
Is this report is necessary for the system because it is not mention in the sap stand jobs.
SM37 log
Job started
Step 001 started (program RDSMOPSOL_MONIREFRESH, variant &0000000000875, user ID BASIS)
Opening and closing session started. Session SM2000000000065
Opening and closing the session was successful. Session: SM2000000000065
Opening and closing session started. Session SM2000000000005
ABAP/4 processor: MESSAGE_TYPE_X
Job cancelled
SM:CSA SESSION REFRESH
No. Program/Command Prog. type Spool list Parameter User Lang.
1 RDSMOPSOL_MONIREFRESH ABAP &0000000000876 BASIS EN
Sm21 log
00:00:50 DIA 00 000 SAPSYS EEA OPERATION MODES: Switch to operation mode Normal triggered
00:30:57 BTC 08 200 BASIS R68 Perform rollback
00:30:57 BTC 08 200 BASIS AB0 Run-time error "MESSAGE_TYPE_X" occurred
00:30:57 BTC 08 200 BASIS AB1 > Short dump "081112 003057 sapsm BASIS " generated
00:30:57 BTC 08 200 BASIS D01 Transaction Canceled 00 671 ( MESSAGE_TYPE_X 20081112003057sapsm BASIS 2001 )
00:30:57 BTC 08 200 BASIS R68 Perform rollback
00:30:57 BTC 08 200 BASIS AB0 Run-time error "MESSAGE_TYPE_X" occurred
Details
Recording at local and central time........................ 12.11.2008 00:30:57
Task................ 05312 . 08 B8 BTC background processor No. 08
User................ BASIS
Client.............. 200
Terminal............
Session............. 1
Transaction code....
Program name........
Problem class....... T Transaction Problem
Development class... SABP
Further details for this message type
Module name......... abdynpro
Line................ 1133
Error text.......... ab_jmess
Documentation for system log message AB 0 :
The specified runtime error has occurred in the system.
Parameter
a.. MESSAGE_TYPE_X
Technical details
File................ 000048
Position............ 0000253620
Entry type.......... l ( Error (Module, Row) )
Message ID.......... AB 0
Variable parts...... ab_jmess abdynpro1133
Time Ty. Nr Cl. User Tcod MNo Text Date : 12.11.08
00:30:57 BTC 08 200 BASIS AB1 > Short dump "081112 003057 sapsm BASIS " generated
etails
ecording at local and central time........................ 12.11.2008 00:30:57
ask................ 05312 . 08 B8 BTC background processor No. 08
ser................ BASIS
lient.............. 200
erminal............
ession............. 1
ransaction code....
rogram name........
roblem class....... K SAP Web AS Problem
evelopment class... SABP
BAP Mini dump
ate................ 20081112
ime................ 003057
ost................ sapsm
ser................ BASIS
ocumentation for system log message AB 1 :
A short dump was generated for the specified program termination.
You can analyze this short dump in the system log evaluation by
selecting this line or evaluating Table SNAP (Transaction ST22).
echnical details
ile................ 000048
osition............ 0000253800
ntry type.......... s ( ABAP Runtime Error )
essage ID.......... AB 1
ariable parts...... 081112003057sapsm BASIS
Time Ty. Nr Cl. User Tcod MNo Text Date : 12.11.08
00:30:57 BTC 08 200 BASIS D01 Transaction Canceled 00 671 ( MESSAGE_TYPE_X 20081112003057sapsm BASIS 2001 )
Details
Recording at local and central time........................ 12.11.2008 00:30:57
Task................ 05312 . 08 B8 BTC background processor No. 08
User................ BASIS
Client.............. 200
Terminal............
Session............. 1
Transaction code....
Program name........
Problem class....... K SAP Web AS Problem
Development class... SDYN
Module name.........
Location............
T100................ 00 671
Parameters..........
Documentation for system log message D0 1 :
The transaction has been terminated. This may be caused by a
termination message from the application (MESSAGE Axxx) or by an
error detected by the SAP System due to which it makes no sense to
proceed with the transaction. The actual reason for the termination
is indicated by the T100 message and the parameters.
Additional documentation for message 00 671
ABAP/4 processor: &
No documentation exists for message 00671
Parameter
a.. MESSAGE_TYPE_X
00:30:57 BTC 08 200 BASIS R68 Perform rollback
Details
Recording at local and central time........................ 12.11.2008 00:30:57
Task................ 05312 . 08 B8 BTC background processor No. 08
User................ BASIS
Client.............. 200
Terminal............
Session............. 1
Transaction code....
Program name........
Problem class....... W Warning
Development class... STSK
Further details for this message type
Module name......... thxxhead
Line................ 1240
Error text..........
Caller.............. ThIRoll
Reason/called....... roll ba
Documentation for system log message R6 8 :
An error has causes an SAP rollback. All database updates are reset.
Technical details
File................ 000048
Position............ 0000254520
Entry type.......... m ( Error (Function,Module,Row) )
Message ID.......... R6 8
Variable parts...... ThIRollroll bathxxhead1240
Regards,
ShivaHi karteek,
I have check there is Switch of operation mode but when I have checked the t-code sm63 there is no new mode are in normal mode.
There is one thing I want to ask dose this report (Program/Command RDSMOPSOL_MONIREFRESH ) run in your system or any one server because I have think there is some problem in job shued
and is also not mention in the sap stand jobs.
there is an error in sm21 in job.
BASIS SM36 EFK BP_CHECK_REPORT_VALUES: Invalid program values found. Reason:
BASIS SM36 EFC > Program RDSMOPSOL_MONIREFRESH has no variants, but a variant was specified
Is this SM37 log
Job started
Step 001 started (program RDSMOPSOL_MONIREFRESH, variant &0000000000875, user ID BASIS)
Opening and closing session started. Session SM2000000000065
Opening and closing the session was successful. Session: SM2000000000065
Opening and closing session started. Session SM2000000000005
ABAP/4 processor: MESSAGE_TYPE_X
Job cancelled
Sm21 log
SAPSYS EEA OPERATION MODES: Switch to operation mode Normal triggered
BASIS R68 Perform rollback
BASIS AB0 Run-time error "MESSAGE_TYPE_X" occurred
BASIS AB1 > Short dump "081111 003056 sapsm BASIS " generated
BASIS D01 Transaction Canceled 00 671 ( MESSAGE_TYPE_X 20081111003056sapsm BASIS 2001 )
BASIS R68 Perform rollback
BASIS R49 Communication error, CPIC return code 017, SAP return code 223
BASIS R64 > CPI-C function: CMINIT(SAP)
*BASIS SM36 EFK BP_CHECK_REPORT_VALUES: Invalid program values found. Reason:*
*BASIS SM36 EFC > Program RDSMOPSOL_MONIREFRESH has no variants, but a variant was*
specified
BASIS R68 Perform rollback
BASIS AB0 Run-time error "MESSAGE_TYPE_X" occurred
BASIS AB1 > Short dump "081111 220948 sapsm BASIS " generated
BASIS D01 Transaction Canceled 00 671 ( MESSAGE_TYPE_X 20081111220948sapsm BASIS 2001 )
Details Page 2 Line 6 System Log: Local Analysis of sapsm 1
Time Ty. Nr Cl. User Tcod MNo Text
00:00:51 DIA 00 000 SAPSYS EEA OPERATION MODES: Switch to operation mode Normal triggered
Details
Recording at local and central time........................ 13.11.2008 00:00:51
Task................ 04100 . 00 D0 Dialog work process No. 00
User................ SAPSYS
Client.............. 000
Terminal............
Session............. 1
Transaction code....
Program name........
Problem class....... S Operation Trace
Development class... SBTC
Sm63
Start/end time Name of the active operation mode
00.00 - 01.00 Normal
01.00 - 02.00 Normal
02.00 - 03.00 Normal
03.00 - 04.00 Normal
04.00 - 05.00 Normal
05.00 - 06.00 Normal
06.00 - 07.00 Normal
07.00 - 08.00 Normal
08.00 - 09.00 Normal
09.00 - 10.00 Normal
10.00 - 11.00 Normal
11.00 - 12.00 Normal
12.00 - 13.00 Normal
13.00 - 14.00 Normal
14.00 - 15.00 Normal
15.00 - 16.00 Normal
16.00 - 17.00 Normal
17.00 - 18.00 Normal
18.00 - 19.00 Normal
19.00 - 20.00 Normal
20.00 - 21.00 Normal
21.00 - 22.00 Normal
22.00 - 23.00 Normal
23.00 - 00.00 Normal
Regards, -
Schedule lines are not getting generated during MRP Run
Schedule lines are not getting generated during MRP Run. I have maiantained source list for the material with proper validity date and also maintained scheduling agreement . MRP relevvant Indicator , I have marked - 2 which means -Record relevant to MRP. Sched. lines generated automatically.
Still I am not able to get schedule lines and instead of that *Purchase Requisitions* are getting generated.
Can any one help me and suggest me what to be done in this case .
Thanks & Regards ,
NirmalyaDear,
Welcome to SDN,
In transaction OMDT you have to enable the indicator create schedule lines
In MD02 MRP control Prameter here select the Delivery schedules -3- Schedule line. Processing Key as NETCH and Planning Mode - 3 delted and recreated.
Maintain source list ME01, in that put MRP indicator as '2' i.e. schedule lines via MRP.Put your agreement no in that.
If u run MRP properly u will get schedule lines automatically in ME38.
Make the schedule agreement, make it source relevent in the source list make is FIX and MRP indicator as 3.
Regards,
R.Brahmankar
Maybe you are looking for
-
Key figure schema in CO-PA reporting
Hallo SAP Gurus, Is there any method to copy the key figure schema created in one operating concern to other operating concern in the same client? In our company, we have 18 operating concerns for 18 company codes. I have created one key figure schem
-
Length of a field in calendar report...
Hi, I have a calendar report based on 2 columns as necessary, a date column and a varchar2 column. All the records for a particular date are grouped and shown under the date in the calendar report as required. Off late, we have faced an issue as belo
-
How can I get my music transferred from my ipod classic back to my computer?
I have a 5th generation Ipod classic that is cracked on the surface but works still on a docking station at home in which I can select the music through my tv. My problem is that certain music and ablums show they are on my itunes but do not play on
-
Hey just doing a check. In. Do you have any more information about the Lightroom app for tablet? Like when it is coming out, what features will it have? Because I can't Waite. Especially for editing a raw file on a tablet. Excited. I do have a Fe
-
How to download run time ABAP dump in production environment
Hello, I am getting run time ABAP dump in production environment. Please guide me onHow to download run time ABAP dump in production environment? Also, please tell me how best can analyze that dump. Like there are tools like gdb, purify etc. to analy