Not able to interface Project Costing transactions to GL

We are on R12.0.6
We have costed transactions from Sep2009 till date. Since past GL periods are closed, these transactions are stuck and we get error while running PRC:Create Accounting in Projects
Error no: 95325 The GL date is not in an open or a future enterable period. Please select a valid GL date or open the period.
We cannot open past GL period. Let us know how to transfer this transaction to GL in current period. We are fine if these are transferred in current open GL period
These are Misc Cost transactions for non-labor items against which we have generated revenue and done billing. User posted revenue and receivables to GL but missed to transfer costs at that time
Regards,
Ketan

Thanks so much Vijay,
The Sweep process shows all stuck cost transactions for each month. Review option of the process displays the transactions and Update option actually moves GL date of transactions to current open GL period. This is ideal solution since we do not have to open past GL period and we are fine to post those transactions to current GL period.
Vijay, just last query. These are expenditure items having cost, revenue and billing attached to each item. Revenue and billing is already posted to GL in past GL periods. When we use above Sweep process and select Expenditure as parameter, only the GL date of cost (stuck transaction) will get shifted? I hope the revenue and billing date of the expenditure item will not get affected (we do not want the revenue and billing date to get shifted). I did not see the revenue date getting shifted during testing but wanted to double-confirm on that. Can you pls let us know.
Regards,
Ketan

Similar Messages

  • Not able to Interface Draft Invoice to AR

    Hi,
    We have one Draft Invoice which is Approved, Released, and AR Period also open and Remit-To-Address also defined but we are not able to Interface it to AR.. Could you please tell me what could be the reason.
    Thanks
    Bharath

    Hi Dina,
    Thanks for your reply, Project, Customer and Project Manager are Active not end dated & Log file also not showing any reasons.
    Could you please tell me anything else I have to check to resolve this case
    Regards
    Bharath
    Edited by: 983186 on Jan 23, 2013 9:44 PM

  • In P6 version7 not able to copy project with the baseline.

    Hi,
    In P6 version 7 it is not able to copy project with the baseline. It copies only the schedule.
    Please help.
    regards,
    Baber.

    Tried the solution from another thread but did not work completely (as warned) - the workaround didn't quite work for me either:
    https://discussions.apple.com/thread/1398462?start=0&tstart=0
    Ended up taking a backup, did a fresh install, created the account as the first one so that it gets the same UID as the other Mac (on which my account was the first) and restored my data - was painful but finally on track.

  • Not able to assign Project to the Urgent Change Request with Developer Id with the existing Authorizations. With SAP_ALL authorization, everything works fine.

    The Urgent Change request is in created status and I am not able to assign project to it. Also I am not able to change the status of the change request to In developement with developer's Id. Everything works fine if i assign SAP_ALL authorization to the developer.
    Below are the roles assigned to Developer ID -
    SAP_CM_SMAN_DEVELOPER
    SAP_SM_CRM_UIU_FRAMEWORK
    SAP_SM_CRM_UIU_SOLMANPRO
    SAP_SM_CRM_UIU_SOLMANPRO_CHARM
    SAP_SMWORK_BASIC_CHANGE_MAN
    SAP_SMWORK_CHANGE_MAN
    SAP_SOCM_DEVELOPER
    Z_S001
    ZSAP_SOCM_DEVELOPER
    Issue screen -
    SU53 for Developer-
    Please suggest which roles/Authorization should be assign to Developer Id.
    Thanks
    Kavita

    Hi Kavita,
    Copy these roles to Z-roles
    SAP_CM_SMAN_DEVELOPER
    SAP_SM_CRM_UIU_FRAMEWORK
    SAP_SM_CRM_UIU_SOLMANPRO
    SAP_SM_CRM_UIU_SOLMANPRO_CHARM
    SAP_SMWORK_BASIC_CHANGE_MAN
    SAP_SMWORK_CHANGE_MAN
    SAP_SOCM_DEVELOPER
    Assign this to user.
    Put a stace using ST01.
    Find that object and modify/add in your custom role.
    Regards,
    Divyanshu

  • Users are not able to edit projects even with right permissions

    Hello,
    We have a weird issue. Your help or inputs is appreciated.
    A user is not able to edit projects in SAP PPM 50 unless 1)the project is created by the user and 2)user has access to ACO_SUPER auth object. For the projects, the user is trying to edit, we made sure user has write ACL access in the administration tab of the project.
    Obviously, we can't give all users ACO_SUPER access. Please advise how to proceed.
    Thanks in advance

    Hi Pranith,
    You are right..ACO_SUPER is not recommended for all users, it's an super user access.
    In PPM-Project management, there are two authorizations
    1) General Authorizations
    2) Project Specific authorizations
    General authorizations:
    This is provided to user using a backend PFCG roles like 'SAP_CPR_USER' which contains business partner view access and other similar roles are assigned for project creation, template creation etc.,
    Project Specific authorizations:
    This authorizations are provided using ACL 'Authorizations' tab within the project and here you have different authorisation activities like admin, write, read & none.
    As you said, the user who creates the project will get 'Admin' authorization and after that if you want give access to other users, then you need to add manually users in the project definition-authorisation tab or you can provide default authorization through project role type.
    Have you added the users manually in authorisation tab?
    Regards,
    Ravi

  • FBL3N  Report  -not able to get all the transaction code details

    Hello,
    when FBL3N report  ran for one the expenses account (time paid off  - project charges account) , only few  line items are displaying  the transaction code like CJ88 and CJ8G.
    can you please tell me why all the line items are not showing the transactions codes and is there any know situation when the T- codes are not displayed.
    What I need to do, to get all the T- codes in the report ?
    I really appreciate your help.
    Regards
    Radha

    I know it is a line item report and I was expecting to see the transaction code details in the report for every line item. But in I'm not able to see all  T- codes for all the line items
    Thanks
    Radha

  • Not able to create Follow up transaction since it has been grayed out

    Hi Experts,
    We have a scenario where in we will create the Sales Transactions (OR) in ECC and then it will replicates to CRM.
    In CRM we wants to create Returns Order (RE) as a follow up Transaction to OR (which is replicated from ECC to CRM) .
    When I tried to create Returns Order (RE) in CRM as a follow up document to Sales Transaction (OR), the follow up Transaction CRM Returns (RE) has been grayed out. I mean it is in display mode only.
    And then I created Sales Transaction (OR) in CRM itself and then I tried to create follow up Returns Transaction (RE) I was able to create.
    But I am not able to Create Returns Order (RE) for the Sales Transactions (OR) that have been replicated from ECC to CRM.
    Can anybody help me in resolving this issue. Any help ful answer will be rewarded with points.
    Thanks in advance,
    -Frederick Johnson.

    Hi Fredrick,
    Please check, whether you have completed all the steps for Copying Control for Business Transactions in the following path in IMG:
    SPRO->Customer Relationship Management->Transactions->Basic Settings->Copying Control for Business Transactions:
    - Define Copying Control for Transaction Types
       In this step, you define the control for copying business transaction types.
       To do this, you enter a source tranaction type and a target transaction type, and define the corresponding conditions for this combination.
    - Define Copying Control for Item Categories
    In this step, you define the control for copying item categories.
    To do so, you enter a source item category and a target item category, and define the corresponding conditions.
    - Define Item Category Determination when Copying
    In this step, you define a specific item category determination which should be run during copying. The item category is used to find the target item category in the source transaction for the transaction type in the target transaction. This means that the transaction type for the source transaction is not relevant for the item category determination.
    If the system cannot find an entry for the copying transaction in this table, the item category is found in the target transaction using the normal item category determination.
    This might help you
    regards
    Srikantan

  • RH 9 - Not able to edit project settings (styles)

    Hi.
    Once I import my FM 9 files I'm not able to edit my project settings via the Project Settings dialog. I can access the dialog, but when I try to edit the Style settings, none of the current style settings display. I followed the directions in Online Help and it did not indicate that this could not be done with imported documents as opposed to linked documents. Could that be the reason why?
    Thanks in advance.

    While importing a FM document, the style settings can be done through import wizard. Following steps may be followed.
    1. Click File->Import->FrameMaker Document menu item.
    2. "Import File" dialog opens. Browse and select the desried FrameMaker document.
    3. "Content Settings" dialog appears. Do any TOC/Index/Glossary related setting if required. Click Next.
    4. Click "Edit" button.
    5. "Conversion Settings" dialog opens where style related settings can be done. The dialog will show all the styles of the FrameMaker document being imported currently.
    This way style settings can be done for FrameMaker document being imported.
    The "Conversion Settings" dialog opened through "Project Settings" dialog displays the styles of all the linked documents and not of imported document. However, if some settings are done for a linked document, those settings are available by default for all the FM documents being imported in the project.
    I hope this resolves the issue.
    Please let us know in case you have further queries.
    Mayank

  • Delegate not able to edit project in project professional

    I have a scenario where the delegate is not able to edit the project in project professional which already under the ownership of the person whom he is delegated for. 
    Is this standard feature or limitation? Any fix or references from Microsoft? 
    Regards, Syed Faizan ur Rehman, CBPM®,PRINCE2®, MCTS

    Hi,
    this is just a limitation. Delegation does only work in PWA, not in client. Sorry!
    See also
    http://blogs.msdn.com/b/project/archive/2010/03/19/project-2010-introducing-delegates.aspx (does also apply to 2013), section 3.c "Project Professional. The delegate session does not apply to Project Professional."
    Regards
    Barbara
    To increase the value of this forum, please mark the replies that helped to solve your issue as answer. If you find answers to questions from other forum participants to be helpful, please mark them as helpful. Your participation will help others to find
    an appropriate solution faster. Thanks for your support!

  • Reg:Not able to run Std-Costing

    Hi Team,
    Finished product has been already run with Cost Collector & Std-Costing, but the respective BOM against said code has been changed (item has been added to BOM). After this, Standard Costing & Cost Collector is not able to run.
    Can you pls suggest me.
    With Regards,
    P.Arunkumar.

    Dear Arunkumar,
    I think you are working with REM scenario.
    Standard Cost estimate can be carried out only once for any material for a period.
    Assuming that after taking if your BOM is getting Changed say For Eg: One more new component is
    added in the BOM of a Finished Product,then in that case goto the product Cost collector of the Finished
    product and click on Change mode Button (Shift + F6) and then click on The Cost button (Shift +F1) and
    then save the datas.
    Now while doing the confirmation in MFBF,you can see the latest BOM components getting
    posted.
    So no need to carryout eh cost estimate once again,so till this period that particular component will be
    having only the actual value in KKF6N.So during the next period take the cost rollup and so that the
    component will be having Planned as well as actual values.
    Check & Revert back.
    Regards
    Mangalraj.S

  • Not able to close project:

    While closing a level 1 WBS,  we are getting error message "Incoming order value not settled in full"
    However for this project, All WBS below level-1 are closed and for level 1 WBS, no operative indicator is selected.
    Not billing/ Planning or account assigned.
    Also there is no order attached to this WBS element as wbs element is not a billing element.
    Strange thing is now billing element indicator is gryed out.
    So we could even not carryout CJA2/ KKA2 as this is not a billing element.
    Also we could not reverse CJA2 as system gives error that WBS is non billing element. and we could not set it as it is gryed out,
    CJI3 shows balance zero.
    Also WBS  settlement parameter we could not bring in edit mode so that we could change those.
    Please assist how we could remove this error and close the WBS.
    regards, madhu

    Hi Madhu,
    Try CJEN. It may solve the issue.
    Warm regards,
    Srinivas Potluri

  • Not able to see the Cost analysis in the Process order (T-Code COR2).

    Hi SAP Guru's
    Csoting in the Process order Configuration.
    I have done the Config setting related to the Product Costing Controlling with regard to the
    Cost Sheet, Cost Componet Structure.Overheads, asssigning the Cost elements in the Costing sheet.
    assigned the same in the Process order.
    And also the Costing variant options seen in OPL1 t-code can not be displayed in the Process order Csoting Variant selection.
    where as the in the Costing variant for the cost component structure, i can see  the Xompany code with required plant details.
    looking  the costing alanysis data in Process order, unable to see

    Hi,
    If you are looking at cost analysis.  You will get this only some you do confirmations to the production or process Order.
    I hope you did confirmation of material and quantities to the Process Order
    Best Regards
    Surya

  • Not able to see project (slideshow) in Organizer

    I got the Blue Screen of Death while working on a slideshow in PSE 7. When I restarted, the project was corrupted and I could not get back into it. Fortunately, I had backed up just a couple days prior using PSE 7. I did a restore, and all my projects show in the Organizer except the one that I was working on.
    I can see the .psess file in c:\Program Data\Adobe\Photoshop Elements\Catalogs\My Catalog7\projects. Is there any way to salvage my project? I've put so many hours into it, and thought I was covered by the backup in PSE 7.
    If the project can't be salvaged, what are the files that need to be manually backed up for a slideshow... so I can prevent this from happening again in the future?
    Thanks

    All the rest of the slides were black "empty".
    Most likely, this is because the .psess contains references to images that don't exist in the current catalog.  A .psess file references images by their internal catalog IDs, not filename.  Perhaps the .psess was created or modified after the version of the catalog that you restored from backup, and the IDs of some of the images referenced by the .psess don't exist in the catalog.
    If I wanted to backup the slideshow manually, is the .psess file the only one that is needed to re-create the slideshow?
    No, you need the .psess file, the catalog folder (which happens to contain the .psess files), and all the actual images referenced by the slide show.  In other words, you pretty much need a full catalog backup.  It doesn't have to be a backup made by PSE -- it could be a backup made by a general-purpose backup program.

  • Not able to publish project as a single swf File

    Hello Captivate experts.
    I have a problem publishing only one swf file with Captivate.
    My project consists of three slides. The first one is a introduction Slide, the second and the third one only contain one swf  each (swf that i also created with captivate).
    These files are the files who always get published together with the main .swf. So after publishing I got three swfs instead of only one
    I know that a topic like this has been discussed, especially because of the new feature of Captivate 4 wich allows to export only one file, but so far i haven't read anything about swf files that can not be included. (I only found that flash video can not be inserted into a single swf).
    I realized that this problem only occurs with swf files created with captivate. Swf files created with Flash don't result in a septerated file.
    Did anybody have this problem before? Does anyone know a workaround?
    Thanks in advance
    captiware

    HI Captiware,
    When you insert a swf, which was created from Captivate, as animation into Captivate and publish => the swfs are kept external. This is by design.
    Manish
    http://blogs.adobe.com/captivate

  • Not able to create project using tcode solar_project_admin

    Hi,
    In solution manager, in tcode solar_project_admin - when creating project, say (SOL200), I got message saying that (Project SOL200 already exists) .
    from tcode solar_project_admin --> Project -> create. 
    I can not create any project, whenever I tried to create a project, I get error  message saying  already exists !! .
    Please suggest on how to create project.
    Thanks and Regards,
    Faris

    SAP Note 1540274 will fix this for you.
    This error happens when the module SPROJECT_CHECK_EXISTENCE has an error in it.
    Plz implement the note to fix the issue.
    The error message you get is : SPROJECT303

Maybe you are looking for

  • ExecTask - java.io.EOFException: Unexpected end of ZLIB input stream

    BOXI 3.1 FP 7 deployed on AIX environment with all the lang packs. Trying to install SP2 on AIX, when it comes to deploying the war files, AnalyticalReporting, the install encounters error. This error appears to be with size of the war file.  Anyone

  • Basic Navigaton (even a donkey can do it, but not me)

    Hi, I was learning action script 2 at school (Miami Ad School). I was doing more or less fine... then, I purchased Flash CS3 thinking that it was going to be better/best/easier/more fun... And, no, nothing accomplished. Action Script 3 is sort of chi

  • Output file location for batch printing

    Hi all, We have a current implementation of Oracle Documaker for our LOB. What we do is run a .BAT file that runs the GEN* brothers (gentnw32, gendaw32, and genptw32). This then uses the XML defined in the DATA segment of the fsisys INI file. This pr

  • Two different themes in one application

    Hello, I am quite new to Apex and currently I have a problem which g**gle can't answer :-) I want to set two different themes on some pages in the same application. When trying to change the theme on one page this can only be done for all pages in th

  • Can't login with gdm and get error message

    Hey, I had an arch install up and running last night. I was tinkering with gnome themes, and installed a bunch and eventually tried to mess with the login screen. I installed something, I think like gnome-settings-manager or something like that, and