Off set for component requirement  in PM order

Dear Experts,
In my PM order,  offset date for component requirement date is working only for the first component. for the next component it is taking basic start date( i e order generated date by default) as the requirement date even though i entered offset for some days.
Experts, please explain me how to come out of this problem.
Thanks & Best regards,
Praveen

Dear Praveen,
Its working Praveen.
Please check this way: 1st operation>double click operation no.>put component>double click item no. of component>now set offset
2nd operation>double click operation no.>put component>double click item no. of component>now set offset
Now suppose you taking two component for same operation then for the second you can have different offset by clicking item no. of that componet.
Please check and let us know again.
Regards,
Kaushal Rai

Similar Messages

  • Is OPL5 setting for 2LIS_04_P_MATNR required in each client?

    I did settings in transaction OPL5 for the required plant and order type in my configuration client. This does not reflect in my test client in the same BW server.
    The test client is locked down from changes and hence it does not allow me to make changes.
    Has anyone faced this problem before?
    Without this setting the datasource does not retrieve any data in my test client.
    Thanks for your help

    I found this tcode not on the BW system but on my R/3 system.
    To transport the table entries in OPL5 try the following..
    -Click on table view menu->transport and include the table view in a transport request and then transport to QA system.
    -click on edit menu->transport->include in transport(somehow include in transport option is disabled in my system).
    hope it solves ur query..
    cheers,
    Vishvesh

  • Switch Off rounding for BOM Components in Sales Order

    Hi all,
    We are using a multi-level sales BOM that has finished goods as components. These materials have a rounding profile attached to them. However, we want the rounding profile to be active ONLY when these materials are sold individually and not as a part of the BOM. Is there a way to switch off rounding for child level materials when they are a part of the BOM ?
    Appreciate your responses.
    Thanks and regards,
    Rohit Zalani
    Edited by: ROHIT ZALANI on Apr 21, 2008 11:15 PM

    We solved the same using the item cat configuration.

  • Setting for "Exploding BOM in Process order"

    Hello All,
    I have a requirement where I want to create BOM for sales order using CS61 and then I want to explode this BOM automatically in Process order(Production order) and it should happen automatically.Please let me know the settings for the same.
    Regards,
    Rohit

    Hi  Subhro,
    I thought you are talking about the BOM material for the ref technical object say functional location or equipment in the service order. If you have maintained the BOM for the equipment you can pull the all the component list in the component tab.
    In the component tab click on the List button available in the component tab. You will see the list of BOM material.
    DP

  • User status for component item in service order (plant maintenance order)

    Dear experts,
    I cannot find the customizing for assigning a user status (profile) to a component item of a service order.
    IW31 - tab components - mark an entry - click on button "component status"
    Can you help me?
    Best Regards,
    Philipp

    OSS message created. Answer from SAP:
    11.02.2011 - 15:04:46 CET - Antwort von SAP     
    Hello Mr. Miller,
    user status for components are not possible and not intended. I'm
    sorry that I cannot provide better news.
    Best regards
    Reinhard Gruber
    Senior Support Consultant
    AGS Primary Support,
    Business Suite & Technology
    SAP AG
    Therefore this message is closed... but not yet answered
    Edited by: Philipp Miller on Feb 11, 2011 3:28 PM

  • Specific Vendor selection from a Customer for component in a Bulk Order

    We have a situation that for a Particular customer ordering Bulk they can only select an API based on Vendors
    Customer one orders Bulk A and API X but API X can only come from Vendor 1
    Customer two orders Bulk A and API X but API X can only come from Vendor 2
    How can you manage this best in SAP PP ECC ?

    Hi Milton007,
    Well as per your thread i would like to suggest you there is a cycle in MM module perspective Which is also called as P2P cycle
    and here you have an option to select the best vendor.
    So, i hope go for this scenario.
    Regards,
    Madhu.G

  • Production Order - Modify field Material Provision Indicator for component in the production order

    Good afternoon,
    I have a component in the bill of material, that has the option Material Provision Indicator activated.
    When i create the production order, the component automaticaly is activated with the  Material Provision Indicator option.
    However, in the production order, this field isn't possible to modify, because is closed.
    Anybody knows way the modify this field? Configure to open?
    Thanks.
    Kind Regards,
    António Pinho

    Hello Amar,
    I am also getting the same error while Releasing Production Order and Costing (CO11N). This error is related to EHP7 in our case.
    Please try one of the following solution and see whether the error is gone or not.
    1. Implement the SAP Note 1317551 - Error AD_SUBCON 141 / 143 / 144 (T417)
    OR
    2. Complete the customizing of Material Provision Indicator (T Code OICO) as per the attachment.
    Regards,
    Prashant Karanjgaonkar

  • SPRO setting for Shipping screen in Purchase Order

    Hi Friends,
    I am working at Purchase Order in AFS and I added a custom screen using BADI (ME_GUI_PO_CUST) at item level that behave same as standard shipping screen but I want this custom screen should display in all condition, actually it disapper when standard shipping goes off.
    so, to accomplish this do i need make any changes in BADI or something to do in SPRO???
    Please suggest....!
    -SUNIL.

    Re: Only 0 KG of material available
    Kindly check above mentioned thread.

  • Batch determination for component  in co11n

    Hi Gurus
    This is my Scenarios
    Component A - Batch - 120 - Qty 2.00 MT
    Component A - Batch - 121 - Qty 4.00 MT
    Suppose if there is a requirement of 3.0 MT for component A in Production order , when i do Batch determination ( w/o dialog box ) the system proposed Batch 121.
    But since Batch 120 is produced before 121 , i need the system to propose Batch split as follows
    Batch - 120 - 2.00 MT
    Batch - 121 - 1.00 MT
    Is it possible without Dialog batch determination
    Regards,
    Prasanna

    Hi,
    Yes, u can split Batch  manually  without Batch determination.
    Goto Component Overview -> Select the Component ->Edit ->insert->batch split (CO02)
    Now u can enter Batch and qty manually.
    Pradeep
    Edited by: Pradeep Kumar on May 23, 2008 9:24 AM

  • Print of Component List from Production Order

    Hi Everyone,
    How do we print the list of components which will be used in Production Orders? The scenario is that we have the components in WM bins. As soon as the production Orders are confirmed, we need to print a list of all the components which are required for Production. How do we print that?  WM is planning to develop a system where the print out has a bar code and the RF Gun will read the quantities of the components required for production. Can you please let me know where I can see the print preview of the components involved in manufacturing?
    Thanks and Regards
    Lisa

    Hi Lisa,
        The production order can be printed in CO02 screen itself.(Ctrl+P). To define what to be printed, you need to identify/define the correct list in the transaction OPK8. Once the correct combination is selected for the required plant and order type, this can be printed in production order.
    But for the preview after printing, you can view the spools created in SP01.
    Hope this helps.
    Thanks
    Muthu

  • COREid - where is the Multi-Language on/off setting stored

    Hi folks,
    I need to find out where the on/off setting for Multi-Language support is stored, whether it is in the LDAP directory or in a file.
    I know I can change it in the GUI, but I am attempting to fix an automation script so that is not a good option at this stage.
    thanks,
    kam

    In LDAP, please get to obid=<language_pack>,o=Oblix,<DC> node and set "obenabled" attribute value to "true".

  • Shopping Cart - Default Setting for Items

    Since the default setting for items requires user to enter the default values on each shopping cart creation. We would like to use the BADI BBP_DOC_CHANGE_BADI to set a default value, so that user would not have to entry it over and over.
    After I check the BADI, where I cannot find any export parameters associate to these default fields.
    Regards

    Hi Vadim,
    I also have a similar requirement where our customer wants to change or prepolulate the PO type in the Default settings for items.I wanted to knwo if this is user based and if there is any waye we can keep updating them based on some action on the portal.Ideally in our case we have to do it from teh portal.So if there is any RFC that can update or fill these details we can use webdynpro applications to trigger them at runtime and then update them.Any ideas ?
    Thanks,
    Best Regards,
    Muinul

  • Component allocation in planned order and production order

    Hi all,
    I want  table  or Function module for component allocation in production order and planned order.If component changes done in
    planned order or production order.
    In Table PLMZ and STPO I am getting component which are allocated in routing MASTER DATA.But if after generation of
    production order or planned order and I had changed one component in production order then it will not show in PLMZ and STPO
    table.
    Please reply.
    Regards,
    Vidyasagar

    Dear
    Please check the following table :
    AFKO         Order Header
    AFPO          Order Item Detail -Compoenets
    AFVC          Order Operations Detail
    AUFG         Allocation Table Sub-Item, Store Group
    AUFI           Allocation Table, Document Sub-item, Store
    AUFK          Order master data
    RESB
    FM: CO_BC_INSERT_CMP_OF_ORDERS . BAPI : BAPI_PRODORDCONF_GETDETAIL.
    Refer : Change components and Routing of production order
    Edited by: Jiaul Haque on Dec 13, 2010 7:54 PM

  • List of dependent requirements of planned order for a component

    Dear guru ,
    I search a list of dependent requirements of planned order for a component
    What do you suggest ?
    Thanks.

    Hi Cristano,
    Go to MD04 transaction, enter comopenet and plant. Then from the list select the Planned order and click on the Order Report from the bottom tool bar available below the list.
    You can see the componets details for that planned order.
    Thanks and regards
    Murugesan

  • MRP setting for Purchase (Planned Order ) Requirement date

    Dear Sir,
    During the MRP run , we desire that the genertaed Planned Orders for the Purchase related items , should have requirement date as either the current date or the current date plus procurement lead time defined in the Material Master against the item .
    To achive the abobe requirement , we request you to pl guide us as what setting / parameters are required to be set in the MRP setup .  Or if there is some other alternate approach , pl suggest the same .
    With Thanks and Rgds
    Sonia Agarwal

    Dear
    Generally , during MRP run , system will genarted Planned order for Purcahsed item if it is opening period .
    The opening period for the planned order represents the number of workdays that are subtracted from the order start date in order to determine the order opening date. This period serves as a time float, which is available for the MRP controller when converting a planned order into a purchase requisition.
    You define the opening period for the planned order in Customizing for MRP in the IMG activity Define floats (scheduling margin key) and assign it to the material in the Scheduling margin key field (MRP 2 view) in the material master
    Now if you want to have Planned order for purchased item with requirement date as current date , then maintain Demand date like Sales Order requirement date as curent date in VA01 or PIR date as current date.
    Where as MRP will consider the Planned Order based on planned opening date , lead time , GR processing time from MRP2 view .So for current date requirement , u should keep Lead time and GR processing time as 0.
    Regards
    JH

Maybe you are looking for

  • Firefox won't start, but is running in Task Manager

    I was running 3.x for a long time with no troubles. Last week it crashed, and since then I have been unable to start Firefox although it is showing as running in the Task Manager when I attempt to start it. So it opens no window, but appears to be ru

  • Help! My iPod touch is not working after I dropped it!

    I have the iPod touch 4G. I was sitting down, and when I stood up it fell out of my pocket and onto the tile floor. It feel on the back of it while wearing it's case (a paul frank one that's 2 weeks old). It's screen has been smashed before, but I ha

  • Browser with Download Bar?

    When I download a file on Safari it just sits there until the file is ready to open and the "open in app" window shows. Do any of the other browsers for the iPad actually show a progress bar for downloads so you have some idea how long it will take?

  • How can I get rid of the ber at the top of the screen that shows allow it is driving me nuts

    At the top of the scren there is a bar acress the top of the screen the has a window that says allow, some time I have to hit the allow button to let a page download, & it is driving me nuts. How do I get rid of it.

  • POWL does not update Expense Reports for Approval

    Hi, I am about to replace the UWL with POWL and the configuration have been made successfully when it comes to leave approval and expense reports but the Expense reports for approval refuses to update itself (no items in the list) If I go to Transact