Order settlement to G/L instead of Cost Centre.

Dear All,
My client has following scenario:
1. Cost centers are created as sections of the plant.
2. G/Ls are created with respect to activity (i.e normal consumption, project consumption, turnaround consumption).
In general maintenance order is settled to cost center that is copied from equipment master to order settlement rule. But, in above scenario cost should be settled to combination of "Cost Center + G/L" i.e. if mechanical section creates an order for any of the above said activities, the order should be settled to mechanical cost center and respective G/L account.
"One way around to this issue can be accomplished by settling the order directly to G/L defined in combination with section and activity."
Is this a correct practice if we settle maintenance order directly to G/L and do not use cost centers?
Your expert opinions and any other solution if you can suggest in this regard will be very helpful.
Thanks.

Hi,
Maintenance Orders are generally settled to cost centres as maintenance activities are nothing but Expenses. Please note that Cost Centers are meant to capture costs through GL accounts which are to be created as a Primary Cost elements in CO and the costs are passed to the cost center through account assignments.
The settlement will require an assignment to a CO object which may be a cost centre,order,WBS etc.  If you are trying to simply assign the settlement receiver as "GL account" in Order, system will ask you for asignment to a CO obeject. Hence it is imperative to use cost centres.
For your scenario, you need to specify the range of cost elements to which settlement is allowed in the "Allocation structure" configuration. Tick on settlement by cost elements.Allocation structure is linked to your settlement profile.
When settlement process runs, your order cost will flow to the respective cost centre(from settlement rule) and the corresponding cost element will be affected. The details of debit and credit can be checked through the CO document which is generated.
Hope this throws some light on your query.
Regards,
S.Basu

Similar Messages

  • After production order settlement, where does the cost go?

    Dear Experts,
    I understand after we did the "order settlement" for production order, the cost will be settled to material manufactured from the said production order.  Say, the total cost is $10,000 to produce 1000 units of finished goods (FG), then the cost settled to each individual FG at $10 each, am I right?  Where can I see the settled cost in the material master?..
    I checked in the cost center report, S_ALR_87013611, I can see the cost Credited from "production" cost center with a breakdown in settlement cost element such as machine hour, setup and personnel hour.  I understand the other side of Debit was to the production order, and only after order settlement, I'm not sure which cost center will be Debited.
    That would be the CO side, how about the FI, would there be any cost posted to the GL side after production order settlement to the material?
    Please advise..
    regards,
    Abraham

    Hi Abraham,
    It's not the button i mentioned. I was just trying to take u to the accounting document from the settlement screen. well just drill down the settlement screen and u'll get it. No big deal.
    But more important is the concept. I'll share my understanding here. (cost by production order)
    Any value that flow into controlling module should have a cost object. Here production order is the cost object.
    First u create a production order (cost object) for say 1 unit of X with a std price of Rs. 10
    Std price comes frm material master as a result of std cost estimate
    U start production - Raw materials are consumed - 2 qty x Rs.3.
    Entry RM Consumption Dr Rs. 6    Inventory Cr Rs.6 (Prod order is debited with Rs.6)
    Activity (Let's say machine hours - 3 Hrs x Rs.2) According to the routing it was  2 hrs but actual production took 3 hrs.
    Entry - None - But production order is debited with Rs. 6.
    When production is complete for 1 qty of X, entry flows
    Finished Goods Dr Rs.10    Change in Stock  Cr. Rs.10  (Production order is credited with Rs.100
    Abraham, now visualise both sides of the production order. It will have debit of Rs.12 and credit of Rs.10.
    Now accountant sees the production order and confirms the values are ok and puts the status of TECO to the order. which means the order is technically complete.
    Now when u run the order settlement, this production order is picked up by the system (due to it's status). System sees difference between debit and credit of Rs 2.
    So it cedits the production order with Rs. 2. Now both debit and credit of production order is equal (Rs.12)
    Entry Price diff A/c Rs,2     Change is stock A/c Rs.2
    Now this rs. 2 is settled to COPA. It does not flow to material.
    Reason:  in a std costing system materials are valued at standard cost and
    Hope this helps. Do revert in case of doubts.
    Best Regards
    Vimal

  • Using a different Sender GL in Internal Order Settlement

    When we settle an Internal Order from GL/Cost Element 1 to Fixed Assets, we get:
    Dr: Fixed Asset
    Cr: GL/Cost Element 1.
    For various reasons, we do not want to Credit the original GL/Cost Element but rather another one.
    Does anyone have any sugestions as to how this can be achieved?
    Thanks.

    Hi
    Can you tell me what is meant by "Internal Order from GL/Cost Element.."? 
    As per the functionality, when you settle an internal order, something is moved from the intrnal order and put to another.  Hence the place from where it is moved is credited and the receiver is debited.  The internal order has postings through the cost element you have posted.  So the movement is from what the internal order has in its account. 
    Order settlement is done through a secondary cost element created and this cost element is used for debiting and crediting the sender and receivers.  Hence your idea of using a totally different GL/Cost element (of course that do not have postings with respect fo the internal order in question) is not practical, I hope.

  • Internal Order Settlement to GL account

    Hi,
    I am trying to settle a Internal order to a GL account. A cost centre is also mapped in automatic account assignment for this GL account.
    Everything is fine but the settled cost is not appearing in cost centre report. But there is an statistical posting on this report.
    I want to see the real psoting on cost centre report and not statistical postings.
    Any advice or workaround....
    Thanks a  lot.
    Govind

    Why are you posting to a GL? Where did the Internal Order gets its costs from? Something doesn't make sense here.
    Modify your settlement rule by creating a settlement to this Cost Centre. As long as your Allocation Structure is defined well, you don't need to mention a Cost Element. Make sure the Settlement Profile, etc. are defined and assigned to the Order Type etc. That config I hope is in place.
    Now run your settlement and it should work well.
    Cheers.

  • Creating a Sub Cost Centre

    Hello
    Does anybody know how to create a sub cost centre. As in a cost centre which is part of/under another main cost centre.
    I would be really greatfull if anybody can help.
    Thank you
    Regards
    Bindi

    You could use a statistical Internal Order for lower level analysis of a Cost Centre.
    We use these for our Schools.
    Each School has one Cost Centre eg: E10030
    And then many Internal Orders which represent the departments eg:-
    ECAT10030   Catering
    EENG10030   English Dept
    EMAT10030   Maths Dept
    Some Schools have over 100 Internal Orders.
    Validations ensure an Internal Order is always used with a School Cost Centre.  No posting can take place against the Cost Centre alone.
    Substituions enter the related Cost Centre for an Internal Order when creating a document.
    The Cost Centre is held against the Internal Order in its Master Record.
    Edited by: Amanda Byrne on Jul 26, 2010 1:26 PM

  • Reporting commitments for IO and Cost Centre

    Hello Help!
    I need your expertise please ..
    When reporting on a cost centre's commitments in Y_DEV_17000159, the commitments posted to the internal order (which is also attached to the cost centre) does not appear in the report.
    However, when I do a report on the cost centre only, it shows commitments except the IO. And when I execute a report on the IO, it shows all IO commitments.
    Is there a way to report on both IO and cost centre commitments in the one report?
    P.S. the order does have Statistacal Postings enabled.
    Many thanks for you help on this!
    ? Vanessa ?

    Hi,
    When you post to Real internal Order, and Cost Center.
    The Internal Order will take precedence always.  Cost center posting will become statistical.
    To your question "whether IO and Cost Center co-exists in one transaction?"
    Yes, very much, many cases this happens normally for transactions related to marketting campaigns etc
    Hope this would clarify your question
    Best Regards
    surya

  • Costs to be recorded to Internal Order instead of Cost Center

    Hi,
    My client has created a new Personnel Area and has started hiring people for it. They did not create a cost center for this. Meanwhile, if any costs are to be recorded for the employees in this Personnel Area, the client wants them record to an Internal Order (instead of Cost Center). Later, when they create a cost center, they may transfer the costs from Internal Order to the Cost Center.
    What needs to be done to satisfy this scenario.
    Best Regards,
    Veera

    hi
    create internal order through kO01, which is of type real order, and post all the expenses by keeping this internal order as cost object. later as you want to settle this internal order to cost centre, you should have settlement profile attached to the internal order to settle that. please update settlement profile while creating the internal order
    krishna

  • Internal Order settlement to one value field in CO-PA (revenue and cost CE)

    hi there,
    we want to settle an internal order to one CO-PA Value field.
    The problem is, that when on the internal orders are postings with CE type revenue and costs, in settlement it reduces the internal oder by the correct amount, but in CO-PA all values come with positive sign)...That would be fine if we would use several value fields, but we want to use only one value field for this settlement..
    IO: Revenue: 10 Cost 5  ---> 5  --> thats the amount we want to transfer to CO-PA through settlement
    in COPA: 15  (10 + 5)..
    I treid to exclude the revenue CE from settlement, but this doesn't work (settlement rule incomplete)
    Thank you for your help.
    Regards,
    Markus

    Hi,
    The sign of a value field in CO-PA for the settlement of orders, projects is always determined depending on the cost element type of the cost element/account.
    The logic is as follows for record type C:
                               sign in CO-PA for postings
    cost element type            debit          credit
        11                                   -               +
        others                             +               -
    The logic of settlement into CO-PA works like this:
    1.) The first step is that all values are transferred from the sender as they were posted in the database on this side
        On the sender side all debits have '+' sign and all credits have    a '-' sign no matter what cost element type is used.
        Usually costs are posted as debit with cost element type '1'    and revenues as credits with cost element type '11'.
    2.) The second step reverses the sign of all cost elements with type    '11' (and exclusively those).
        The intention is to have only positive values in CO-PA to be used in reporting. (There you can set up rules what needs to be added or subtracted).
    Note 369378 explains the logic and provides a workaround.
    regards
    Waman

  • Process order settlement to cost center

    Hi,
    We have a requirement to settle only the quantity to material and the costs to
    cost center from the process orders. This is to ensure the materials are
    handled as non-valuated and the COGM is computed from the goods consumption
    postings.
    The process orders will have both co products and by products as well.
    There is also one more requirement to allow Purchase orders against the non-
    valuated materials.
    I am planning to propose the following :-
    1) To make the materials valuated but set the standard price to zero to give
    the effect of non-valuated materials and at the same time can also raise
    purchase orders because otherwise non-valuated materials cannot be used to
    raise Purchase orders.
    2) When goods receipt happens from the process order the actual costs of the
    process order will remain as it is in the process order since the standard
    price of the FG is zero and only the quantity will be received into inventory.
    3) When process order settlement happens the full actual costs will be settled
    to a price difference account and cost center tied to the price difference
    account.
    Do you guys see any flaws in the above design?
    Edited by: FICO Consultant on Feb 21, 2012 4:28 AM

    Answered

  • Cost Centers & Profit Centers in PM Order Settlements

    Dear All,
    Can anyone please explain me the exact use of following Fields in the PM Order?
    Additional Data Tab    -     Responsible CCt , Profit Center  , Object Class  
    Location Tab             -   Account Assignment u2013 Cost Center
    Settlement Rule         -  Settlement Receiver (When category is CTR-Cost Center)
    Also would appreciate if the explanation can be given on the impact on above in settling the Orders.
    (CAPEX Orders as well as OPEX Orders)
    Thanks & Regards,
    Thushantha

    Hi,
    Additional Data Tab
    Responsible Cost Center: - The responsible cost center is the responsible area for authorization check on internal orders.
    This does not have to be the cost center to which the order settles its costs.
    (ex The cost center "site office" is the responsible cost center).
    Profit Center:-  Operating results for profit centers can be analyzed using either the
    cost of sales approach or the period accounting approach.
    By analyzing the fixed capital as well, you can expand your profit
    centers for use as investment centers.
    Location Tab
    Cost Center:- which belongs to Equipment Master or Functional Location. This cost will be comes under Account Assignment Category
    Settlement Reveiver:- Its the set of cost elements which receives the Actual cost from the work order & transfers to the cost center.
    regards,
    Venkatesan Anandan
    Edited by: Venkatesan Anandan on Mar 11, 2009 3:03 PM

  • Product Costs by Sales Order - Settlement Options?

    Hello All -
    I am trying to understand if I need to settle to a sales order (SDI) or directly to material (MAT) or to COPA (PSG).
    If i look at my sales order, it has item category ZPSF, which product costs by sales order configuration shows a requirement class ZKE.  ZkE has a valuation of M, which means separate valuation of reference to sales document/project.
    Does this mean I need to settle to sales order first?
    Then i run vA88 to settle sales order to copa?
    if ZKE valuation is blank, does that mean its not valuated?  I have read on other sap help pages that means it is valuated.  Please clarify.
    also, when does one directly settle to MAT? what scenarios?  this confuses me.
    Thanks!
    Emmas

    I'll give this a try. When working in a make-to-order environment there are 2 settings in the requirments class that you must consider in determining how to settle the costs (and maybe the revenue as well).  The first setting is the account assignment category.  In the standard system "E" is used to designate the sales order as a cost collector.  "M" is used to if you don't want the sales order to be a cost collector.  Whether the sales order is a cost collector or not will determine your settlement options. 
    The second critical field is the valuation setting.  If you set it to "M" then the stock assigned to the sales order will be valuated (by valuated I mean that once the goods are produced they will be held in inventory as sales order stock with a value).  If you leave the valuation field blank then the stock assigned to the sales order will be held in inventory without a valuation. 
    If the sales order is not a cost collector then the cost to manufacture the order will be collected in your production order and the settlement rule for the production order will be to the material you are producing.  Since the material has a valuation, the costs collected in the production will be reduced by the material's valuation once it is received into finished goods inventory.  Any remaining costs are settled to wip or variance based on the production order's status and the RA key and variance key settings.
    If you have set the sales order as a cost collector then the production order costs can either settle to the finished material or to the sales order.  If you are using valuated sales order stock you would normal have the costs settle to the material and the production order would behave very much like the previous example.  If you are not using valuated stock then you would need to settle the costs to the sales order and all the production costs would accumalte in the sales order.
    If you are using the sales order as a cost collector than you will probably want to settle the sales order as well.  During the sales order settlement you have the option of settling the cost and revenue assigned to the sales order to COPA.  The settlement profile along with the RA key assigned to the sales order controls how these are settled.

  • Standard table for production order settlement cost

    Hello,
    Is there any standard table available which carries the production order settlement cost?

    Dear,
    Once you do Production order settlement using T.Code KO88.
    You will find all relevant tables once RKACSHOW is executed for the corresponding object .
    Try the table is COEP
    Thanks,
    MS

  • Order settlement cost ( Activity cost) can we consider for financial report

    I am in port Implemetation as per their senario financial reports based on cost center hierarchy,
    for minisrial report requirement, they submitting Operational wise nothing but cost center heirarchy wise
    for Pm order settlement Man hour cost based on kp26 computed cost converted actual at the time of confirmation. At the time of settlement to concern cost center is debited but primary cost booking for (man hour) salaries not deducting the primary cost element. Here is salaries and manhours both is apprearing in the cost center. My client requirement is based manour activity cost deducted in salary primary element, they want that process. After Order settlement based on amount we can deduct concern intial cost booking cost center to Order settle cost center.
    Please suggest and PM order cost affect in cost center in primary booking and after order settlement
    Please anyone resolve my issue
    Clarification above issue
    when we settle PM order Activtiy cost (Manhours) based on the salaried booked in primary cost element,we assume per hour man hour cost and specify in kp26 based on the activtiy cost planning system picks cost and at time of order settlement it will settle concern cost center.
    intially we booked salaries in primary cost not thing but salaries a/c and once again we are settling the same salary assumption cost to cost center ...
    when we go  for cost center report Initial salary a/c booking Administrative cost center and now production cost center with activity cost with secondary cost element ....so problem is both cost centers are debiting for the same salaries( activity cost) but my client want cost center  report all including primary and secondary cost element total balance.
    Please resolve my problem it very critical
    Edited by: msreddy08 on Sep 10, 2009 6:27 AM
    Edited by: msreddy08 on Sep 10, 2009 6:39 AM

    Dear Sudhakar,
    salaries cost booked in administrative cost center with primary cost element salary a/c
    but Activity type man hour is meant for per hour salary cost. we can specified in kp26
    so when we take cost center report, we get salary amount and activity cost in admin cost center and product cost center for the same salary amount... for financial report requirment, if we use cost center report the salay amount appeared twice.
    Please explain the activity cost against salay amount ..

  • PM Order Settlement to Cost Center(real) & Internal Order simultaneously

    Dear Experts.
    I have a request from client to settle 100% of PM order to Cost Center (real) and internal order (statistical) simultaneously. The purpose of statistical orders is to capture all the expenses (electricity, water, security charges, maintenance, etc...) location-wise. 
    PM Order settlement through statistical IO will contribute to  the maintenance aspect, and other expenses will be captured to statistical IO through financial GL posting. Hence each location will have a unique statistical order maintained.
    In the settlement Profile, I have maintained Order and Cost Center elements as "Settlement Optional" Under "Valid receivers". But the system doesn't allow this settlement. As per my understanding SAP allows settlement (100%) to go only to a single object.
    Appreciate your inputs on this matter.
    Thanks,
    thushantha.

    hi,
    Please check how you maintained the real object in the settlement rule.
    You must maintain both the cost center and internal order on the same assignment line such as:
    CAT:     Settlement receivers
    ORD      ORD_Number   Cst_Center_number         100%   PER
    The system will correctly generate KI178 if you have the following:
    CAT:     Settlement receivers
    ORD      ORD_Number                              100%   PER
    CTR      Cst_Center_number                       100%   FUL
    regards
    Waman

  • For internal order settlement rule amount column is requied instead %

    Hi Gurus,
    For internal order settlement rule percentage is there but business wants  to settle from AUC to final asset by amount wise how can we do this.
    I tried to change the investment profile but it is coming amount field while saving it is not displaying.
    Please help in this regard
    Thank you.
    Ranganadh

    Hi
    Check the path
    IMG>Controlling>Internal Orders>Actual Posting>Settlement>Maintain Settlement Profile>Maintain Settlement Profile.
    Here there is a tick for amount settlement under Indicators. You need to maintain this check box for your requirements.
    Regards
    Sanil Bhandari

Maybe you are looking for

  • NF-e 3.10 - Erro 204 - Duplicidade - Botão consulta status

    Boa tarde a todos. Estamos em fase de testes do projeto de implementação do XML 3.10. Eu tive algumas notas no meu ambiente de teste integrado com rejeição 204 (duplicidade de nota). Eu preciso realizar a consulta de status para essas notas, porém no

  • Chapter one won't play

    This is odd. I have several chapters in my movie (created in FCP). They all imported fine into DVD SP. I used a DVD SP template, everything works great in the simulator. I burned the disk as disk image. Everything plays fine on the computer. But when

  • Overview Missing Parts

    Hi All, In a production order there is an Overview for missing parts.  It has information like committed quantity and committed date.  We are looking for a standard SAP report that would give us this information by production order and material inste

  • Send a pdf to ipad

    how do you send a pdf to ipad.  In Lion I just saved it to the cloud but that doesn't work in Mountain Lion or am I doing something wrong?

  • Web Services - General

    I need to do a project about Web Services. Could anyone tell me where to find, or just tell me: 1- What is a Web Service? 2- What a Web Service do? 3- Why I need one? 4- How can I build (a real SIMPLE) one? (in Java) All I need is basic tutorials to