Order with two configurable material codes

Hi all,
I have this necessity:
create a sales order with one material code ( A ) to which are connected two configurable materials code, is it possible ?
If yes,
which should be the material type of the material code ( A ) and how to set the MRP views?
is necessary create a BOM with BOM usage 5 ( sales distribution ) ?
Thanks in advance for any kind of help.

Thanks MxG,
I dont know how to use this BAPI. .Can you suggest me a sample code.
My reqmnt is, i have
Sold to party, ship to party, bill to party , VC config material and all char values that should be populated while creating a sales order.
please help me with what values should i populate in i/p paramters and and how to use this BAPI with some sample code if posible.
Regards,
Jessica.

Similar Messages

  • BAPI/FM in ECC to create a sales order with variant configurable material

    Hi all,
    I need to create a function module that creates a sales order in ECC with a variant configurable material.
    can some one tell me if there is a in built function module or BAPI that i can make use of to create a sales order with variant configurable material in ECC.
    Regards,
    Jessica Sam

    Thanks MxG,
    I dont know how to use this BAPI. .Can you suggest me a sample code.
    My reqmnt is, i have
    Sold to party, ship to party, bill to party , VC config material and all char values that should be populated while creating a sales order.
    please help me with what values should i populate in i/p paramters and and how to use this BAPI with some sample code if posible.
    Regards,
    Jessica.

  • Process order with variant configuration material

    Hi,
    I create a process order for a material XX.
    This material has a BOM with a material that has variant configuration "class type 300" for price configuration.
    When I save the process order I get a message saying "There are still characteristics for components to evaluate". I dont want to evaluate this material in my process order.
    What can I do to not have this message?
    Regards.

    Hi all,
    Yes, I work with variant configuration. But sales orders are not involved.
    What I do is:
    1) I create a purchase order for material X (this material belongs to a BOM), this material has variant configuration. I give a value to the characteristics in the PO.
    2) I create a process for a material XXX that has a BOM (material X is in the BOM and cannot be removed).
    3) When I save the process order the system asks me to evaluate again the characteristics. This is what I dont want it to do.
    Any ideas?
    Regards.
    Eduardo

  • BAPI/ FM in CRM to create a sales order with variant configurble material

    Hi All,
    I need to create a sales order using variant configurable material in CRM not manually through GUI. I need to develop a function module that will create sales order using variant configurable material in CRM .
    Can some one tell me if there is an in-built BAPI/Function Module availabe in CRM to create sales order using variant configurable material in CRM .
    When i researched i found that there is a BAPI 
    BAPI_BUSPROCESSND_CREATEMULTI which can create a sales order in CRM.
    I dont know if this can create a sales order with varinat configurable material in CRM
    can some one guide be how i can build a function module in CRM which generates a sales order with variant configurable material.
    Regards,
    Jessica Sam

    Jessica
    I am not a CRM expert and am still learning. But you can try the BAPI CRMXIF_ORDER_SAVE and see if that helps.
    Good Luck
    Ram

  • STOCK TRANSPORT ORDER  With in One company code

    Dear Laksmipathi,
    While RP delivery in stock transfer order  With in One company code, the sym will pick movement tyoe 641 and which ic configrued in SL .But  in STO  there is no sale order creation  that  i mean  SL  will pick only in sale order.
    Here  order type UB and plant combination  sym will pick the Delivery type NL
    NL -NORM -V sym will pick Item category  NLN  of Delivery not  of  sale order.
    NLN-NN(Schedule line)
    Generally we know the SL which is determined by  item category  and MRP  type , here  item category is coming only in RP  delivery document.
    So my question is
    Question  1.how  this  641  which  has  determined  while RP Delivery  document?
                                   if it is  determining from schedule line NN , how  it can be consider since  sale      order is not  in the picture?
    Question 2. In 641  the cost has been updating /Accounting document is getting generatiing  where as in VF01 billing doc  not relevent for Accounting  doc  .so  how we can settle or balance the  cost  of this material  while occured in 641  or  PGI?
    Question 3.What  are the business benifits while  doing  STO?
    i am new in this  and Pls  advice  how to give the  point  to  you .
    Regards
    ISHI

    Dear Thakkar,
    Pls  compare  my question and ur answer
    Question 1.how this 641 which has determined while RP Delivery document?
    if it is determining from schedule line NN , how it can be consider since sale order is not in the picture?
    What is   I am not clearu2014that  if i641 is determining from schedule line NN , how it can be consider since sale order is not in the picture?
    Ur Ans:
    A1. In case if STO the item category is assign to Delivery typeitem category groupusages+ Item category of the higher-level item Tocde (ZERO)0VLK Taking the item category and and checking the schdeline assign to the same. In schedule line you will find 641.
    Query
    OVLK  which is  delivery header  and taking the item category of Delivery through  Delivery typeitem category groupusages+ Item category of the higher-leveL.
    Can we determine the SL  with  delivery  type  and delivery  item category since sale order is not in the picture?
    How we can take the sale  order item category  for  find SL since sale order is not in the picture?
    Question 2. In 641 the cost has been updating /Accounting document is getting generating where as in VF01 billing doc not relevant for Accounting doc .so how we can settle or balance the cost of this material while occured in 641 or PGI?
    What is   I am not clear-How settle cost  of this  material ?
    Ur Ans : The accounting is happening for material value.
    Are  you  think Is  it  correct  this  answer  yourself?
    Question 3.What are the business benifits while doing STO?
    I  am cleared in third answer which you   given   and I am appreciating to  you ur  response, but  the answer should be  according to my question.
    Thanks
    Ishi

  • Sales order for a configurable material

    Hi all,
    While creating a sales order for a configurable material i'm encountering an incompletion log saying enter gross weight & net weight. Even after i enter some value in the respective fields, i'm still thrown with the same incompletion & i'm unable to complete the order. In the material i find that the gross weight, netweight, volume are maintained as "zero". How do i resolve the problem??should the material master be changed??
    Thanks and regards,
    Deepak Prasanna S

    hi,
    If ur not having access to change teh master data in client system, Then u have to feed data manually in the sale order
    VA02/VA01->go to item details->in shipping view u can feed the details.
    1.But in ur earlier posting u told even after filling the details, the system pops up the message.Revert waht is error r u getting.
    2. But is advisable to  change in material master since each time while creating sale order u can't feed the input
    regards,
    Arun prasad

  • WHATS THE FLOW OF A PURCHASE ORDER WITH REGARS TO MATERIAL MANAGEMENT ?

    WHATS THE FLOW OF A PURCHASE ORDER WITH REGARDS TO MATERIAL MANAGEMENT ?

    Hi
    see the MM flow with related Transaction codes
    MM Cycle:
    Purchase Requisition-> Staff in an orgn places Pur requisition for want of some goods/products - ME51
    Request for Quotation(RFQ)-> The Purchase dept in the orgn calls/requests for the quotation for the products against which PR was raised. - ME41
    Vendor Evaluation->After receving the RFQ's, after comparison a Vendor is finalised based on the terms and conditions.
    Purchase Order(PO)-> Pur order was issued to that vendor asking him to supply the goods/products -ME21N
    Goods Receipt Note(GRN)->Vendor supplies the material/Products to the orgn-
    MB01
    Goods Issue (GI)  -> People receives their respective itesm for which they have placed the Requisitions
    Invoice Verification-> ALong with the Material Vendor submits a Invoice for which the Company Pays the amount - .MIRO
    Data to FI -> data will be posted to FI as per the vendor invoices
    you better go through all these links u will get all the info what ever u need
    for mm
    http://www.sapgenie.com/abap/tables_mm.htm
    http://www.sap-img.com/sap-download/sap-tables.zip
    http://www.allsaplinks.com/material_management.html
    http://www.training-classes.com/course_hierarchy/courses/2614_SAP_R_3_MM_Invoice_Verification_-_Rel_4_x.php
    http://www.sapfriends.com/sapstuff.html
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PSMAT/PSMAT.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/CAARCMM/CAARCMM.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MYSAP/SR_MM.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOMDMM/LOMDMM.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCBMTWFMMM/BCBMTWFMMM.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MMIVMVAL/MMIVMVAL.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MMWMLVS/MMWMLVS.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MMISVE/MMISVE.pdf
    Reward points if useful
    regards
    Anji

  • Sales order costing for Configured Material (Material Variant Not KMAT Mat)

    Hi All
    For a Configured Material (Variant) (Not KMAT Material), which is having Std price costed.
    But if we create a Sales Order for the Configured Material, what options are availale to Execute Sales order costing and take the sales order value to COGS during Delivery.
    The reason being Client wants to Cost BOM items are price which is different from the Price used in Std cost estimate due to Price Volatility.
    I can understand we can do this in KMAT, but not sure how to do in Conifgured material. We can execute sales order costing and get Statistical cost value in EK02/EK01, but how to get this value posted during PGI..?
    Thanks
    Aravind

    Hi Ajay
    Even if i maintain M in Valuation filed, my Material Variant HALB material is already having standard cost in its material master and it is picking the std cost during PGI Delivery and hitting COGS A/c.
    Now how to get my sales order costing to real and post my sales order costing value to GI..this is the client requirement.
    Due some complication KMAT is not used and logistics go with Material Variant

  • Sales Order with Variant Configuration

    I´m trying to create a Sales Order with Variant Configuration.
    First, I tried to create the order with the BAPI SD_SALESDOCUMENT_CREATE but It would not let me update characteristics.
    Then I separated into two BAPI's:
    SD_SALESDOCUMENT_CREATE to create Sales Order and  BAPI_SALESORDER_CHANGE to modify the characteristics.
    I run the two SAP BAPI's from SAP and create the Sales Order and make the characteristics correctly, but when I try to invoke from The Middleware the message  V1 555 The sales document is not yeat complete  is displayed and does not update the characteristics.
    Both functions are such as Remote-enabled Module.
    The remote user profile is SAP ALL
    Reviewing where the message is used, I see that the message is in the include MV45AF0B_BELEG_BEARBEITEN_ENDE
    IF DA_LINES> 0 AND
    SY-NE SPACE AND BINPT
    CTU_AMODUS BI_INFO-NA 'A' AND
    CATTAKTIV IS INITIAL.
    MESSAGE I555.
    ENDIF.
    Do you have any idea why since Middleware is not working?.
    Best Regards.
    Blanca Segovia.

    Hi Diwakar
    I changed the creation of Sales Order using only SD_SALESDOCUMENT_CREATE and using Commit Work and it is the same, running the function from se37 create the Sales Order and make the characteristics correctly, but when I try to invoke from The Middleware the message V1 555 The sales document is not yeat complete is displayed and does not update the characteristics.
    I Open that Sales order in VA02 and check 'Incompletion Log'  the screen show 1 Configuration, I Open the tab of the characteristics without changing the characteristics and only save, then the status changes to Complete document.
    You give me another idea that could be happening?
    Thank you very much.
    Blanca Segovia.

  • How to enter invoice with two different tax codes in one line?

    Dear friends,
    I have this PO for which I enter the invoice.
    I recieve later a subsequent debit for this PO from the transporter. This subsequent invoice has got extra debits, one with 21% VAT and one with 19% VAT, which means two items with two different tax codes.
    I want to enter this subsequent debit for each item of the PO, and I want to enter both debits in every item of the PO.
    How can I enter in one row in MIRO a debit with two different tax codes.
    Thank you.

    I want in the same line item to enter two tax codes.
    Do you Know if there is any way to do this?
    It is a subsequent debit and it has two items with two different tax codes. I want to enter the subsequent debit for a PO with many items and enter the value of the whole subsequent invoice. So there is the need to enter one line item with two tax codes.
    How can this be done?
    Thank you?

  • Create a production order with variant configurator data

    Hello,
    Can anyone tell me the way to create a production order with variant configurator data. Is there a BAPI ? an IDOC ?
    Is there several steps ?
    I have to create an interface which creates automatically PP orders. The data input is a file.
    Thanks for your help

    Hi,
    There are fews BAPI's available for creation of Production Order. They are:
    BAPI_PRODORD_CREATE
    This bapi will suit to your requirement, as input will be provided from file.
    Others are
    BAPI_PRODORD_CREATE_FROM_PLORD " this converts planned order to production order
    BAPI_PRODORD_CREATE_FROM_REF      " this creats production order considering other production order as reference.
    Hope your query is answered.
    Regards,
    Brajvir

  • One sales order with two bill to party at the document header

    Hello to all
    We have the following issue: create one sales order with two bill to party and only one payer. The reason is that the materials are paid with the same customer(only one account document) but we need to print two invoices one by each bill to party and each invoice printed with its own invoice number)
    We are thinking in one development due to the key users won´t create different line items or create different sales order.
    The process will be the following:
    1-Create the sales order with one payer and two bill to party or a new bussiness partner(you can use only one bill to party in each customer)
    2-Invoice the sales order. The system will create only one account document because there is only one payer but the system will create two printed documents with the invoice.
    So if someone had the same requeriments, any help will be appreciated.
    Thanks in advance.

    Pablo,
    You intend to create one invoice (one payer) but 2 different document print layouts.
    That should work. But, you have stated 'printed with its own invoice number'.... does this mean you need 2 distinct document numbers in the system? That will not be possible.
    An alterantive is to create a Proforma invoice and a regular invoice and send it to the 2 parties involved.
    Ashutosh

  • Costing the production order for the configured material

    We are trying to cost the production order for a configurable item.  But the system is not calculating any cost in the production order.  Sales order related to this configurable material is costed.  What additional setting I need to cost the production order for the configured material ?

    Hi Niki
    If your SO is costed, thats enough from a System's perspective... Planned cost will be the sales order cost estimate because SO saves the Chars required for the Configurable material
    Planned cost in Prod order depends on the Costing variant you have assigned in the order type... Check the error log if there is any error in cost calculation in prod order
    br, Ajay M

  • Creation of sales order with Variant configuration info

    Hi friends,
       I am creating sales order along with Variant configuration data. We have 3 level BOM structure.
    I am using BAPI_SALESORDER_CREATEFROMDAT2 and filling in ORDER_CFGS_REF, ORDER_CFGS_INST, ORDER_CFGS_PART_OF ORDER_CFGS_VALUE, ORDER_CFGS_REFINST
    tables exactly the same way BAPISDORDER_GETDETAILEDLIST FM returns.
    Sales order is being created with no variant configuration information.(Not in the header level atleast)
      Can any one help me on this.
    Thanks
    Seshagiri

    Updating Variant Configuration data for SO item became little tricky for us in an ongoing implementation. After spending some hours investigating the correct combination of data to pass, we were able to post the document correctly. As no detailed documentation is available online for this scenario, I hope this post will help community for similar requirements. J
    For updating Variant configuration (VC) data for Sales order item, we need to populate below tables of standard FM or BAPI (e.g. SD_SALESDOCUMENT_CREATE).
    Normally the standard FM or BAPI does not return any error messages in case configuration data is not updated successfully.
    ·         SALES_SCHEDULES_IN: The required date field should be populated with appropriate value (REQ_DATE).
    ·         SALES_ITEMS_IN: Field PO_ITM_NO should be populated with appropriate value.
    ·         SALES_CFGS_REF Table:
    1.       This table should have 1 record per item.
    2.       Combination of CONFIG_ID and ROOT_ID should be unique across line items.
    POSEX
    000010
    CONFIG_ID
    000001
    ROOT_ID
    00000001
    SCE
    1
    COMPLETE
    T
    CONSISTENT
    T
    CBASE_ID_TYPE
    G
    ·         SALES_CFGS_INST:
    1.       This table should have 1 record per item.
    2.       Combination of CONFIG_ID and INST_ID should be unique across line items.
    CONFIG_ID
    000001
    INST_ID
    00000001
    OBJ_TYPE
    MARA
    CLASS_TYPE
    300
    OBJ_KEY
    MATNR value
    QUANTITY
    Quantity value
    QUANTITY_UNIT
    Quantity Unit
    COMPLETE
    T
    CONSISTENT
    T
    OBJECT_GUID
    MATNR value
    PERSIST_ID_TYPE
    G
    ·         SALES_CFGS_VALUE:
    1.       Combination of CONFIG_ID and INST_ID should be unique across line items.
    2.       We can have multiple characteristics for a material. In that case appropriate records should be inserted in this table. Note that CONFIG_ID and INST_ID should be same for all the rows you insert in this table for multiple characteristics for a material.
    3.       The characteristic value should be in SAP internal format.
    CONFIG_ID
    000001
    INST_ID
    00000001
    CHARC
    Material characteristics
    VALUE
    Material characteristics value
    ·         SALES_CFGS_VK:
    1.       Combination of CONFIG_ID and INST_ID should be unique across line items.
    2.       We can have multiple characteristics for a material. In that case appropriate records should be inserted in this table. Note that CONFIG_ID and INST_ID should be same for all the rows you insert in this table for multiple characteristics for a material.
    CONFIG_ID
    000001
    INST_ID
    00000001
    VKEY
    Material characteristics

  • Valuated sales order stock for configured material

    Hi All!
    I have a small problem   : I created a new type of material (OMS2) - a configurable one, managed on quantity and value basis. I work with valuated sales order stock for configurable materials but the account in the purchase requisition is determined by means of event key GBB insted of event key BSX.
    Where is my error?
    Any idea would be appreciated.
    Florina C

    Hi
    I think you are talking about Special Stock "E"...ie) Sale Order Stock...
    If my understanding is correct then,
    If you go and see the Table T156....For the
    Movement Type: 101,
    Special stock Indicator : E,
    Qty. Updation Checked,
    Val. Updation Checked,
    Movement Indicator : Against PO,
    Consumption Indicator: Sales Order Stock.....combination....the transaction Event Key....GBB only has been Assigned....these  settings you cannot change...
    This linkage you can view in OLMW-----> Account Determination -
    > Acc. Determination W/O Wizard -
    >Account Grouping....also
    Reward if useful
    Regards
    S.Baskaran
    Edited by: baskaran srinivasan on Dec 20, 2007 12:18 PM

Maybe you are looking for

  • Error message in Audition 2.0 when trying to burn a CD: no devices found

    I am using Windows 7 and Adobe Audition 2.0.  on a new laptop (Asus).  When i try to burn a CD from the 'CD' workspace I get the error message 'no devices found'.  I have burned other CDs on this machine separately from Audition so i know the  Matsus

  • Inspire 5700: SB Live 5.1 / Audigy2 ZS MiniDin (original cable) Rear not working

    As in topic: My Rear speakers in digital mode over MiniDin are not working. Why? They are working with optical/coax on DVD Player / 5.1 source and in CMSS/DolbyPrologic mode. Only Fourpoint 5.1 DIN is not working on rear speakers..

  • Determination of String variable weight

    Hello, Is there any way to determine a String variable's weight? in KB or MB? or any sort of logic that can be implements to determine this? Actually I have a String variable which is update by various kind of source data, now I want to stop that upd

  • Regarding Versioning of Project Code

    Hi, We are facing one issue. Please try to provide some resolution for the same. We deployed one .exp on Oracle BPM Server for Weblogic and then created new instances which have reached to certain interactive activity. Now, we increased the project v

  • How can i compile and run javatv ri on linux platform

    hi, can any one plz help me what is the requirement to execute javatv reference implementation on linux and what are the steps i should followand, and any commands required thx in adv