Overheads in Material ledger

Hi experts,
We are implementing a material ledger / Actual costing and we would like to know the possible ways that we have for charging the actual Overheads. We are using the Product cost by period.
In our model we have 3 cost centres at the month end with all the Overheads that we need to charge all Cost collectors in this period.
What are the possibilities?
Thanks in advance,
cmpp

Hi All
I see two possibles ways:
-Using costing sheet: go to spro Define Costing Sheet, set a rule there and run CO43 at month end activities.
-Using template allocation: Set transaction CPT2 and run CPTD at month end activities.
I hope you enjoy. CPT2 is more complicated, I believe Costing Sheet would be better.
Regards.

Similar Messages

  • Cost of goods manufactured vs COGS+ Material ledger

    Hi Experts,
    My company is implenting Material Ledger. They want to see the actual cost of goods manufactured. We are able to develop the actual cost of goods sold in COPA. The required report is to show:
    1- Direct material used at standard + variances (price + usage) to give the actual.
    2- Direct labor (standard + variances = Actual)
    3- Manufacturing overhead ( standard + variances = Actual)
    Attached excel file is showing the requirement.
    Your guidance to develop this report by any means (Report painter, BI, other).
    Regards
    Ahmed Zain Hassan

    Hi Ahmed / Ajay.
    1. In order reports KKO0, you dont see the revaluation of ML, as you said Consumption and Activities are revaluated at  Material level, and as far as i know, theres no way to add  records that represent the revaluation.
    2. The easy way to have a Order Report revaluated at actual cost is with LIS(Logistic InfoSys), creating a Z infostructure (eg copy lis S027) that store consumption and activity QTY, and a user exit  that read the actual cost of consumed materials (depending if this is V, S2, S3) and activities and revaluate. In LIS, there are standard way to "re-post" or repopulate the infostructures. This LIS can be reported with the standard functions (ReportPainter, quers on SQ01), or create a Z tcode that show the info stored in the way you want. Problem: Not all know how to customize LIS, and also you need code in the exit.
    3.  In my country (Peru), there are lots of companies that develop a Z Kardex valuated at actual cost (because, is a legal requirement), and also create Zprograms that calculate the order at actual cost (indeed, i create this reports twice). Its a bit complex, but not impossible and depends on custo EG if you have multiple valuations, you need to write code in order to get the infor for this specific valuations.
    4. About COPA, you can post to copa the Actual Cost Component Split calculated by ML. In this CCS, you can identify the Labor, Direct Materials, and overheads.  You have 2 options, You can post the delta to the original field or have an aditional field that store the difference. This stuff is done in KE27, i see 1 example in the SCN (i guess i bookmarked). Its important to understand you dont have the detail of the delta per consumed material, just an agregated value.
    Here is the link
    http://wiki.scn.sap.com/wiki/display/ERPFI/KE27+Periodic+Valuation
    5. There is a new ML DrillDown report functionality. Indeed, i couldnt spend time analizing the solution (my test system is with EHP5 and dont plant to upload the OSS), but i guess this is the future. You can look for info with tcode KKML0 in the marketplace, also check this oss 1639462 - ERP accelerators: enhancements in ML drilldown reporting
    My questions:
    What you want?
    + Order Report, i mean Cost detaild per Order? The Actual CCS por order?
    + Material Report? I mean, the monthly average of a Fert, and its CCS ?
    + a PA Report, that show Sales (Incomes), and Costs per matiral , split by Direct, Labor and OverHead?
    Arturo.

  • Material Ledger Postings - Contradicting IAS 2?

    Hi All,
    Material Ledger captures both Price Differences and Exchange Rate Differences and allocates these according to Stock and Consumption.
    During the month, when we encounter Price and Exchange Rate differences, these are held on the P/L. At month-end, when we close ML, the Price and Exchange Rate differences 'attribuatable' to Stock are moved from the P/L to the Balance Sheet (or "Capitalised").
    This is seemingly contrary to IAS 2, which clarifies that Exchange Rate differences cannot be capitalised on stock. Is that an acceptable accouting treatment for (say) external reporting. Certainly SAP does follow IAS, so I'm probably just missing the point?
    Reproduced Verbatim:
    "Inventory cost should not include: abnormal waste, administrative overheads unrelated to production, selling costs, foreign exchange differences arising directly on the recent acquisition of inventories invoiced in a foreign currency and interest cost when inventories are purchased with deferred settlement terms."
    Can anyone shed light please?
    Regards.
    Venky.

    Dear Ram
    Thanks for your reply.
    Both the production orders are for the same material, same BOM was used and the only difference is the goods receipt was not made for one productin order. We need to hold that order for 2 weeks. Fortunately this happens in the month end and the BOM is very small by which we could able to find this difference.
    In CKM3 w.r.t actual cost copmponent split the value of one number is 4500 instead of 4800. The total consumption difference for the two orders are shown as the price difference and the price is calculated for 1 EA of the finished material in stock.
    My requirement is since we have given to stock only one number the consumption difference has to be posted to 1 EA. and the consumption difference for another one should be loaded to pending production order.
    or is there any way to post the price difference to pending production orders.
    Thanks
    Soundar

  • 3 valuations in Material ledger

    Hi,
    My client's requirement is as follows:
    1) Legal valuation has to be in Local currency but on Actual Costing
    2) Profit Center Valuation in Local currency but on standard costing - same as Group valuation
    3) Group Valuation in Group currency in standard costing - Group valuation
    Is this possible when, Actual costing Material ledger implemented?
    I imagin, Legal valuation field in Material Master will be updated by periodic unit price when we run CKMLCP.  Then Profit center valuation field in the Material Master will be updated when we run CK40N in standard costing PC valuation costing run.  Then again we will run ck40n in standard costing for Group valuation to update Group valuation in Material Master.
    If my client opts to run ck40n for legal valuation, then he should also be able to mark and release standard cost new price, in Legal valuation field of material master and actual costing will not release standard price for new period.
    The requirement is typically complicated, as my client wants to maintain his Global template, though one country comes under actual costing requirement.
    I would like to dig out answers from real time experience please.
    Cheers,
    Ashok

    I can give you some information but not everything.  I have gone through the deployment of material ledger using 3 valuations, but not the ones you are using.  We used Local, Group and Group at Group.  All 3 are at actual costing.  What this means is that the local currency is the currency in the country where the plant exists.  The group valuation is a straight conversion to US dollars from the local currency based on the currency conversion tables M and P rates.  Note that both of these first two currencies can include intercompany profit if reflected on the transferring sales order between companies.  The Group at Group is the US dollar conversion without the intercompany profit.  We find this works for our business.
    The other thing about material ledger is that you need to have a standard cost estimate so that material ledger can keep track of the cos component structure.  The way it works is as follows:
    Say the standard estimate shows labor=$100, materials=$200 and overhead=$300 for a total cost of $600.  All transactions in the month using this material use the $600 standard.  Now, when material ledger is run at month end, the PUP (periodc unit price) is calculated and let us assume the PUP values are labor=$150, materials=$250, overhead=$350 for a total PUP of $750.  Material ledger already has tables with the details of the standard components against every transaction.  Now it will apply the remaining adjustments totalling $150 to the proper cost components for COPA purposes.  This is pushed to COPA using transaction KE27.  Think of it like this...Actual cost is equal to standard ($600) plus/minus variances ($150). 
    Therefore, you always should have a standard cost estimate when using material ledger.  At least that is my usage and understanding.  I hope I provided useful information for you in some way.
    David

  • Material Ledger : Cost component split different in CO PC and ML

    Hello SAP People,
    In ML cost component split I don't have the same split that in CK13N COPC.
    History
    We changed the cost component structure in OKTZ, because we wanted to split on two different cost component the cost of Copper :
    -     Copper
    -     Primes :Premium cost (transformation cost for producer) on copper.
    In CK11N the split is OK and we can read the new cost element corresponding to premium cost.
    To split the costing tool goes on the purchase info records to read condition type that are different for copper and premium.
    The problem we have is that when we run Material ledger we are not able to see after a good receipt a similar split in the cost component view.
    We already run MLCCS_RESET and MLCCS_Startup programs this month and created new Raw material after. But it seems the ML do not take care of this and all the actual cost (I stop to single level) are on the copper cost component and there is nothing on Premium cost component.
    We just run single level on ML for current month.
    Could you please help me to explain why we are not able to obtain the correct split between Copper and u201CPrimesu201D

    Hi Marco,
    yes, these both are independent from each other. You will have no issue when these are different.
    It is very typical that you want to report different kind of information for activities as for materials.
    A typical setup might be
    Activity                                   Material
    Asset depreciation                   Raw Material Cost
    Room cost                               Energy
    Labour                                     Production Cost
    labour overhead                      Production Overhead
    Electricity                                 Packaging
    When you use the activity for the production of a material (confirmation CO15) the assignment goes normally to a single cost component in the material, above for example into production cost. This is controlled by the cost element. Only when the primary cost component split is activated and a transfer structure betweeen both is maintained you could achieve
    Asset depeciation, Room Cost, Labour overhead  -> Production overhead
    Labour -> Production Cost
    Electricity -> Energy
    Best regards,  Udo

  • Material ledger is not active in valuation area C002

    Dear All,
    I have a Scheduling Agreement for a material 'A' with Vendor 'V' with diff prices with validity dates, I did the GR & when i am posting the invoice thro' miro, system is throwing error as above Material ledger is not active in valuation area C002 Why should I activate the material ledger here ? Pls suggest how can i solve this ?
    regds,
    Kallu

    Hi
    For a Particular material, Material Ledger is active or not? Can be checked in Accountig view of Material Master.
    Why we need Material Ledger?
    A fundamental task of the material ledger is carrying inventories in multiple currencies and/or
    valuations.
    Material inventory values are normally carried by the SAP system in one currency. The material
    ledger component enables the R/3 System to carry inventory values in two additional
    currencies/valuations. Therefore, all goods movements in the material ledger are performed in up
    to 3 currencies or valuations. Currency amounts are translated into foreign currencies at
    historical exchange rates directly at the time of posting. Businesses such as those in highinflation
    countries can therefore carry their inventories in a more stable currency (such as US
    dollars). This reveals inflationary effects on inventory values.
    If you use transfer prices to represent value flows in your company in different
    valuation views, you must use the material ledger. This allows you to carry your
    inventories in three different valuations (legal valuation, valuation for reporting
    purposes, and profit center valuation).
    Before activating the material ledger, make sure you know which currencies and valuations
    you want to use, because you cannot go back and change the setting.
    Activating the material ledger is a prerequisite for using multiple valuations.
    Thanks
    Raman

  • Material ledger is not active in valuation area S001

    Dear All,
    I have created a Scheduling Agreement & did the GR. When I am doing invoice posting system is throwing error as Material ledger is not active in valuation area S001
    What might be wrong here ? For same material if I create PO then everything is working fine. Problem is only with SA.
    regds,
    CB

    Hi,
    Please check your Material Ledger Activation  setting for the Valuation AreaC002 in T-code OMX1. The Check box for the ML activation against the Valuation Area-S001 may be ticked.  After activation/ticking this box, T-code CKMSTART was not executed to complete the ML activation.  If you want the activation of Material Ledger, you have to run T-code CKMSTART to complete this ML activation or Otherwise uncheck this box.  I hope this step will resolve your issue.
    Regards
    appalas

  • General  Ledger Special Ledger out of balance *URGENT* Material Ledger???

    We've activated Material Ledger in a company code in Jan'07.
    Accounting document created because of 102 Movement type FI document looks fine but in Special Ledger document dollars against Group currency are posted to Price Difference account? This is not happening for all 102movement type documents but i couldn't establish the pattern! Any help would be highly appreciated.
    Some background: 
    Company code and Controlling Area both got USD as main currency.
    This problem is sporadic and with 102 movement type only.
    Materials causing issue got Price control 'S' and Price determination '2"

    Hi Raghu,
    Probably I am mistaken; I was talking about SPL field movements and user exits used there. you can check that through transaction GCB2 where ledger is assigned to a company code and then u can drill down to activity and field movement assigned to the activity and can find if a user exit is used to post to a price difference account.
    Let me know if I am talking about relevant stuff here. If it is with SPL then I can help u more.
    Thanks,
    Kumar

  • GR/IR account problem with material ledger

    Hi,
    I just found an issue as effect of material ledger implementation.
    after the material ledger is active, when we post a transaction in foreign currency (invoice receipt), the LC 2 amount of GR/IR account is somehow different from the document amount, and the difference is transferred into Material price difference account that we maintain in OBYC - PRD transaction.
    because of this, the LC2 amount of  GR/IR account can't be cleared.
    any suggestion, please?
    thanks,
    Nasikhin

    hi,
    It will affect your valuation for the document, which are still open..
    You shd run this only after closing all documents and completing whole MM cycle..
    Once this is run, you can't go back and make settlements...
    So, beware...
    Regards
    Priyanka.P

  • Material Ledger Unit Of Measurement different from Material Master

    Dear Team,
    In my client, there is a difference between unit visible in CKM3N and MM03. The base unit of measurement in MM03 is MT. Other than that, there are some other units maintained (not M3) in additional data tab in material master. In CKM3N, the visible unit is M3. M3 is not present anywhere in MM03.
    Why would such unit flow in material ledger table? (CKMLPP has unit M3). Please advise.
    One more observation is that when there is some price change document in Material Ledger, the proper UoM (MT) is being captured. Only in the basic price determination structure visible unit for each head is M3. Please check the attached screen shot.
    Any help would be appreciated.
    Thanks.
    Jay Shah.

    Hi..
    Refer to Data Inconsistency of BUOM in Material Ledger Tables

  • Material Ledger - confirmation in different months

    Hi Gurus,
    I have a problem as follows:
    We are using material ledger for actual costing. When we post partial confirmation for a production order in period t, goods receipt and goods issue is posted for period t. However, in some cases, confirmation is posted although one material has not arrived at the factory yet and that material is not assembled on the finished product in period t, but it is assembled in period t+1. In this case, when we close material ledger, we receive an error as "there are nondistributed rows" in transaction CKM3. How can I solve this problem either in logistics side or financial side?
    Thanks and cheers,
    Fatih Zenginer

    Hi Faith,
    Are you familiar with transaction CKMVFM - Value Flow Monitor? You can analyze Not Distributed differences with this transaction. The price limiter is the key.
    Thanks,
    Greg

  • Valuation area not yet productive with material ledger

    While doing goods receipt at MB1C,i got the below error:
    The description of the error is given below
    Valuation area XXX2 not yet productive with material ledger
    Message no. C+020
    Diagnosis
    The material ledger has been activated for the valuation area but material data has not yet been converted in this valuation area.
    Procedure for System Administration
    If you want to work with the material ledger, choose Accounting -> Controlling -> Actual Costing/Material Ledger -> Utilities -> Production Startup.
    There you can convert the data for the material ledger by following the instructions in the online documentation.
    Note
    Setting the material ledger to productive cannot be undone.
    See also:
    Actual Costing/Material Ledger in the SAP Library.
    The implementation guide for Actual Costing/Material Ledger.
    Can you kindly suggest me how to fix this error.
    Regards
    Sabera

    Hi Sabera,
    The Valuation Area is not activated for your material ledger. Go to SAP Access>>Accounting>>Controlling>>product cost controlling>>Actual Costing>>environment>>Production Start up>>Set Valuation area as productive.
    If you already activated Valution area in to Productive Statge.
    Then go to T.Code OMX1 and for your valuation area XXX2 tick the ML activation box.
    the error wont come
    regards
    srikanth

  • Material ledger Tables

    Dear All,
    Issue: Not able to post Good receipt due to the error that material does not exit.
    Background:  we have activated user exit in material master for material type ZROH and assigned a internal number range to it in MMNR. this user exit will append the material group mentioned during master creation in the internal code generated by system.
    example PPMM is the material group and the internal code generated by system is 122222 so when we save the material in mm01 our material code is PPMM122222.
    we are trying to do GR by 501 and now the material ledger function module is truncating PPMM from the material code and its trying to post document with 1222222. which then goes into error that material does not exist.
    Analysis: I have checked in the MARA/MARC the material code is PPMM1222222.  but i guess in some table whcih is relevant for material ledger system has stored internal material number 1222222.
    So I am looking for tables or solution for this isssue

    Hi Expert,
    Please refer the SAP Standard Material Ledger Tables:
    The following tables contain data that can appear in the material ledger documents:
    Table - MLHD - Material Ledger Document: Header
    Table - MLIT- Material Ledger Document: Items
    Table - MLPP - Material Ledger Document: Posting Periods and Quantities
    Table - MLPPF - Material Ledger Document: Field Groups (Posting Periods and Quantities)
    Table - MLCR - Material Ledger Document: Currencies and Values
    Table - MLCRF - Material Ledger Document: Field Groups (Currencies and Values)
    Table - MLCRP - Material Ledger Document: Price Change (Currencies, Prices)
    Table - MLMST - Material Ledger Document: Costing Run Header Data
    Regards,
    GK
    SAP

  • Issue with Standard Cost estimates / Material Ledger

    Background:
    We have been using SAP for the last 5 years with Material Ledger active. Due to a number of reasons, we have not revised its standard cost estimates from 2001 till now. This means that at month end, we do not mark and release prices as recommended, nor do we mark prices and use dynamic release.
    What Happened:
    A new material called PFSW3 was made. This is a FERT. Before production
    could start my team released the standard cost estimate for this material. Production was now able to proceed without problem. Then, when the time came to sell the material (VF02), SAP again raised the error 'cost estimate not found'. On checking the standard price in MM03, we discovered that the future cost estimate was missing. So we created and marked a new cost estimate in the middle of February 2007.
    Problem:
    When the first sale took place, SAP released the marked cost estimate and posted a Price Change document to adjust for the new standard cost. I understand this was due to dynamic release. Now, when month end came, the system settled all the production orders of material PFSW3 but did not do multi level costing on it.
    Internal Investigation:
    My team has determined that the material PFSW3 has price determination 2 set by mistake. All our other production materials (HALB and FERT) are
    set to price determination 3 in the material master (accounting view).
    Questions:
    To sum this situation up,
    we need to know why the material PFSW3 was not marked closed in its period status (CKM3) at the time of closing through CKMLCP?
    What are the implications of not closing this material in Feb 2007 (current period status is showing 'Quantities and values entered')?
    How can we close this material this month?
    The future cost estimate is again missing for PFSW3 in March 2007 and I
    fear we are going to face more problems as this material is sold to customers.
    Please respond this is an urgent issue.

    Dear Shumyl,
    Please, have a look at Note 645083 - Material period status set to "Closing Entry Completed" that might help to closing your material in previous period.
    Hope it will be useful.
    Regards,
    Flaviano.

  • VPRS Cost in Material Ledger

    hi all,
    i have some problem here.
    we use 2 local currency. first local currency is IDR, and second local currency is USD.
    our client use material ledger, so in material master accounting 1, we maintain 2 value of inventory (in IDR and USD)
    let say we create material XXX (using standard price)  in 01 jan 2011 , with IDR value 1,000,000. the system will convert to USD with exchange rate in 01 jan 2011 (which is 10,000). so the USD value will be 1,000,000/10,000  = 100 USD.
    then in 10 january 2011, Sales order is created for material XXX with document currency USD .
    cond type VPRS get 1,000,000 IDR and covert to doc Curr (USD) with exchange rate in 10 jan 2011 (which is 9,000).
    so the VPRS value in USD will be 1,000,000/9,000 = 111,11 USD.
    by this case, the VPRS value in sales order is DIFFERENT with value in Material Master. it also become a problem when we want to see PROFIT MARGIN.
    can  cond type VPRS get the correct USD value according to Material Master?
    thanks.
    Best Regard,
    Hendry

    Please check the following notes which may help you
    a)  Note 547570 - FAQ: VPRS in pricing
    b)  Note 640692 - Currency conversion VPRS
    c)  Note 1365939 - VPRS logic and Customizing settings in SD
    thanks
    G. Lakshmipathi

Maybe you are looking for

  • Have found multiple iTunes Library.xml files. Moved Library to new Hard Drive and it needs to be completely rebuilt?

    Hello. I have a Mac Mini operating Mac OS X 10.7.2. I recently had to move my iTunes Library to a new hard drive. I followed the directions on how to move the library and refind everything yet when I do so what comes up is a mere skeleton of what I h

  • Código de Status 109

    Boa Tarde, Estamos com a situação de um rejeição de 9 Nfe que estão retornando o código de status 109 - Serviço Paralisado sem Previsão da SEFAZ-MT. Como podemos alterar esse código de status, para que o nota fiscal possa ser reenviado para a Sefaz?

  • Show/Hide tabs in top level navigation of a role based on assigned services

    Hi, I have an interesting requirement. I have created an overview page in abap web dynpro which has links to various services. Based on the r3 roles assigned to the user, we need to show/hide the services in the overview page and top level navigation

  • HP D110a all-in-one printer error message

    https://8rz18a.bay.livefilestore.com/y2pSb_0Z74sl3​dxijvg6iSBpnrRIfOHl-Rmo4vHkLP_He0qkD6saRJdJkQJW6Up​... First time posting here. I tried to post an error message via Skydrive. I hope it works in this forum. If it does, would someone please tell me

  • Oracle 11g Performance Issue

    We have Oracle 11g (11.1.0.6) on HP-UX environment with CC&B application. It was working fine and after we upgrade the database to 11.1.0.7 last week, since then the database performance is really slow. After we upgrade the database we notice that xd