Overtime accounting in work center

Dear friends,
I am running my shop floor in 2 shifts. But some time i will plan for over time working also.
How to capture this over time working in SAP_PP(Work center shifts) module?
How to capture who has worked on this over time ?
Please clarify
Thanks
Senthil

Hi Narashiman,
Thanks. Now i am working on your idea. If it works i will award your more points.
You assume that within 5 dyas i have to produce 100 components.
In first 2 days i have produced 40 components.
third day 20 components, fouth day 20 components and fifth day 20 components.
So as per your statement, in CO11 (Production order confirmation_operation level), if i select partial confirmation i have to enter yield quantity as 40 for first 2 days then respective days.
Then i have to select final confirmation on last day (ie is fifth day).
Is it correct?
Thanks
Shri

Similar Messages

  • Error in Account Identification work center - Type = SYSTEM_ERROR, ID = ERR

    Dear Experts,
    I am getting an error in the initial Account Identification tab like "Type = SYSTEM_ERROR, ID = ERROR_SESSION_INIT, description = 16AA9A3937A9BB56E10000000A11447B". But surprisingly its disappearing when i give some input in any field.
    But our clients dont want to see Blood (red) in the screen. Could you please provide some input why this error is coming and how sort this out.
    Thanks in advance.
    Cheers
    MH

    Hi,
    This is the only error message that is raised in the screen? Try to check if have any relevant errors in trx. ST22 or in trx. SM21 and post here for a further analysis.
    Best Regards,
    Caíque Escaler

  • Change the default work center in CRM 2007 webclient

    Hi all,
    With IC_AGENT role,the default work center is 'Account identification'.When I click the buttone'end' ,it jump to account identification work center ,how to change this default,config or coding ?
    Thanks a lot!
    Best regards,
    LeKa

    Hi Ashwin,
    In our ZIC_AGENT, I have defined the navigation bar that contained the 'IC_BPIDENT:account identification' work center.  This is as default pages whatever ending phone call on webclient or cancell any action, it also jump to 'IC_BPIDENT' view.
    I want to enhance the function, when i end a call from webclient ,it could jump to 'call list' work center instead of 'account identificaton'.
    did you have any ideas ,please tell me.
    Thanks.
    Best regards,
    LeKa

  • Payment  Terms in account work center

    HI All,
    where can I found the Payment  Terms into the Account Work Center?
    Is it possible to add this information into the Account overview?
    Thank for any help.
    Simone

    Hi Simone,
    You can find it in the Sales Data Tab.
    This data comes from ECC (if you have an integrated scenario) and is not editable in C4C.
    Kind regards,
    Henri

  • Account and contact person search in more Work Center pages

    Hi All,
    I have to face the following problem. Currently I am at customer and the customer wants to have four different work centers (broker, cedent, original insured). The work center pages should show the AB SEARCH. In those ABs the links Search Brokers, Search Broker Contacts; Serach Cedent, Search Cedent Contacts etc.)
    I Use the Target IDs MD-BP-SR and MD-CONP-SR for all searches.
    Everything went fine (I checked simultanously in WebUI). After I entered the third ORIGINAL INSURED the AB of all Work Center appeared the same. All had Cedent Accounts, Cedent Contact Person as links in the AB Create. When I make the Cedent links unvisible no Work Center has them in.
    How can I solve this problem? I work on that since two days. Has anyone an idea? Even here in SDN I couldn´t find a solution for that.
    The CRM is a brandnew one? Could it be that the search MD-BP-SR can only be used in one workcenter??
    Thanks to all for your help,
    Martin

    Hi Pieter,
    thx for your answer. AB=Assignment Block. This Search Block.
    I would like to have 4 WC for Cedent, Broker, Original Insured an Prospect (XXX). These WC should have all an AB / Work Center Link Group that includes Search XXX Accounts and Search XXX Contacts. I have an developer here, that would add the role, so that we can search role specific (Roles: Broker Original Insured, Broker etc.). An better idea for that?
    But my problem is, that the WC pages look all the same. Even if I go to WC Prospect, that should incl. the Work Center Linkgroup Create (Link will be Create Prospect) it doesn´t appear, because all work center pages look similar.
    I entered all (LogLingID, WC Link Groups etc.) from scratch, but I compared with standard.
    I would love to help, but it is not really clear to me what you are doing.
    You mention you have 4 workcenters, all with an option to search for accounts and a search for contacts.
    CORRECT.
    How are you planning to differentiate between them all if you use the same target id's (MD-BP-SR and MD-CONP-SR)?
    Is your issue that you changed the description of the links, and they appear the same?
    You also mention 'AB'. What would that be?
    Yes. The Links all have Search Cedent Accounts in every WC Link Group. But why?
    Regards Martin
    I would upload a screenshot or send it, but don´t know how...first time posting a thread.

  • Link between work center and G/L Account

    Hi All,
    I need to link work center to the G/L account in PM Module . I know the link between work center and cost center . But would like to know how MO cost hits which cost element/ G/l account and there assignment
    Thanks and Regards,
    Vivek

    Hi check the below definitions
    Cost centre : Organizational unit within a controlling area that represents a defined
    location of cost incurrence.
    Profit Centre: Organizational unit in Accounting that reflects a management-oriented
    structure of the organization for the purpose of internal control.
    Work Centre: An organizational unit that defines where and when an operation should
    be carried out.
    Regards
    Sreeni

  • How to reuse standard Activity subcomponents - Appointments, Tasks, Phone Calls and Emails within a custom work center?

    Requirement : We have a requirement to reuse the standard Activity subcomponents Appointments, Tasks, Phone Calls and Emails within a custom work centre. The requirement is to leverage and copy all sub functionalities Appointments, Tasks, Phone Calls and Emails available within the standard activity work center. This feature is available within Accounts, Opportunities, Leads etc. (Refer screenshot: Std_Act_Screen.jpg)
    We are unable to consume/embed the standard Activity (Work center) sub components Appointments, Tasks, Phone Calls and Emails within the custom work center. This is because of backend consistency check violation UI designer error message displayed. (Refer screenshot:Error while consuming standard activities.jpg)
    Ø  Open Question:
    a.      Is there a limitation to consume/embed the standard Activity (Work center) subcomponents Appointments, Tasks, Phone Calls and Emails within a custom work center?  We have noticed that this standard Activity Work center subcomponents Appointments, Tasks, Phone Calls and Emails has been repeatedly reused within the application in Account, Opportunity, Sales lead, Lead, Sales Quote Objects.
    b.      Is there an alternative way in which we can call [Through API etc..] the standard Activity Work center subcomponents Appointments, Tasks, Phone Calls and Emails?
    We need your guidance to overcome the error to enable the reuse of the standard Activity Work center sub-components Appointments, Tasks, Phone Calls and Emails within our custom work center or suggest a suitable workaround on how this can be achieved.
    Regards .. Dheeraj Saini

    Whenever you find out let me know. I wanted to assign a text tone to someone and now in iOS 7 i can't. Or I haven't figured this out yet.

  • Select the work center in sales order

    Hello gurus,
    When I create a saler order, the system create automatically a service order with the corresponding data which are reported in transaction OISD for the service material. The key of this table only permits a work center for one material service and plant. And it is impossible to add more work centers for the same service material and plant.
    So I need to be able to choose the work center when I generate the sales order. How can I get it?
    Thanks in advance

    Dear Venkat,
    Try These tabels:
    MARC Plant Data for Material
    /BEV1/RBVBAP                     Sales Document: Item Data        
    COER                             Sales Order Value Revenue        
    VBAP                             Sales Document: Item Data        
    VSVBAP_CN                        Version: Sales document: Item data
    VVBAP                            Sales Document: Item Data        
    GLPPC                            Profit Center Accounting: Plan line items
    GLSPC                            Profit Center Accounting: Line Items    
    Regards,
    Naveen.

  • Control G/L account and Cost Center for movement type 251

    Dear Friends,
    I would like to use mov. type 251 for GI for sale and like to control over G/L account and Cost center.
    The G/L account is by default from the valuation class of the the material and if the user will enter wrong G/L
    we had done the customising in OMJJ movement type 251 - Account grouping - Unchecked the check box of column
    "Check account assignment" - Impact is " the system always uses the G/L accounts or account assignments determined automatically"
    I also made default cost center for G/L account and plant wise through OKB9.
    Now I would like to suppress/dispaly the G/L account and cost center - for same I had done Setting in Entry control menu of OMJJ for 251 of field Account control - Value  - "-" field is suppressed. But it is not working.
    Please advise to solve this situation.
    Thanks & Regards
    Rajan

    Dear Rajan
    Yes, I have checked in MB1A earlier. We have separate node for Field seletion layout for Enjoy transaction MIGO for mvt type in which the G/L account (KONTO) an Cost center (KOSTL) have only optional or required entry selection.
    warm regards
    Ramakrishna.

  • Request for detailed acts to upload Work center,  BOM, Routing data in LSMW

    Hello PP ANgels,
    Request for detailed actions to upload Work center/Resource,  BOM, Routing/Recipe data in LSMW.
    Thanks in advance

    Sanjay,
    In the forum I found that you had used some "drops", that require a password to view.
    In these forums, the only links I post are public (help.sap.com) and from SAP support (service.sap.com/support).  SAP Support is mostly available only to customers and partners of SAP.  If you meet these criteria, and need a login for the SAP support site, contact the license administrator for your company's SAP licence (this is usually a Basis person).  If you cannot locate this person in your company, contact Service Marketplace directly (service.sap.com/mp).  Alternatively you can contact your local SAP Sales office and speak to your account administrator.
    Maybe it would be a better idea to group all standard solutions in one place.
    I expect it will be so...in Nirvana.  Here, life still entails suffering.
    With respect to your detailed questions, I would have a hard time answering, I have never used recordings in LSMW to create work centers, I always use standard batch/direct input.  I suspect that the VGEXX items are the units of measure from CRHD, I suspect LARXX items are activities from CSSL, and I couldn't comment on FORXX items without doing some research.
    This is the SCM PP forum.  You might get more answers posting this in the ERP PP forum SAP ERP Manufacturing - Production Planning (SAP PP) , since work centers/routings/recipes/BOMs are more or less irrelevant in SCM.
    Sorry I couldn't be of more assistance.
    Best Regards,
    DB49

  • SD billing Accounting document Profit center not coming from billing doc

    Hi Expert,
        I have stuck with the accounting doc entries. Issue is that accounting document should have
        the same profit center as billing document. Actually i have created profit center for my each of
        my divisions and want the same profit center whenever that particular division  is selected. But it
       is not  working.
        I have tried with substitution  method also by t-codes 0KEL and 0KEM. It works correctly till
       billing document means division wise profit center is coming in order,delivery , and billing but
       when we check accounting document,Profit center doc. Controlling Document and Profitab.
       Analysis  in Delivery and Bill it is coming from what i have maintained in material master.
       But it should come from what is in the delivery and billing document.
        Please share your ideas.
       Thanks &  Regards

    Hi SAP Consultant
    I would not agree with the first reply above.
    When you define a substitution in 0KEL and 0KES, it is intended to overwrite the PC from Material Master. It is a wrong notion that this Substitution will only impact FI, and not CO / COPA
    1. Are you able to see the over-written PC in Sales Order? (I think YES)
    2. Are you able to see the over-written PC in Billing doc? (I think YES)
    3. If in FI doc you are not able to see that, then see where is the problem. Probable reasons would be a Substitution written in OBBH, You are having a CO Object in the line item, a user exit written in the exit SDVFX008
    Ask your ABAP to check on these lines, if 1 and 2 is YES
    Br, Ajay M

  • Cost Center, Work Center and Profit Center

    Hi ALL,
    Can any one please explain me the concept of Cost Center, Work Center and Profit Center.
    And where and when do I assign the cost center???
    Amit

    Hi Check the following "
    Cost centers represent areas of responsibility where costs are incurred or where responsibility for costs may be assigned.  They represent the smallest unit of responsibility within the organizational structure of an enterprise.
    A cost center can be pictured as a ‘cost bucket’ such as a department, product line, production stage or geographical area. 
    An unlimited number of cost centers may be created.
    All cost centers within on controlling area have to be assigned to a cost center hierarchy (standard hierarchy).
    Costs originally posted to one cost center may be distributed and assessed to one or more other cost centers using allocations.
    How are costs assigned/posted to a cost center?
    External financial accounting documents created in FI, AM or MM that post to a G/L expense account can be configured to require a cost center assignment be entered at the time of transaction entry.  The system automatically creates a parallel CO document that posts to the indicated cost center.
    Cost elements master records can be configured to be posted to a certain cost center (automatic account assignment).
    In addition, other non-financial activity (i.e., direct labor hours) may be posted directly to cost centers from within CO or via other modules such as PP  or HR
    chandra

  • Scheduling - Min. queue time & work center / reduction

    Hello,
    I have a small issue with scheduling of production order.
    I have maintained in a work center with Std. queue time = 15 days and Min. queue time = 7 days.
    Means less then 7 days it should be not reduced and by enough time it should be calculated with 15 days.
    I know the forward scheduling production takes 20 days ( 5 days for first operation plus 15 days Std. queue time for second operation)
    By backwards I schedule the finish date which is less then 20 days in the future.
    I would expect system would take 7 days (Min. queue time) instead of 15 days with using reduction strategy.
    But system throws the message "Start date is in the past: today scheduling" and increases the finish date, with queue time = 15 day, instead to take
    7 days!
    I dont see system takes Min. queue time in account. Please help to find the error. Thansk!

    Hi
    Yes .Reduction strategy is only for floats to carry out detail scheduling
    Reduction in the float before and after production in the order, expressed as a
    percentage of the original float.
    For example  :
    The original float before and after production was 10days in both cases. You
    have entered level 2 as the maximum reduction level. The reduction of the float
    is in the first level 40 and in the second level 60.
    This means that in the first level the float is reduced by 40% of the
    original value, that is 6 days. In the second level the float is reduced by 60% of
    the original value, that is to 4 days
    Regards
    JH

  • No work center data on 01.01.2013

    Dear Time Experts,
    During Time eval for one employee I got an error "No work center data on $01.01.2013".
    The person's DOJ is 28.01.2013
    Earlier faced similar issue and resolved by deleting B2 cluster and again running Time Eval fresh from DOJ.  But now same procedure not working.
    Refered below link but not able to delete B2 cluster as it shows person already accounted.
    Re: getting error in PT60
    "No Work Center Data on $01.01.2008"
    Cheers,
    Nayak

    Hi,
    I am also facing same error. Your issue resolved ? I deleted the B2 cluster but having same error. Can you please tell me the solution for this problem.
    Thanks
    Dev

  • Post balance sheet account to profit center accouting

    Hi.experts.
    I want to post some blance sheet accounts to profit center accounting,these account include material stock,wip. what should I do?
    thanks in advance.
    Fannt

    Hello
    Balance sheet items can be transferred periodically or online in realtime
    You can transfer the following balance sheet items to Profit Center Accounting in the standard SAP system at end of period:
        Payables and receivables
       Material stocks
       Assets
       Work in process
    This can be done in period closing activities for AR/AP
    The assignment of payables and receivables to various profit centers is basically derived from the offsetting entry line of the FI document to which they belong. It is not possible to make structural changes to them within Profit Center Accounting. If, for example, you assign a new profit center to a material, or change the derivation rules when creating sales orders, these actions do not affect the assignments of documents which have already been posted.
    The payables and receivables to be divided are calculated in FI at the end of the period. To do so, call up the SAP Easy Access screen and choose Accounting ® Financial Accounting ® General Ledger ® Periodic Tasks ® Closing ® Regroup ® Debit Balance Sheet Account Subsequently.
    Enter the company codes for which you want to perform the calculation. For these company codes, the payables and receivables are divided according to profit center and business area. The results are then saved.
    You can now transfer the data to Profit Center Accounting. Do not choose the next menu option Post B/S readjustment n Financial Accounting. Instead, transfer the data in the Profit Center Accounting application menu, under Actual Postings ® Period Closing ® Transfer Payables/Receivables
    You obtain a list of all the company codes in the active controlling area. Select the desired company codes and the period and fiscal year which you want to transfer to Profit Center Accounting.
    The system then posts the payables and receivables to Profit Center Accounting under the reconciliation accounts of the general ledger. No FI documents are created in the process
    You can call up the function for transferring material stocks in Profit Center Accounting Customizing, under Actual Postings ® Transfer Selected Balance Sheet Items ® Set Up Material Stocks.
    The selection screen provides you with the choice of all company codes within the active controlling area. Select the period to be transferred. The current period is always based on the status of Materials Management. Normally, the data from the previous period is transferred.
    You access the transfer function by choosing the following path from the Customizing menu for Profit Center Accounting: Actual postings ® Transferring selected balance sheet items ® Generate opening balance for work in process.
    The selection screen provides you with the choice of all company codes within the active controlling area. You also enter the period and fiscal year.
    You generally work with the standard results analysis version 0. Should you wish to use a different results analysis version, note that this must be set up in CO Customizing for updating in Financial Accounting, as the corresponding account determination is required.
    The program transfers all changes in work in process within a single period. When running this function for the first time with a given controlling area, please select the field Create opening balance. The system then posts the opening balance to the start period. You can also post the opening balance to period 01 at fiscal year change, so avoiding having to carry the balance forward.
    You access the transfer program by selecting Actual postings ® Transferring selected balance sheet items ® Generate opening balance for assets in Customizing for Profit Center Accounting.
    The selection screen provides you with the choice of all company codes within the active controlling area. The depreciation area book depreciation per trade law (01) is provided as a default. You also select the posting period and the fiscal year.
    You should run the program in the background, as large amounts of data are normally selected. If you select the field Line item, a line item will be created for each asset in Profit Center Accounting. When handling a large volume of data, you should only use this option for test purposes.
    The system assigns assets to profit centers indirectly, via assigned internal orders or cost centers (see Assigning Assets). The program transfers the acquisition and product costs, as well as cumulated value adjustments. The accounts used for this transfer are taken from account determination for Asset Accounting.
    Note that it is only possible to calculate key figures (such as Return on Investment) in Profit Center Accounting correctly if an indirect statement of assets and depreciations is made in Financial Accounting
    Reg
    *assign points if useful

Maybe you are looking for

  • Your perfect mp3 pla

    I have yet to find it and I don't think I ever will. At least 20 hours battery life per charge. Completely customizable. Backlighting color changer of the new Neeon. Themes. The Zen Micro case, but much stronger. 40gb. Shows up as a hard dri've when

  • Problems with SelectOneChoise component in table filter

    I have tried to make a SelectOneChoise filter in a table and I have two problems which are: 1) If I use the filtering in the coloum with the SelectOneChoise and then navigate to another page and then back to the page with the table then the filtering

  • Double Click Functionality - Help Please

    Hi, In ControlPanel >> Mouse Properties >> there is an option for increasing the double click speed. Similarly , i need to have a JSlider , getting User Input from the JSilder Object, thereby increasing the double click speed for my Swing Application

  • I have incomplete album in my iTunes but payed for full.

    I got it a while ago but just recently got an iPhone and been downloading the music to it and every other song i got is avalible but my Toots album is just 5 of the 20 songs...

  • Activity allocation vs actual settlement

    Hi, I would like to seek advice on the difference. say in KB21N, i have 2 different activity allocation. 1 to cost center another 1 to sales order. 1) after posted in KB21N, may i know if cost is already updated in cost center or sales order? 2) for