Parallel checks in AVC

Hi,
I would like to know If I have 3 parallel ledgers (for each of ledger there is define the consumable budget - budget type) , is it posiible to configurate the control object derivation  for each of  ledger. I tried to do it but when I made a payments I got the message that one of the budget types do not have enough money.
Thank you in advance,
Natalja

.

Similar Messages

  • Re : Availability check in third party

    Hi
          While creating sales order for third party scenatio a availability check is automatically carried out. But for noraml sales processes if stock is there it does nor check availability. I want to know how to avoid the availability check in third-party scenario. I checked BANS and NORM. Item category(TAN and TAS) also i checked. I coun't found any changes.
    How to solve this.
    Thanks Anto

    Dear Antony,
    Availability Check in Sale order will be controlled in the sale order by the following..
    1. You can control the Availabilty check in sale order by means of the Requirement Class
    2. You cn fine tune (i.e., either you want to Switch ON it or OFF) the Availability Check in Sale order by using Schedule line Category.
    Rquirement Class: TCode : OVZG
    Here you do need to check the indicator AvC(Availability Check). If you checked this indicator which will carry out Availability check in Sale order.
    Rquirement Type will be assigned to Requirement Class using the transaction OVZH.
    You can find out which requirement type has been used in Sale order - in Procurement Tab at Overview screen.
    In VOV6(Schedule line Configuration) - there will be an indicator Availability check. This indicator will be used either to Switch ON/OFF Availability Check in Sale Order.
    Ex:
    Say in Req. Class - you have checked the AvC indicator, but for your schedule line you do not check the Availiability check indicator - then you can not carry out Availability Check in Sale Order.
    i.e,Availability Check box should be checked in both places. Then only, you can carry out Availability check in Sale order.
    In your case, it must be checked in either of the above mentioned palces.
    Because, then only you can carry out Availability Check in Sale order..
    Hope it may help you.
    Thanks,
    Venkatesh.S.P

  • Sync from a MAC and Parallels

    Music and photos in my MAC but calendar is in Outlook that I access from Parallels on my MacBook Pro. Can I sync from both sides of my computer while choosing to only sync calendar on the Parallels PC side?

    in Parallels check the Iphone so that it is used by Windows. In iTunes make sure that you calendar is set to sync and nothing else. In devices uncheck the iPhone so that it goes back to the mac side and in itunes make sure that everything is checked except the calendar.
    I have not been able to verify this on mine but it should work.

  • Parallel Desktop vs. BootCamp

    I just saw the software at the MAC site and i red some reviews. Why shall I go for BootCamp ?
    (what I have done and I am happy with despite the fact that I didnt found the @ until yet on XP)
    It sounds much simpler to use Parallel Desktop. So where is the bug ? Does somebody know ?

    Some more info:
    If you're heavy into games, Parallels isn't the best choice yet, due to the lack of 3D acceleration, etc., that Trevor mentioned above. Parallels also doesn't have full USB 2.0 support yet, and there are some issues with USB devices under Parallels. In the next major release (early 2007) Parallels expects to have most of these issues taken care of.
    That said, it does provide a great way to run Windows apps while OS X is still running. The performance isn't quite as fast as booting in to Windows, but for me that's compensated for by the fact that I can copy and paste from an OS X app into a Windows app. I have it running on my Mini and on our Mac Pro (both legally licensed), with a Vista VM and an XP VM, and I can switch between them without a problem. The newest beta release (which is still a beta, so I wouldn't recommend it for mission-critical use) has also some very nice features:
    - Ability to boot a Parallels VM from a Boot Camp partition (i.e., you don't need two installs of Windows to run both)
    - Ability to have Windows apps run side-by-side on your Desktop with Mac apps - making it appear that the Windows desktop isn't there (it does this via a bit of trickery, hiding the Windows desktop but leaving the apps windows and Windows taskbar visible)
    - Ability to drag and drop files from the Mac Desktop or Finder onto the Windows desktop and have them copy themselves over.
    If you want more info about Parallels, check out the Parallels Desktop for Mac Support Forum.
    Intel Mini 1.66 GHz, Mac Pro 2.66 GHz   Mac OS X (10.4.8)  
    Vista and XP running under Parallels

  • No error message while the budget is exceeded in PO

    Hello,
    I'm working in ECC 6.
    I created a PO with budget data (Fund, funds center and commitment item) with reference to an existing contract (without  account assignment in the contract).
    the budget was exceeded and the budget data was incorrect, but the system lets me save the PO.
    It seems the system checks the target value in the contract and doesn't check the budget in the PO line item ...
    When I tried to reproduce the same in the system R/3 release 470.
    I have the error message BP629 " payment budget exceeded" and this is what I was expecting to have in ECC.6 but it was not the case.
    is there an exit missing or customizing missing in ECC.6 to ask the system to check to budget availability for the PO linked to a contract??
    Thanks for your help,
    Regards,
    Chiachen

    Hi, then check
    1. CI info(as I wrote below)
    2. Budget profile in OF12(total or annual amount), which assigned to FM area(in OF 34)
    3 OF20 if AVC switch on for Value type 51 with action 3(and for apropriate budget- Commitment or payable)
    4 OF23 check if AVC switch on for your account assignments from PO
    5 try to reconstruct AVC in  FMBV
    6. Check if in PO amount not statistical

  • Budget Query

    I have created 1 PO  on 26.04.2007 i.e.last year.GRN & Invoices have also been prepared. Due to some reasons PO was blocked.Now if am trying to unblock the same PO,I am getting an error message as "Item 010 Fund Centre/commitment item/payment budget for the year 2007 exceeded".
    Please note that when checked in the FM reports the budget for the year 2007 is in negative.Please tell me if any other way or T code is there to check Budget & commitments.
    Please guide what may be the reason for error message..

    Apparently, it's former budgeting... Check if AVC is activated for this year (the transaction you gave refer to tolerances of AVC, but not to AVC itself). If it is, check if there is enough budget to unblock the PO (unblocking causes consumption of budget). The, if there is enough budget left, you can re-construct your AVC (FMBV) and check if you succeed to unblock the PO.

  • Error creating Purchase Order

    Hi Gurus,
    I've this issue. I'm using SRM 5.0.
    I've configured a product category mentioning it needs to go to sourcing only when the vendor is not mentioned. Otherwise it should bypass sourcing and after the last approval the PO has to be created in backend automatically. We are using Classic Scenario. Now i've this issue. When I create a shopping cart without vendor it goes to sourcing cockpit and from there when I fill the vendor information and create purchase order, purchase order gets created in backend. BUT when I provide vendor information in the shopping cart and Order it after all approvals, it doesn't create PO in backend. Instead I see an error in the error logs of Shopping cart mentioning.
    <b>"Shopping cart 0040000365: Error creating the follow-on document"
    </b>
    I see this under <b> Application Monitors > Shopping cart > Local Errors </b>
    Could someone please help me if there knows the solution for this or any note available for this.
    Regards,
    Sam K

    Hi Sam,
    Check your settings for when Sourcing is carried out. I assume you have setting in
    place always external procurement for every product category in place, why every
    SC goes to sourcing cockpit. Adjust that setting. You need to work with product
    categories to seperate things out or implement BADI for sorting out to individual
    needs. In parallel check the settings for the doc type, number range and the follow
    on doc to be created from SC.
    Cheers,
    Claudia

  • SYSFAIL error in Inbound Queue

    Hi,
    I got a SYSFAIL error in the Inbound queue. When I double clicked on it, it showed up the Status text as "An exception occurred that was not caught". This has been raised on 14-01-2009 (today's) date and when i checked for the B-Doc corresponding to this, i couldn't find out any entry for this.
    Initially i tried unlocking the queue and thereby re-processing it, but it failed again.
    The details are:
    Function Module : BAPI_CRM_SAVE
    Queue name : R3AD_SALESDO0004700954
    Date : 14-01-2009.
    Any pointers on this would be of great help.
    Thanks in advance
    Rasmi.

    1. Check in Tx: ST22 (ABAP Runtime Error). That would give you more insight in the cause of exception / dump and how to solve it.
    2. Also, in parallel check whether the connection to ERP is established and the RFC call is getting connected (Tx: SM59).
    3. If the error/exception/dump is occuring on ERP side, check whether CRM server details are maintained in table: CRMRFCPAR (on ERP side).
    4. Check whether internal user exit is coded to catch the exception and throw out appropriate error.
    5. check whether there is any code error in mapping module (available in table SMOFSUBTAB).
    These steps might be useful to find out your problem.
    Best Regards,
    Pravin..

  • Funds Management - Budget Posting

    Hi experts,
    I set up a fund management scenario with SAP CRM 6.0, then I'm trying to test it on WEB UI but I'm facing an issue which I'm not able to solve.
    The issue regards the Budget Posting functionality, specifically everytime I try to transfer budget from one fund to another the system gives me the following error: "Budget Consumption is 100.00 percent of total available budget (check level FU_FND)".
    In the error details the sistem tell me that the budget consumption/total available budget ratio is over the defined tolerance limits. Please adjust your posting amounts.
    Of course I tried to do it with the lowest amount but it doesn't work.
    Then, I guess I did a mistake during the configuration.
    Anyone who can help me working this problem out?
    Thanks a lot!
    Regards

    Hi Gabriele,
    the msg is raised as per the availability control set up - please check the following customizing:
    Customer Relationship Management
    Funds Management
    Availability Control (AVC)
    There please check the AVC profile assigned and the tolerance profiles.
    best regards,
    johannes

  • DSO performance

    Hello experts,
    I have a performance issue with loading data from a DSO to a cube.
    We have multiple DSO loading to the same cube. about 7 DSO's. the all contain the same data but only the region is different.
    When loading the data to the cube, I encounter a major performacne issue with one of the DSO's. all but one take about 1.5 hours to load data. all DSO contain about the same amount of  data. And yet what takes 6 of them to to in 1.5  hours each takes 1 about 16 hours. same data same amout. i have run the DSO in the RSRV transaction for but the test cam up green.
    Are there other test performance tweaks i can do to make this one go faster like the other ones? or any ideas why only this one is taking so long?

    Hi,
           Following are some of my thoughts .
    check in the data load whether the packet size is moving of small amount. ie loading the data at 100 records at a package and 10,000 at a package makes a difference in data load timing. Check setting in infopackage or DTP the package size.
    Also if you are using DTP check the number of background process in DTP overview and adjust them based on your system max background jobs.
    Also if you are running loading in parallel check whether your data loads is waiting for process ie it waits for other jobs to completed so that it will get a background process to proceed on data load.
    Hope the above points will help you.
    Thanks,
    Arun.

  • Comm api errors

    Hi
    We are developing an application with Point of Sale capabilities. To interact with the printer and cash drawer we use the comm api. The cash drawer is attached to the printer and the printer is attached to the pc via a serial port.
    We have tried and succeeded to print and open the cash drawer on a desktop running Win2000 and WinXP, but when we run the same code on a Dell laptop running WinXP the following happens:
    Printing:
    Garbage as well as the text we pass through is printed and the following is printed to the standard output (not by us):
    Unable to GetCommConfig() &#8211; 1
    CashDrawer:
    Cash drawer opens and the following error is caught
         Unsopported Comm Operation
    javax.comm.UnsupportedCommOperationException: Win32 Comm Driver: Error 1
         at com.sun.comm.Win32SerialPort.setCommDeviceParams(Native Method)
         at com.sun.comm.Win32SerialPort.setSerialPortParams(Win32SerialPort.java:276)
    at SerialDemo.main(SerialDemo.java:49)
    and the following is printed to the standard output(not by us):
    Unable to GetCommConfig() &#8211; 1
    We are sure we&#8217;ve placed the win32comm.dll, javax.comm.properties and comm.jar files in the correct places. Are we missing something obvious? Do laptops handle serial ports differently? Is Dell evil?

    Thanks for the advice.
    We've checked for conflicts and compared the settings.
    There is nothing that we could see that would indicate
    a conflict of any sort. But it got us thinking...so we
    uninstalled the generic text driver we installed and
    the exceptions and error printouts have stopped, but
    if we print the string "Hello World\n" the text
    "?Hello World" or "Some other garbageHelloWorld" where
    Some other garbage has been a small L superscript
    thingy or a sc combo character.I am guessing it's a serial printer...
    If it is parallel, check the CMOS\BIOS to see if your laptop LPT1 is set to ECP,EPP or Standard ( I think that's what the third one might be called) and verify that it matches the first PC settings...
    For a serial printer, on thing to check is the DIP switches... Your laptop ( on a guess that this maybe a different printer than the one used with the first PC) may have the Comm\Serial port set to 9600 8 none 1 Xon\Xoff and the DIP switched on the printer may be 9600 7 even 1 Hardware... For the most part you still communicate between the printer and the laptop, but some stuff gets lost\corrupted...
    As for changing the driver, Windows does not delete all the files when removing or replacing drivers for some device especially printers, so if the driver is corrupt, then assuming that it is windows and same version, look in device manager and see what drivers are loaded, uninstall like you had done earlier ( you may need to reboot with the printer disconnected) and manually delete the driver files ( actually just move them to a backup folder\directory in just in case ) then re-install the drivers...
    Hope this help you find the solution...
    - MaxxDmg...
    - ' He who never sleeps... '

  • Create the login id in adobe, but we are able o login.

    create the login id in adobe, but we are able to login.

    Hi,
    It all depends on the strategy you manage for the budget and availability control. Do you manage budget through BCS? You have to check what budget address is derived when you post a document on your FC (via FMBSDERIBO transaction). Additonally, you can check what AVC object is derived (if you have AVC strategy for deriving controlling objects) via FMAVCDERIAO. Another thing, is to check tolerance profiles - FMAVCDERITPROF.
    Another thing to check is to reconstruct the AVC ledger, becasue sometimes system requires it, otherwise wrong budget amounts are checked while posting documents. You can do it via FMAVCREINIT.
    Budget will be taken from upper nodes, only if you say so (in the transactions I mentioned).
    Regarding your other question, if the budget should be derived on FC 'XXX' and no tolerance profile exists, then zero-budget does not mean unrestricted budget.
    Regards,
    Eli

  • Windows on my mac

    Hey I was wondering if someone could tell me if i could use and iso image from one of my pc's at home and use it as the iso image needed for bootcamp to install windows on my mac via usb
    Thanks

    I personally was not successful using bootcamp either. I wound up using parallels. check with others.. for more opinions though. I just saw that this is almost a year old.. sry but still the same situation if anyone is wondering. I'd like to hear if anyone is happy with the bootcamp running windows 7?

  • Adding checkbox to DataTable

    I want to add a check box to my data table so the user can select one or more rows for an action (Delete in this case).
    Right now, I use a simple ListModel and it's using my java bean data directly.
    But, my java bean data doesn't know anything about selection, and thus does not have a "selected" property.
    Is there a way that I can create a parallel check box array or something that ties in with my list of rows so I don't have to create a new "checkbox aware" bean for my data?

    Just add a new property to the DTO, you don't need to do it in your backing bean.
    Also see http://balusc.xs4all.nl/srv/dev-jep-dat.html#SelectMultipleRows

  • Can interfaces be excluded from AVC checking by custom activity type?

    Certain interfaces with specific document types need to be excluded from the availability control checks. Can this be done via the derivation strategy for control object? If so, how?

    Hi,
    You need to use a special BADI for Account Assignment Derivation of AVC Ledger - FMAVC_DERI_AFMA
    The methods of this BAdI are called in function module FMAVC_CALL_DERIVATION_ACO, immediately before or after deriving an availability control object.
    Good luck,
    Elena

Maybe you are looking for