Hi All,
Is it possible to pay Planned delivery cost against the Delivery challan reference. Is there any standard setting for that.
Helpful answers will be rewarded.
Regards
Dhinakar.

Hi All,
Is it possible to pay Planned delivery charges using Delivery note reference.
Regards
Dhinakar

Similar Messages

  • GR wise Planned Delivery cost in MIRO

    I receive my materials (ordered in a single PO) in several deliveries
    (MIGO). The PO has a delivery condition in it. GR based IV is checked
    in PO.
    When I try to do invoice verification, total unsettled quantity is
    proposed in one line.
    I want separate lines for each Goods receipt for planned delivery cost
    in MIRO.
    For example :
    1. Create a PO(GR based IV checked) for 100 KG/ PO has a delivery cost
    viz. 10 INR per KG
    2. Receive goods in 3 deliveries ( 10 kg, 20 kg and 30 kg).
    3. Go for MIRO for planned delivery cost. here system is proposing 600
    INR for 60kg in one line item.
    We need 3 line line items - each corresponding to one GR.
    (While this happens for MIRO for goods, for planned delivery cost it is
    not happening).

    How ever in MIRO, it will consider the total GR quantity and will propose accrodingly..
    else u can make invoice with 3 different delivery notes, so that u will get 3 different invoices..
    Please refer to this link for further explaination :
    http://help.sap.com/saphelp_47x200/helpdata/en/b0/6cc62efd3311d2b4f3006094192bbb/frameset.htm
    BR,
    Krishna

  • About "planned delivery cost" in MIRO

    Hi all,
    If choose "2-planned delivery cost" in MIRO, I want to know if the credit limit will be applied the same as choosing "1-Goods/service items"? I know these are two different functions, but I want to know if the tolerence limit settings is effective to "2-planned delivery cost".
    Thanks in advance.
    Christina

    yes it will
    if both the vendors are same ie to say in the original document that gets defaulted during MIRO.
    Regards
    Sujoy

  • Defaulting Goods Items/Service Item + Planned Delivery Costs in MIRO

    Hi,
    How to defaulting Goods Items/Service Item + Planned Delivery Costs in MIRO.
    Tks.

    Hi ,
    Create a variant in Tcode SHD0 and assign to the Tcode MIRO.
    Regards
    Ramesh Ch

  • Planned delivery cost in MIRO

    I have a PO. I have entered the freight condition as FRA1. The vendor for the condition is specified at the time of the GR. I create mnultiple GR for the PO line Item.
    When I book the MIRO for the planned delivery cost the system does not propose the quantity and the amount. The GR based verification is checked in the vendor master data.
    Please suggest me a way to do this? or is it a standard system.

    Hi,
    Please check if condition is defined in M/06 ,ACCRUALS option should be ticked - otherwise system will not create any seprate delivery cost document in system at the time of GR. Check Purchase Order History,seprate delivery cost should be appeared against the Purchase Order History
    Also check ,in Pricing Procedure (m/08) ,accrual key should be available against delivery condition.
    Or else check at the time of MIRO,Goods Items/ Delivery cost/both option should be selected.
    Hope this will be helpful to you.
    Thanks & Regards,
    Sandesh Sawant

  • Planned Delivery Cost in MIRO for different freight vendor

    Hi,
    Kindly share, how to get rid of above issue:
    1) PO created with a freight condition (FRA1 with a different vendor assigned to it under item conditions tab)
    2) GR done, & all accounting entries were OK, (including freight costs in FR1 or FR3)
    3) while doing MIRO with selection Planned-Delivery-Cost, Amount & Qty fields are "Blank" and auto flowing from Clearing A/cs
    I found this error in both Domestic or Import POs.
    I've read many threads, but could not find a clear solutions for the same.
    Plz help
    Sankar

    Hi,
    Plz find screens.
    Amount & Qty fields not flowing in MIRO from open GRIR/clearing account balance.

  • Change the sequence of planned delivery costs in MIRO

    Dear Experts,
    In import an import PO the various CVD & ACD conditions are maintained in the PO .
    To enter the bill of entry , MIRO is used where the invoice is booked for planned delivery costs for the PO .
    In MIRO , this planned delivery costs appear by default in certain sequence. I want to change this sequence .
    eg by default the system shows :
    Sec Ed cess on CVD
    ACD
    BCD
    Ed cess on BCD
    CVD
    Ed cess on CVD
    Sec Ed Cess on BCD
    I want to change the seq of appearance in MIRO.
    How is it possible
    Pls guide
    Regards
    Anis

    Dear Anis bazmi
    You will get the conditions as you desire one below another  in PO or MIRO if you have defined them exctly the same way in your calculation schema steps, other wise there is no way in getting the way you want and it can not be changed either in PO stage or in MIRO also.
    Just check, when you are processing MIRO, please select Planned delivery Costs form the menu below instead of the combination of  both.
    Regards

  • Tab option for choosing Planned delivery cost in Miro screen

    Hi all
    I'm a new user in SAP system and I have a question as follows:on Miro screen, I do not see the tab, select Planned delivery cost, I think someone did somthing in  system and made it hidden.it displayed above the layout tab, so  I want to know how displays it on the screen?
    Thanks for your help

    Dear,
    Please go into transaction MIRO
    then on item level u can see One option with 3 selection criteria
    1) goods/serv item
    2) planned delivery cost
    3) goods service + planned delivery
    please select the 2 option
    regards
    amey

  • Planned delivery cost for the scheduling agreement

    Hi Experts
    1. I have an requirement to post Invoice ver. for the Planned delivery cost (freight,customs duty,CVD etc) against the Scheduling Agreement just like Import Purchases with checking off the GR Based IV Indicator before doing the GR
    I tried it but its giving me that no delivery costs are Planned in the Scheduling agreements it runs fine in case of the PO because PO is a time independent.  Please inform how to post the same for schedule agreement with time dependent indicator on. I tried switching off the time dependent indicator and the system allowed, but my requirement is to Post I.V for the delivery cost with the time dependent indicator on.
    Appreciate if you can suggest something in this case Urgently .
    2. Aother issue is we have some uploaded Scheduling agreement from legacy system with Time dependent conditions. For this we need to post planned delivery cost in Miro. Since the system is not allowing to post, how to about for this. Shall we enter the delivery cost in unplanned delivery cost in Miro and post.  Please suggest if any alternate solution is available.
    Regards
    Arvind

    Hi,
    As you know if the delivery cost document is not posted during GR the
    delivery cost is not proposed during invoice (MIRO). Planned delivery
    cost will be proposed in invoice only when there are records in EKBZ
    table. The EKBZ table will be updated when delivery cost is posted
    during GR itself.
    Please ensure in the PO itself thatr the conditions have been defined
    properly with the relevant amounts and values.
    During GR when planned delivery cost conditions are present in PO,
    system checks for values in amount field. Then only appropriate
    calculations will be done for delivery cost and planned delivery cost
    document will posted during GR and hence updates EKBZ table.
    Solution to this issue is described in below steps,
    1) reverse the invoice document
    2) reverse GR document.
    3) You have to give values in amount field in relevant conditions ZGDS
       in the PO.
       If you face any issues changing the values, delete above conditions
       and put it again manually and give values in amount field also.
    4) Post GR once again, delivery cost document will also be posted.
       You can check it in PO history.
    5) During invoice select Item + planned delivery cost and post the
       invoice. If you need planned delivery cost to be posted separately,
       then you can post individual invoice for item and delivery cost.
    Please note it is not possible to post delivery costs for documents with
    multiple accountassignments. 
    For your second question, I am afraid I can not answer. Please open a new ntry in the forum, so that someone else can answer it.
    Best Regards,
    Arminda Jack

  • Tax code error while posting Planned delivery costs in Import Scenario

    Hi!!!!!
    I am getting on error while posting Planned delivery costs in MIRO for Import Purchase Order with zero value tax code v0. The error is
    "Tax code V0 country IN does not exist in procedure ZAXINN"
    For Import I defined a pricing procedure which contains all condition types for CVD, Ecess, SEcess, Additional Customs Duty and Others.
    While making Import PO im putting V0 tax code. I assigned the Tax Codes to the Company code.
    Please let me know what config is missing.
    Regards,
    Durga

    Is you ZAXINN assigned to the country India
    and is your taxcode (created in FTXP) created for country India?
    kr
    hakan

  • MIRO-Planned delivery Cost

    Hi,
    We have made a PO where there is a problem with one of the wrong condition type(Transit Insurance) which does not have any secondary vendor assingement,but the condition type  is having  Account key (Other Clearing)
    As the MIRO-Planned delivery Cost Conditions for Sec Vendors Such as
    Basci Customs, Excise, octroi, are allready posted& the GR for this material is allredy done & the material is allready issued
    the value which is lying in the other Clearing account needs to be settled as there is no vendor assingemnt to this condition type we are finding it difficult where to nullify this account
    Please suggest what can be done

    Hi
    Now that you have already posted the Transit insurance amount , I suppose  you are getting the amount against the material supply vendor. One way for you to settle the expenses is to use the JV - FB60 for this to remove the amoutn and reassign the other vendor in FI
    Regards

  • IN MIRO for planned delivery costs always .19 paise extra coming?

    In MIRO for planned delivery costs always .19 paise extra is showing?
    very strage issue, kindly suggest me on the same
    archana

    ACtually when I am doing MIRO price is taking as USD * exchange rate = as local currency, instead of the price entered in INR for particular condition type like local freight in PO,
    because of which value is increased by .19 paise..
    like in PO local freight  entered charge is 5000000 rs in first column but the same is displayed 111160.52 usd in second column... but exchange rate is 44.98..
    IN MIRO it should take 5000000 for me but it is taking 111160.52 * 44.98 = 5000000.19 rs.. kindly let me know the solution for this
    regards,
    archana

  • Issue in MIRO for Planned Delivery Cost

    Hi,
    We are facing a problem during MIRO (Planned Delivery Cost)...
    First, We create Two PO's with Freight Value (use diff. vendors in both PO). During MIRO (including both PO), we done Invoicing with Goods / Service Items...when we are trying to create MIRO of Freight value (Planned Delivery Cost)... a pop-up open for choose the Vendor...
    Here, Issue is that only 2 Vendors should be there BUT there shows many vendors to choose..
    Please guide, how to solve this...During MIRO only 2 vendor should appear in that pop-up window...
    thanks

    HI,
    Here, Issue is that only 2 Vendors should be there BUT there shows many vendors to choose..
    many vendor means how match all vendor list?
    have you activate vendor partner  function at your end ? if yes check following things
    check vendor master record and check Invoicing party of that vendor ,also check invoice party of main vendor
    you may get invoicing party of both vendor there
    Regards
    Kailas Ugale

  • Issue with reversal of MIRO for Planned Delivery Cost

    Hi Xperts
    We have found out an issue while reversing the MIRO document for Planned Del costs. When we have done the MIRO, the accounting entry got correctly posted with correct account keys.Conditions are not inventoried.
    However, when we had reversed it - the stock account got hit.Do not understand, why that happened.Do you have any clue?
    1. Suppose we have done the MIRO for Del Cost & then performed GR.Now Stock has already consumed & afterwards we have found that the MIRO for Del Cost is wrong & reverse - in this scenario shall the Stock account will get a hit????
    2. I have maintained Price Control "V" in Material Master.However, I have maintained a Standard Price by mistake.In that case shall SAP ignores the MAP & takes Standard Price into account & post PRD??
    Regards
    Soumick 

    Hi,
    Before checking Planned Delivery costs accounting documents in MIRO posting and MIRO cancellation document, 1st check how Planned Delivery costs designed for your procurement process.
    Use t.code:ME23N, check your Purchase order
    Option-1:
    Is Planned Delivery costs added to inventory account and at the same time Planned Delivery costs posted to Separate Planned Delivery costs G/L account.
    OR
    Option-2:
    Is Planned Delivery costs posted to Planned Delivery costs G/L account ONLY
    OR
    Option-3:
    Is Planned Delivery costs added to inventory account ONLY.
    Based the above one setting, system  will post goods receipt and invoice posting document with corresponding accounting entries. Also cancellation of invoice posting document refer to these setting.But account posting depends on price control available in material master.
    NOTE:
    Standard price procedure (price control “S”):The system carries out all stock postings at a price defined in the material master. Variances in price are posted to price difference accounts.
    Moving average price (price control “V”): The system valuates goods receipts with the purchase order price and goods issues with the current moving average price.Differences in price between the purchase order price and the invoice are posted directly to the relevant stock account if there is sufficient stock coverage.
    Regards,
    Biju K

  • Problem with MIRO Transaction while posting Un planned Delivery cost

    Hi all,
    We have entered all the details including unplanned delivery cost in transaction MIRO. When we are trying to post the same by using post button directly with out simulation, system is asking for plant details.
    For first time we have entered wrong Plant details , system immediately asking again for plant details.
    Next time even if we entered correct plant details, the system is coming out from the screen MIRO and it is not posting the document.
    If you go through simulate button and it is working fine and it is giving Warning message, If we enter the wrong Plant details.
    My Client requirement is If we post the MIRO transaction including Un planned delivery cost with Post button. If we enter wrong plant details. System will through Error message, until we enter the correct plant details.
    Is there any way to do this. Pl help me in this regard.
    Regards,
    Ramesh

    In the MIRO T Code, U can see PO reference tab is there, Just below it there is Purchase order/scheduling agreement field is there . enter the purchase order number in blank field next to Purchase order/scheduling agreement and press enter. U can see it will  take the required data automatically.
    hope this helps
    regards

Maybe you are looking for

  • Error in the file conversion

    Hello,       I am trying to create a prototype interface where I need to create a flat file from the idoc ( through t-RFC port not the file port). I was able to create the XML file succesfully through the idoc. When I tried to create a flat file by c

  • Can't import cds onto itunes without computer crashing/shutting down

    hi, everytime i try burn cd's onto itunes my computer either freezes or appears to shut itself down but seems to be still running, i had a similar problem when playing computer games, after a while the whole system would appear to shut down but would

  • Oracle.DataAccess.Client

    I am having problem using "Imports Oracle.DataAccess.Client" on my code. When I put Imports Oracle.DataAccess.Client at the begining of the page, it will underline it and show sign of error. When I use OracleCommand, OracleConnection, OracleDataReade

  • 2 problem when syncing iphone with my mac.

    On the last days whenever I connect my iPhone (2G 3.0) to my Mac (10.6.1) I get a message "applemobiledevicehelper quit unexpectedly". All I need to do is just click 'ignore' and then everything works fine with iTunes (9.0.1). The problem is iPhoto (

  • Error message:" labview 7.1 development system has encountunered an error"

    sir, I had written program which had compiled earlier successfully, now i had improved the program for having some external diaplay by including sub vi 's consisting of DIO lines, the program when compiled now is shutting down abruptly giving a messa