Hi All,
I have a sales order with a requested delivery date of 08/31/2010 -
Schedule line confirmed with a delivery date of 08/31/2010 and Goods Issue date,Material availability date and other dates of
08/25/2010.
when i create a delivery system creates with a planned gi date of 08/27/2010.I dont have any pick / pack time
Please help me understand how system is calculating planned gi date in the delivery.
Thanks
Meghna

It is depend up on material availability date.
Scheduling date are prposed by the system by backward scheduling(in general)- if stock is not found as per requested date, then forward scheduling will be done and confirms new dates.
In your case- system proposes
In your case system considering transit time and transportation planning time- (from route)- then calculated loading time and GI time and proposed GI date
For Transportation and delivery scheduling- refer
http://help.sap.com/saphelp_47x200/helpdata/en/dd/5607e7545a11d1a7020000e829fd11/frameset.htm
Thanks
Chidambaram

Similar Messages

  • What is the difference between Planning cycle and Delivery cycle?

    Hi gurus ,
    After created the planning calendar for store ,  I have the same option value for planning cycle and delivery cycle (planning calendar) in the MRP area data for site specific material master , so what's the difference between these two field ?
    Thanks in advance ,
    Ryan

    Hi,
    If you have to deal with more complex situations, you can define a delivery cycle in the material master record in addition to the planning cycle. In so doing, you determine the days on whichthe vendor delivers his goods. The delivery cycle is entered in the material master record as a planning calendar in the Planning calendar field.
    You enter a delivery cycle if the delivery date (or the goods receipt date) depends on the day on which you order the goods. For example, you carry out the planning run and place your orders on Mondays and Tuesdays. If you place the order on Monday, the delivery is made on Wednesday, if you wait until Tuesday to place the order, the delivery is not made until Friday
    Where as Planning calander is Three character number (numeric or using letters) that specifically identifies a PPS-planning calendar. The difference between Planning calender and delivery cycle is If you have selected the MRP type "MRP" and have set a period lot-sizing procedure according to planning calendar, you enter here which planning calendar is to be used.
    If you selected the "time-phased planning" MRP type, the planning calendar that you specify here defines the delivery cycle. This specifies the days on which the vendor delivers the material. You can enter the planning cycle in addition to the delivery cycle

  • What is the difference between Planning calendar and Delivery cycle?

    Hi gurus ,
    For the Planning calendar(MARC-LFRHY) and Delivery cycle(MARC-MRPPP), what is the difference between their functionality ?
    I have created the planning calendar by MD25 ,and when I maintain this field in the MRP screen , i found the delivery cycle have the same choose value , so could you make me clear about this ?
    Thanks in advance .
    Ryan

    Hi,
    If you have to deal with more complex situations, you can define a delivery cycle in the material master record in addition to the planning cycle. In so doing, you determine the days on whichthe vendor delivers his goods. The delivery cycle is entered in the material master record as a planning calendar in the Planning calendar field.
    You enter a delivery cycle if the delivery date (or the goods receipt date) depends on the day on which you order the goods. For example, you carry out the planning run and place your orders on Mondays and Tuesdays. If you place the order on Monday, the delivery is made on Wednesday, if you wait until Tuesday to place the order, the delivery is not made until Friday
    Where as Planning calander is Three character number (numeric or using letters) that specifically identifies a PPS-planning calendar. The difference between Planning calender and delivery cycle is If you have selected the MRP type "MRP" and have set a period lot-sizing procedure according to planning calendar, you enter here which planning calendar is to be used.
    If you selected the "time-phased planning" MRP type, the planning calendar that you specify here defines the delivery cycle. This specifies the days on which the vendor delivers the material. You can enter the planning cycle in addition to the delivery cycle

  • Billing plan as per delivery schedule

    Hi,
    Is it possible to have the billing plan dates as per the schedule lines of the items using the billing plan configuration(either via either periodic billing plan or milestone billing)
    for e.g. for  a line item - qty 10(value 1000), delivery schedule is as follows
    10-Mar-2009 - qty to be delivered is 6
    02-Apr-2009 - qty to be delivered is 4
    ( dates and qty would be decided as per the customer needs. No periodic differences between dates).
    My expected billing plan should be as follows
    10-Mar-2009 - value to be billed is 600
    02-Mar-2009- value to be billed is 400
    if yes, please let me know.
    Thanks in Advance for your answers.
    Regards,
    Madhuri

    Hello,
    I believe the Condition Record for Rent would be based per Month. Now you cannot change this record to Daily because in that case system will bill only for 28 days in month of February.
    Instead there is a way out, in the Condition Type maintenance - T-Code V/06, Under Changes which can be made, put a Tick mark in Qty Relation Check Box.
    This will allow you to change the Calculation Type while creation of Sales Document. Thus for the month of January, you can change the Calculation Type to daily & leave it as it is (Monthly) for other months.
    Hope this helps,
    Thanks,
    Jignesh Mehta

  • What config is required to set up Transportaion planning for the delivery?

    Hi experts,
    I am trying create shipment for delivery.It not picking the delivery for shipment.I checked the status in delivery and Transportaion planning is not showing as 'A'.What config is required to set up TP for the delivery?
    Please advise

    please define your transportation planning point , shipment type
    u can define ur transportation planning point in IMG- enterprise structure - Logistics execution
    and shipment type u can define under IMG- Log Execution - shipment - define shipment types
    Maintain ur delivery type etc  relevant for transportation in
    IMG- logistic execution- shipments-maintain transportation relevance
    Pls do reward if this information is of helpful to you
    regards
    AMI

  • Billing plan with partial Delivery

    Hello,
    I would like to ask question regarding the Downpayment process when processing partial delivery.
    I have a scenario where i manage a sales Order with item required 2 PC.
    I have a billing plan for the sales order, with a Fisrt payement against the sales Order (30% of total value). Then i create a delivery with 1PC (partial delivery).
    My question is, is it possible to create a closing invoice on the 1 PC delivered? Does SAP manage this kind of cases?
    Thanks for your feedback
    Regards

    Hi
    It is possible to do partial delivery.While creating Sales order give order quantity as 3pcs.For first billing date you give 2pcs and for  another 1pc give another billing date.So for the first billing  date you do order related billing and do delivery for 1pc only which is a partial delivery.
    Regards
    Srinath

  • MD04 exceptions for planning plant and delivery plant

    I have a material that is to be produced in another plant via a special procurement key.  When a production order is created at times on MD04 I can see exceptions at the planning plant and not the delivery plant.  Is there a way to make sure the planning plant displays the exceptions as well? Thanks in advance for any help.

    I found the answer.  Since planning is only expected to be done at the planning plant the rescheduling dates and exception messages only apply there.  There isn't any config to allow the production plant to see the reschedule dates or exception messages.

  • Cross-Docking Planning (TR x Delivery)

    Hello,
    I'm working with Cross-Docking in the ECC 6.0... And I had sucess with the matching between a Inbound TR and Outbound TR (The same category)!!!
    But, I can't to do the matching between a Inbound TR and Outbound Delivery...
    Could anyone tell me if this combination possible?
    Thanks in advance.
    Regards
    Diego

    Hello,
    Can anyone reply this?
    I don´t have a solution yet.
    Thanks a lot,
    Jesus

  • Planning Ahead for delivery

    Just a quick question - I am expecting my new X230 on Monday. What is the protocol for any shipping damage to the packaging? Do I accept the package and follow up if there is a problem inside, or do I not sign for it and have Lenovo deal with UPS? Hoping to get a pristine package - but I wasn't sure what to do if there were shipping issues.
    Thanks!

    John Hawkinson wrote:
    What I'm thinking is that I will create Masters for each page I might use (one for each product they might want, company description, cover page). Then when I get a new RFP, I'll copy the main file, delete the masters I'm not going to need and tweak the masters I will need.
    I'm noticing my file is getting quite large though and I'm wondering if this is the best way.
    I don't think there's anything wrong with this approach. Test and see if opening a copy of your template and Save As -ing drops the file size back down. It should, unless there's something weird.
    Which approach to use depends a lot on how you like to work, and all sorts of incidentals about your workflow.
    The size may be due to your file containing embedded graphics (graphics that aren't linked to their sources on a drive, outside the file.) \\
    * Consider linking graphics to reduce the file size.
    * You may want to consider using conditional text to show and hide content.
    * You may also want to consider using cross-references from the document you're building for a new RFP, to stored boilerplate paragraphs in one or more separate documents. Cross-references only bring in text, not graphics or tables, so this might not suit for all uses. Also, some folks report problems with the reliability of cross-file cross-references. One workaround is to convert the cross-references to text before finaliing the document.
    * You may also want to consider using Data Merge with a Data Source file that contains references to boilerplate stored in text and graphics files that are saved on disk. You can edit a generated merged document like any other InDesign document, so you can add personalized content manually.
    Search Google for terms like "InDesign cross-reference tutorial," "InDesign data merge tutorial," "InDesign linking graphic files tutorial," without quotes for details on these topics.
    HTH
    Regards,
    Peter
    Peter Gold
    KnowHow ProServices

  • Issue in determination of planned delivery data in PR.

    Hello,
    I have an issue in PR, where planned delivery time is picked wrongly. PR is created through MRP.
    In info record, the planned delivery time is 8, in vendor master record planned delivery time is 0, and no contract exists. But when PR is created automatically through MRP, planned delivery time is 10 in PR. How is this possible, from where else does planned delivery time flow?
    There are 4 materials in PO, among which 3 materials have pl.del time as 1 and for the fourth the time is 10, because of which when delivery is created for PO using VL10B, 3 materials are planned in one delivery and the fourth material is planned in another. Split in delivery is occurring. Statistical delivery dates are the same for all the four materials.
    Please help e regarding this issue.
    Regards,
    Krishna Bharadwaj.

    Hi Krishna,
    What is the planned delivery time of the material in the material master?
    Also are you assigning the source of supply in the PR and have mentioned the Porg?
    Regards
    Vivek Singh

  • MRP planning improved delivery date

    Hello you all,
    I have a question regarding the MRP planning of improved delivery dates. Let me schedule the scenario.
    As material is ordered, the expected delivey date is indicated by delivery rules. If for some reason the supplier can deliver earlier, this is mentioned in the PO tab Confrmations confirmation catagory AB.
    As we run the MRP via transaction V_V2, the updated delivery date is not shown in MD04.
    What do i need to do to see the correct data in MD04?
    If this is all a bit fuzzy, please ask for further details. I am not a SD consultant.
    Thanks in advance for your reply.
    Best Regards,
    Peter Lans

    Hi,
    Run the program SDRQCR21 in SA38.
    This will correct the data in MD04.
    Hope this helps.
    Regards

  • Is there standard report for planned and actual devlivery date?

    Hi Guru,
    Could you help me to find standard report to compare planned delivery date in PO and actual delivery date (GR Posting date)?
    I wonder, Is there standard report for planned and actual delivery date?
    or I have to create a customizing report.
    Thank you very much.

    hi
    i dont think it is possible to see both in one pan so try to create some Z report
    u try ME80fn here u have to change the views ,in del shedule view u can see the delivery dtae and in PO histry view u can see the posting date
    regards
    kunal

  • What is the difference between scheduling agreement and delivery schedule

    Hi
    1. Can anyone explain me the difference between scheduling agreement output
        and scheduling agreement delivey schedule
        Will the both look same in T.code SP02 when seeing the output for a document.
        Can anyone send me T.codes for above ones in purchasing.
    2. when seeing the Detailed statement for rebate agreement,there is item number.
        In which table can we see the item number for rebate agreement

    Hi,
    If you have to deal with more complex situations, you can define a delivery cycle in the material master record in addition to the planning cycle. In so doing, you determine the days on whichthe vendor delivers his goods. The delivery cycle is entered in the material master record as a planning calendar in the Planning calendar field.
    You enter a delivery cycle if the delivery date (or the goods receipt date) depends on the day on which you order the goods. For example, you carry out the planning run and place your orders on Mondays and Tuesdays. If you place the order on Monday, the delivery is made on Wednesday, if you wait until Tuesday to place the order, the delivery is not made until Friday
    Where as Planning calander is Three character number (numeric or using letters) that specifically identifies a PPS-planning calendar. The difference between Planning calender and delivery cycle is If you have selected the MRP type "MRP" and have set a period lot-sizing procedure according to planning calendar, you enter here which planning calendar is to be used.
    If you selected the "time-phased planning" MRP type, the planning calendar that you specify here defines the delivery cycle. This specifies the days on which the vendor delivers the material. You can enter the planning cycle in addition to the delivery cycle

  • Code for fetching delivery date

    Dear friends,
    Please help in the code for fetching the delivery date & planned date of delivery for the materials upon entering the Sales Order Number.
    Thanks,
    Nishu

    Hi,
    READ LIPS table with the Sales order and get the delivery number and with the delivery number go to LIKP table and get lFDAT (delivery date)and WADAT(planned Delivery date).
    select vbeln
           from lips
           into l_vbeln
           where vgbel = salesorder
              and vgpos = salesorderitem.
    if sy-subrc = 0.
    select wadat
           lfdat
           into (d1 , d2)
           from likp
           where vbeln = l_vbeln.
    endif.
    Regards
    vijay

  • Distribution of unplanned delivery costs during delivery cost LIV

    Hi all,
    This clarification is regarding delivery cost LIV - where difference between:
      -  the amount invoiced by the freight vendor
    and
    - the amount accrued based on PO
    is treated as unplanned delivery cost and is intended to be distributed amongst the line items of the accrued planned delivery cost.
    Customizing for the company code - Configure How Unplanned Delivery Costs Are Posted - is set as "Distribute among invoice items".
    When we try to post an LIV in regard to the aforesaid scenario [Tax code is with 0% tax], the system returns the following error message:
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    Balance is not equal to zero: 58.42 EUR
        Message no. M8186
    Diagnosis
        You cannot post the document as the balance is 58.42 EUR.
    Procedure
        Check the gross invoice amount, the tax amount, the amounts in the items
        selected and any unplanned delivery costs in the document header. The
        items selected on the item list may not be the same as those in the
        invoice.
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    Also, went through the OSS note 129066 which mentions that Unplanned delivery costs cannot be distributed to the planned delivery costs as of SAP release 4.6C.
    Our system is SAP 4.7 and hence we are unable to understand the reason for this error..
    Is there any enhancement relevant in this regard?
    Can anyone please throw some light on this.
    Best Regards,
    Bhargav

    Thank you for contacting SAP Global Support Center.
    It seems you're posting the planned and unplanned delivery cost
    simultaneously.
    The planned delivery cost and unplanned delivery cost cannot be invoicedtogether when only freight cost is being invoiced.
    Unplanned delivery cost and planned delivery cost can be invoiced
    together only when you invoice both goods and freight cost.
    This is the standard design of the system. Even in customizing for
    unplanned delivery cost, the system behavior is designed such a way thatit can be invoiced along with goods only. Both options which we have
    given behave similarly except for the posting to account.
    Therefore, your system behavior is as per standard design and there
    is no error in your system. For this functionality there are no other
    workarounds too.
    Additionally, Please consider if the workaround below is working.
    In order to post unplanned delivery costs with planned delivery costs
    the customizing has to be set so that the unplanned delivery costs are
    posted to a seperate G/L account rather than distributed amongs line
    items.
    SPRO
    >>Materials Management
    >>Logistics Invoice Verification
    >>Incoming Invoice
    >>Configure How Unplanned Delivery Costs Are Posted
    "2" Different G/L line
    May I ask you to review note 129066. The the validity is from 4.0 to
    4.6 C but it is valid for your release also.

Maybe you are looking for

  • G5 Wont boot.

    I've searched and i've searched, and i can't really find a similar problem to this. It would seem most G5 boot issues are ram related.. Anyway. It's a G5 1.8 SP, launch model. Yep, about 7 years old now. Running 10.5.8 The boot HD is a 500GB and only

  • How do I remove and phone from my iTunes account?

    My dad and I share an iTunes account. He only has a couple apps so he uses my account to buy them and update them. We both backed up our iPhones to iCloud and we both updated our phones today through iTunes. Now all of our contacts are merged togethe

  • SAPSQL_ARRAY_INSERT_DUPREC" "CX_SY_OPEN_SQL_DB in VA02

    Hi Experts,               I have an issue when tried to update the reason for rejection for a particular line item. When updated the reason for rejection..and press save  ,system prompts to select the schedule line, when it is selected...program says

  • Size of PDF output created in FrameMaker

    Hi, I am getting different page sizes when I print a FrameMaker document directly to a printer and when I create a PDF file from FrameMaker and print the PDF. The page printed by PDF seems to be reduced to 95% of the page printed by FrameMaker. I hav

  • Button with sound in scrollable frame

    I ran into a problem. If i add sound to a button inside of a scrollable frame the 'on click' action of the button doesnt work. Outside of a scrollable frame it all works fine. Can somebody help me ?