Planned Order for a Product not being shown

Hi Experts!!
I am an ABAPer and I am new to SAP APO. We are now working on /SAPAPO/PPT1. When clicked on some quantity, all the planned orders existing for that product are being shown with respective quantities. Now, I am trying to create a new planned order for a product through FM BAPI_MOSRVAPS_SAVEMULTI3 by splitting the quantity among the receipts. I have gone through several posts and have written the logic. But the newly created planned order is not being shown in /SAPAPO/PPT1. I can't find it anywhere. Am I doing something wrong here?
Here I explain it with an example. I have an aggregated entry for the month of June with quantity 3000, which is already split under receipts 1234 and 1235 as 1000 and 2000 EA respectively. Now, I need to split it as 1000 EA for each planned order and hence am creating a new plord. I am using same FM for changing plords as well with quantities as 1000. So, now both the receipts are being shown with quantity 1000 and the aggregated value as 2000... and the newly created one is missing. But I need the new one to be displayed and the aggregated should be 3000. Why is this happening? Am I missing something?
I already have posted a query that is related to this total requirement. Change Receipt Quantity for Planned Order in LiveCache . This has the first part of the total requirement. Just provided for extra info, but not related to this issue however.
Please help me out. Your help is highly appreciated. Thanks a lot!!

Hi Srinivas,
With prior experience, i am sure that the BAPI SAVEMULTI3 can be used for Creation & Change.
I dont think,the FM's which you are using, are recommended by SAP. So , try to use BAPI most of the time,as it ensure data consistency.
As you told, order is not flown to ECC, but visible in APO, i would suggest you to check the importing parameters of the bapi, like EVENT CONTROL ( should be '1' ).
and COMMIT_CONTROL(should be 'E').
Also, check your queues after execution of bapi. you should find your change pointer in the inbound queue of R/3 System. Do let me know if you still stuck.
Thanks,
Santosh KB.

Similar Messages

  • Changes to Planned Order in R/3 not being updated in APO

    HEllo -
    I am creating SNP planned orders EE in APO and sending them through CIF to R/3.
    When I make changes( Qty change) to the planned order in R/3, those changes are not being updated in APO. When I run CCR, I get the error 159 - Differences in content.
    When I create a planned order in R/3, that order does not flow into APO, running CCR gives the error 151 - Missing in APO.
    Ofcourse, I can trigger the reconcialition job and make then go through but I have not been able to find the root cause. Can someone help me with this?
    Appreciate your help
    Varun

    Hi Varun.
    In the R3 system have you activated the BTE's?
    SPRO
    Integration with other SAP components->APO->Basic Settings for Data Transfer->Change Transfer->Change Transfer for Transaction Data->Activate Online Transfer Using BTE
    Applications: ND-APO and NDI need to be activated.
    Hope this helps.
    M

  • Setting nedded for creation of Planned Order for Dependent Requirement.

    Hi PP Gurus,
    I have a one material for which I m running MRP which have three Components.
    I m using strategy 10 for FG and SFG also.
    When I m running MRP for FG the system is creation planned order for FG, but not for SFG even though no stock available for them.
    I m using lot size EX for all SFG.
    Please Help.
    Thanks in Advance.

    Dear ,
    You should maintain proper MRP related parameters for both FG and SFG.Check all the MMR parameters :
    1.MRP Type -PD for FG/SFG
    2.Procurement Type -E  for FG/SFG
    3.Planning Startegy -10  in FG
    4.BOM/Routing Explosion -Keep it Blank
    5.Indiviaul/Collective Indicator -not applicable as it is MTS  so keep it blank
    6.Validity of BOM /Routing should be corrcet before MRP run in MD02-NETCH , 2,1,3,3,2
    7.What is the Lot Sizing Set up-EX in OMI4-Scheduling Tab -Requirement date =Delievery Date and BOM Validity Date  .
    Ref .Re: MRP not plalned for dependent components
    8.Check in MRP4 -MRP Dept Requirement Parametre should be balnk for plalling the SFG  in MMR of FG -MM02
    I hope this issue may be with BOM explosion as per the validity and lot size -schedueling set up .
    Hope this will be useful
    Regards
    JH

  • When is the next ios update and will it fix/address the issue with photos not being shown in chronilogical order?

    when is the next ios update and will it fix/address the issue with photos not being shown in chronological order?

    All of us here are users just like you. We have no inside info of when Apple products or operating system updates/upgrades will be released. The next iOS may not even change the issue you have.
     Cheers, Tom

  • How to see planned orders for P3 mrp type products in APO?

    Dear experts,
    I have materials with P3 MRP type (not planned in APO but in R/3 using MRP)
    I have active integration models with P3 and X0 mrp type products for planned orders
    however I can not see in APO product view the planned orders for P3 materials,
    is this normal or should I see those planned orders in APO?
    Thanks for your answer,
    best regards
    Elynn

    Hi,
    The following prerequisites must be met so that planned orders can be transferred from SAP R/3 to SAP APO
    and vice versa:
    1.The material masters must be transferred to SAP APO.
    2. PPMs must exist for planning in SAP APO.
    3. The relevant integration models must be active.
    4. An active integration model for planned orders must exist in SAP R/3.
    5.An active integration model must also exist for materials, so that the components of the planned order are transferred.
    6.The relevant distribution definitions must be maintained in SAP APO, so that planning results can be
       transferred from SAP APO to SAP R/3.
    Thanks,
    nandha

  • Can MRP only create planned orders for ROH, not for FERT?

    HI all,
    Is there any way to only generate planned orders for raw materials after MRP, forbid creating planned orders for FERT?
    We want create planned orders for FERTs manually.
    Thanks,
    Harvey

    Harvey,
    Yes, that was also my understanding of your scenario. Did you try X0 for Fert?  Run MRP against the entire plant, and MRP will not create any new planned orders for the X0 parts.  It will explode the BOM and create dependent requirements in the components.  In addition, you can create FERT planned orders manually, or using an external planning system, and these manually created orders will also create dependent demand on your components.
    If you are also using Sales orders to consume your PIR, you will also have to look at requirements determination for Sales orders.  This is configured based on MRP type.  If you change existing MRP types, you may have to add SD config so as to continue to pass requirements to MRP.  Your SD resource should be able to help you through this, or I can give you basic instructions if you decide that the PIR/demand/planned order/dependent requirements works to your satisfaction.
    Rgds,
    DB49

  • MTO - how to prevent a second planned order for a sales order?

    Dear friends,
    We are working on Make to Order process (Planning strategy group 20).
    No Production/process order is used
    Shop floor uses a different system --> details from planned order is passed to the shop floor system; and finished product is delivered/posted into SAP Sales order stock - through interfaces
    No QM in place
    A typical day-to-day scenario –
    Sales order Qty = 100
    MRP Run à Planned order qty = 100
    Raw materials posted to ‘Sales order stock’
    Planned order is firmed
    For example if Produced qty = 90
    sales order stock of the finished product = 90
    Balance 10 cannot be produced / delivered for various reasons
    Planner posts the raw material to cost center / rejections / own stock etc., and ensures that the ‘sales order stock’ of the raw materials are zero.
    Planner deletes the planned order
    Next MRP run triggers a new planned order for the balance qty 10
    Now, the requirement is to prevent the new planned order getting generated for the balance quantity, during the subsequent MRP run (despite the shortage in the Sales order stock of the finished product).
    The following options have been evaluated –
    Once the final good receipt is done & before deleting the planned order,
    o       Change the Sales order quantity to match the total produced quantity
    o       (or) Change the schedule line category for the Sales order item from CP to CN
    §         Since the Sales order and planned order are handled by different teams, considering the frequency of correspondence/coordination needed between these two teams to get the sales order items corrected, this idea is not accepted
    §         Additional authorization for the planner to change the sales order item is not acceptable
    Include Under delivery / Unlimited tolerances
    o       at the customer (master) level
    o       (or) Sales order level…
    §         In this case, System seems to consider the tolerances only when the  delivery for the Sales order is posted; and not when the sales order stock is received within the tolerance limits;
    §         Considering the time gap between the GR and Delivery of the finished product, this option is not accepted
    Kindly suggest the other options / settings / processes, to meet this requirement
    Thank you for your time and efforts.
    With Best Regards,
    Senthil

    Closing this thread
    Thanks
    Senthil

  • Separate planned order for each sales order

    Hello experts,
    Here, on a given day when more than one sales order are created, only one planned order is generated by the system. My lot sizing procedure is ex. How can I create different planned orders for different sales order? My planning strategy for the header material is 40.
    Thanks in advance!
    Snigdho

    Dear,
    In lot size EX if requirement comes on single day system will create combine procurement proposal in MTS.
    Separate procurement proposals can only be achieved if you work with make-to-order production. Here, the requirements are managed in separate planning segments of the stock/requirements list.
    Please refer the OSS note 550568 question no 6 for details.
    Regards,
    R.Brahmankar

  • Collective conversion of planned order to one production order

    Dear all,
    1. I have N number of pld ord for same material so i need to convert as production order with cumulative quantity.
    Because to reduce  Issing and confirming and receiving of number of production orders.
    2. I need to create Number of production order with diffferent material numbers  in one screen with different production order number.
    Because per day i need to create more number of production order with different material number. If i create one by one it will consume more time as well as its not practical possible for our business scenario.
    Pls let me know any standards are available in SAP.
    Regards,
    S.Suresh.

    Dear Suresh,
    You can convert Planned Orders into Production order collectively as a mass maintanance in CO41 Tcode.
    Revert if any doubt in case using above tcode.
    Further if you wish to have one production order against multiple planned orders it is not possible as per Standard SAP.
    You can convert to each planned order into individual production order not to single production order.
    If you wish clubbed production order then better you use Individual / Collective Indicator  as
    2     Collective requirements only
    Then you will get cumulative planned orders only against each material and you can convert all of them cumulatively to production orders in CO41 as a mass maintanance.
    Hope your problem resolves.
    Regards,
    Tejas
    Regards,
    Tejas

  • Creation of Production order for FInished Product through Project

    Hi,
    Pls clear me on how we can create a Production Order for finished product.  
    If we confirm the production orders in PP, cant the same be confirmed in PS.. Should we consider the same activity types in both PS and PP
    Pls clarify

    hi srikanth,
    your answer has been very helpful... but could u clarify  why MRP is run in MD51 for WBS element and in MD02 for network..
    Pls clarify...  My scenario is like this ...                                                                               
    A
                            B                                                                                C
                    D  E F G H I                                                                                J K L M N O
    I have  a Assemblies B and C which are always delivered in sets.. under assemblies B and C,  we have 6 sub assemblies which has its own components.  I am assigning sub assemblies to differenet WBS elements 01 and 02. so, initially these sub-assemblies are produced to stock. this should happen in PP i.e., through production orders generated in MRP run ( MD51 ). In the next phase i will assign Assemblies B and C to another WBS element.  Again system should generate two Production orders thru MRP for this. Here the 6 sub-assemblies produced earlier will be consumed in confirmation of the production order...
    What i am doing is this correct...
    and the procurement for the components is happening thru the purchase requisition generated via MRP. the components themselves are not directly assigned to the project..
    Pls advise and clarify?

  • PDF Export Options not being Shown

    Need to export to pdf again. Last export was for only 6 pages, as a test. Now want to export the entire document. However, only 6 pages are created in the export. No options to revise the pages, are presented.
    The iD app is acting strangely, in that many other options are not being shown. Also, on loading a document, there are notes about hyphenation and missing LILO. Beginning to believe I need to reinstall.
    Pleae advise best course of action at this point.

    before you reinstall, see if trashing the prefs helps. See Replace Your Preferences

  • In My Shared View the inbox tabs like My Tasks , Initiated Tasks are not being shown

    In My Shared View the inbox tabs like My Tasks , Initiated Tasks are not being shown :
    How to display the tabs in shared views also.
    I just wanted to created one shared view that will look like Inbox but filter data for State = 'Completed'

    Please update me if you can find any way to achieve this in BPM workspace

  • Multiple planned orders for a requirement

    Hi,
           We have PPDS MRP with NEW shelflife w/ lot size profle run for product and produces multiple planned orders for the the requirements.
    I have a requirement of 4,750 and 14,976 in the system and available stock 86,966.
    The system creates two planned orders with 34,632 and 26,771 PCs.
    Why is the system creating two order instead of one??
    The min. lot size is 1876 and rounding is 936.
    can somebody tell me what factors the system is considering??
    Thanks.

    Hi Visu,
    Which lot size procedure you are using , please check in lot size tab in Product master, it should be lot for lot.
    if it is lot for lot , please change it to by period and weekly , is it change the planned order quantity ?
    Manish

  • Planned order for MPS items can be unfirmed in MRP plan

    Hi All,
    I'm using SCP functionality (not ASCP) in MRP module. I run a global MPS first and then use it as supply schedule to drive mrp plans. I noticed that some planned orders (for MPS items) loaded into MRP from MPS can be unfirmed in MRP and I can enter new quantity and new date for them, whereas other planned orders for MPS cannot be unfirmed.
    What is the logic behind it? How to control it?
    thanks in advance,
    Tom

    Hi Ram,
    I don't think that there should be any issue due to the planned order created in the system against the PIR for the next month ....& it will not lead to improper planing even if the demand changes still we are not going for the firmed planned order....... if the PIR changes during the next MRP run then it will adjust the planned order accordingly .....
    Still you want to  restrict the planning to the current month then the simplest way that  I can think of is planning horizon....
    Thanks
    Kaushik

  • Partial conversion of planned order for AFS material

    Hi,
    I cant able to convert partially the planned order in to production order for the AFS material. Has any one has faced this problem? Is there is anything i need to do in IMG?
    Regards / US

    Hi,
    Which version of AFS you are working only AFS 6.03 has given with this facility.  Pl check if it is AFS 6.00 you have update the patch level.
    Regards
    Mohan

Maybe you are looking for