Dear all,
In Planned Orders , in the components tab , the following fields are assigned/populated with some values by the system.
Order level
Order path
Assy Order Level 
Assy Order path
Please clarify , on what basis or what is the logic behind this ?
Thanks,
Sheik

Hi Sheik,
I can't see in the online display of a planned order any of the fields that you have mentioned.
Nevertheless, these fields exist in RESB table; in my understanding they are used by SAP inner logic, and am not sure that they make any sense for other use.
Regards,
Mario

Similar Messages

  • Costing affect with MRP at planned order level and after production order

    Dear all,
    How the costing affect with MRP at planned order level and after production order completion?
    Edited by: Maulik on Jun 24, 2009 1:59 PM

    Dear Maulik,
    check Mr. Vinod's inputs abt costing
    1. Maintain following master data:
    MM01 Material Master with Costing and accounting view. Make sure all the cost Std, Moving avg etc is maintained along with valuation class in Accounting view 1. In costing tab pls make sure "with qty structure" and "Material Origin" are ticked.
    CS01 BOM with components marked with costing relevance in Status/Long Text Tab. Also check all the qty are correct.
    CR01 Work Center in Basic data tab maintain standard value key sau SAP1 and in costing tab maintain the workcenter, activity type and formulas (Usually standard formulas like for Machine Hours SAP006, Labour SAP007, Setup Activity SAP005 is used).
    KL01 Cretae activity types, in basic data tab maintain ATyp Category AS "1" and cost element (as provided by your FI Guy).
    KP26 Activity pricing, here with the combination of Activity type and the cost center you assign price to the activity.
    2. SPRO Activity
    Maintain Costing sheet IMGControllingProd cost controllingProd Cost PlanningBasic settingoverheadsdefine costing sheet.
    OKKN Define costing variant, you define costing type (In the costing type, you define the purpose of a material cost estimate by specifying, for example, which field in the material master record the costing results can be transferred to like std price, moving avg etc), Valuation Variant (defines how the prices are prioratized), date control and transfer structure.
    3. Costing Process Flow:
    1. CK11N CREATE COSTING RUN
    2. CK24 CREATE PRICE UPDATE (You Mark and release the prce to be updated)
    4. COSTING VARIANT WRT PP
    1. OPL1 DEFINE COSTING VARIANT WRT PP
    2. OKK4 or OPN2 DEFINE VALUATION VARIANT
    3. OKK1 or OPM1 DEFINE COSTING TYPE
    4. OPL8 ORDERTYPE DEPENDENT PARAMETER (assign the above creted costing type for both planned and actual)
    Hope this will throw some light on product costing.
    Regards
    kumar

  • Planned order not getting generated at plant level

    Hi experts,
          When i run MRP for a particular plant in T- code (MD01) Planned order is not getting generated but when MRP is done against a material in T - code (MD02) in the same plant planned order gets generated... Is there any customizing  to generate planned order in plant level.....
    Regards,
    Joseph.
    Edited by: joseph5885 on Aug 12, 2010 9:23 AM

    Dear Joseph,
    No it is not recommended. only in emergance cases this will be done
    Usually in MDRE and MDAB will be scheduled before MRP run at background for inconistancies in planning file enries
    So the above said t-codes will take care of the same
    Added
    Refer this link
    [Planning file entry;
    Regards
    Madhu
    Edited by: K.Madhu Kumar on Aug 12, 2010 6:53 AM

  • Collective Planned orders Scheduling for lower level orders with reference to the Superior order

    Hi All,
    Collective planned order scheduling.
    I have been trying to reschedule the superior planned order and i was expecting the lower level planned orders to reschedule based on the superior planned order.
    My problem is
    when i try to reschedule the superior planned order the system is not rescheduling the lower level planned orders.
    For example if i change the basic finish date of superior planned order as 30/09/2014 and reschedule the planned order it is only scheduling the header planned order and the lower level planned order is not scheduling.
    Could some one tell me why this is not happenning at planned order level.
    As the rescheduling of collective order will work at production order level but for some reason it is not happening at planned order level(as there is no option available to do so).
    Please give your thoughts on this asap.
    Mahee.

    Hello Mahee
    Please observe that your system is working as designed. Planned orders are scheduled independently, even when they are part of a network/collective order. Note 152319 explains the planned order scheduling in detail and it provides the following information:
    * No scheduling of overall networks is executed although a directly manufactured component is assigned.
    Note that no scheduling of the overall network is executed for planned orders. For the components requirements dates are determined. In order to cover them, planned orders are created in the next MRP run. Since the requirements are not managed using the exact time, the results of the planned order scheduling and of a scheduling of the overall network of the converted collective order can differ.
    BR
    Caetano

  • Additional Field in Planned Order

    Dear Experts,
    Is there any additional field can be used to store additional informaton like shift?
    For an example:
    Shift Y appear in upload planned order program, then Y will be shown in Planned order.
    Is there any addinitional field or user exist can be used in planned order?
    Thank you.

    dear friend,
    there is NO any field you can use for your particular purpose.
    I suggest you can't use any user exist.
    Ask your abaper to extend the standrd table PLAF
    or
    to create a new custom table  and write a program which uses it.
    good luck!

  • How to set User-field in Plan order

    Hi
    could you tell me please how to set a user-filed in plan order. when I run MRP planing, I can write some data in this filed.
    thanks
    henry

    Hi,
    Actually these user defind fields are used/assigned in the routing.
    Initially u have to define your own user defind profile through OPEC transaction.
    Assign this profile in the routing.
    So when ur executing Mfg activities, suppose if ur using some high materials like silver...etc.
    Then after executing the particular operation some amount of silver chips or silver scrap will generated .
    To keep chip/scrap qty operation and date which user defind is used.
    Once u have assigned this profile to routing, then it will be automatically copied in the planned order/production order.when ur confirming the order then u have to enter the all related data.
    Regards
    Vijay

  • Capacity Leveling in CM25 by Sequence Number in Planned Order

    Hello Gurus,
    I am having an issue with dispatching planned orders using tabular form.  We have to use the tabular form in order to be able to have our program select all planned orders.
    I have been testing and testing this trying to get it to work.  We have sequence numbers defined for our planned orders in the PLAF-SEQNR field.  When entering CM25, we are wanting to dispatch all of our planned orders at once and have them dispatched in the correct order by sequence number.  I have the Strategy Profile defined for Finite Scheduling, Plan. direction forwards, and no closing of gaps.  and I have my Dispatch Sequence layout key defined to only use the Sequence Number in the Planned Orders.
    We need to use the tabular form so we can select all planned orders.  I set up the requirements grouping to only include planned orders that are not yet dispatched.
    When I use the graphical form instead of tabular and I manually highlight all of the planned orders and dispatch then they are all in the correct order with all of the gaps are closed...which is what i want.
    However, I need to be able to do this using the tablular form.  No matter how I try to set up the strategy profile, it doesnt seem to work using tabular form.  They are dispatched according to start date with gaps in between the orders.
    Any help is greatly appreciated.
    I also have the following defined in Strategy Profile for Dispatching Control:
    Sort operation to be dispatched
    Consider operation sequence in the order
    Midpoint scheduling
    Thank you.
    Edited by: Kevin Gorman on Jan 14, 2009 8:19 PM
    Edited by: Kevin Gorman on Jan 15, 2009 3:26 AM

    Hi Vishal,
    I hope the below link will provide you need full information:
    http://help.sap.com/saphelp_470/helpdata/en/8a/a5a7674adc11d189740000e8322d00/content.htm
    Hope it clears your doubt.
    Regards,
    Madhu.G

  • MPS run, planned orders were created for all levels ?

    Hello PP members
    I ran a small scenario
    material    MRP Type     Low Level    SG           M/T Type
    A      M0         000             40              FERT
    B               PD              001              40             HALB
    c               PD              002               10             ROH
    Maintained PIRs(MD61) for material A, and ran MD41( Single Item Multi level Planning)
    As material A is an MPS item, I was expecting that it should create planned orders only for material A, but in this MPS run it created planned orders for material B & C. (Looked into MD04, where I see planned orders were created
    for all the levels)
    As per the MPS run, it will plan only for one level of BOM (in this scenario for material A)
    Any suggestions, why planned orders were created for material B & C
    please clarify

    Just check
    System must have created a dependent requirement planned order and not the planned order for requirement you put in demand management for B and C
    i.e. if you enter a demand in MD61 for B and C, run the transaction, system will not consider this requirement during MPS run. MPS run will consider the requirement if the requirement for the child is comming from parement where parent is MPS item.
    Hence you need to run MRPm for B amd C if teh requirement(not dependdent requirement from A) is to be considered.
    I hope you are clear
    Edited by: Rajesha Vittal on Jan 28, 2008 8:06 AM

  • SG:50, Cannot convert planned orders to prod orders at BOM component level

    Test scenario for Strategy Group 50 (Planning without final Assembly)
    Product Structure
    Material-->  SG50.00 > FERT> (Strategy Group: 50)
    Material---> SG50.02 --> HALB --->(Strategy Group: 40)
    Material---> SG50.04 ---> ROH --->(Strategy Group: Blank)
    Maintained PIRs and Ran MRP at the header level, Planned orders are created
    with order type VP at levels of BOM structure. Thus cannot covert planned orders
    to production orders without having sales order.
    But my understanding of Strategy Group 50, is BOM components can be produced before hand (i.e.
    before sales orders are recieved ). Now planned orders with order type VP not able to convert
    planned orders to prod orders at BOM component level

    Stuti/Prasobh:
    Thanks for your inputs, it answers my question
    Intially maintained Individual/Collective indicator to "2" at header level (FERT), which is why all the planned orders are created with order type VP
    Changed the Individual/Collective indicator to "blank " at header level (FERT), and maintained Individual/Collective indicator  to "2" at component level
    Reran the MRP (MDO2), with the following settings --> Delete and Recreate planning data and Check mark on  Also plan on unchanged components
    Able to see planned orders at component level with order type LA
    Due points have been assigned

  • Set new Required Field for MD14 and MD15 for conver from Planned order to P

    Dear all,
    I would like to set new required field (Purchasing Organization)  in T-CODE MD14 and MD15 for convert from Planned Order to PR. What's should I do?
    Please help, I 'm new for MRP.
    Best Regards,
    Kate

    Hi Kate,
    You are not on the right track; MD14 and 15 will choose the PLANNED ORDER population for the conversion. In planned orders there's NO PURCHASING ORGANIZATION DATA (normally)!
    So even if you managed to put the field on the screen, it will not do anything that makes sense.

  • Field setting when collective conversion from planned order to PR

    Dear expert:
    Is there any way(except ABAP enhancement) to add the field "tracking number" in MD15 when I conduct collective conversion from planned order to PR. Seems in standard config this field in not included in this screen. I have set this field as a mandatory field, but even though when I conduct the conversion, this field still can not be displayed in the MD15 conversion screen.

    Hi,
    There are following T. Codes to convert Planned Order to PR;
    MD14 - Individual Conversion
    MD15 - Collective Conversion
    MDUM - In Background
    Also MD04
    User Exit is LMDZU001 - User exits in additional planning

  • How to activate batch field in Planned Order

    Hi all Gurus,
    My customer asked me to activate batch field in Planned Orders (MD12) so that they can enter batch number before converting planned order to production order. By entering a variant in the table I could make it display in the table but not in change mode.
    Is it something to do with screen variant or do you have any suggestions?
    Thanks in Advance
    Sree...

    Hi,
    Please maintain following config...
    1. Go to Production --> Material Requirements Planning --> Procurement Proposal --> Planned Orders --> Define Layout for components list.
    2. Then go to Field Selection Profile. Select the profile and click on profile field selection fields
    3. Click on Change Field Selection and Select Batch or any other required field. Save the changes.
    This should work, pl come back to me in case you have any further doubts.
    Regards,
    Gaurav

  • Lock/ disable field in planned order MD12

    Dear expert,
    Can we lock the field in planned order? In my case, I want the purchasing staff to be able to change only the production version, for others field i want them to be locked. Therefore the purchasing cannot change any fields in there except the production version.
    this is due to the need for material subcon.
    Maybe u can give any advice. what should i do?? do i need to make new customizing t-code for ex: ZMD12 or just make new customizing from authorization t-code su3?
    Thanks
    Pauline

    Dear Pauline,
    Check in SE93,by creating a new T Code ,with the start object as Transaction with variant.
    Transaction type: Variant transaction
    In the SAP Reference IMG, under "Basis Components" -> "Application Personalizaion" -> "Tailoring of Application Transactions",  you can define transaction variants. These allow you to preassign values to fields within a transaction, define field attributes, or hide entire screens.
    To run a transaction variant, you define a variant transaction. On the next screen, enter the name of the transaction and the name of the variant.
    Note
    Variant transactions are client-specific.
    If you try to start a variant transaction and the corresponding variant does not exist, the transaction runs without a variant.
    If the above does not helps you means,check this link to explore more,
    Transaction variant
    Regards
    Mangalraj.S

  • Reduction level in planned orders

    Hi,
    Few part# are having planned orders with reduction level 2 even though there is sufficient time for production.  Say for eg: parts are supposed to be delivered on 29/09/2009 it is taking reduction level 2 even though it has an opportunity to start earlier.  I have updated the material masters with lead time from routing and these changes are clearly visible in Work scheduling view in material master.  Not all the part# are having this problem, very few are having this problem. 
    Pl help,
    with regards
    deepak

    Hello Bramahankar,
    Thanks for your kind response.  I would like to explain little more in detail, the problem i have is like this.
    1.  Parts are supposed to be delivered on 29/09/2009, so the system based on lead time required and backward scheduling few part# are having start date as 18/09/2009 and few may plus or minus 3 days to this.
    2.  Out of 20 part# 4 part# are having reduction level 2 and its starting very late, say like the the start date is 19.09.2009 even though it can start 2 or 3 days early and avoid reduction level 2, but the system isn't doing this. 
    I have tried all sort of things like updating lead time in material master, re run MRP but its not helping out.
    Could you pl help.
    With regards
    deepak

  • Capacity planning at Planned order level

    Dear All,
                      In my current scenario i'm able to see load of process orders against the workcenter in CM01. My requirement is to do capacity levelling at the planned order level.
             I have created Production version also & attached to the planned order. Still in CM01  no load or planned order is shown on workcenter.
    when i convert it into process order then it shows load / process order.
    pl.let me know how i can do the capacity planning at planned order level.
    Thanx & regards,
    dev

    Hi,
                       In MD12 when click on Go to > Capacity Levelling >
    Error Message : No work centers with capacity requirements were found
    I have given formula : SAP006 in capacity & Relevant to finite schedulling indicator is also active.
    what may be the cause ?
    thanx & regards,
    dev