Planned Orders -Order level & Order path fields
Dear all,
In Planned Orders , in the components tab , the following fields are assigned/populated with some values by the system.
Order level
Order path
Assy Order Level
Assy Order path
Please clarify , on what basis or what is the logic behind this ?
Thanks,
Sheik
Hi Sheik,
I can't see in the online display of a planned order any of the fields that you have mentioned.
Nevertheless, these fields exist in RESB table; in my understanding they are used by SAP inner logic, and am not sure that they make any sense for other use.
Regards,
Mario
Similar Messages
-
Costing affect with MRP at planned order level and after production order
Dear all,
How the costing affect with MRP at planned order level and after production order completion?
Edited by: Maulik on Jun 24, 2009 1:59 PMDear Maulik,
check Mr. Vinod's inputs abt costing
1. Maintain following master data:
MM01 Material Master with Costing and accounting view. Make sure all the cost Std, Moving avg etc is maintained along with valuation class in Accounting view 1. In costing tab pls make sure "with qty structure" and "Material Origin" are ticked.
CS01 BOM with components marked with costing relevance in Status/Long Text Tab. Also check all the qty are correct.
CR01 Work Center in Basic data tab maintain standard value key sau SAP1 and in costing tab maintain the workcenter, activity type and formulas (Usually standard formulas like for Machine Hours SAP006, Labour SAP007, Setup Activity SAP005 is used).
KL01 Cretae activity types, in basic data tab maintain ATyp Category AS "1" and cost element (as provided by your FI Guy).
KP26 Activity pricing, here with the combination of Activity type and the cost center you assign price to the activity.
2. SPRO Activity
Maintain Costing sheet IMGControllingProd cost controllingProd Cost PlanningBasic settingoverheadsdefine costing sheet.
OKKN Define costing variant, you define costing type (In the costing type, you define the purpose of a material cost estimate by specifying, for example, which field in the material master record the costing results can be transferred to like std price, moving avg etc), Valuation Variant (defines how the prices are prioratized), date control and transfer structure.
3. Costing Process Flow:
1. CK11N CREATE COSTING RUN
2. CK24 CREATE PRICE UPDATE (You Mark and release the prce to be updated)
4. COSTING VARIANT WRT PP
1. OPL1 DEFINE COSTING VARIANT WRT PP
2. OKK4 or OPN2 DEFINE VALUATION VARIANT
3. OKK1 or OPM1 DEFINE COSTING TYPE
4. OPL8 ORDERTYPE DEPENDENT PARAMETER (assign the above creted costing type for both planned and actual)
Hope this will throw some light on product costing.
Regards
kumar -
Planned order not getting generated at plant level
Hi experts,
When i run MRP for a particular plant in T- code (MD01) Planned order is not getting generated but when MRP is done against a material in T - code (MD02) in the same plant planned order gets generated... Is there any customizing to generate planned order in plant level.....
Regards,
Joseph.
Edited by: joseph5885 on Aug 12, 2010 9:23 AMDear Joseph,
No it is not recommended. only in emergance cases this will be done
Usually in MDRE and MDAB will be scheduled before MRP run at background for inconistancies in planning file enries
So the above said t-codes will take care of the same
Added
Refer this link
[Planning file entry;
Regards
Madhu
Edited by: K.Madhu Kumar on Aug 12, 2010 6:53 AM -
Collective Planned orders Scheduling for lower level orders with reference to the Superior order
Hi All,
Collective planned order scheduling.
I have been trying to reschedule the superior planned order and i was expecting the lower level planned orders to reschedule based on the superior planned order.
My problem is
when i try to reschedule the superior planned order the system is not rescheduling the lower level planned orders.
For example if i change the basic finish date of superior planned order as 30/09/2014 and reschedule the planned order it is only scheduling the header planned order and the lower level planned order is not scheduling.
Could some one tell me why this is not happenning at planned order level.
As the rescheduling of collective order will work at production order level but for some reason it is not happening at planned order level(as there is no option available to do so).
Please give your thoughts on this asap.
Mahee.Hello Mahee
Please observe that your system is working as designed. Planned orders are scheduled independently, even when they are part of a network/collective order. Note 152319 explains the planned order scheduling in detail and it provides the following information:
* No scheduling of overall networks is executed although a directly manufactured component is assigned.
Note that no scheduling of the overall network is executed for planned orders. For the components requirements dates are determined. In order to cover them, planned orders are created in the next MRP run. Since the requirements are not managed using the exact time, the results of the planned order scheduling and of a scheduling of the overall network of the converted collective order can differ.
BR
Caetano -
Additional Field in Planned Order
Dear Experts,
Is there any additional field can be used to store additional informaton like shift?
For an example:
Shift Y appear in upload planned order program, then Y will be shown in Planned order.
Is there any addinitional field or user exist can be used in planned order?
Thank you.dear friend,
there is NO any field you can use for your particular purpose.
I suggest you can't use any user exist.
Ask your abaper to extend the standrd table PLAF
or
to create a new custom table and write a program which uses it.
good luck! -
How to set User-field in Plan order
Hi
could you tell me please how to set a user-filed in plan order. when I run MRP planing, I can write some data in this filed.
thanks
henryHi,
Actually these user defind fields are used/assigned in the routing.
Initially u have to define your own user defind profile through OPEC transaction.
Assign this profile in the routing.
So when ur executing Mfg activities, suppose if ur using some high materials like silver...etc.
Then after executing the particular operation some amount of silver chips or silver scrap will generated .
To keep chip/scrap qty operation and date which user defind is used.
Once u have assigned this profile to routing, then it will be automatically copied in the planned order/production order.when ur confirming the order then u have to enter the all related data.
Regards
Vijay -
Capacity Leveling in CM25 by Sequence Number in Planned Order
Hello Gurus,
I am having an issue with dispatching planned orders using tabular form. We have to use the tabular form in order to be able to have our program select all planned orders.
I have been testing and testing this trying to get it to work. We have sequence numbers defined for our planned orders in the PLAF-SEQNR field. When entering CM25, we are wanting to dispatch all of our planned orders at once and have them dispatched in the correct order by sequence number. I have the Strategy Profile defined for Finite Scheduling, Plan. direction forwards, and no closing of gaps. and I have my Dispatch Sequence layout key defined to only use the Sequence Number in the Planned Orders.
We need to use the tabular form so we can select all planned orders. I set up the requirements grouping to only include planned orders that are not yet dispatched.
When I use the graphical form instead of tabular and I manually highlight all of the planned orders and dispatch then they are all in the correct order with all of the gaps are closed...which is what i want.
However, I need to be able to do this using the tablular form. No matter how I try to set up the strategy profile, it doesnt seem to work using tabular form. They are dispatched according to start date with gaps in between the orders.
Any help is greatly appreciated.
I also have the following defined in Strategy Profile for Dispatching Control:
Sort operation to be dispatched
Consider operation sequence in the order
Midpoint scheduling
Thank you.
Edited by: Kevin Gorman on Jan 14, 2009 8:19 PM
Edited by: Kevin Gorman on Jan 15, 2009 3:26 AMHi Vishal,
I hope the below link will provide you need full information:
http://help.sap.com/saphelp_470/helpdata/en/8a/a5a7674adc11d189740000e8322d00/content.htm
Hope it clears your doubt.
Regards,
Madhu.G -
MPS run, planned orders were created for all levels ?
Hello PP members
I ran a small scenario
material MRP Type Low Level SG M/T Type
A M0 000 40 FERT
B PD 001 40 HALB
c PD 002 10 ROH
Maintained PIRs(MD61) for material A, and ran MD41( Single Item Multi level Planning)
As material A is an MPS item, I was expecting that it should create planned orders only for material A, but in this MPS run it created planned orders for material B & C. (Looked into MD04, where I see planned orders were created
for all the levels)
As per the MPS run, it will plan only for one level of BOM (in this scenario for material A)
Any suggestions, why planned orders were created for material B & C
please clarifyJust check
System must have created a dependent requirement planned order and not the planned order for requirement you put in demand management for B and C
i.e. if you enter a demand in MD61 for B and C, run the transaction, system will not consider this requirement during MPS run. MPS run will consider the requirement if the requirement for the child is comming from parement where parent is MPS item.
Hence you need to run MRPm for B amd C if teh requirement(not dependdent requirement from A) is to be considered.
I hope you are clear
Edited by: Rajesha Vittal on Jan 28, 2008 8:06 AM -
SG:50, Cannot convert planned orders to prod orders at BOM component level
Test scenario for Strategy Group 50 (Planning without final Assembly)
Product Structure
Material--> SG50.00 > FERT> (Strategy Group: 50)
Material---> SG50.02 --> HALB --->(Strategy Group: 40)
Material---> SG50.04 ---> ROH --->(Strategy Group: Blank)
Maintained PIRs and Ran MRP at the header level, Planned orders are created
with order type VP at levels of BOM structure. Thus cannot covert planned orders
to production orders without having sales order.
But my understanding of Strategy Group 50, is BOM components can be produced before hand (i.e.
before sales orders are recieved ). Now planned orders with order type VP not able to convert
planned orders to prod orders at BOM component levelStuti/Prasobh:
Thanks for your inputs, it answers my question
Intially maintained Individual/Collective indicator to "2" at header level (FERT), which is why all the planned orders are created with order type VP
Changed the Individual/Collective indicator to "blank " at header level (FERT), and maintained Individual/Collective indicator to "2" at component level
Reran the MRP (MDO2), with the following settings --> Delete and Recreate planning data and Check mark on Also plan on unchanged components
Able to see planned orders at component level with order type LA
Due points have been assigned -
Set new Required Field for MD14 and MD15 for conver from Planned order to P
Dear all,
I would like to set new required field (Purchasing Organization) in T-CODE MD14 and MD15 for convert from Planned Order to PR. What's should I do?
Please help, I 'm new for MRP.
Best Regards,
KateHi Kate,
You are not on the right track; MD14 and 15 will choose the PLANNED ORDER population for the conversion. In planned orders there's NO PURCHASING ORGANIZATION DATA (normally)!
So even if you managed to put the field on the screen, it will not do anything that makes sense. -
Field setting when collective conversion from planned order to PR
Dear expert:
Is there any way(except ABAP enhancement) to add the field "tracking number" in MD15 when I conduct collective conversion from planned order to PR. Seems in standard config this field in not included in this screen. I have set this field as a mandatory field, but even though when I conduct the conversion, this field still can not be displayed in the MD15 conversion screen.Hi,
There are following T. Codes to convert Planned Order to PR;
MD14 - Individual Conversion
MD15 - Collective Conversion
MDUM - In Background
Also MD04
User Exit is LMDZU001 - User exits in additional planning -
How to activate batch field in Planned Order
Hi all Gurus,
My customer asked me to activate batch field in Planned Orders (MD12) so that they can enter batch number before converting planned order to production order. By entering a variant in the table I could make it display in the table but not in change mode.
Is it something to do with screen variant or do you have any suggestions?
Thanks in Advance
Sree...Hi,
Please maintain following config...
1. Go to Production --> Material Requirements Planning --> Procurement Proposal --> Planned Orders --> Define Layout for components list.
2. Then go to Field Selection Profile. Select the profile and click on profile field selection fields
3. Click on Change Field Selection and Select Batch or any other required field. Save the changes.
This should work, pl come back to me in case you have any further doubts.
Regards,
Gaurav -
Lock/ disable field in planned order MD12
Dear expert,
Can we lock the field in planned order? In my case, I want the purchasing staff to be able to change only the production version, for others field i want them to be locked. Therefore the purchasing cannot change any fields in there except the production version.
this is due to the need for material subcon.
Maybe u can give any advice. what should i do?? do i need to make new customizing t-code for ex: ZMD12 or just make new customizing from authorization t-code su3?
Thanks
PaulineDear Pauline,
Check in SE93,by creating a new T Code ,with the start object as Transaction with variant.
Transaction type: Variant transaction
In the SAP Reference IMG, under "Basis Components" -> "Application Personalizaion" -> "Tailoring of Application Transactions", you can define transaction variants. These allow you to preassign values to fields within a transaction, define field attributes, or hide entire screens.
To run a transaction variant, you define a variant transaction. On the next screen, enter the name of the transaction and the name of the variant.
Note
Variant transactions are client-specific.
If you try to start a variant transaction and the corresponding variant does not exist, the transaction runs without a variant.
If the above does not helps you means,check this link to explore more,
Transaction variant
Regards
Mangalraj.S -
Reduction level in planned orders
Hi,
Few part# are having planned orders with reduction level 2 even though there is sufficient time for production. Say for eg: parts are supposed to be delivered on 29/09/2009 it is taking reduction level 2 even though it has an opportunity to start earlier. I have updated the material masters with lead time from routing and these changes are clearly visible in Work scheduling view in material master. Not all the part# are having this problem, very few are having this problem.
Pl help,
with regards
deepakHello Bramahankar,
Thanks for your kind response. I would like to explain little more in detail, the problem i have is like this.
1. Parts are supposed to be delivered on 29/09/2009, so the system based on lead time required and backward scheduling few part# are having start date as 18/09/2009 and few may plus or minus 3 days to this.
2. Out of 20 part# 4 part# are having reduction level 2 and its starting very late, say like the the start date is 19.09.2009 even though it can start 2 or 3 days early and avoid reduction level 2, but the system isn't doing this.
I have tried all sort of things like updating lead time in material master, re run MRP but its not helping out.
Could you pl help.
With regards
deepak -
Capacity planning at Planned order level
Dear All,
In my current scenario i'm able to see load of process orders against the workcenter in CM01. My requirement is to do capacity levelling at the planned order level.
I have created Production version also & attached to the planned order. Still in CM01 no load or planned order is shown on workcenter.
when i convert it into process order then it shows load / process order.
pl.let me know how i can do the capacity planning at planned order level.
Thanx & regards,
devHi,
In MD12 when click on Go to > Capacity Levelling >
Error Message : No work centers with capacity requirements were found
I have given formula : SAP006 in capacity & Relevant to finite schedulling indicator is also active.
what may be the cause ?
thanx & regards,
dev
Maybe you are looking for
-
Getting error message when trying to burn cd's
hi i am getting a error message when trying to put certain cd's on i-tunes : Microsoft Windows XP Professional Service Pack 2 (Build 2600) VIA Technologies, Inc. VT8366A-8233 iTunes 7.5.0.20 CD Driver 2.0.6.1 CD Driver DLL 2.0.6.2 Current user is an
-
Word 2007 VBA - Can't Move around in a Recordset - From a Beginner
[reposted from the VB.net forum where I mistakenly posted it] Hi, This is a simple program. The issue is that Recordset.MoveNext and .MovePrevious aren't working, though .MoveFirst and MoveLast are. If I exchange MoveLast for MoveNext and MovePrevi
-
Havinig a lot of problems with my MacBook since I've upgraded to the Mac OS X Mountain Lion program. Can someone tell me if it's possible to reset my computer back to factory settings?
-
Exclude article in Bonus Buy Promotion
Greetings, I have a question regarding the set up of bonus buy promotion - If I created a prerequisite for some article groupings, but want to exclude certain articles from this bonus buy. Is there any method to address the exclusion? Example: Articl
-
DV NTSD drop-frame vs. non-drop-frame??
My impression has always been that DV NTSC is non-drop frame. I'm having to capture a 100 hours of DV tapes from a Sony WV-DR7 deck. FCP capture is giving me this warning: "You are about to capture Non-Drop Frame media from a device currently detecti