PO price is not picking from Inforecord

Hello All,
When PO is created by one particular user the price is not picked from inforecord. Inforecord validity periods are active and this price is not of previous purchase order. The problem is only for this user. Can you please advice what needs to be done here.
Thanks a lot in advance.
Best regards,
Raji

Hi,
1. Check out user profile whether EVO parameter is maintained properly for all the users.
2. Check in EVO parameter key you set radio button on Always copy.
EVO is parameter ID for Defining Defualt values for buyer. Relevent customization carried out in SPRO --> Mat mangt --> Pur --> Env data --> define default value for buyer.
Rewards, if helpful to you.
rgds,
rajesh

Similar Messages

  • Po prices is not updateing from inforecord

    Guru
    In Po when enter the Material & QTy & Price for that material is appering from info earlear now  the problem is that Price is not picking from the last Po or Inforecord what must be problem. can u help me
    Thanks
    Sudhir

    Hi
    Price from inforecord has following steps
    1) System will search for inforecord with valid price if it finds then the price will be pulled to PO
    2) If there is  inforecord and no valid price then system will look for last PO to pull the price.
    3) If there is no info record then we have to enter the price manually.
    In your case check the above prerequisites additon to that
    1) If it is refering the last PO no then check whether the item is deleted or not.
    2) If it is refereing the valid price in info record then check the validity period of the PIR.
    Hope it helps.
    Thanks/Karthik

  • Price was not picking from the Condition type for Item Category 'P'  in PO

    Hi Experts,
    I Created one condition type based on Material and WBS which price was fixed based on this
    I used the Purchase Order having Item <b>Category ‘P’ or ‘Q’</b> Price should pick from the condition type where I mapped the WBS Element and Material.
    The Net price was not picking from the Condition type Record.  Why? What should be the Problem?
    Whether my logic is correct or not?
    <u><b>
    The Scenario:</b></u> I want to fix the Material price base on each WBS Element for a Project. For each WBS Element the Price will be various for same material.
    Please help on this.
    Thanks
    Muthukumar

    Hi,
    In standard configuration you cannot set item delivery date as a pricing data.
    Maybe you shoud look at SAP enchancement - in dedicated structures you can pass additional item data (structure KOKMP).
    IMG link:
    Materials Management -> Purchasing -> Conditions -> Define Price Determination Process -> System Enhancements
    hope it helps.
    regards,
    wojciech

  • INCO TERMS NOT PICKING FROM INFORECORD

    Sir,
    With the help of Inforecord i am trying to create a PO
    Incoterms are not picked from Inforecord it is picked from Vendor master.
    How can i pull these setting
    regards
    amey

    Hi Amey,
    The Inco-term you have maintained in info-record will populate in the Inco-term field in Item - Delivery tab.
    If it is populated, it would have precedence over the header Inco-term.
    If helpful award points
    Regards,
    Vivek

  • Cost not picking from Inforecord

    Dear All,
    As per our costing strategy, cost should be pick up from  inforecord but strange part is that for one of the material the cost is not picking from inforrecord.
    The inforrecord is not marked for deletion, this material has only one valid inforecord which is active , this infrecord is not maintained in other plants, we don't maintain outline agreements.
    Am I missing anything on this?
    Quick responses are appreciated.
    Thanks,
    Ram

    Hi Rajneesh,
    Thanks for response.Our Valuation stratagey is as below.
    Planned Price 1
    Cost from Purchase inforecord
    Standard cost
    We did not update the planned price1 and  we have valid inforecord , still at the moment the cost is picking up from current standard cost.  Strange part this is not for all material , for some materials this strategy is working fine as per costing strategy. Even I compared these materials , everything is same.
    No clue for me, appreciate your reply.
    Thanks

  • WHY Price is not defaulted from inforecord in a P.O with material group.

    When i tried to create P O for a material group & i mentioned material text, Price was not defaulted in PO from inforecord unless i mention inforecord number even if  i mentioned vendor & valid inforecord is exist for the same material group & vendor.

    Hi,
    Data will be adopted only from PR,RFQ & contract.Eventhough if u maintained inforecord, data will not flown from info record it is only the price picked from inforecord.
    thanks
    suresh

  • Price is not Picking from Contract while making PO

    Hi Gurus,
    Value Contract for services is created, While making the Purchase Order the price is not picking.
    Note:-The Contract is in Valid Period only.
    Can any one tell me what reasons may be there.
    Regards,
    Prabhakaran M

    As a std procedure while creating PO price won't be picked from contract.  Rather you need to create a PO w.r.t the contract. In that case PO will take the same conditions stored in the contract.
    Else if you are working with sourcelist, then you need to define the contract as a source of supply.  In this case when you create PO system will pick Contract as source and contract price will appear in PO.

  • Against PR when created the PO,price is not picking from PR to PO?

    Hello Gurus,
    Against the PR,created the PO system is not picking the price from PR to PO ?

    Hi Rama,
    For repeat purchases in Purchase Order, it will take the previous Purchase Order price.
    For first time purchases, it will ask you for a price, unless you have Info record ready.
    In order for the system to NOT ask you for a price during PO creation when you DONT have Info Record ready:
    1) Under valuation tab in PR, choose Adopt as Net Price. Once you do this, per line item, the price will be adopted in Purchase Order.
    If you cannot find the field above, you need to set Parameter EFB - 01 (configured in OMET) to your/the buyers parameter settings in SU01.

  • Net price not picking from info record

    I am creating a new PO, but net price is not picking from info record. Info record is getting copied in the line item for PO, but net price is not copied. Due to that I am unable to create PO. If I manually enter price PO can be created. Could someone tell me what might be the reason Price is not automatically taken from Info Record. Please guide me what all I need to check.
    The same data is working in one cleint, and in another client this data is facing problem.
    Thanks
    Vineeth

    Hi
    1) If there is condition record exit in system,then while creating po system will take condition record
    2) If In inforecord last po number is exist for material and vendor ,then system will take this into consideration
    3) if your creating po first time for material and vendor ,and we have maintain purchasing inforecord for purchasing organization and for plant,then system will take it into consideration
    40 If none is available we have to put condition manually in po
    Regards
    Kailas ugale

  • PO having Item Category u0091Pu0092 or u0091Qu0092  price not picking from Condition Record

    Hi Guru,
    Purchase order having Item Category ‘P’ or ‘Q’ Price should pick from the condition type.
    Where my condition type against on material and WBS based on this Price will be fixed. 
    Now I create the PO for same, which the price was not picking from the Condition Record.
    Please help on this.
    Thanks
    Muthukumar

    The condition record was created and is being picked up in the calculation.  Also, I am now testing with a material that does not have a PIR created, so the PIR does have an impact on my current results.
    My current test has results as follows:  condition P101 = Std. Cost (as expect) $100.00; ZUPP = calculated at 5% (as expected) $105.00.  However, the Net Price in the PO line item is showing only $100.00, not the $105.00.
    A look at table EKPO shows the following: Net Price  (NETPR) $100.00; Net Value (NETWR) $100.00 ; Gross Value (BRTWR) $105.00.
    Can you tell me what I am missing with this setup?

  • Pricing Condition not picking from Info record

    Dear Sapians
    We have made all the Changes for Higher Education Cess. Now while creating PO some conditions are not picking from info record(only for some materials). In Dev. server Everything working fine.
    What could be the problem?
    Warm Regards
    Sukumaran.E

    Hi Sukumaran,
    You need to go to PO -> item conditions -> press analysis button.
    double click on the pricing condition on left hand side screen. You will get proper analysis. Like "PBXX     111 Condition ignored (requirement 005 not fulfilled)"
    These descriptions will give clear hint on the reason of price not being picked up.
    - Sanjeev

  • Price is not transferred from materail contract to po

    Dear Experts,
                        When i create a service po , the price is not transferred from material contract to po , for material po it is working fine.In debugging i got to know that it is picking up purchase requisitions package number , and not contracts package number.Can u guys help me out wid dis,my all UAT is pending becoz of this issue
    Reward points for helpful answers
    deepthee

    hi,
    when you create  a service po, the prices from the Contract Service line items will flow down to Service PO when you make service selection in Service PO.
    when you create servcie PO, and you enter item cat 'D', you have the option to select the servcies from your Contract by 'Service Selection' button.
    If you use this, the price from contratc will flow to PO. Otherwise the prices will not flow.
    Regards
    Seema

  • File Adapetr: File is not picking from File directory

    Hello,
    Issue: we are facing issue with file sender adapter like file is not picking from source file directory.
    Scenario: FTP1>PI>FTP2
    1. SAP PI sender communication channel will pick the file from FTP1 and process to PI file server (NFS)
    2. from PI file server (NFS), file will process again to FTP2
    So while picking the file, it shows following error:
    Could not process due to error: java.lang.IllegalStateException: Error during RETR epilogue: com.sap.aii.adapter.file.ftp.FTPEx: 451 Transfer aborted. Broken pipe
    Conversion of file content to XML failed at position 0: sun.io.MalformedInputException
    Processing started
    this issue occur after we migrate the PI server from hpunix to aixunix.
    Best Regards,SARAN

    Hi,
    check the FCC parameters, fieldfixedlength option would be used when the exact length of field is constant in the Sender, In the FCC the fieldfixedlength parameter carries the length of the each.
    Check out Michal's blog on content conversion for all your doubts :The specified item was not found.
    Kindly check the below links for further assistance.
    http://help.sap.com/saphelp_nw04/helpdata/en/2c/181077dd7d6b4ea6a8029b20bf7e55/frameset.htm
    regards,
    ganesh.

  • File is not picking from the source location.

    Hi all,
    File is not picking from the source location. FTP is working properly and file is also placed in source location. I am new the XI, if anybody can give me the solution it would be really helpfull.
    Thanks to all.
    Korean

    Hi Majin,
      Check the folder path properly, check the file name( file name is case sensitive) you have given correct or not. See that your communication channel is active. Also check the cache status and check adapter status also by that you will come to know wht is the problem.
    Thanks,
    Ranjeeth.

  • Price not picking from PR

    Hi Seniors,
       I have maintained a PR with valuation price of 12000 eur. And when i create quantity contract with reference to that PR..it is not picking the valuation price from that PR. it is asking manually ? why it so ??
    Regards,
    Jana

    To copy PR price to PO ,follow the answered link
    Re: Price from PR to PO
    Adopt PR Price in PO

Maybe you are looking for

  • Using URL Parameters with HTTP Comms Channel

    Hi, I need to build a new interface (HTTP - RFC) which will use several URL parameters. I've created a HTTP communications channel and Sender Service and this works. I'm able to define several URL Parameters by checking 'Adapter-Sepcific Message Attr

  • 2 Oracle Clients in the server

    Guys, we have a server which has an Oracle 8.1.7 installed. Since we developed a new .net application that requires Oracle 9iR2 Client, we have to install an Oracle 9iR2 also on the same machine. However, we are having problems executing stored procs

  • Message Handlers

    Hi Experts, The message_handler which we have access to in the generic service uses the interface IF_HRBAS_MESSAGE_HANDLER which have only ADD_MESSAGE method. We have a situation where the messages from one form's errors are not being cleared when ch

  • Photoshop cs4 or 5 animation tools help

    I would like to know if pscs4 or 5 extened) can do a traveling shot of a background and on other layers have walk cycles. Also with the walk cycle and backgrounds - should they be made into smart objects in case they need to be scaled. I am looking f

  • Stream netflix on iPad 3rd gen to TV without HDMI

    Is it possible to stream netflix video content from my iPad 3 on iOS 6.1.2 to my TV using Apple COMPONENT cable? My TV has composite and component inputs but no HDMI. I know apple TV isn't an option. I have the latest version of Netflix app.