Possibility of creation of Master Contract through Copy controls not direct

Hi,
Our requirement is to create a Quantity Contract from opportunity through copy controls. At the same time the system should not allow to create a Quantity contract directly through the transaction code crmd_order.
Is there any way to block the creation directly but allow to create by copy controls.
Thanks in advance,
Venki

hi
what i understood from your requirement is that you do not want to create contract directly,but u desired that its always get created in follow up to the opportunity
then as i told you earlier too,have you did that in customisation of your transaction type
like selecting the option blocked for online mentainance
that way the contract transaction wont be able to get created directly using CRMD_ORDER
but as you wanna create in follow up to the opportunity
so you can select contract as short cut in opportunity transaction type
this way u get ur issue solved
we use BAdi when standard isnt enough to solve the probs,if above customisation doesn solve ur probs then use this BAdi CRM_ORDERADM_H_BADI.
best regards
ashish

Similar Messages

  • Reference order with inquiry through copy control

    Hi SD gurus,
    We are currently having automatic order creation and then the open inquiry are required to be linked manually to newly created sales order via u2018create with referenceu2019 option inside the order menu.
    We want to achieve this  below functionalities via copy control (VTAA) for this requirement:
    1. Enable creation with reference to an inquiry in change mode of a sales order without repeating the item from inquiry. Only consumption from inquiry.
    2.  Enable this with different sold-to .
         Sales order----
    Inquiry
         Sold to 1  not equal toSold to 2      
    Point 2 can be achieved through copying requirement routine 002 at header level but then there is no success for point 1. Both things should work together.
    If you have any idea then please suggest.
    Thanks in advance.
    Regards,
    Dheeraj Tolani

    What do you mean by position type?
    Please use the language used by SAP so that it could be easily understood.
    What is ZTAB & IRSS. Are they materials?
    Regarding copying, this is a brief theory
    In copy control, you define control data for the document flow of sales documents.
    You can specify for a particular sales document type, which document type is to be assigned to copied reference documents, and which item categories or schedule line categories are to be copied.
    You must also make specifications for copying requirements and data transfer, as well as quantity and value updates in document flow.
    In precise, you are telling the system what data to copy from QT to sales order. It copies data from Quotation order type to Standard order type basing on settings you indicated in copying control.
    System won't do anything more than copying from preceding documents and it would transfer data based on copying rules in copy control.

  • Setting the custom master page through powershell is NOT working

    Hi,
     I am writing the below code to set the  custom master page through powershell.
    But its not working .when i went to site settings-->master page --> in the drodown , the  maste page set is seattle.master ONLY, though my current master page is available in the dropdown.
     Can anyone pls help, whether i am missing in the below :
          Add-PSSnapin Microsoft.SharePoint.Powershell
           $SiteURL = "http://srvr1:22307/sites/SPW5"
        $weburl= $SiteURL
        $Site= Get-SPSite $SiteURL
        $web =  $Site.OpenWeb()
    $web.CustomMasterUrl = "/_catalogs/masterpage/myMasterpage.master"
    $web.MasterUrl = "/_catalogs/masterpage/myMasterpage.master"
    $web.Update()
    Das

    Hi,
    Is it a publishing page? If yes can you try the PowerShell scripts corresponding to the following code snippet?
    var publishingWeb = PublishingWeb.GetPublishingWeb(web);
    publishingWeb.CustomMasterUrl.SetInherit(inheritFromParent, false);
    publishingWeb.CustomMasterUrl.SetValue(masterPageUrl, false);
    publishingWeb.MasterUrl.SetInherit(inheritFromParent, false);
    publishingWeb.MasterUrl.SetValue(masterPageUrl, false);
    I've noticed sometime (not sure though) that Master page doesn't get updated if the inherit property is not updated first.
    Thanks,
    Sohel Rana
    http://ranaictiu-technicalblog.blogspot.com

  • Complaint wth ref. to invoice in CRM - Copy control not taken into account!

    Hi all,
    We are facing problems when replicating return orders (business object Complaint)  with reference to invoices in ERP.
    The copy control in ERP is not taken into account. Does anyone know if it is possible to check the copy control when replicating the complaint to ERP with reference to the invoice?
    The return order is being replicated correctly and the link to the invoice is shown (so, the flow is correct).
    But:
    1.- The manual pricing conditions in the invoice in ERP are not being copied in the return order.
    2.- Some data as the 'Incoterms' is being redetermined from the customer master data and is not being copied from the invoice.
    3.- Data related to material is also being redetermined when the order is replicated
    The copy control is not being taken into account and we can replicate return orders from CRM to ERP with reference to invoices for which the copy control is not maintained in ERP...
    Please help...
    Thanks in advance!
    Yolanda

    Try something like this, in place of  ls_input_field_names-fieldname = 'ZZDEP2PVNDPGM'..
    ls_input_field_names-objectname = 'ORDERADM_H'.
      ls_input_field_names-ref_handle = '100'.
      insert ls_input_field_names into table lt_input_field_names.
    Edited by: Kevin Alcock on Aug 10, 2009 4:03 PM

  • COPY CONTROL NOT PRESENT FOR SALES DOCUMENT TYPE DS

    I am new beginner to the module SD, i am stuck on the issue regarding copy control
    I have created an Schedule Line Agreement and want to copy it to the sale document OR standard order, once entering the number for the schedule line document , i am getting a message the copy control rule does exist for DS to OR.
    I have been to the setting for copy control with T-code VTAA but there are many fields that required to be filled up,
    Which fields do i fill in ?
    I have filled in the fields for item category for OR (TAN) and for DS (LPN).
    If i use the copy control with these settings i am getting an error message "The copying routine number for table VBAP is missing in table TVCPA"
    Any Help would really would be helpful
    Regards,
    Sahil

    Sahil,
    I suggest you close this question, since this is an MM forum.  You are unlikely to get many answers here.
    I also suggest that you first perform a search, before re-posting this question elsewhere.
    First, search within the forums (search box on the upper right of this screen).  I just tried a search on 'copy control' and got over 20,000 hits.  Surely one of these posts will be able to help you.
    Next, check online help. This help is generic, and not generally specific to a particular industry:
    http://help.sap.com  ERP SD Help starts at
    http://help.sap.com/saphelp_erp60/helpdata/en/8c/df293581dc1f79e10000009b38f889/frameset.htm
    Next, look for generic solutions  in Best Practices. This main Library is
    http://help.sap.com/bp_bl604/BL_IN/html/Content_Library_BL_EN_IN.htm
    Next look for industry specific solutions in Best Practices:
    http://help.sap.com/content/bestpractices/industry/index.htm
    If you are experiencing a problem, or you believe that SAP is not working per the online help, you can then search OSS notes.
    http://service.sap.com/notes
    Next search in one of the standard online search engines (such as Google).
    Only after you have performed all of these searches, and studied all of the online help that is supplied for free by SAP, then consider posting a question to these forums.  A good SD forum is
    SAP ERP Sales and Distribution (SAP SD)
    Best Regards,
    DB49

  • Creation of Purchase Contract through Upload

    Dear Gurus,
                       Mine is SRM 5.0 version and its ECS. I have created a Contract in the frontend and then Downloaded the contract in an Excel and then Deleated the Document Number and the GUI Id's and when again trying to upload the file through the Upload option from Frontend, it gives the following error message:
    <b>The specified file could not be read</b>
    Please Advice on the above issue.
    Thanks in Advance,
    Mohit.

    Hi
    <u><b>Please go through this -></b></u>
    <u>For moving contract from ERP to SRM system,please take help from</u>
    help.sap.com
    they mentioned everything very clearly.
    <u>http://help.sap.com/printdocu/core/Print46c/en/data/pdf/CABFAISMM/CABFAISMM.pdf</u>
    <u>http://help.sap.com/saphelp_srm50/helpdata/en/42/f93dfd975f3ee6e10000000a1553f7/frameset.htm</u>
    <u><b>Also please refer to SAP Consulting Notes below -></b></u>
    Note 859049 - SRM 5.0: Restrictions for uploading and downloading
    <u>Related Notes</u>
    907271 - Upload: New condition when you update the item
    812884 - How to change the fields used for Excel Up- and Download
    790860 - Frequently asked questions for Excel upload and download
    734946 - SRM: Restrictions for upload and download
    Note 734946 - SRM: Restrictions for upload and download
    <u>Related Notes</u>
    859049 - SRM 5.0: Restrictions for uploading and downloading
    790860 - Frequently asked questions for Excel upload and download
    673479 - Excel download: Quantities not displayed correctly
    Note 812884 - How to change the fields used for Excel Up- and Download
    <u>Related Notes</u>
    863542 - Excel download for bid invitations with display variant
    859049 - SRM 5.0: Restrictions for uploading and downloading
    Note 790860 - Frequently asked questions for Excel upload and download
    Note 673479 - Excel download: Quantities not displayed correctly
    <u>Also see the Report - <b>BBP_CONTRACT_INITIAL_UPLOAD</b></u>
    You can use this report to upload the contracts and scheduling agreements from an ERP system to an SRM system. A contract or a scheduling agreement from the SAP backend system is uploaded to the SRM system as a contract or a global outline agreement (GOA), based on the transaction type customized in the SRM or SAP backend systems.
    <u>Refer to this link for details.</u>
    http://help.sap.com/saphelp_srm50/helpdata/en/6d/1e8442a07b0e53e10000000a155106/frameset.htm
    <b>Other related links -></b>
    Re: Initial Upload of Contracts using Flat file to SRM
    Upload legacy contract into SRM and CCM
    Re: Contract Upload to New System
    Re: Upload COntracts
    Do let me know.
    Regards
    - Atul

  • Material master distribution through BD10 is not working

    hi i am learning and created all the customizing setting to send material master data from sending system to the receiving system but the sending system shows idoc has been sent to port Ok with status 03 but i dont see the material being created in the receiving system. Where am i going wrong? Do i need to trigger BD11 in the receiving system?

    Hi Suresh...
                  After reaching port with status 03..
                  we have to run the program RBDMOIND for status conversion..
                  Once we run this program all the IDoc's which are at port are
                  sent to their receiving partner...and status becomes 12...

  • Sales doc copy control not working with price condition

    Here's the situation.
    For OR sales document I have  Procedure ZSALES and price conditions Z001
    For a QT Sales document I have Procedure ZQUOTE which does not have a Z001 condition in that procedure.
    If I create an OR (with the proper customer / matieral) the Z001 populates, based on it's defined record.
    If I then create another OR with reference to the original OR, the Z001 populates with no problem.
    Up to now everything's fine, now here's the probem......
    If I create an OR with reference to a QT, the Z001 does not populate in the OR order.I know there is no Z001 in the QT for it to copy from, but if I do [New Pricing] in the order it still does not come in.(I've tried [new Pricing] with Pricing type A..G)
    I have found OSS Note 413066, but this is in reference to 46c systems. we are on ECC 6.0
    any ideas ?

    Hi Bill,
    If PP assigned for both are different it's not going to populate field even if you are redertermining price, since it would be following the PP of Quotation (ZQUOTE), not Sales Order (ZSALES) because it's gonna copy the elements of that PP in order. Are your PP assigned are same or different?
    Hope this will answer your query
    Regards
    SD

  • Vendor Master copying through Copy Express

    Hi Experts,
    I am copying from One Database to a NEW Database ( this database has diffrent configuration ) the Vendor Master Data through Copy Express but while runing the Copy Express I am getting an error as 'Bank does not exsits in the company'. In the Base Company Database from where I am copying has a diffrent bank acccount but in the NEW Database which is created is a another company and has diffrent bank account hence I cannot keep the same bank account as in the Base Compnay Database.
    Please let me know how to achive a soltuion to it.
    Regards,
    Kawish

    Dear Vijay,
    Please note that the folowing details as required by you.
    SAP Version - 2005B
    Patch level 39
    When executing the query from query generator as SELECT * FROM T0.BankCountr, T0.BankCode,T0.DflAccount,T0.DflBranch FROm OCRD T0 I am getting value in Default Bank as -1 and and rest coloumn are blank.
    If I create manually the House Bank Account in the target company ( which means I create the base company bank account in the target company ) then upload may be done but one have to then manually change in the vendors BP master the target company bank account which is a tedious task.
    Hope you are able to give a proper solution in this regard.
    Regards,
    Kawish
    Edited by: Rui Pereira on Apr 29, 2009 1:50 PM

  • Master Contract

    Dear all,
    I HAVE CREATED A MASTER CONTRACT & TRYING TO ASSIGN A QUANTITY CONTRACT TO THIS MASTER CONTRACT. BUT IT IS THROWING THE FOLLOWING ERROR "Contract data cannot be edited for document type CQ" WITH THE MESSAGE NUMBER - Message no. V1777.
    PLEASE GUIDE ME ON THIS.
    Thanks & Regards,
    AnandK

    Dear Rajesh,
    A MASTER CONTRACT consists of other contracts that are grouped as
    lower level contracts. Thus, the master contract has the general
    data that is relevant for all lower level contracts over a specified
    period. Contracts are groups in order to ensure that all data in the
    lower level contracts remain consistent and that granted in the
    master contract are copied into the lower level contracts.

  • What happens if I store Master Contract number in standard contract?

    Hello,
    This is the follow up question about linking Master contract and Standard Contract.
    I have found that there is a field to store a Master Contract number in a Standard contract.
    If I enter Master Contract number there and display Master contract through VA43, I could see the standard contract number.
    But my question is that that is all its functionality?
    What is the benefit of doing this?
    Regards,

    mochadduk wrote:
    I have a Droid 3. I live in New York, and my contract/plan is in New York. I intend to take my phone to California when I go on vacation there soon.
    I would like to know: Will it show up on my statement or anywhere else on document that I have made calls/sent text messages in California? Will I be responsible for roaming surcharges or anything like that, because I'm out-of-state?
    Apologies for the silly questions - I'm not sure about any of this. Thank you in advance for your help!
      There should be no additional charges on your bill, roaming charges in the US went away quite a few years ago. I live in NY and have traveled to Vegas and California in the past and have made/received calls and texts with no problem. It will show on your bill the location that the call came from, but there is no charges.
      Now, out of the continental US is another story.

  • Assigning Lower Level Contract(s) to Master Contract

    I've looked all around here and can not find the answer.
    So I have a Master Contract (type GK). Now I want to create other Contracts and have them displayed as lower levels in the Master Contract.
    If I create a new Contract, and enter the Master contract number in the header, I receive the error "Referenced document  is not a group master contract"
    Ultimately I want to create numerous contracts referencing the Master, so I can view them all under teh Master Contract. I do not simply want to create with reference and use doc flow.
    Anybody ?

    Hi PLs refer below steps
    Creating Master Contracts
    1. In the initial screen, choose Logistics -->Sales and distribution -->Sales.
    2.Choose Contract -->Create.
    3.In the Contract field, choose the contract type Master contract (GK is the master contract type in the standard system) and, if necessary, the organizational data.
    The values for sales organization, distribution channel, and division may be proposed from the user parameters. Entries for the sales office and sales group are optional.
    4.Choose Enter.
    5. Enter the number of the sold-to party in the Sold-to party field.
    6. Choose Enter.
    7. Check the data on the following screens and, if necessary, enter additional data:
    Business data
    Partner
    Contract data
    Billing plan
    Linking a Contract to a Master Contract
    On the initial screen, choose Logistics ->Sales and distribution ->Sales.Choose Outline agreement ->Contract ->Create.
    You can also link existing contracts to master contracts. In this case, choose Outline agreement ->Contract ->Change. Then enter the contract number and go to step 6.
    Enter the contract type and, if necessary, the organizational data.
    The values for sales organization, distribution channel, and division may be proposed from the user parameters. Entries for the sales office and the sales group are optional.
    Choose Enter.
    If you have activated the check for existing master contracts in Customizing and master contracts already exist for the customer, a dialog box appears. You can branch from the dialog box into the list of master contracts and select a suitable master contract from the list by placing the cursor on the master contract and choosing Copy.
    If no dialog box appears, you reach the contract overview screen. Either enter a master contract number or search for a suitable master contract using a matchcode.
    Choose Enter.
    The system determines whether the reference is valid by checking that
    u2013 The contract type can refer to the master contract type
    u2013 The identical fields match
    If the reference is valid, the system copies the data from the master contract into the contract according to the referencing procedure assigned to the master contract.
    If the reference is not valid, the system issues an error message. If the identical fields do not match, it deletes the number in the Master contract field. In this case, either enter a suitable master contract number or check the settings in the Customizing activity Define Referencing Requirements.
    Enter any other data you require.
    The referencing procedure in the master contract controls whether you can change the data which was copied from the master contract.

  • Revenue Recognition: Fiscal/Period updated as 0000/00 for a Rev rec document created after creation of a Contract.

    Hi All,
    We have created a Contract/Subscription and the corresponding Rev Rec document that got posted is with fiscal/period as 0000/00.
    Revenue Recognition: Fiscal/Period updated as 0000/00 for a Rev rec document created after creation of a Contract.
    We have not executed VF45 or any revenue recognition process.
    What amay be the reasons and how can we proceed further on this ?
    Thanks,
    M.Shiva Kumar

    Dear Amrish,
    Problem of this you did not maintain the provision account in your revenue account determination.  Please go to vkoa transaction and maintatin this provisional account any account number.
    eg;  application: v. condition type: kofk, chart of account: int, sales org:  0001, revenue account: 89999, provisional account 788888 (something)
    I hope you understood 
    Thanks & regards

  • Copy Control within Sales Order (Contract)

    Hi Guys,
    I have a requirement to stop the copy of the Exchange rate from the Header Level of the Contract to the Line Level of the Contract. Its under under billing on both Header and Line level. Contract is created via VA41.
    I have tried VTAA, however I cannot find exactly where I can make this change, is this the right area, if so would you be kind enough to pin point the area?
    Thanks for your help!
    Cheers.
    Emal

    Hi,
    Please use following use exit to do so
    As I believe you are not using with reference of other contract to create contracts, the copy control is used when you create the new docuement with refernce with other docuement.
    V45W0001 Function module exit for copying sales header data into items for contracts.
    This enhancement contains the user exit: EXIT_SAPLV45W_001
    Activities:----
    1. Create your enhancement, using a project (CMOD). You can either use an existing one or create a new one.
    2. Activate the project.
    The ABAP coding will only run once the project has been activated. Until then the enhancements will not take effect.
    regards
    Vivek.

  • Copy control routines in Sales Order and Debit Memo Req.

    Hi,
    I have a scenario wherein, I am creating a Debit Memo Request with reference to a Sales Order. DMR(Debit Memo Request ) & SO (Sales Order)will not be created on the same day. I want to have Pricing date in the DMR (both at item and Header level) as current date and dont want it to be copeid from SO.
    Can it be possible with the standard available routines in copy control between SO and DMR? IS there a need for creation of separate routine.
    Thanks.

    Hi,
    As per the business requirement it is ok to change the Pricing since based on the pricing date the Exchange rate is calculated.
    The exchange rate at the DMR level should be calculated on the date of creation of DMR and so the pricing date from the Sales order should not be copeid.
    Any suggestions pls.

Maybe you are looking for