PP : Need to find Multiple Batches for different production Orders

Hi Experts,
I have a requirement that, user wants to see the  "Single batch assigned for multiple production orders and different materials"
Which its a off case, it cannot be done , but i have gone with 1. So user wants to know all the Orders which has same batch but for different  materials & Orders.
Please help me in this regard.
Br,
SandeepCH

Hi Shri,
Please find the attachment  for your better understanding.
Yes, as you said one material can have multiple batches, But that same batch cannot be linked with other material. This was my requirement.
So now i want to know all the  batches which came in double for different materials.
Br,
SandeepCH

Similar Messages

  • Multiple batches for a production order and mapping with components

    Hello Gurus,
    Our business requires to create multiple batches for one production order + they want to trace which component in the production order has been issued to the main equipment.
    For example, I am creating production order for 'A' equipment for 4 qty. Business wants to create 4 different batches for these equipment
    Lets say now 4 batches are created A001, A002, A003 and A004.
    Now lets assume 2 nos of 'B' component are required for 1no of 'A' component. So the requirement of B component is 8.
    Lets say 8 batches are generated B001, B002 ......B008
    Now lets say batch B001 and B002 are issued for A001 and packed together. How do we map this?
    I understand we can do some enhancement for creating the multiple batches but I still dont know how to map them with each other.
    Please help

    Hi Ethan
    There is a functionality called WIP batches, that allows you keep the batch traceability within an order.
    With WIO batches you can track which batch of component was used to produce each batch of finished product.
    See this link for more details:
    Work-in-Process (WIP) Batch - SAP Library
    BR
    Caetano

  • Same operation for different production orders

    hi, we use different sheets (like aluminium, steel etc). each sheet (as roh material for certain operation) is for different production orders. we keep all sheets as one bundle and cut all the sheets at a time. say aluminium sheet is for order X, steel sheet is for order Y. How to handle this during confirmation and GR, Settlement of individual orders etc? pls advise the best practice with this type.

    Yadav,
    As per my understanding, you maintain the sheets of different materials as different raw materials.
    The cutting operation takes place altogether for cost effectiveness.
    I don't think it would be a problem for you do deal with.
    Different sheets will be part of different orders.
    The GI would take place accordingly.
    The confirmation will be independent untill it is linked with backflushed.
    Explain the scenario in details.
    Hope this helps you.
    SmanS

  • KO8G for running production order settlement

    Dear All,
    I need to use the KO8G, for running production order settlement, on a batch job.
    I found a SAP Note Number 498387 where is said that, for the selection of statuses of orders of the order category 10 or greater, will be used a status selection profile.
    Iu2019m using the status selection profile SAPPI07 on KO8G selection variant for orders.
    When I execute KO8G report, system gives me these messages:
    -     Sender 0 selectu2026
    -     Msg number KD233 : No settlement for this sender
    Someone have Idea how I can solve this problem.
    Regards,
    Helena

    Like I was written in my first message the Standard variant SAP&01, which contains values of Order type, Status of order...Created,Closed, Tech Complete, Released doesn´t work for production orders, like is said on SAP Note Number 498387.
    So I need use the status selection profile on variant selection.
    My problem is that, I've defined a Variant selection with status selection profile SAPPI07,wich has the status Created,Closed, Tech Complete, Released, but When I execute KO8G report, system gives me these messages:
    Sender 0 selectu2026
    Msg number KD233 : No settlement for this sender
    Can you help me?

  • Different batches for same product in one HU

    Dear SAP Gurus:
    I have a couple of questions:
    1. Can you have multiple batches for the same product on one HU?
    2. If the answer is YES, what do I need to do because right now when we try to scan the product ID which includes the batch the system does not saves the scanned batch on the HU but it leaves the one that the "Delivery Document" already had. We tried deleting the batch (leaving it blank) on the "Delivery Doc." but still it does not saves the scanned batch.
    Thank You in advance for your help.

    Mario,
    Be sure you can pack multiple batches in one HU in standard system. What's more, you can pack several different materials and HUs in one HU.
    I'm not familiar with RF but you can check this link and you can also ask HU experts on LE forum:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/76/ea7c38b5e211d391cf0008c7d94f4b/frameset.htm
    You can use this transaction to pick and pack material in one step. This can be useful, for example, if you need to pick several materials to be packed into one handling unit (HU). You can select an existing handling unit or create a new one. Identify the materials to be picked and packed by the delivery number.
    Regards,
    Csaba

  • Design a single template for multiple reports with different column order

    Hi,
    I need to migrate the existing reports from SQL Server Reporting Services to Crystal Report 2008, and the column order in the report is very important to the clients since clients have existing code to ingest these reports into their database. Now I want to create a single template with lot of parameters for all reports. My question is how I might use one template to create multiple reports with different column orders in the reports?
    For example, client A has the following column order in their report: firstName, LastName, DateBirth, SSN. Client B has the following column order in their report: SSN, DateBirth, LastName, FirstName. Can I use one template to create these multiple reports?
    Thanks in advance.

    -As I mentioned you can find Template Field object in Insert menu of crystal report Designer 2008.
    As soon as you select Template Field object you will be able to see a box beside ur mouse cursor. Drag and drop this box at required place. Now when you place this object in report you will get some thing like this "<TemplateField1>" listed under Formula Fields tree. Double click "<TemplateField1>" formula to add your conditions.
    -I have not tested it for large amount of Customers. However as the number of customer increases the number of conditions will get increased.
    For the customer that want the same ordering of columns you can put those customers under one condition.
        for Example...
              if(?Client in ['clientA','clientA']) then
                        <TableName>.<Field>......
    -What do you mean be 40 columns? Do you mean 40 fields or you want to show 40 columns in report? Please elaborate.
    Regards,
    Amrita
    Edited by: Amrita Singh on May 21, 2009 7:54 AM

  • How can I manage multiple iPads for different students?

    Problem: I need to manage multiple iPads for my students with special needs. I need to download different apps to different iPads and I'm not sure how to keep their apps separate but still keep ultimate control of the units (i.e. lock them from loading anything on the apps that we at the school district haven't approved).
    I need to be the only one doing updates, loading software, etc., and don't want to keep using my own personal iTunes account...any suggestions?

    If the presenter is using a computer and everyone else has an iPad this is very easy and free. Just use http://join.me and on the iPad just download their free app

  • Re: Running the same (Forte) application multiple times -for different

    Hi
    We had the same problem - how to deploy a number of identical applications, using each their own db.
    (for training).
    The solution we used is to wrap the entire application into different applications by using a very small
    module called KURSUS01, KURSUS02 etc, that did nothing but call the start procedure of the main app.
    Then in the dbsession connect, we made a call appname to get the application name, and appended the
    first 8 chars to the dbname. Thus our dbnames now points to logicals name: rdbdataKURSUS01, rdbdataKURSUS02 etc.
    All this allows us to deploy the identical apps in the same env, or change one version, and run both the old
    and new program on the same pc and server at the same time (eg. KURSUS01 and KURSUS02).
    I also think this is a kludge - but it works nicely!
    Jens Chr
    KAD/Denmark
    -----Original Message-----
    From: Haben, Dirk <[email protected]>
    To: 'Soapbox Forte Users' <[email protected]>
    Date: 15. januar 1999 09:41
    Subject: Running the same (Forte) application multiple times - for different business clients.
    Hi All
    We have a number of different business clients all willing to use our
    application.
    The (forte) application is to run on our machines etc for these (business)
    clients.
    All (business) clients will have their data kept in separate Oracle DBs
    (instance).
    The problem now is that the entire (forte) application is written using
    DBSessions.
    Now, depending on what business client needs to be serviced (so to speak) we
    need to attach to the right DB - or use the "right" SO.
    The two options we can think of are:
    Option1:
    Programatic change to somehow "know" what (business) client (DB) I'm talking
    about and then use the right DB.
    Pro:
    Only one forte environment to maintain
    Can run multiple (business) clients on same PC at the same time
    Con:
    Requires many program changes
    bending O-O rules(?)
    can't dynamically name SOs so can it be done at all? (ResourceMGRs maybe?)
    Option2:
    Use separate environments! One for each business client.
    Pro:
    More defined separation of app and data,
    SLA-easy
    Con:
    Maintain "n" number of environments
    Can only run the application for one environment (business client) at a time
    on one PC - Big Negative here!
    Not knowing any feasible solution to option 1 (without much code changes and
    developer moaning) I would go for option two; as I have already worked on
    multi-environment setups on VMS back at the Hydro (hi guys).
    I would appreciate any comments from anyone who has solved this problem.
    How, Why Pro Con etc.
    TIA,
    Dirk Haben
    Perth, WA
    To unsubscribe, email '[email protected]' with
    'unsubscribe forte-users' as the body of the message.
    Searchable thread archive <URL:http://pinehurst.sageit.com/listarchive/>
    To unsubscribe, email '[email protected]' with
    'unsubscribe forte-users' as the body of the message.
    Searchable thread archive <URL:http://pinehurst.sageit.com/listarchive/>

    Hi
    We had the same problem - how to deploy a number of identical applications, using each their own db.
    (for training).
    The solution we used is to wrap the entire application into different applications by using a very small
    module called KURSUS01, KURSUS02 etc, that did nothing but call the start procedure of the main app.
    Then in the dbsession connect, we made a call appname to get the application name, and appended the
    first 8 chars to the dbname. Thus our dbnames now points to logicals name: rdbdataKURSUS01, rdbdataKURSUS02 etc.
    All this allows us to deploy the identical apps in the same env, or change one version, and run both the old
    and new program on the same pc and server at the same time (eg. KURSUS01 and KURSUS02).
    I also think this is a kludge - but it works nicely!
    Jens Chr
    KAD/Denmark
    -----Original Message-----
    From: Haben, Dirk <[email protected]>
    To: 'Soapbox Forte Users' <[email protected]>
    Date: 15. januar 1999 09:41
    Subject: Running the same (Forte) application multiple times - for different business clients.
    Hi All
    We have a number of different business clients all willing to use our
    application.
    The (forte) application is to run on our machines etc for these (business)
    clients.
    All (business) clients will have their data kept in separate Oracle DBs
    (instance).
    The problem now is that the entire (forte) application is written using
    DBSessions.
    Now, depending on what business client needs to be serviced (so to speak) we
    need to attach to the right DB - or use the "right" SO.
    The two options we can think of are:
    Option1:
    Programatic change to somehow "know" what (business) client (DB) I'm talking
    about and then use the right DB.
    Pro:
    Only one forte environment to maintain
    Can run multiple (business) clients on same PC at the same time
    Con:
    Requires many program changes
    bending O-O rules(?)
    can't dynamically name SOs so can it be done at all? (ResourceMGRs maybe?)
    Option2:
    Use separate environments! One for each business client.
    Pro:
    More defined separation of app and data,
    SLA-easy
    Con:
    Maintain "n" number of environments
    Can only run the application for one environment (business client) at a time
    on one PC - Big Negative here!
    Not knowing any feasible solution to option 1 (without much code changes and
    developer moaning) I would go for option two; as I have already worked on
    multi-environment setups on VMS back at the Hydro (hi guys).
    I would appreciate any comments from anyone who has solved this problem.
    How, Why Pro Con etc.
    TIA,
    Dirk Haben
    Perth, WA
    To unsubscribe, email '[email protected]' with
    'unsubscribe forte-users' as the body of the message.
    Searchable thread archive <URL:http://pinehurst.sageit.com/listarchive/>
    To unsubscribe, email '[email protected]' with
    'unsubscribe forte-users' as the body of the message.
    Searchable thread archive <URL:http://pinehurst.sageit.com/listarchive/>

  • Skip lot across multiple batches for same material

    Hi,
    I am looking for a way to control skip lots across multiple batches for the same material.
    We need to do a quality check in production after a certain quantity produced (on a machine, for a material). My idea was to do skip lots (for GR)  until we reach a threshold (say 10.000 pcs) and then do an inspection for the next GR for that material.
    Any ideas how to set that up?
    Thanks for any hint
    Andreas

    Hi mergler,
    Ref to your query pls check this link Stock Posting for Skip Lots
    Thanks in advance

  • Do I need to export multiple sizes for all standard print sizes? i.e.Say I crop the image in LR to 6'5" x 9' to fit within an 11" x 14" (overall) mat of a framed print.. Now let's say I want to reprint that same image in a 12" x 16" size ... to fit within

    Do I need to export multiple sizes for all standard print sizes? i.e.Say I crop the image in LR to 6'5" x 9' to fit within an 11" x 14" (overall) mat of a framed print.. Now let's say I want to reprint that same image in a 12" x 16" size ... to fit within a mat of with overall size of 20" x 24"? Or will the 1st export be "locked" at 6.5" X 9" (proportionately)?

    So, for the first one Export it cropped to 6.5 x 9 - and in the Export Dialog box there is a capability to rename the file for exported output - which would allow you to add something like the crop or intention to the base name of the file.  e.g. for _IMG0846.nef - setup the output filename to _IMG0846-65x9 for 11x14.jpg and output it at, say 300 or 360 dpi.  So, it has a unique name and purpose in your output folder.
    For best results, now, re-crop the picture in LR - just open the crop [R] dialog again, reframe the image to the new ratio, 12x16 and Export again - with an adjustment to the filename. e.g. _IMG0846-12x16 for 20x24.jpg
    So, now you have two clearly identified image files in your output area and you can provide those to whomever is printing for you, etc.  Discard them when you're done since you always have the original to return to to re-frame again as necessary.
    This way you get output sharpening and resolution (in pixels) optimized for your output print size.  Maybe not super important for smallish prints-but more important for larger ones.   Output at 100 quality.

  • I need to find the download for ACR 7.3 to use my nikon d600 raw files. i have cs5 running on macboo

    i need to find the download for ACR 7.3 to use my nikon d600 raw files. i have cs5 running on macbook pro with mountain lion OS.

    Hi,
    Unfortunatly the 7.x series of camera raw plugin is not compatible with photoshop cs5.
    You could download the 7.4 DNG Converter and convert your d600 files to dng copies which then photoshop cs5 will open.
    http://www.adobe.com/support/downloads/detail.jsp?ftpID=5568

  • Need to find a BAPI for the below requirement

    Hi All,
    Need to find a BAPI for the below requirement.
    We are assigning roles to users using SU01 T-Code and we are in the process of automating this and since we need a BAPI which can do this. Apart from assigning roles to users, SU01 T-code is doing many functionalities, but if we can get a BAPI which can perform assigning roles to users will suffice the requirement.
    Thanks in advance,
    Srilakshmi.

    Hi SreeLakshmi
    see the list of BAPIs given below.
    1065 Business Object Employee
    BAPI_JOBROLE_CLONE Create a User Role in Another System By Copying
    BAPI_BUPA_ROLES_GET SAP BP, BAPI: Determine All Roles
    BAPI_BUPA_ROLE_ADD SAP BP, BAPI: Add Role
    BAPI_BUPA_ROLE_EXISTENCE_CHECK SAP BP, BAPI: Check Existence of Role
    BAPI_BUPA_SET_ROLE SAP BP: Set Object Part / Roles
    BAPI_GET_EVENTTYPE_FOR_ROLE Determine Business Event Types Using Standard Role
    BAPI_EMPLOYEET_CHANGEPASSWORD Change employee password
    BAPI_EMPLOYEET_CHECKPASSWORD Check employee password
    BAPI_EMPLOYEET_CREATE_PW_REG Create entry for employee password
    BAPI_EMPLOYEET_DELETE_PW_REG Delete entry for employee password
    BAPI_EMPLOYEET_DEQUEUE Unlock employee
    BAPI_EMPLOYEET_ENQUEUE Lock employee
    BAPI_EMPLOYEET_GET_PW_REG Read entry for employee password
    BAPI_EMPLOYEET_INITPASSWORD Initialize employee password
    Reward if helpful
    Regards
    Lakshman

  • Is there any link between oe_order_headers_all and hz_cust_accounts tables. I need to find the cust_account_id for some order_number. Please help me with this

    Is there any link between oe_order_headers_all and hz_cust_accounts tables. I need to find the cust_account_id for some order_number. Please help me with this

    you can link
    OOH.invoice_to_org_id=CUST.cust_account_id   -- invoice customer
    OOH.sold_to_org_id=CUST.cust_account_id   -- sold to customer
    OOH.ship_to_org_id=CUST.cust_account_id   -- ship to customer

  • Manual entry of batches for finished product

    Dear Guru's,
      I want the manual entry of batches in the production order & automatic batches for raw materials. I have maintained the autoamtic batch number assignment as Inactive in T-code OMCZ. After maintaing this system is asking for manual entry for batches for raw materials also. I want the manual entry for production order & automatiic entry for raw materials.
    I have changed the setting to " No automatic batch creation in production / process order" in production scheduling profile through T-code CORY. Assigned this production scheduling profile in work scheduling view. Even though I am facing the problem.
    Hope it is clear. Need your inputs.
    Regards
    Kalyan

    Dear,
    Kindly follow the path > logistic general > Batch management >Define Batch Creation for Goods Movements (here you can use function for creation of batch against movement type)
    > logistic general > Batch management > Define Initial Creation of Data for Batch Master Transaction (Here you can use function for creation of batch against material type)
    Kindly check and revert back.
    thanks
    Muhammad Ashfaq

  • Payment terms for different products from a single vendor

    Hi Pundits,
    Our client has a requirement to assign different payment terms for different products. Each product he buys from his vendor has it's own payment terms. He wants us to customize in such a way that when he/user enters the invoice, not only the vendor number is shown along with the product name but also the payment terms for that particular product are calculated.
    I know that only one payment term can be assigned in the vendor master data. Is there anyway to get around this?
    Creating the same vendor multiple times and assign payment terms looks a possible option but that looks quite hectic cause he has close to 1000 payment terms.

    Taurian, thank you for that suggestion!
    I can maintain as many existing payment terms as the client has with his vendors and let him choose the payment terms at the time of invoice entry.
    The only problem is that he might have to change it according to the current market rates for that product. So maintaining any payment term is of little use.
    Edited by: Dummy_Variable on Aug 16, 2011 8:26 AM

Maybe you are looking for

  • How can I use my home Mac and my MacBook's iTunes and not have to erase...

    I have a desktop Mac and a Macbook. Obviously I have iTunes on both. Both are the same account. But no matter what, when I connect to either one, in order to add music, videos or ANYTHING I have to erase and start all over! I hate this soooooooo much

  • Problem with a ALC888 Realtek soundcard

    Hey all I have a problem with my pc and soundcard. I have a  HP Pavilion Media Center TV m7739.sc desktop pc with a ALC 888 sound cad. I have set a Nvidia graphic card in the pc. And now have a pc with a lcd screen and a projektor in. But the sound d

  • Where DTP requests will be stored

    Hi , I know Infopackge requests stored in table RSLDTDONE . But I want the table where DTP  Reqeusts will be stored . Please anybody can help

  • MSCRM Email Router not processing digitally signed emails

    In my production environment digitally signed incoming emails are not getting processed and stay there in inbox.  Does Email Router supports Digitally signed emails ? Thanks in Advance - Vijay

  • Purchase order doesn't create in srm sus

    Dear customizer, i have implemented a plan driven procurement with sus (r/3-sus) scenario,we have a problem when we transfer idoc from r/3 to sus.In sus sistem give me this error message "An error occured within an XI interface: Exception occurredE:B