PPDS Heuristic for Constrained/Finite planning

Hello PPDS Experts,
I am trying to setup PPDS Heuristcs for a client to achieve a feasible plan for the following scenario:
1) 7 BOM Levels to be planned in APO
2) PPDS Heuristic run must be constrained by material availability at all levels
3) PPDS Heuristic must run in Finite capacity mode at all BOM Levels
With CTM, we can achieve all this in one go;
With PPDS Heuristic, i think we have to use multiple planning steps to achieve this; I tried the following steps until now;
1) Step 1 -> Determine Low Level codes
2) Step 2 -> Un-Constrained MRP Heuristic
3) Bottom - Up Multi Level heuristic
1) Step 1 -> Determine Low Level codes
2) Step 2 -> Un-Constrained MRP Heuristic
3) Step 3- Stable forward scheduling
1) Step 1 -> Determine Low Level codes
2) Step 2 -> Un-Constrained MRP Heuristic
3) Step 3-> Stable backward scheduling
Even after trying all these approaches, my planning result is still wrong; I want to achieve a feasible plan that is constrained by material at all levels and capacity at all levels.
Is there a general PPDS Heuristic sequence that i have to use to achieve this feasible plan.
thanks
swathi

Hi,
I will suggest to go with following approch
1. Infinite Planning run.
2. Finite planning with find slot backward/forward direction for first level BOM.
3. Run bottom up heuristic to adjust planning accordingly.
This may lead to constraint violation at  upper level.
4. Finite planning with find slot i forward direction for next level of BOM. Direction backward is not used  so that there will not be problem of material availability.
You can carry on like this for further BOM levels.
Still planning with above steps may not give desirable results as some times larger lot sizes maynot find suitable slots and there can be poor utilisation of resources.
For somewhat better results after first level of planning some manual intervention will be required.
I will like to aske few questions-:
1. Is your rough cut/mid term plan is balanced considering these constraints.
2. What is approximate lead time at each level?
3. What is total lead time.
4. Duration of shortterm planning horizon at each level(PPDS horizon)
5. Purpose of above questions is in case of multilevel planning genrally short term planning as you to higher bom levels depends on  inventory already available in stock.
Regards,
Santosh

Similar Messages

  • How to prevent for a particular org manually created IR/ISO should not be considered for Constrained EDD plans

    We have a situation that around IRs with ~500 parts which manually created in Org A and ISO Created in Org B and ISO picked as well. But due to some reasons, shipment will get delay for 1 month and till that time plan should not be considered this IR' as supply in Org A.
    Currently our Constrained EDD plan is considering this IR quantities as supply for the Org A demands and not generating any Planned orders. Seems we don't option to firm IRs by changing the need by date after 1 month. Also its not respect the need by date of IR and its getting reschedule in action and pegged to the current Demand in Org A. Please advise if you have any thoughts.

    We have a situation that around IRs with ~500 parts which manually created in Org A and ISO Created in Org B and ISO picked as well. But due to some reasons, shipment will get delay for 1 month and till that time plan should not be considered this IR' as supply in Org A.
    Currently our Constrained EDD plan is considering this IR quantities as supply for the Org A demands and not generating any Planned orders. Seems we don't option to firm IRs by changing the need by date after 1 month. Also its not respect the need by date of IR and its getting reschedule in action and pegged to the current Demand in Org A. Please advise if you have any thoughts.

  • SAP_CDPBP_02: Heuristic for Block Planning

    Hi All
    I am presently working on a APO PPDS implementation Project where we are considering Block Planning solution. We are currently exploring the SAP_CDPBP_02 Heuristic for Block Planning. Our current requirement is to use the Block planning solution for capacity utilization situation where this particular heuristic should help us with Block adjustments in case of capacity overload /underload i.e. the Blocks should be extended in case of overload , and should be shortened in case of underload, after running this heuristic.
    Somehow this particular heuristic doesnu2019t seem to work for us although SAP help suggest that it can solve the Block adjustment problem. We are working with SCM 4.1 release. SAP note 975604  suggests that we need to apply the support pack SAPKY41012  to SCM 4.1 release, for this Heuristic to work but this particular support pack is already applied to our system and still we are not getting the desired result.
    Saurabh

    Hi Siddharth
    Thanks a lot for the reply. I wanted to know the procedure while executing this heuristic on the DS planning board.
    1) Do you select the resource and execute the heuristic by going to Functions--> Heuristic --> Adjust and Reschedule Block limits
    Or 2) You select the Block and the overloaded orders simultaneously and then go to Functions > Heuristics> Adjust and reschedule Block Limits.
    Also what settings are you choosing in the Resource master in the PPDS Bucket capacity tab:
    You are choosing Bucket Definition as "No PPDS Available Bucket capacity" or
    " From Block Planning" & "Time continuous capacity" in the Finite capacity.
    Also are you unchecking the "Use Bucket capacity" checkbox or letting it as it is with the checkbox ticked in the settings for the heuristic SAP_CDPBP_02.
    Saurabh

  • Logs for PPDS Heuristic

    Hi,
             We are running PPDS Heuristic using the transaction /SAPAPO/CDPSB1 or the program /SAPAPO/BACKGROUND_SCHEDULING.
    Where do I check the logs for these runs?  Like SNP Heuristic, I don't see an option to check logs.
    Thanks.

    You can use transaction /sapapo/rrpeval to view PPDS planning runs or transaction SLG1 with using APO as object and PPDS as subobject. If using SLG1 then you will need to then filter by transaction and look for your specific transaction/time.
    For SNP heuritic logs use transaction /sapapo/snpaplog and select SNP heuristic in the application field. SLG1 can also be used - enter APO_SNP as object and HEU as subobject. You can most, if not all, logs created in APO by using SLG1 and the appropriate object/subobject.
    Regards
    Andy

  • Finite planning in planning board

    Hi Guys,
    Sorry to ask these basic question. But please clarify me here.
    1) As per SAP,we have Find slot, insert and squeeze in operations under finite scheduling.Now letz say our resource capacity is 100% and then have an order on 25.05.2014 which consumes only 40% capacity, it is finite scheduling (find slot), if an another order comes on same day which consumes only another 40% capacity, being finite scheduling where the second order be placed.
    Will it place after the first order to get the slot or along with same first order saying it has the capacity.
    How it will be for insert operation and squeeze in operation.
    How PPDS planning look for the capacity of the resources?Is finite scheduling(Find slot, insert and squeeze in operations) work only with single-mixed resources?
    2) As per standard SAP how PPDS will plan- Is it finite scheduling or infinite scheduling ?
    Thanks,
    Prash

    Hi Prasanth,
    Planning Heuristics  like SAP_PP_002 plans infinitely based on strategy setting inside Heuristics. If you change strategy setting inside heuristics to finite scheduling mode  it will plan finitely provided finite scheduling indicator is checked in resource.
    Regarding finite capacity settings  as time con. or bucket decides whether you will plan bucket oriened finite planning or normal. Bucket oriented is genrally used in case of block planning with capable to promise scenario.
    As per best practice you should have planning run with infinite planning followed by schedulinhg heuristics or optimizer to achive finite plan.
    Regards,
    Santosh

  • Master Data Setup Steps & Execution for SNP Aggregated Planning

    Hi,
    I need some URGENT Help on the Master Data Steps and Execution of SNP Aggregated Planning.  I've read the SCM 5.0 help with quite confusing understanding from it as regards to Master Data setup.
    I want to run SNP for a Group of Products at a Group of Locations (say Customer Group or Group of Distribution Centers) at an Aggregate Level & then later Disaggregate the Generated Supplies from the Aggregate Level to the detailed Product-Locations level.
    I have setup a Location Hierarchy with the Group of Distribution Centers and Product Hierarchy with a Group of Products  & since  SNP_LOCPROD aggregation is assigned to the 9ASNP02 Planning area ... I created a LOCPROD Hierarchy which use the Location & Product Hierarchy.
    The Main intention is to Improve Performance of Planning Runs at a Rough Cut  / Aggregate Level by doing a Rough Cut Capacity Check & Split Distribution Center requirements to Multiple Plants producing the same product.  This would also help increase the Optimizer Performance.
    I am finding there is no place to run SNP Heuristic by Specifiying a Hierarchy in the Selection screen of /sapapo/snp01.  So how is Aggregated Planning even run ?
    (I know there are Aggregation & Disaggregation Functions available in SNP Interactive Planning ... but what do I put in the Selection as 'Hierarchies' are not available in the Selections in the 9ASNPAGGR  Aggregation Planning Book).
    Can someone also Provide me Detailed Steps and point me to a Detailed Training document on this  ?  I could not find anything on the SDN Form as well as BPX Forum as well as on Wiki site from within SDN.
    Please if anybody can Guide me Urgently  ?  I am needing to test this quickly to Demo to someone to demonstrate the APO Capabilities  (else the Customer may lose interest in APO as he is comparing functionality with another tool).  I don't want this to happen.
    Regards,
    Ambrish Mathur

    Harish,
    Read your Blog with great interest. I think you have very nicely captured the Features over there.  It was very helpfull.
    I still have some very very basic questions (sorry if I was not clear earlier) and I will try state with an Example.
    Are you saying ...
    1.  If I have 2 Products FG1 & FG2 .. then I need to FIRST
         create another Product Master called FG1_2_GP (say)
         via Trnx.  /sapapo/mat1  ?
    2. Similarly for the 5 DCs say DC1, DC2 .... DC5 ... I need
        to First Create a Location of type 1002 DC1_5_GP (say)
        via Trnx. /sapapo/loc3 first  ?
    I think I have not done these at all.
    3.  Finally are you saying that I need to now Create the
         Hierarchies ... ZCPGPROD  (using FG1 & FG2)
         and ZCPGLOC (using DC1, DC2 ... DC5)  and
         then create a generated Hierarchy ZCPGLOCPROD
         with Structure SNP_LOCPROD and using the ZCPGPROD
         and ZCPGLOD as Component Hierarchies ?
    4. I am still not clear how would you Link  Product Group
    FG1_2_GP  with  ZCPGPROD  ??  Where do we setup that FG1_2_GP is a Header of FG1 & FG2 ?
    5. Similarly where do you Link Location Group DC1_5_GP with the Location Hierarchy  ZCPGLOC  ?
    6. Finally in SNP Interactive Planning with Planning Book 9ASNPAGGR using the Location-Product (Header) as Selection what will I enter in this field ?
    I read your Blog. More details on the Example would help ... I saw in your Blog the PH_POWDER product Group (containing PH_FG1,2,3 Products) example which I was not clear whether it was a New Product you created via /sapapo/mat1 or a New Hierarchy Code created via /sapapo/relhshow.  Similarly you did create Location Groups PH_DC_AGG but do not seem to have used it.  I think you have assigned PH_POWDER group and assigned to Locations 3000, 3100 & 3400 individually via /sapapo/mat1 ... but was not clear on how you linked it to the Location Product Hierarchies.  You have also not created a Location Produc Hierarchy at all using PH_POWDER and PH_DC_AGG at all ... or have you  ? 
    7. Is the Untold Trick that the Product Hierarchy Name and the Product Group created in Trnx. MAT1 must be same  and the Location Hierarchy Name and the Location Group code created in LOC3 Trnx. should be same ?
    8. I had created a Generated Hierarchy at ZCPGLOCPROD ... is this what I enter in 9ASNPAGGR as Selection of Location-Product (Header)  ?
    9. I want to first understand Standard SNP before I go into the diretion of creating my own Planning areas and Planning Books. Is this really needed for me to Plan 2 Products in these 5 DCs at an Aggregate level.  I will be doing Aggregation of all kinds of Demand (STOs, POs, Forecast, SalesOrders, TLB Order Demand) and want the Supply generated at Aggregated Level to Disaggregate to the 2 FGs at the 5 DC Locations based on Proportion of Demand.
    I think my question is far more basic wrt the Master Data Setup ... would help if you can clarify each of my questions separately in your reply.  The Confusion is due to lack of clarity on the Master Data Setup in linking the Product Group PRODUCT Code & Location Group LOC Code to the respective Hierarchies and also SNP Interactive Planning not having a Place to enter these created Hierarchies.
    I do want to praise and appreciate your contribution to the Blog ,,, well done.  Full 10 Points Guaranteed on reply to above questions.
    Regards,
    Ambrish

  • Since last software update, pre-paid internet does not work anymore. Get "you have not signed up for a data plan" message. Pre-paid acct is in order! What's up???

    I have had  an iPad 3G for more than a year now. I did not get it with a SIM card, since I expected to use almost completely at home, where we have wireless internet. Eventually, I decided  it would be handy to be able to take it on the road, and signed up for pre-paid Internet with KPN (national Dutch telecommunications company). That worked fine, until the last big iPad software update. Since then, whenever I try to make a connection outside the house, I get the following message…
    Mobile Data Account
    You have not signed up for a data plan.
    Would you like to set up a new account?
    If you don’t, you can do it later in Settings.
    …with the options of ‘Later’ or ‘Now’ to press. If I press Now, I get a screen “Please wait while the page is loading – this should only take a few seconds to complete.” But it never does, the ball just keeps spinning and spinning and spinning….
    To my mind, with pre-paid internet I should not HAVE to set up a Mobile Data Account in the first place. I’ve checked with KPN, and my account is completely in order. I’ve checked with the local Apple store, and the geniuses say they’ve never seen this. Can anyone help me?

    I updated to 3.6.4 and when I went to NetFlix to watch the next show of a series, it said
    something like
    Installation complete, restart your browser.
    I restarted browser, same problem. Restarted comp. Same problem.
    I updated Adobe Flash 10.1, still same problem.
    But able to watch some vids on other sites, but full screen gave me the big blank white screen with audio only, had to click around in the dark ( so to speak) to find the minimize button.
    I did a System Restore to before the Firefox and Adobe updates.
    I then did not update Firefox as recommended and went to NetFlix and wellah, i can view the movies again.
    And Full Screen is fine.
    I then experimented and updated Firefox only, went to NetFlix and got same msg with no viewable shows.
    So did a System Restore once more.
    Staying at 3.6.3 for a while longer until I know I can watch my movies.
    I don't own a TV, so this is my only form of an occasional escape.
    I do hope this is figured out soon.
    With what I have done, it seems to be Firefox, Not Flash.
    Good Luck to us all.

  • Rolling forecase for Actual and Plan

    Hi
    Iam working on Rolling Forecast for Actual and Plan report.. My Planning here is Quaterly based so for example say we plan it on April so the months after april (May - Dec) would be Planning. So when my month keeps on moving the forecase also moves..
    So can you please guys help me to get out of this with an solution..
    Thanks

    Hi,
    If you are using BI-IP for your scenario of forecasting then you can refer to the below links for forecatsing strategies.
    http://help.sap.com/saphelp_nw70/helpdata/en/43/0c033316cd2bc4e10000000a114cbd/frameset.htm
    for forecasting strategies
    http://help.sap.com/saphelp_nw70/helpdata/en/43/0c033316cd2bc4e10000000a114cbd/frameset.htm
    If you are using SEM-BPS you can consult these links:
    http://help.sap.com/saphelp_sem60ep1/helpdata/en/0a/242537cedf2056e10000009b38f936/frameset.htm
    http://help.sap.com/saphelp_sem60ep1/helpdata/en/0a/242537cedf2056e10000009b38f936/frameset.htm
    Forecast (old)
    http://help.sap.com/saphelp_sem60ep1/helpdata/en/0a/242537cedf2056e10000009b38f936/frameset.htm
    Forecast(Exit)
    http://help.sap.com/saphelp_sem60ep1/helpdata/en/0a/242537cedf2056e10000009b38f936/frameset.htm
    Regards,
    Priyanka Singh

  • Can I use an radar alarm on my iphone 4, without passing by the telephone card, for example in plane mode?

    Can I use an radar alarm on my iphone 4, without passing by the telephone card, for example in plane mode? This question in order to avoid the roaming when I leave my country for a foreigner one

        Hi there Eartley! That sounds like an amazing opportunity for you! I am glad you are going to be able to study in Italy. The iPhone 6 is an excellent phone to travel with and you should have no problems using a local SIM card while you are in Italy. While I have not been to Italy myself and can not make recommendations for service providers out there, our Global Support Team may be able to help out! Here is where you can get in touch with them http://vz.to/1DgQ1IJ . Have a great trip!
    bryans_vzw
    Follow us at Twitter @vzwsupport

  • How do I pay for my storage plan when I don't have a credit card? Last year I used an iTunes voucher but can't find that option this year. Please help!

    How do I pay for my storage plan when I don't have a credit card? Last year I used an iTunes voucher but can't find that option this year. Please help!

    Create an iTunes credit by redeeming a gift card and it will be charged to your credit.  From http://support.apple.com/kb/ht4874:
    "payment methods accepted include iTunes store credit, credit cards, and debit cards"

  • How do I pay for my storage plan on iCloud?  I have followed the instructions "tap for account" but there is no facility to do this?  Help!

    How do I pay for my storage plan on iCloud?  I have followed the instructions but there is no facility to do this.  Help!

    Hi there jeanirismary,
    You may find the information in the article below helpful.
    iCloud storage upgrades and downgrades
    -Griff W.  

  • How to look for New start Called call for a Maintenance plan

    Hi,
    I need to find out all calls for a maintenance plan of scheduling type- 'New Start' and Status- 'Called'. How to find this using tables.
    For 'New Start' scheduling type probably table field and value is MHIS-TERMA = 'N'. There are different statuse in this table but I am not able to identify the status 'called'. Also what is the field MHIS-ZAEHL(Maintenance package number) for?
    Thanks,
    Vimal

    Taken from the standard IP10 program:
    * possible status combinations
    * TSABR - Scheduling status: planned date called
    * TSVBT - Scheduling status: call outstanding
    * TSENQ - Scheduling status: call horizon not reached
    * TSENM - Scheduling status: stopped manually
    * TSTAT - Sceduling status
    * TSABR   TSVBT   TSENQ   TSENM   TSTAT
    *   X       -       -       -       A     called with order
    *   X       -       -       -       -     called without order
    *   -       X       X       -       -     on hold (TSENQ), due (TSVBT)
    *   -       X       X       -       F     on hold, due and fixed
    *   X       -       -       -       X     skipped
    *   -       X       X       X       -     blocked
    *   -       X       X       X       F     blocked
    *   X       -       -       -       -     LRMDT <> 0, completed

  • Any FM to calculate planned costs for a Maintenance plan

    Hi all,
    Is there any FM to calculate planned costs for an Maintenance plan.
    I can use report RISTRA30(IP31). but i need to use for multiple multiple Mplans and different time frames. using SUBMIT to this report and getting data will lead to performance in my actual report.
    Please do provide any FM's or any other pointers for the same.
    warm regards,
    Sumanth

    Dear,
    In maintenance plan you can speciefy - order type,task list type,task list group & counter.
    when system automatically create service/maintenance order then system will determine plan cost, but for this you have to maintain planned price by t-code KP26.
    And then you can see report by IP31
    REGARDS,
    Kapil
    Edited by: Kapildev Farakte on Nov 17, 2009 10:38 AM

  • Signing up for a new plan with Droid 2 global

    I want to sign up for a new plan (I am not a current verizon customer), switching from Tmobile. The problem is that the phone I want is the droid 2 global, which I cant get in stores until the 29th. I could order online, but I wont be at my home for the next few weeks to pick up the phone.
    There is a verizon store where I am going, but I will not be able to sign up for the new plan from there (due to some un related reasons that you dont need to worry about)
    My main question is, is there a way for me to sign up for verizon's services before monday the 29th, and only pick up the phone from a different store later?

    What is the point in signing up for the services before you have the phone?  Your current T-Mobile device will not work with Verizon.  If you have a Verizon phone already, you can call in or go to the store and ask to have the device activated on month-to-month service and port your number over if you wish.  You'll then have service on your Verizon phone, but no contract, leaving you free to sign a contract and get the Droid 2 at the subsidized price when and where you wish.
    If you don't have a Verizon phone, you'd just be paying for service you can't use, so why not wait until the Droid 2 is available at the store you want to buy it from?

  • I have a plane which is in effect till march but I also registered and payed for a teacher plan.

    Today I'm in a plan which is in effect till march but I also registered and payed for a teacher plan.
    How do I see both in my Adobe ID?
    Will I'll receive a receipt every month (I need to give it to my accountant)  since I see that I got a confirming email for a monthly sum and not the total sum. do I have to pay till march for both?
    Could you please reply via mail?
    [email protected]

    https://www.adobe.com/account.html for serial numbers or subscriptions on your Adobe page

Maybe you are looking for

  • Airport express causes iphone and ipad to lose wifi

    We have a new (3 months old) Airport Extreme in our house.  It provides internet connectivity for an iMac, macbook pro, iphone 3gs, and ipad 2 (and a pc).  Never had any problems. Two days ago, I purchased an Airport Express to put downstairs, and wi

  • Error in Model View Distribution

    Hello all,    Re: Error in distribution of  model view I am referring this thread, as i am facing the same error. The thread does not have answers to solve the issue. The issue is, when i try to distribute my view i am facing the below error. Communi

  • Weird problem in alv

    friends, i have this weird problem, i am using the below code, the code is working fine in the debugging, but when run it is only showing the topofpage, which contains all the input parameters, there are several input parametrs, so it takes more than

  • Sales order approval workflow

    Hi, I am new to workflow. I have to implement sales order approval process in sap. Below are my queries: 1) Can anyone tell me that is there any standard method for "approval" available in BOR. 2) Organization level should be derived from the custom

  • Lost data after restore attempt

    Hi everyone. I have a macbook pro 13 and yesterday I updated it to the 10.6.6 v with the new mac app store. The mac store was very slow and it stopped completely many times. I tried many things like deleting boot camp, logout etc but it wouldn't work