Ppp callback ISDN cost for remote end

Hi,
I just want to know if the ppp callback feature uses the D-channel or if a call is established then dropped. Basically If I have a remote end requesting a server to callback. Will the remote end start a call then drop which will introduce a cost

Troubleshoot & verify your configuration.
• debug ppp [ packet | negotiation | error | authentication ]-displays information on traffic and exchanges in an internetwork that implements PPP.
error -displays protocol errors and error statistics associated with PPP connection negotiation and operation.
For further information click this link.
http://www.cisco.com/en/US/tech/tk801/tk379/technologies_configuration_example09186a0080093c2f.shtml#comm

Similar Messages

  • ISDN BRI for Backup and remote Support

    Hello,
    is it possible to configure an ISDN BRI
    to use them for Backup and if no Backup is up (primary connection works)i can use
    the ISDN BRI for Dialin (Remote Administration)?
    My Backup Solution works fine but i do not know, how i have to configure the ISDN BRI so, that acceppt my ISDN Call for Remote Administration.
    Thanks in advance
    Lorenz

    Hi
    You can configure 2 dialer interfaces one for dial in and another one for the dial out purpose.
    make the 2nd dialer interface as a backup interface for your primary interface and define the floating routes accordingly..
    would suggest to go thru the following link which has the whole lot of possible config scenarios discussed and it may help u out in getting the things place ..
    http://www.cisco.com/en/US/tech/tk801/tk133/tech_configuration_examples_list.html
    regds

  • PPP Callback over ISDN failure - user not authorised

    Hi,I'm still a rookie with Cisco and in need of help: Have a MS XP PC dialing into 803 over ISDN, successfully connecting if 803 config'd for Callback optional (no callback secure) but failing for callback secure with log message "Callback not authorized for this user Support". and despite reading up on PPP callback configs from the RemoteAccess Selfstudy guide, IOS DialTechnologiesConfig, and various examples I am unable to find what I'm doing wrong in the configs. Attached is file with router SW version, debugs used for logging, the active config, and the log. I have edited router name, usernames, and telnr for security reasons.
    Regards
    Zet

    Hi,
    thanks for your advice. I've tried it with the same failure results as before.
    Also tried setting up 2 1720s with Image ver 2.3(9)Rel(fc2) according to cisco sample doc "Config PPP Callback over ISDN" (isdn-ppp-callback.pdf) even tried PAP instead of CHAP - same result: authenticates user ok but fails callback. If the client is router server reports "no callback config for user ..." and if client is PC " callback not authorized for this user ..."
    Have got the 1720 logs for server & client routers if you require.
    Where else would it look to, to identify the client as callback, the global username declaration makes sense, according to Command Guide it looks like "dialer callback-server username" references the interface command "dialer map ip .... We've now tried both, neither working. I am truly at a loss here, any ideas?
    Regards
    Zet

  • ISDN backup for ADSL connected sites using separate router

    In our set-up we have a central site with a large number of remote sites connected.
    We have moved a number of remote sites from ISDN connections to ADSL connections. However, we would like to keep the ISDN and use it for backup.
    The problem I have is - how do I implement ISDN backup with our current set-up? From the documentation, I can see how to do this for more "straightforward" set-ups but not for the set-up we have! Let me explain:
    At the central site, we have a Cisco 7206 router. The ISDN connected sites connect directly to this router (which is configured with a large number of dialer map statements for each site)
    The 7206 connects to a PIX515E firewall. The ADSL connected sites connect over the public internet using IPSEC with the tunnels terminating on the PIX.
    The 7206 router contains static routes for the ADSL connected sites, pointing to the firewall.
    At the remote sites, we have a Cisco 837 router for the ADSL connection.
    This is connected (via ethernet) to the router we want to use for ISDN backup - a Cisco 800. The 837 and 800 are configured with HSRP.
    However, at the moment, if the 837 or the ADSL link was to go down, there would be no means to connect to the central site. How can we configure this to use the 2nd router for ISDN backup, given our set-up?
    Any suggestions would be greatly appreciated!
    (incidentally, I have only recently joined this company and have taken this over, without any information to go on as to why things are set up as they are !)

    Hello again,
    I think you can pretty much ignore my last message. I've done a bit more digging and I think I have a better idea of what you mean now!
    Lets see if I've got this about right. To recap:
    I need to set up a GRE tunnel between the remote site and 7206 router at head office, which in turn would be using IPSEC tunnel between remote router and PIX.
    So, steps required:
    1) set up IPSec tunnel to to PIX (this is the way it is already currenly configured - am I right in thinking no further configuration would be required as far as the PIX is concerned, for the new set-up?)
    2) set up GRE tunnel between remote ADSL router and 7206 - requires tunnel interface on both router with start point and end point configured. Use GRE keepalive to enable the line protocol to be brought down if the far end cannot be reached.
    3) Add static routes on ADSL router to reach head office network via tunnel interface
    4) Add static route on 7206 router to reach remote network via tunnel interface
    5) Configure ISDN map statement on 7206 mapping remote network to ISDN number
    6) Configure "floating" static routes on 7206 to use ISDN to reach remote network
    7) Configure HSRP on ADSL and ISDN routers with tracking of tunnel interface. If tunnel interface goes down, then ISDN router takes over as active.
    8) Configure static routes on ISDN router to point to head office network using BRI0 interface.
    So, under normal operation, traffic between head office and remote office will be routed across the GRE tunnel using the ADSL link.
    If the ADSL link was to go down then the GRE tunnel would also go down. So, the 7206 would then use the floating static routes to reach the remote network via the ISDN connection.
    The ISDN router would take over as active at the remote site since the tunnel interface would have gone down, forcing the HSRP to failover.
    Does that all sound about right? Is there anything I've missed?
    I'll start trying to put some configurations together when I get the chance - but, if its ok, I'll probably run these past you too, just to make sure they seem correct!
    Thanks,
    Neil

  • QOS from Central side to Remote end

    I am wanting to apply QOS onto some of our WAN circuits.   Here is my scenario.   Headquarters end has a 45Mb DS3 to the MPLS cloud.  Remote end has a multilink T1 (3Mb) connection to the MPLS cloud.   We are doing BGP to the cloud itself.     My problem is, the remote links request data from the Headquarters end (which works fine going from remote to HQ).  However, when the download/file transfer starts, it completely saturates the 3Mb connection and nobody else can do anything on that circuit.   I have applied some policing on the HQ end, but I also have a few hundred remote sites connecting to this cloud with the same AS number which causes some issues.   Does anyone know of a way to QOS or prioritize mission critical traffic in this manner? 
    Please any help with this matter would be appreciated.
    Thanks,

    Disclaimer
    The Author of this posting offers the information contained within this posting without consideration and with the reader's understanding that there's no implied or expressed suitability or fitness for any purpose. Information provided is for informational purposes only and should not be construed as rendering professional advice of any kind. Usage of this posting's information is solely at reader's own risk.
    Liability Disclaimer
    In no event shall Author be liable for any damages whatsoever (including, without limitation, damages for loss of use, data or profit) arising out of the use or inability to use the posting's information even if Author has been advised of the possibility of such damage.
    Posting
    Normally, there are two things that normally can be done; BTW they are not mutually exclusive.
    If your device supports CBWFQ, you could define a class per branch and shape for the branch's egress bandwidth.  However, if you have several hundred branches, you may run out of policy classes.
    The other approach is to use vendor QoS.  Many MPLS vendors will offer some kind of QoS support although sometimes it's an extra cost option.

  • I have a time capsule connected directly to fiber connection. I have connected a windows server directly to TC and configured it for remote desktop connection. From my interanet I can access srvr but not from my home. What config I need on TC?

    I have a time capsule directly connected to fibre optic point out. All pcs and macs are connected wirelessly to the internet. I have connected a windows server pc to TC. When configured for Remote desktop connection, I can access windows server from within interanet but don't know how to access it from internet. I guess I need to change some settings in TC to get some ip adress for the remote desktop connection from my home. Anyone who can help me out? Appreciate it.
    Narmin

    I am a little lost now.. I have read again your title and your first post.. and they seem inconsistent.
    In the title you state.
    From my interanet I can access srvr but not from my home.
    Interanet is not a word I know.. I assumed intranet...are you talking about internet or intranet? And just to be clear say WAN or LAN.. !! Is your home part of the interanet??
    In the first post you state,
    I can access windows server from within interanet but don't know how to access it from internet.
    Now this is more normal.. the issue is not in the home at all, it is accessible from there but fails from internet. If this is correct, then you can do a few obvious things to determine where the problem is.
    But first I need to know are you actually testing from a different internet connection to your home lan.. you are not just trying the public IP from inside the LAN as that will fail due to the TC not doing NAT Loopback.
    I am also assuming the TC is the only router in the network, and has the public IP on the WAN interface.
    And I am also assuming you have turned on the ping responder and you can actually ping your public ip from the internet and get a response. This helps no end in figuring out where there are issues. Strange but I have no idea if there is a ping responder in the TC WAN so you might need to forward that as well. Also if you have a dynamic public ip address are you using dyndns or no-ip or some other service to connect.
    1. Test bypassing the TC.. plug the internet connection straight into the windows server,, and test if you have access. If yes, the TC is the problem.. if not, your setup on the windows server is wrong.. look at firewall in particular.
    2. Assuming from test 1 the TC is the problem, Post the screen shots of the port forwarding setup for us to look at.. that is by far the easiest way to check it out.
    There are lots of references to port forwarding in the TC.. eg
    http://must-know-mac.blogspot.com/2008/07/how-to-port-forward-time-capsule.html
    The things that generally go wrong are firewall on the computer that is accepting the port.
    The ISP doesn't allow connections on a particular port. (not likely in your case)
    The router is behind another router.. double NAT will kill any port forward.
    Upnp has already allocated a port.. not an issue as TC doesn't use upnp although a reboot of everything after you set port forwards is well worth it.. amazing how things don't stick properly without a reboot.
    IP on the receiving device is not static and so changes.
    Not enough or right type of ports are opened. This is always messier than it looks as one port is often not enough for two way communications.

  • SQL Service Broker 2012: the connection was closed by the remote end, or an error occurred while receiving data: '64(The specified network name is no longer available.)'

    Anyone can help with the below issue please? Much appreciated.
    We have about 2k+ messages in sys.transmission_queue
    Telnet to the ports 4022 is working fine.
    Network connectivity has been ruled out.
    The firewalls are OFF.
    We also explicitly provided the permissions to the service account on Server A and Server B to the Service broker end points.
    GRANT
    CONNECT ON
    ENDPOINT <broker> <domain\serviceaccount>
    Currently for troubleshooting purposes, the DR node is also out of the Availability Group, which means that we right now have only one replica the server is now a traditional cluster.
    Important thing to note is when a SQL Server service is restarted, all the messages in the sys.transmission queue is cleared immediately. After about 30-40 minutes, the errors are continued to be seen with the below
    The
    connection was
    closed by the
    remote end,
    or an
    error occurred while
    receiving data:
    '64(The specified network name is no longer available.)'

    We were able to narrow down the issue to an irrelevant IP coming into play during the data transfer. We tried ssbdiagnose runtime and found this error:
    Microsoft Windows [Version 6.1.7601]
    Copyright (c) 2009 Microsoft Corporation.  All rights reserved.
    C:\Windows\system32>SSBDIAGNOSE -E RUNTIME -ID 54F03D35-1A94-48D2-8144-5A9D24B24520 Connect to -S <SourceServer> -d <SourceDB> Connect To -S <DestinationServer> -d <DestinationDB>
    Microsoft SQL Server 11.0.2100.60
    Service Broker Diagnostic Utility
    An internal exception occurred: Timeout expired.  The timeout period elapsed prior to completion of the operation or the server is not responding.
    P  29830                                 Could not find the connection to the SQL Server that
    corresponds to the routing address tcp://XX.XXX.XXX.199:4022. Ensure the tool is connected to this server to allow investigation of runtime events
    The IP that corresponds to routing address is no where configured within the SSB. We are yet unsure why this IP is being referred despite not being configured anywhere. We identified that this IP belongs to one of nodes other SQL Server cluster, which has
    no direct relation to the source server. We failed over that irrelevant SQL Server cluster and made another node active and to our surprise, the data from sys.transmission_queue started flowing. Even today we are able to reproduce the issue, if we bring
    back this node [XX.XXX.XXX.199] as active. Since, its a high business activity period, we are not investigating further until we get an approved downtime to find the root cause of it.
    When we get a approved downtime, we will bring the node [XX.XXX.XXX.199] as active and we will be running Network Monitor, Process Monitor and the SSB Diagnose all in parallel to capture the process/program that is accessing the irrelevant IP.
    Once, we are able to nail down the root cause, I will share more information.

  • Desperate help needed to configure WVC210 for remote access?

    Hi, I'm new and desperately need some help on setting up my WVC210 for remote access.
    I manage to setup and see images from my WVC210 using my home LAN via both wired and also wireless.
    I have 2 questions:
    (a) for wireless connection, i only manage to get connection to my WVC210 if i disable the wireless security from my router. But that means i'm opening my wireless LAN to everyone. How can i still get connection to the camera if i enable the wireless security from my router. (FYI: my router is 2Wire ADSL  from Singnet Mio)
    (b) how can i get connection to my WVC210 from outside or in my office? I type in the camera Fixed IP address (displayed on the front screen) on the web browser, by it shows a error page. Is there some setting that i might need to adjust ?
    Pls kindly help me
    Thank you.

    Bernard,
    For Item (2) is there any difference between the camera built-in dyndns updater versus the software updater? I am under the impression that the software updater is easier to manage.
    The biggest difference for you is that the camera always stays at the same location, and the laptop goes with you. Every time you access the internet from a different location with the laptop the software updater is sending the new IP address to dyndns.com. This causes you to lose access to your camera because the FQDN doesn't point to your home IP address anymore. Once the dyndns credentials are in the camera (or router) there is no management needed. The device will automatically update dyndns.com with your new IP address as it changes, and you do not need to do anything.
    For Item (3), are you saying port forward 1025 is it for the 2nd camera only or for both? Or is it 2nd camera use 1025 and first camera use 8080?
    Here's an example of what I mean:
    Camera 1: 192.168.1.210 port 1024. In router, forward port 1024 to 192.168.1.210
    Local Access: http://192.168.1.210:1024
    Remote Access: http://bernards210.dyndns.org:1024 (Example)
    Camera 2: 192.168.1.211 port 1025. In router, forward port 1025 to 192.168.1.211
    Local Access: http://192.168.1.211:1025
    Remote Access: http://bernards210.dyndns.org:1025 (Example)
    Camera 3: 192.168.1.212 port 1026. In router, forward port 1026 to 192.168.1.212
    Local Access: http://192.168.1.212:1026
    Remote Access: http://bernards210.dyndns.org:1026 (Example)
    to access the 2 camera outside, do i have to have another dyndns host name or can i use the current one for both camera?
    As you can see in the above example, the dyndns name remains the same for remote access to all three cameras. The only change is the port number at the end. Your router will translate the port number to the IP address that the port is forwarded to, allowing you to select the camera that you wish to view by changing the port number in the address.
    I was actually thinking that the camera web browser can show 2 camera at the same time. Is it possible?
    No. Each browser window will display a single camera. You can however opens multiple instances of your browser to allow viewing of more than one camera simultaneously. A better solution is to install the Video Monitoring Software that is included with the camera which allows you to view multiple cameras in the same window.

  • Steps for Period end closing

    Hi All,
    Can any one please provide me with the actual steps towards Period end Closing and year end closing for Financial Closing.By step I mean steps in order i.e which step will be followed by which one.
    This is urgent
    Pinee

    Hi
    http://www.sap-basis-abap.com/fico/sap-fi-month-end-and-year-end-activities.htm
    First you will have to close the Posting period in the Materials Management side. To do this use the T.Code MMPV and give the period that needs to be Opened. Once this is done you will not be able to Post any Material Documents in the previous period.
    Now at the Financial side you need to open the next period and at the same time you need to close the Previous period. This can be done in T.Code OB52
    here is the list for FI/CO year end closing check list:
    now i am sending one document with T.codes
    CLOSING ACTIVITIES
    1 Execute Report for Inter Company Activity & Journal Entries
    2 Open posting period for next yr (T.Code: OB52)
    3 Run Business Area's Assignment report. (T.Code: F.50)
    4 Review list of recurring journal entries (T.Code: FBD3)
    5 Execute Recurring Entries for A/R, A/P, G/L (T. Code: F.14)
    6 Process Parked A/R, A/P, G/L accounting documents (T.Code: FBV0)
    7 Final Cutoff for the Maintenance of Fixed Asset- Add Transfer and Retire (T.Code: ABUMN)
    8 Run Depreciation in Test Run and post (T.Code: AFAB)
    9 Verify Display Log for Depreciation Test Run (T.Code: AFBP)
    10 Capitalize AUC Assets if needed (T.Code: AIAB, AIBU)
    11 Enter Payroll Data to SAP (T.Code: CAT2)
    12 Verify Depreciation Balances with GL balances (T.Code: ABST2)
    13 Post Depreciation (T.Code: AFAB)
    14 Execute Asset History Report, and retire assets if needed (T.Code: S_ALR_87011963, ABAVN)
    15 Adjust specific depreciation areas if necessary (T.Code: ABCO)
    16 Reconcile AM sub ledger with GL (T.Code: ABST2)
    17 Check Bank Data (T.Code: S_P99_41000212)
    18 Review AR Open Items (T.Code: FBL5N)
    19 Review AP Open Items (FBL1N)
    20 Execute Pending Invoices(T.Code: MRBP)
    21 Clear Open Item for GRIR, freight (T.Code: F.13)
    22 Reconciliation of Financial Documents and transactional figures (F.03)
    23 Open new CO Posting Period: (T.Code: OKP1)
    24 Compare current (cost estimates) with last current price (Moving Avg) (T.Code: OKBH)
    25 Update current cost price to material master price field (T.Code: CK11N, CK24)
    26 Process Freight charges, Match SD freight to actual (T.Code: V-31)
    27 Review Internal Order Postings(T.Code: OKSA)
    28 Settle All Orders (T.Code: KO88)
    29 Verify All Post Goods Issue have been Invoiced (Billing Due List) (T.Code: VF04)
    30 Review SD Billing Doc from prior month that have not yet been released to accounting (T.Code: F.2D)
    31 Reconciliation of MM movements in Transit Intra-SAP to Non SAP
    32 Reconcile PI Inventory with SAP (T.Code: MI07)
    33 Perform Manual Adjustment if needed (T.Code: F-02, FB50)
    34 Verify balance of the GR/IR account (T.Code: MB5S)
    35 Post Accruals and Deferrals (T.Code: FBS1)
    36 Clearing of Cancelled Documents (T.Code: F-03, F-32, F-44)
    37 Check Profitability Segment Adjustment (T.Code: KISR)
    38 Aging Report-Reconcile GL balances with sub ledger balances AP (T.code: FBL1N, FBL5N, FBL3N)
    39 Check the check run numbers (T.Code: FCH1, FCHI)
    40 Bank reconciliation Data (T.Code: FF67 & FEBA)
    41 Enter Tax Journal Entry (T.Code: FB41)
    42 Reconcile GL balances with sub ledger balances AR/MM/AP (T.Code: F.03)
    43 Display Balance Sheet Adjustments (T.Code: F.5F)
    44 Post Balance Sheet Adjustments (T.Code: F.5E)
    45 Post Foreign Currency Valuation (foreign exchange) (T.Code: F.05)
    46 Check generic cost centers for posting with wrong accounts
    47 Correct wrong postings on generic cost centers
    48 Check Validation dates for Cost Centers, Cost Elements, CO area (T.Code: GGB0)
    49 Check COGI--for both month end and year end
    50 Doubtful receivables (T.Code: F104)
    51 Verify In-transit Inventory
    52 Reconcile PA to G/L (T.Code: KE5U)
    53 Post Cost Center Assessments and Distributions (T.Code: KSU5 & KSV5)
    54 Run CO-FI Reconciliation to balance (T.Code: KALC)
    55 Run BW reports P&L and Balance Sheet
    56 Maintain CO yr variant (T.Code: KCRQ)
    57 Fiscal Yr Balance carry forward AP/AR/AM (T.Code: F.07,
    58 Fiscal Yr Balance carry forward CO (T.Code: CXS1)
    59 Fiscal Yr balance carry forward FI (T.Code: F.16)
    60 Fiscal Yr balance carry forward PCA (T.Code: 2KES)
    61 Set Document number ranges - FI - new year (T.Code: OBH2, OBA7)
    62 Set Document number ranges AP/AR - new year (OBA7)
    63 Generate Financial statement Reports (T.Code:OB58) OR (T.Code: FSE2)
    64 Change Fiscal Year For Assets (T.Code: AJRW)
    65 Year end Closing-- Asset Accounting--final for year end (T.Code: AJAB)
    66 Close CO Posting Period : (T.Code: OKP1)
    67 Close Prior A/R Posting Period (T.Code: OB52)
    68 Close Prior A/P Posting Period (T.Code: OB52)
    69 Close Prior MM Posting Period (T.Code: OMSY)
    70 Reverse accruals and deferrals for the new month (T.Code: F.81)
    71 Reconciliation of Financial Documents from old fiscal year and new fiscal year (T.Code: FNSL)
    72 Load Balances, Budget Data for Cost centers, sales
    73 Update Retained Earning Account , balance carry fwd (T.Code: F.16)
    Month end closing Activities
    1. All the expenses including amortization, prepaid expenses, Preliminary expenses and accruals have been booked.
    2. Complete Bank Reconciliation (T.Code: FF67)
    3. Make sure that Sum of Inter company balances is Zero
    4. Suspense Accounts should be cleared regularly.
    5. Ensure that all documents related to MM & SD have been entered in system. (T.Code:F-22 & F-43)
    6. Ensure that all billing documents are released to accounting.
    7. Calculate Overheads on all process Orders (CO43)
    8. Technically complete all process orders which are fully processed (CORM).
    9. Calculate Variance (KKS1)à (Relevant only if Standard cost is calculated).
    10. Settle all process orders which are technically complete (CO88).
    11. Close All settled Process Orders
    12. Close MM period (Transaction Code: MMPV).
    13. Carry out GR/IR clearing (F.13) transaction
    14. Depreciation Run (AFAB) has been carried out for the month
    15. Close FI Posting period after the month end closing activity is over (T.Code:OB52)
    Year end closing Activities:
    1. Calculate production work in progress on process orders which are not technically complete. (CO88).
    2. Carry out Assessment cycle for Cost Centers.(T.Code: KSUB)
    3. All month end closing Activities should be carried out.
    4. Carry Forward Balances to next year
    (With TC: F.16 we can carry forward the balance to next year.
    With TC: OBH2 copy the number ranges to next year
    Open next year periods by selecting the Posting Period Variant.
    then test by posting the transaction in F-02)
    Hope ths helps
    Please reward points
    Sunil

  • Web-based API tool for remote edit videos

    Hello, sorry for posting in a wrong place. I'm looking for an API for remote editing uploaded video files. Our website allows to record streams to MP4 file and storage them on our servers (mostly streamed games). Now I would like to edit this videos by simply cut (start video from here, end video here) and then export new file to Youtube. I need to do that remotly, not by additions software installed on users computers. Does anyone knows API like that? Twitch.tv has that feature, and I would like to have it too on my streamspot.tv webpage
    Thanks for help
    Simi

    Here are some suggestions...
    Comments - http://www.iwebformusicians.com/iWeb/Comments-Password-Protect.html
    Example - http://www.iwebformusicians.com/iWebMusicWebsite/Comment.html
    Forum - http://www.freeforum101.com/
    Tooltips - http://96.0.63.10/iWeb-Test/Tooltip.html
    More Tooltips - http://96.0.63.10/iWeb-Test/Tooltip-Text.html
    Popup movie - http://www.iwebformusicians.com/Website-Movie-Video/Click-To-Play.html
    Popup audio - http://www.iwebformusicians.com/Website-Music-Players/Audio-Button-Player.html
    Popup photo - http://www.iwebformusicians.com/Website-Photos/Image-New-Window.html
    Rollovers - http://www.iwebformusicians.com/Website-Photos/Rollover-Image.html

  • Production costs for material with price control V

    Dear all,
    Can anyone pls tell me, how will the costing occur for a material produced in-house and having price control 'V' ? I am not able to see the target costs.
    Also kindly tell me the settings to be done in CO, like target cost version, valuation variant, costing variant, etc.
    Thank you,
    Shrenik

    Rather than giving my own versions I have compiled here SAP inputs. Pl let me know if you require any clarifications:
    Costing variant has the following components:
    <b>Define Costing Types
    Define Valuation Variants
    Define Date Control
    Define Quantity Structure Control
    Define Transfer Strategy
    Define Reference Variants</b>
    <u>Costing type:</u>
    In the costing type, you define the purpose of a material cost estimate by specifying, for example, which field in the material master record the costing results can be transferred to:
    Update Cost Estimate
    Standard price Standard cost estimate (01)
    Tax-based price Inventory cost estimate
    Commercial price Inventory cost estimate
    Price other than std price Modified standard cost estimate or
    current cost estimate
    No update Any cost estimate
    Define Valuation Variants:
    Define Valuation Variants
    Here you create a valuation variant containing the parameters required for valuation of a cost estimate.
    You also specify which costing sheet should be used to calculate overhead.
    Valuation Strategies
    Material valuation
    Here you define the sequence in which the system searches for prices from the accounting view or costing view of the material master record to valuate materials. You can also access prices from purchasing info records and condition types.
    For material cost estimates, you also specify whether additive costs can be added to the selected price.
    With configurable/configured material components and with procurement alternatives, the sequence defined here is ignored if the strategy "price from purchasing info record" was selected, in which case that strategy is always executed first. For more information, refer to the SAP Library in the component Product Cost Planning under Raw Material Costing or Mixed Costing.
    Activity Types / Processes
    Here you define the sequence in which the system searches for prices in activity type planning or actual activity price calculation in Cost Center Accounting or Activity-Based Costing to valuate the utilized activity types and business processes.
    You also specify which plan/actual version is used.
    Subcontracting
    Here you define the sequence in which the system searches for prices in the purchasing info record. In purchasing, quota arrangements are used to create a mixed price for materials that are manufactured with external vendors with parts provided by the customer. You can specify whether the quota of the individual vendors that are entered in the source list for the material to be processed should be determined through the planned quota arrangement or the actual quota arrangement.
    External processing
    Here you define the sequence in which the system searches for prices in the purchasing info record or routing operation for valuation of the external activities.
    Strategy Sequence
    You define the individual valuation methods for the valuation variant as strategy sequences. For the valuation of the material components you define a strategy sequence that reads the fields of the material master record in a particular sequence such as:
    1. Planned price 1
    2. Standard price
    3. Moving price
    The first price that is not zero is used to valuate the material component.
    Target versions:
    Target cost versions  are used in the following ways:
    In variance calculation:
    To control which variance (total variance, production variances or planning variance) is calculated
    To valuate unplanned scrap( scrap variance)
    Unplanned scrap is valuated in the period-end closing activities when the variances are calculated. You can specify in a valuation variant for WIP and scrap which cost estimate you want to use to calculate the target costs for the valuation of unplanned scrap. You assign the valuation variant to target cost version 0 if you want to include it in the valuation of scrap.
    When you are using a cost object hierarchy with active distribution, you use the target cost version to control which cost estimate the system uses to calculate the target costs, which are used as the basis for determining equivalences for actual cost distribution.
    The actual costs collected at the level of the hierarchy are distributed across the orders in accordance with these equivalences. This distribution is proportional to the target costs for the cost element under which the actual costs are written. Actual costs for material costs are distributed in proportion to the target costs for the origin group, such as for the material, if you have entered an origin group in the costing view of the material master record and have set the indicator Material origin, for example.
    If no target costs were calculated under this cost element, enter a cost element group in the target cost version. The actual costs are distributed in proportion to the target costs for this cost element group. This cost element group should be complete. If costs were updated under a cost element that is not in this cost element group, no distribution is possible.
    You can calculate equivalences on the basis of SAP standard target cost versions 0, 1 and 3.
    The standard system supplies the following target cost versions:
    Target cost version 0 ( total variance)
    The amount of the total variance generates a posting in Financial Accounting during settlement.
    For this version, select actual costs as the control costs and standard cost estimate as the target costs.
    Target cost version 1 ( production variance)
    For this version you choose actual costs as the control costs and planned costs as the target costs.
    Target cost version 2( planning variance)
    With target cost version 2, the costs from the preliminary order cost estimate are interpreted as control costs.
    For this version, select planned costs as the control costs and current cost estimate as the target costs. You cannot calculate planning variances for the product cost collector.
    Target cost version 3 (production variance of the period)
    You compare the planned costs of the period calculated on the basis of an alternative material cost estimate (such as a modified standard cost estimate) with the actual costs of the period on the basis of the yield delivered to stock in the period.
    The base quantity for variance calculation is the yield.
    For this version, you choose the actual costs as the control costs and the alternative material cost estimate as the target costs. To determine the alternative material cost estimate, enter a costing variant and choose a costing version.
    The target cost version specifies which data is to be compared. The target cost version also specifies which variance variant is used and therefore which variance catagories are calculated. You can define a different target cost version for each controlling area

  • Option to disable iTunes volume control for remote speakers?

    I have noticed that with iTunes 10, the option to disable the volume control for remote speakers seems to have disappeared from Preferences>Devices. If you click the "?" button, the help window gives an explanation of what its for but the option to check/uncheck it clearly isn't there. Since iTunes 10, streaming my music from my iMac to my Denon receiver via Airtunes/Airplay with an Airport Express has been disappointing. The volume is far too low. With version 9 and every version prior, the volume control option was always there in preferences and I always had it disabled; music came through loud and clear but since this option appears to no longer exist, the volume through the Denon receiver fails to impress, even with the iTunes volume slider at max.
    Anyone else noticed steaming volume too low? If so, agree that it's a bug?
    Message was edited by: Brian I.

    I wholeheartedly agree with "I also used to disable the volume control to reduce the amount that my computer interferes with the sound before it gets to the external DAC." There is no reason why Apple shouldn't restore this important setting option as the volume control does negatively affect sound quality in a high-end set-up and we'd rather not just take their word for it that the volume control's maximum setting is the same as disabling it. Why does the volume slider change the output level even when using the Airport Express' digital output? It shouldn't, and it seems the sound is now being force sent through a stupid digital volume control for no good reason. If for no other reason the "disable" option should be restored to avoid inadvertent volume changes via the Remote app for iPod Touch and iPhone. Strangely as compared to several other posts here, my perceived volume level now seems louder than before, not softer as others are reporting. People that are serious about sound quality do not want iTunes or AirPlay (formerly AirTunes) to manipulate the volume level or any other aspect of the sound at all ever, as it can't help but only hurt. I also thought the "disable" setting was available in the Airport Utility previously, but it's vanished from there too.

  • Rejecting IPSec tunnel: no matching crypto map entry for remote proxy

    Hi!
    I have already search for this but didn't get an exact answer I'm looking for so I try asking it again (if there is the same question).
    I'm in process of migrating some VPN tunnels with  from a Cisco router to an ASA, everything will keep the same but just the peering IP address. However, some of the tunnel was being torn down since it request for a proxy doesn't match the one configured on our side. And the remote peer said there is no such issue on the previous platform, but now they need to reset the tunnel from time to time.
    Apr 18 2013 07:29:10 asa002 : %ASA-3-713061: Group = 192.168.1.226, IP = 192.168.1.226, Rejecting IPSec tunnel: no matching crypto map entry for remote proxy 192.168.1.226/255.255.255.255/0/0 local proxy 10.10.9.81/255.255.255.255/0/0 on interface outside
    Apr 18 2013 07:29:10 asa002 : %ASA-3-713902: Group = 192.168.1.226, IP = 192.168.1.226, QM FSM error (P2 struct &0x745e9150, mess id 0x8d7ad777)!
    Apr 18 2013 07:29:10 asa002 : %ASA-3-713902: Group = 192.168.1.226, IP = 192.168.1.226, Removing peer from correlator table failed, no match!
    The remote peer said they did not change the proxy id on their side so it is possibly the old platform will just not setting up the SA without torn down the tunnel while the ASA on the new platform will torn down if there is any mismatch.
    Anyway I have requested the remote side to remove those unmatched entried to avoid the tunnel being torn down, but if there any configuration that is related to this issue? i.e. Just bring up the SA with matched addresses and ignore others, instead of torn down the tunnel.
    Thanks!!
    //Cody

    Are you trying to send traffic destined towards the internet from 172.16.0.0/20 via this ASA as well? why? are you inspecting those traffic before being sent out to the internet?
    If so, this end also needs to be configured with "any" as well --> crypto ACL needs to mirror image.
    access-list outside_1_cryptomap extended permit ip any 172.16.0.0 255.255.240.0
    Then you also need NAT on the outside interface, otherwise, traffic from 172.16.0.0/20 is not PATed to a public IP, and won't be able to reach the internet:
    nat (outside) 1 172.16.0.0 255.255.240.0

  • Rejecting IPSec tunnel: no matching crypto map entry for remote proxy on interface outside.

    Hi,
    I have read a problem where the VPN between an ISP and ourselves started dropping sessions. I have rebuilt the crypto map and tried to dig deeper into my config and some basic troubleshooting while I await the ISP to respond.
    Any ideas?
    Thanks Steve
    https://supportforums.cisco.com/thread/255085
    http://www.cisco.com/en/US/products/ps6120/products_tech_note09186a00807e0aca.shtml#solution10
    5 Jun 13 15:46:25 713904 IP = 209.183.xxx.xxx, Received encrypted packet with no matching SA, dropping
    4 Jun 13 15:46:25 113019 Group = 209.183.xxx.xxx, Username = 209.183.xxx.xxx, IP = 209.183.xxx.xxx, Session disconnected. Session Type: IKE, Duration: 0h:00m:00s, Bytes xmt: 0, Bytes rcv: 0, Reason: crypto map policy not found
    3 Jun 13 15:46:25 713902 Group = 209.183.xxx.xxx, IP = 209.183.xxx.xxx, Removing peer from correlator table failed, no match!
    3 Jun 13 15:46:25 713902 Group = 209.183.xxx.xxx, IP = 209.183.xxx.xxx, QM FSM error (P2 struct &0xda90f540, mess id 0x76c09eb7)!
    3 Jun 13 15:46:25 713061 Group = 209.183.xxx.xxx, IP = 209.183.xxx.xxx, Rejecting IPSec tunnel: no matching crypto map entry for remote proxy 172.16.0.0/255.255.240.0/0/0 local proxy 0.0.0.0/0.0.0.0/0/0 on interface outside
    5 Jun 13 15:46:25 713119 Group = 209.183.xxx.xxx, IP = 209.183.xxx.xxx, PHASE 1 COMPLETED
    6 Jun 13 15:46:25 113009 AAA retrieved default group policy (DfltGrpPolicy) for user = 209.183.xxx.xxx
    6 Jun 13 15:46:25 713172 Group = 209.183.xxx.xxx, IP = 209.183.xxx.xxx, Automatic NAT Detection Status: Remote end is NOT behind a NAT device This end is NOT behind a NAT device

    Are you trying to send traffic destined towards the internet from 172.16.0.0/20 via this ASA as well? why? are you inspecting those traffic before being sent out to the internet?
    If so, this end also needs to be configured with "any" as well --> crypto ACL needs to mirror image.
    access-list outside_1_cryptomap extended permit ip any 172.16.0.0 255.255.240.0
    Then you also need NAT on the outside interface, otherwise, traffic from 172.16.0.0/20 is not PATed to a public IP, and won't be able to reach the internet:
    nat (outside) 1 172.16.0.0 255.255.240.0

  • Lifecycle cost for an equipment

    Hi all,
    Can anybody point me in the right direction to record revenue for an equipment that is used as a part of Customer Service Order, ie. a technician might spend 5 hours on the job and had to use a particular equipment for 2 hours.  Those hours will then be charged out to a customer, resulting in revenue posting.
    The other half of my question is for that same equipment we need to collect all cost regarding maintenance and general operating cost such as oil consumption.  The maintenance cost could be recorded via PM Order but the oil consumption is a bit harder.
    What is the best way to set this up so at the end of the day we will have an equipment with all revenue and cost allocated to it.
    Regards,
    Gudmundur

    dear thyagarajan
    many thanks for your prompt reply.Actually,we have certain equipments where depts. like  instruementation,mechanical dept. is involved and I have created the concept of main equipment and sub-equipment. Say, main equipment is "X" and sub-equipment is "Y" .Now,in main equipment master data "X",I had entered planner group for mechanical dept. and in sub-equipment "Y" ,I had entered planner group for instrumentation dept. , now if any problem comes in main equipment "X" , mechanical dept.will create main. order and if any problem comes in sub-equipment "Y", instrumentation dept. will create maintenance order.
    Now, my client's requirement is to view total cost for that main equipment as well as dept. wise???how to get this report? as instrumentation is creating for order for their equipment ("Y") , not for the main equipment("X"),
    please explain is there any std. t-code available for this.
    rgds
    rajib

Maybe you are looking for

  • Lock box clearing

    Hi All Can any body explain me how the clearing will happen in lockbox processing. How searching criteria happens in algorithms for invoices? Thank you Deepa

  • Despair of a switcher (longish)

    Hi all, I wanted to share my experience of pure frustration with Apples hardware and see if there is anyone else with similar experiences. After researching and reading many magazines, web sites and books, and playing with a Powerbook, I decided to t

  • Print pdf from another frame in IE via javascript

    I am responsible for a little web application. There we have 2 frames. In one frame is an pdf-file, this frame is not visible for the user. In the other frame is an button. By clicking the button the pdf-file should be printed. The onclick event hand

  • Need BAPI/FM to change Stock Transfer Order

    Hi all. Can  any one let me know the BAPI/FM tp change stock transfer order. I need to change the quantity in it. Thanks in advance. Regards, sami.

  • Nuance Dragon PC and/or Mac on Intel Macs???

    The Nuance advisory relative to system requirements is that Dragon Dictate works on any Mac with an Intel processor.  A rep I spoke with at Nuance, assured me that this is the case and applies to booting into Windows on a Mac to use Dragon Naturally.