PR and PO through MRP run

hi,
What are all settings to generate Purchase Requisitions through MRP run? Also, if, i wanna automate creation of Purchase order from Purchase Requisition (not manually). how to achieve this?
thanks..

Hi,
1. Get PR trough MRP run
1a, You have to have proper master data settings (e.g. material master: MRP type "PD", procurement type "F")
1b, Proper MRP creation indicator shoudl be used in MD01 / MD02 / MD03.
http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d2da044af11d182b40000e829fbfe/frameset.htm
1c, Your planning situation also influences whether you get PR or not. If there's no need to procure anything (e.g. you have sufficient stock level or you have no demand for the goods > MRP won't generate procurement proposal)
2. Convert PR to PO
It depends on your master data settings (material master, source list, QA, outline agreeemts, etc)
If you have proper master data settings and during MRP run it is possible to determine the source of supply, you can use ME59 to get the POs from the PReqs (otherwise you have to use ME57, ME58 too).
http://help.sap.com/erp2005_ehp_04/helpdata/EN/4c/420d29470a11d1894a0000e8323352/frameset.htm
But you can't get PO as the result of MRP run in standard system - you get PR (or PldOrd) and you have to convert the PR to PO (or PldOrd > PR > PO).
Regards,
Csaba

Similar Messages

  • Elaborate in MDBT and open scheduling agreement list through MRP Run

    Hi experts,
    After MRP Run in MD02 i had find out the list of Purchase requisition at ME5A , based on the purchase requisition no i will create scheduling agreement  not for PO, so how it is possible for the list of open scheduling agreement list  through MRP Run Only?
    Kindly elaborate the screen short steps at MDBT - MRP Run in background process what are possibilities >  weekly once or daily basis, report run repeated purchase requisition  no or not , update the daily stock status all those things ?
           what are the possibles in MDBT MRP Run > Maintain conditions,type of generate reports, open reports through t.code and report converted   excel or through mail recording MRP  run?
    Thanks,
    Umapathy

    Hi,
    In MDBT we can create the variant and Schedule as you wish  and execute .and also you can have the status of the schedule whether it is in cancelled or finished .
    Reg
    MSP

  • 'Releasestepcreated' not getting triggered for PR generated through MRP run

    Hi,
    I have PR Release strategy workflow configured, working well when i try to create PR manually, triggers workflow.
    PR's created thorugh MRP run, triggers release strategy but not workflow.
    I checked the event trace 'releasestepcreated' event not triggered through MRP run.
    Please respond ASAP.
    Your inputs will be highly appreciated.

    Short Text 
    Workflow with multiple workitems 
    Long Text 
    Refering SAP notes that i came to know that workflow is not supported
    through MRP run (md03/md04).we are not using Planned orders.
    To trigger workflow for Purchase requisitions created by MRP run, we
    have developed a custom report to trigger workflow explicitly.
    1.MRP batch job runs every night. After MRP job,planned to schedule
    another job to trigger workflow for PR's created MRP run.
    2. Used FM 'SAP_WAPI_CREATE_EVENT' to trigger workflow.
    3. PR requires 5 levels of approvals based on release strategy
    configuration.
    4. The issue is PR 'XXX' created and waiting for approval in agent's
    inbox.When 2nd day MPR runs same PR 'XXX' effected, another
    workitem for the same PR in agent's inbox.
    We have multiple workitems for the same PR in agent's Inbox.
    If i execute one of the workitem,releases PR, multiple workitems are
    getting generated for 2nd level approval for the same PR.
    Please give your inputs to resolve this issue.

  • Schedule Lines through MRP RUN

    Dear Gurus
    I have to generate schedulines through MRP run which is getting generated,but got stuck with the quota arrangement,as schedulelines are not getting generated in accordance with qouta arrangement.Following is the Scenario:
    Material:Testroh
    VENDOR 1: 75% share
    VENDOR 2: 25% share
    For example i hv a requiremnt of 100pcs of Testroh.After running the MRP schedulines r getting generated for VENDOR1 for 100 pcs.It is not picking up the second vendor at all.
    Give ur expert comments to resolve the issue.
    With Regards.

    Dear
    I think you should maintain quota of each vendor in transaction MEQ1 with a validity period. e.g. For first vendor 75%. For Second Vendor 25% and also MRP2 Quota usage 4.
    Refer this below threads from experts :Quota Arrangement
    Regards
    JH

  • Secondary packing material procurement through MRP Run

    Hi
    Is it possible to procure Secondary packing material through MRP Run. Material type of Secondary packing material is VERP. In MRP view we defined MRP type as VB and reorder point also set.

    Hi
    the MRP run would create a procurement proposal if the stock has fallen below the re-order point. The procurement proposal needs to be a purchase requisition if procurement should start immediately (see Creation indicators for the MRP group). Further, you need to set the "automatic purchase order" indicator both on the material (purchasing view) and on the vendor. In the MRP run, the system also needs to be able to assign a vendor (i.e. through a source list). Then a purchase requisition is automatically converted into a purchase order on creation.
    Good luck
    Eivind

  • Event not getting triggered for PR generated through MRP run

    Hi All,
    Could anyone let me know how to get a workflow triggered for the ReleaseStepCreated event (obj - bus2105) when the PR is created through MRP run. The MD02 control paramters have the value '1'.
    Interstingly the workflow triggers when the value is set to '2' or '3'.
    Thanks,
    Ameekar

    Thanks Aman,
    I checked field restrictions but there are none there. Actually i checked them for other object 'AOOMARA' which is being thrown as an exception when i am creating the PR through MRP run.
    Exception says -> field not maintained.
    So i guess, i need to maintain the field for Change Document but i am not sure how. COuld you please aid me with that.
    Thanks A lot !!

  • Create Consignment PR through MRP run

    Hi,
    How to create Consignment PR through MRP run.
    Tx
    Uts

    Hi,
    In MRP2 View maintaint the Special procurement key as 10 --Consignment & Procurement type as 'F'
    Then maintain the Info record with net price & Taxcode for that material.
    Then if you run the MRP in MD02 system will create Consignment PR for that material.
    rgds
    Chidanand

  • Auto Email Throgh SAP After Creating Schedule Line Through MRP Run

    Hello experts,
    is it possible to have email generation when scheduling lines are created through MRP run ? if yes kindly let me know the procedure.
    Regards,
    Durgesh

    Hello Raghavendra,
    For same requirement i did what you suggested but Can you please guide us what Business object needs to be used as start event for WF3100020 which we are activating. Because We are not able to activate the standard workflow.
    It will be better if you help us with steps.
    Thanks in advance.
    Regards,
    Yuvraj

  • Sub Con PO through MRP Run

    good morning all,
         we are in buisness with Projects and do the MRP on project based.
    i have a query.
    all of you know that if Purchase order comes through MRP then it shows account assignment catagory and G/L account number. when we run mrp system creates SUB con Pr and with that POs are get create. that time system shows account assignment catagory Q ( as MRP is on Project base) & item catagory L. But G/L account number shows is stck of semi finished goods. Is it right ?
         generally when we create manually sub con po with no account assignment catagory that time all the values are automatically get captured in sub con G/L account.
    so now i want to change this settings for the Sub Con POs through MRP. please help me how to change this & while changing what effect should i check.

    Slng,
    Please check with your FI consultant.
    They should be able to default the G/L account from thier side for the account assignment catagory Q & item catagory L.
    thanks,
    Ram

  • Clubbing of PR through MRP run for same group items

    Presently PR's are generated under MRP for single line item. we required consolidation of the PR material group wise. is it possible? if yes, how? kindly suggest.

    Dear praneetsadekar ,
    If my understanding is correct then during MRP run it 's not possible to create single Purchase Req.for a list of materials that fall
    under same material group.
    check and revert back.
    Regards
    Mangalraj.S

  • Plannning Material and Plant for MRP Run

    Hi,
    If I have a material (01) extended on 2 plants, on one plant (A) we have production and planning/MRP + stock and on the other one (B), just stocking and transfer. B's requirements are to be entered and planned at A. I also want stock at B to be considered with stock at A when MRP runs at A. In the material master, I have some settings. I want to know if these would be any good:
    Material 01 on Plant A:
    MRP PD
    Strategy 40
    Lot size EX
    Coverage profile applied
    Material 01 on Plant B:
    MRP ND/PD tried both
    Strategy 40
    Lot size EX
    Coverage profile applied (same)
    Planning material: Material 01 itself
    Planning plant: Plant A
    I particularly want to know about points 5 and 6. Will they make any difference if I run MRP on scope of planning(all plants) or just plant A? Will stock at B be considered? What difference does that setting make in my case? Please help!
    Thanks!

    No sales on Plant A. Only transfers and STO's. Stock is STO'd to Plant B (and other Plants, as well)
    Plant B sells the stock.
    Yes, I want to load the forecast in Plant A (COPA to SOP to DM to MRP). What do I do in this case?
    I tried another case, as well. In that I put a special procurement on the material in Plant B view and marked it as external procurement. (the planning material and plant were there, didn't remove)
    Then I entered the forecast in both plants separately (PIRs for both Plants) The requirements from Plant B made STPO Planned orders in Plant B and STCK Planned orders in Plant A. I am using coverage profiles (period is month, standard length 25 days, target 10 days for 1st period for 2 months, target 10 days for 2nd period  for 1 month, target 10 days for the rest of the horizon) Not using any consumption modes.
    The results I am getting don't make sense to me. I have attached screen shots for both plants MD04 and the MRP + work scheduling views

  • Create Material through MRP run

    Hey Sap Gurus,
    Could any one help me out how i can create material through running MRP to customer independent requirement and create purchase requisition.
    what r the steps to do this
    Thanks in advance
    Edie

    Hi,
    you cannot create material master using MRP. MRP is nothing but reqirement planning in this you will be able to create planned order and Pur req and also schedule lines if you have already SA.
    for this you need to configure MRP in SPRO and some master data like material master, source list, planned order are usually created when the material is defined as in house production in Material master and if the material is defined for external procurement the system will create pur  req or schedule lines depending on your cutomizing.
    Regards
    Vikrama

  • Linkage of Sales Order with OPM Batch automatically through MRP run

    Hi Friends,
    Can anyone please suggest me of how the Linkage of Sales Order with OPM Batch can be created automatically after running OPM MRP.
    Thanks in advance.
    Thanks & Regards,
    Bharathram N.

    Dear Friend,
    Thanks for your update.
    I had the set ups already which you have specified. But I dont see in the action messages screen any sales order number for each action.
    My requirement is following..
    1. I will enter SO for an item called A.
    2. Run MRP.
    3. From Action Message Summary, I will release production batch.
    4. Now the batch been created should have the sales order number from which it came originally.
    Hence to achieve above, I need SO with MRP Link action message(backend or front end)..
    Hope the above scenario is clear to you..Plz let me know your thoughts..
    Thanks & Regards,
    Bharathram N.

  • Schedule lines not generated after MRP run

    Dear All,
    I am trying to create Schedule lines through MRP run , but instead system creates MRP element PRqRel  and its PurRqs when i check in MD04 ,  the following are the prerequisite i done before MRP run , but still Schedule lines are not generating.
    1.activated checkbox source list in material master.,Procurement type is F, MRP type PD , lot size MB , marked JIT  Scheduling indicator as 1 in Pur view of material master , no MRP group is used in our process.
    2.Maintained Inforecord.
    3.Maintained source list for the material and marked MRP relevant as 2. Validity also checked.
    4. Quota arrangement for this vendor only.
    5. Created New scheduling agreement.
    6. Material is not sent for subcontracting.
    7. Ran  MD02 with following parameters ,
    Processing key NETCH Net Change in Total Horizon
    Create purchase req. 1 Purchase requisitions in opening period
    Delivery schedules 3 Schedule lines
    Create MRP list 1 MRP list
    Planning mode 3 Adapt planning data (normal mode)
    Please let me know if i am missing something
    Thanks in Advance
    Benny

    Hi,
    Please check the below links...
    Schedule Lines not getting created in MRP
    Schedule Lines not generated for MRP Type PD
    Kuber

  • Scheduled MRP run.

    we are running MRP as a batch job every day. my clientss requirement is to know all the purchase requisitions and planned orders generated against that particular MRP rup. is there any way to get this particular information.

    Hi
        For purchase requisition  check in the t-code  ME5A and for planned orders in CO41.  It also depends on your business process how you configure the MRP parameters I mean whether to generate the requistion or planned orders.
    Also you can check in the tables EBAN and PLAF with status indicator which shows whether they are generated manually or automatically through MRP run..
    Regards,
    Patil

Maybe you are looking for

  • Wrt54gs loses internet connection when using P2P Ares

    I have a wrt54gs v5 and I've installed the latest firmware and reset back to factory then reconfigured.  Whenever Ares is started all other computers (wired or wireless) lose their inet connection.  Within 2-5 minutes of stopping Ares everything star

  • Can I get the URL information in a Link?

    I am using Acrobat XI Professional and Word 2013 running under Windows 8. I want to create hyperlinks in my document using Word 2013. When Word 2013 generates a PDF version of the document, it reproduces the hyperlink save for the '#' symbol – it rep

  • In Keyword List panel, need to support quotes for AND'ing multi-word keyword searches

    As far as I know (and read around), there's no way to search multi-word keywords in the keywords list panel using the "Filter Keywords" box. i.e. If I want to search for the "Great Blue Heron" keyword in a large animal keywords list I have, Lightroom

  • My nokia C3-00 is not opening mails......

    Hello sir help me my nokia C3-00 is not open my mails..... Solved! Go to Solution.

  • Replacement for struts?

    Is there any other method that can replace structs? which is a better way for web application, java n struts or PhP? i am very new in IT field, so there are a lot to learn :) thank you