Preventing MRP for 541'd material
Hi all,
Sometimes we send expensive spare parts to other companies in case of emergency, and get them back when they have it in a few days.
When a material is sent to a vendor with 541 movement (Transfer posting unrestricted-use stock - stock of material provided
to vendor ), the MRP for that material should not create planned orders for that material. Because it is thousands of euros expensive and it will be back in stock in a few days.
After automatic MRP run, planned orders are checked in MD15 and these ones are removed from list for not to create purchasing requests for them.
What can be done to prevent MRP create planned orders for materials that a posted with 541 movement?
Thanks in advance,
Koray
Edited by: ktulumen on Dec 12, 2011 4:51 PM
Thanks for the reply.
In OVZ9 I have a table like this:
Av. Check - Descrp. - A. Check Rule - Checking rule
01 Daily requirements 01 Checking rule 01
01 Daily requirements 03 Checking rule 03
01 Daily requirements A SD order
01 Daily requirements AE SD order; make-to-order stock
01 Daily requirements AQ SD order; project stock
01 Daily requirements AV SD order; returnable packaging
01 Daily requirements AW SD order; consignment
01 Daily requirements B SD delivery
01 Daily requirements BE SD delivery; make-to-order stock
01 Daily requirements BQ SD delivery; project stock
01 Daily requirements BV SD delivery; returnable packaging
01 Daily requirements BW SD delivery; consignment
01 Daily requirements PM Checking rule for plant maintenance
01 Daily requirements PP PP checking rule
01 Daily requirements PS PS Checking rule (project system)
01 Daily requirements RP Replenishment
01 Daily requirements RS Checking rule (SAP Retail Store)
01 Daily requirements SM Service checking rule
02 Individ.requirements 01 Checking rule 01
02 Individ.requirements 03 Checking rule 03
02 Individ.requirements A SD order
02 Individ.requirements AE SD order; make-to-order stock
02 Individ.requirements AQ SD order; project stock
02 Individ.requirements AV SD order; returnable packaging
02 Individ.requirements AW SD order; consignment
02 Individ.requirements B SD delivery
02 Individ.requirements BE SD delivery; make-to-order stock
What line should I enter to enable stock at subcontarctor available?
"Availability check" value for those materials are "02".
Thanks.
Similar Messages
-
MD03- Run MRP for all the material
Hi Expers,
How to run the MRP for all the material in the Plant.In Transaction MD03 we can have the option for entering the only one material at one time.If we have 10000 material then do we have to run the MRP for 10000 time?
Kindly guide me....
Regards,
Devi.MDBT transaction is used to for background MRP Run
Click the below link for more details on how to proceed further.
http://www.sap-img.com/pp019.htm
Scheduling Background Jobs for MRP
Transaction code : MDBT
click Create Variant button (specified a variant name and click continue).
Then fill in the following fields :-
Scope of Planning : Optional (refer to Note if you want to specify a plant grouping)
Plant : Your company Plant
Processing Key : NETCH
Create PUrchase Req. : 1
Schedule lines : 1
Create MRP lists : 1
Planning mode : 1
Scheduling : 1
Planning date : default date
Click the Back button and you will be prompt Save Values.
Type in a Description and click the Save button.
After creating the variant, park your cursor at the variant and click the Schedule job button.
Fill in the Date and Time value.
Click Schedule periodically and you are prompt to choose the period.
Click the Create button and you are done.
To check, you can click the Show Scheduling button.
Note :
Define Scope of Planning for Total Planning in 'OM0E'.
1. Choose New entries.
2. Enter a key and a description for the scope of planning that you would like to define. Save your entries.
3. Select the scope of planning and choose Sequence of plants/MRP areas.
4. Choose new entries and enter the plants or the MRP areas in the sequence in which they are to be planned.
The counter determines the sequence.
5. Save your entries.
Hope this helps.
Regards
Dipak -
Running MRP for finised product material
i have a material BOM (finished product material and it consist of some raw material) those materials have MRP
when i run MRP for this BOM i want to generate PR for the raw materials and a production order for the finised product material
Please i want all the steps for these senarioNehad,
You need to create PIR(Demand) for the finshed product for the MRP to trigger Planned order for the Finished product and Dependent requirments/PR for the Raw materials.
1. Use transaction MD61 to enter demand for the finished product with respect to the plant and requirement type "LSF" if it was strategy "10" or "BSF" for strategy "11". You can check the planning strategy used for the finished product using transaction "MM03" in the MRP3 view... if no strategy is assigned you can still use "LSF" requirement type.
2. Now run MRP using "MD02", you should get planned order for the finished materail and PR for raw material. Please note the MRP type for both the materails should be "PD" you can check this in "MM03" - MRP1 view of the materails.
Regards,
Prasobh -
BOM explosion in MRP for non-stock material
Dear friends,
I have a non-stock(bom item category 'N') service material setup as a component in my production BOM, which during MRP run, should create a Planned order or Purchase requisition for that non-stock component. But, when I run MRP for the top-level material, it doesn't create any requirement for that service material, while all other stock material(Bom item category L), it generated dependant requirements.
Appreciate your help.
Thanks
SuriDear Suri,,
Please go through this.
<b><u>Non-Stock Items</u></b> Use this item category if you want to enter a
material that is not kept in stock before use, and that is only procured for a
specific planned order or production order.
The material is only rarely required for a custom-made product and is used
directly in the product as a purchased part.
<u><b>Before you start</b></u>
You can enter a non-stock item either with or without a material master. If you
enter a non-stock item without a material master, you must enter a description.
For non-stock items, you have to maintain purchasing data in the bill of material.
You enter the following materials as non-stock items because the quantities are
not updated in the material master record:
o Materials with a material type that supports configuration
o Pipeline materials, which can be taken from a pipeline at any time
<u><b>
Special functions</b></u>
The following functions are supported for non-stock items
You maintain purchasing data for non-stock items in the bill of material.
In the planning run, the system generates purchase requisitions
instead of dependent requirements for components that are procured directly.
When you configure your R/3 System for MRP, you can define whether direct
procurement is triggered by the planning run or by production order management.
Product costing processes take valuation data from the BOM item.
The system determines the release strategy on the basis of the price data you
enter. The material group is required to produce a purchase requisition.
Regards
Mangal -
Purchase requisition after MRP for Semifinished & raw material
Hello Gurus,
Please guide me in following scenario :
FERT - X ---> HALB (subcontracting) - Y ---> ROH - Z
Requirement : X - 1000 , Y - 1000 & Z - 1000
In this case, when I will take the MRP for X ,then MRP will generate PR for Y & Z.
But in my case, client purchase the Z & sell it to vendor & then vendor will sell the Y to my client. He wants the requirement of Y & Z both after MRP run of X .
FERT - X ---> HALB (Purchase) - Y ---> ROH - Z
What can I do to map this in SAP?
Thanks & Regards,
SagarHi Sagar,
It can also be maped in following way. Please take your MM and FI Consultant with you.
It could be map in following way:
Create BoM for Z (FG) and add Y (SFG) & X (RM). Keep the procurement type for both as F. Use special procurement key as 30 for Y (SFG). Mark NOT RELEVANT TO COSTING indicator for X in BoM. Maintain MRP type = ND for X (RM).
Now when you run MRP system will only create Dependant requirement for X (RM) and it will check stock of Y (SFG) as well. If stock of Y (SFG) is not available, Subcontracting PR will be generated for Y (SFG).
MRP will not be accurate for X (RM) since it has got dependancy on Y (SFG) which is going to be subcontracted from some Vendor. You can look for Re-order point planning or you can adopt the way suggested by Satish or you can make a new Infostructure in MM which will be updated for consumption movements for X (RM) which later can be used to make its PR directly to Vendor.
Regards,
Shoyeb -
MRP Run with User Exit key for Follow up material
Dear Gurus,
I want to run MRP only for followup materials by using User exit key. For example i have a material X(with discontinued Indicator as 1) and it's follow material is Y.
So we have a user exit key as ZFL, with coding as shown below. Now when i run MD01 with user exit key ZFL and parametre as 1, it only runs MRP for material X and not for material Y. What else we need to do so that when i run MD01 with user exit key ZFL, it shoudl consider both X and Y.
WHEN 'ZFL'.
DATA : BEGIN OF ITAB5 OCCURS 0,
KZAUS LIKE MT61D-KZAUS,
END OF ITAB5.
TRANSLATE USER_PAR TO UPPER CASE.
SPLIT USER_PAR AT ',' INTO TABLE ITAB5.
IF ITAB5[] IS INITIAL.
EXIT.
ENDIF.
CLEAR: NO_PLANNING, STOP_PLANNING.
READ TABLE ITAB5 WITH KEY KZAUS = MT61D-KZAUS.
IF SY-SUBRC <> 0.
NO_PLANNING = 'X'.
ENDIF.Hi Kumar,
You can use either MRP Type, MRP Controller, MRP Group in this user exit to control the MRP run. For these set of Materials you have to assign any of same value or at least differentiate these material from other material. Then only you can control the MRP by using this user exit even though if you use different MRP Group and MRP Controller. In User Exit, you may have to add your dependent material's MRP Group/MRP Controller. Make sure that these set of materials are different than all other materials.
If you don't have any plan to run MRP for other materials then as per Ajit suggestion you make that material's MRP type as "ND". But, in your business case they may want to activate the MRP for all the material not now but may be latter.
Thanks -
MRP for FG not looking at Raw Material
HI all,
I'm running MRP for finished goods material against my production plan (created in MD61). The material has a BOM component but when I run MRP for the FG its not looking at BOM component to consider raw material) availability and thus proposing dates solely based on the Production Plan and not any other requirements.
It simple creates the planned orders based on the production plan entered into MD61. The dates for the planned orders don't take into consideration that on the suggested Production date there is not enough raw material to actual produce the product.
The Production plan does drive requirements to purchase the raw material but the dates are not neccessarily correct to get product to the warehouse on time for production run.
FG set up:
RP Type: PD - MRP
Lot Size: EX u2013 Lot-for-lot Order Quantity
Safety Stock: 125 - EA
Availability Check: 02 u2013 Individual Requirements
Procurement Type: E - In-House Production
In-house Production: 1 - days
Planning Strategy: 10 u2013 Make-to-stock production
BOM / Raw Material set up:
RP Type: PD - MRP
Lot Size: EX u2013 Lot-for-lot Order Quantity
Availability Check: 02 u2013 Individual Requirements
Procurement Type: F - External Purchased
Pland Del Time: 3 - days
GR Process time 1 - days
Planning Strategy: 40 u2013 Planning with Final Assembly
How do I get the MRP for the FG to not only create the planned orders from the production plan but also take into consideration raw material availability? Thanks for your help!!VC,
I need to the PlndOrd date for FG to take into consideration raw material availability...otherwise it's pretty useless to the site.
I guess you are unfamiliar with the workings of standard MRP. MRP in ECC as delivered by SAP will not support this requirement.
There are a couple of assemble to order strategies that may be suitable for you, if all of your RM materials exist in the FGs BOM. Strat 81 and 82, which are intimately linked to the Sales order ATP check. These strategies are not compatible with FGs forecasts.
http://help.sap.com/erp2005_ehp_06/helpdata/EN/41/19206a45fd11d188ff0000e8322f96/frameset.htm
In SAP ERP, MRP just does not check the availability of components during the MRP run. The Net Requirements calculation of a component part (which is the closest concept within MRP to an Availability check) takes place ONLY after all parent parts are completely planned, and all parent part planned orders have been already been generated and saved. In effect, when MRP is running, information is neither gathered nor considered as to what the planning situation will be for the components.
APO has several solutions that, depending upon the detailed requirements, might provide a solution. A common one is to first run an MRP type heuristic, to create planned orders for all the shortages, and subsequently run a 'Bottom-up' scheduling heuristic to bring supply and demand dates into alignment, based upon pegging information. ERP does not have this functionality.
Of course, SAP ERP is infinitely modifiable. If you have enough time and money, you can write custom code that will torture ERP into filling any Business Requirement.
Best Regards & Good Luck,
DB49 -
How to create MRP for material?
Hello guys ,
I want to create the MRP for my FTRM material?
Thanks in advance.Hi,
This is purely PP Configurations, Pls refer below link
http://www.sap-img.com/sap-pp.htm
http://www.sap-basis-abap.com/sappp01.htm
Regards,
Sankaran -
Is it possible to run MRP for one material number and take into account inventory and orders that exist for a different material number?
We have some parts that can be rebuilt (e.g. material abc123). We're considering creating a new material number for the rebuilt version of the part (e.g. abc123R). We want to run MRP for the abc123 material, and recognize the inventory and orders for both materials.
Thanks in advance for your help.
Regards,
DennisHi Dennis,
It is not posible to do as you want, because there is only one number material by physical part... you can not assing two number material by physical part...
Best Regards, -
Purchase Order is generated after MRP for Material with MRP Type ND
Hi Everyone,
Material type := HAWA
My material procurement type = F i.e. External Procurement.
MRP Type = ND in Production server , and VB in Quality
Lot Size = EX
Material Status :- 15 Pre-release both for Quality and production server
The Material is bulk material and bulk material indicator is set.
Purchasing View is also maintained for the same.
Planning Strat = Z5 Company specific
Special procurement key:- Z7 Company specific
I am running MD02 with following parameters.
Create Pur Req =1, PR
Create MRP List = 1, MRP List
Delivery Schedule = 3, Schedule Lines
Planning Mode = 2 Re- Explode BOM & Routing
Scheduling = 1
Issue:
After MRP run, system is generating PR, Though with MRP type ND purchase requisition should not be generated.
Observation:- Looks like there is inconsistency of material date in Quality and production server.
When I tried to run the planning , The Error message was generated"Material status is set to pre- release.
After changing the material status to 20 (Active ) , when we run the MRP , The error message is generated "Material is not planned automatically "
We havent been able to locate the root cause so far
Please guide us
Thanks in Advance,
Ayaz
Edited by: Ayaz Alam Khan on Feb 16, 2011 2:41 PMIF the material is ND, system won't Run MRP for the material
Observation:- Looks like there is inconsistency of material date in Quality and production server.
There is no link
When I tried to run the planning , The Error message was generated"Material status is set to pre- release.After changing the material status to 20 (Active ) , when we run the MRP , The error message is generated "Material is not planned automatically "
system will read the X plant material status or plant specific material status first and then only system will read MRP type -
Excise Invoice Tab is not displaying in MIGO Display for 541 material docs.
Dear All,
Excise Invoice Tab is not getting displayed in MIGO Display for 541(Transfer posting to Vendor) material documents.
I did tranfer posting of some raw materials to the Vendor in MB1B with the movement type 541
and after that i have created a Subcontracting Challan with the reference of the above created transfer posting
material document.
Now i need the Sub contracting challan number to be displayed in the Excise Tab of the transfer posting material document.
But if i display the Transfer posting material document in MIGO, the Excise Tab is not getting displayed.
Kindly help on this so that i can view the Sub contracting challan number in the display of the respective Trasfer posting material document in MIGO.
Thanks & Regards.Pls confirm if you are following the SC process sequence :
u2022 Creation of Subcontracting PO, here in conditions tab maintain the price (Subcontracting charge) (ME21N)
u2022 Transfer Posting of Components to Subcontractor ( Movmt Type - 541) (MB1B/ME2O/MIGO)
u2022 Creation of Subcontracting Challan w.r.t. Transfer Posting Doc (J1IF01) - This challan will have the details normally company needs, in case client need more ... ABAPer have to develop customized smart form
u2022 Goods Receipt w.r.t. Subcontracting PO and Refer Subcontracting Challan at the time of GR (MIGO) {GR with 101 and auto consumption of components with 543 movement}
u2022 Reconciliation of Subcontracting Challan (J1IFQ)
u2022 Completion of Subcontracting Challan (J1IF13)
u2022 Generation of Annexure IV (J1IFR -
How to Prevent/Control doing MIGO twice for the same material
Dear
The stores clerk by mistake has done MIGO twice for the same material. Is there any way to prevent/check the same in standard SAP? Vendor does not send the invoice/delivery challan to stores directly. Invoice is sent to Finance Department.
RegardsIt is very unlikely that you could spec an ABAP solution to this problem.
You may be able to spec an exit that would prevent GR being carried out for a PO Item twice on the same day. But that is not infallible, as there may be valid circumstances when you would need to carry out two GR's for a PO item on the same day. A fix for a small problem that creates a large one is not a good fix.
You also need to ask how big this problem really is - if a user duplicates a goods receipt every once in a long while then you probably do not have a serious problem.
Rather than look at a system fix for the error, I would suggest that you look at what you can do to improve the physical process. -
MRP is not considering material availability dates for sorting customer ord
Hello Experts,
MRP is not considering material availability dates for sorting customer order/ sales order in sequence (thatu2019s is oldest from newest in order) in MD04.
Please suggest.
Thanks,
OmOm,
No. Aside from my obvious desire to preserve my privacy, it would be a disservice to the other forum members. No-one else but you and I would understand your problem, and no-one else but you would be able to benefit from any solutions.
There are dozens of free public portals suitable for posting pictures on the internet. I suggest that you use one.
Best Regards,
DB49 -
How to run MRP for Bulk Material without using LTP
Hi, how can I run MRP for BULK material without using LTP.
Thanks in advance
BKHi,
Use trasnsaction code OPPQ and goto BOM Explosion and selection depends on
Field selected
No dependent requirements are created for informational purposes for bulk material items in the plant selected. This can improve system performance.
Field not selected
Dependent requirements are created for bulk material items in the plant selected. These dependent requirements are displayed in the planned order for informational purposes only. They are not considered in the net requirements calculation; that is, they are not included in material requirements planning (MRP) and are not displayed in the stock/requirements list
Reg,
Deepak.
Edited by: deepak k b on Nov 11, 2008 6:56 AM -
i want to run mrp for specific material (not for all the plant materials) in background in scheduled intervals............what can i do?
Dear,
You need to go for enhancement M61X0001 with function al modules EXIT_SAPLM61C_001 and EXIT_SAPMM61X_001
Please refer my reply from this link,
[MRP run for Specific Material|Re: Excluding materials from mrp run]
Regards,
R.Brahmankar
Maybe you are looking for
-
Firefox update and none of my plug-ins were working till I went and changed them from Ask to Activate to Always Activate. This Adobe Acrobat NPAPI Plug-in says it needs to be updated but when I try it does not update. It returns to the same need to u
-
E71: Key Shortcuts -- OPERATOR LIVE
Menu - Tools - Settings - General - Personalization - Home Screen - Key Shortcuts on my phone is set thus: Left selection key: Menu; Right selection key: Operator Live. What is Operator Live, and do I need it? Thanks! Newbie E71user (Model RM-346, P
-
One BW - One R/3 Development - Multiple R/3 Productive Systems
Dear experts, we are at the moment having a classical 3-tier system environment. 1) R/3 Development --> BW Development 2) R/3 Consolidation --> BW Consolidation 3) R/3 Production --> BW Production Due to increased system load on R/3 Production it is
-
Flash, Servlets & MySQL: Collecting variables
Hi, I have developed a Java Servlet that recieves variables from a Flash file. THe problem is the encoding, i need a way to either convert into the correct encoding for populating into a MySQL db or to extravt the value from the request. Sample code
-
Responsibilities of ABAPer in a Implimentaion project - Reg...
Hello Masters, Could any one write the responsibilites of the abaper in a implimentaion project as well as support project. Thanks in advance. Regards Yubi