Price Change at the time of confirmation of PP order
Dear Sir,
When Production Order is being confirmed (T Code COR6), the
price of the BOM material (Finished Goods with standatd price)is getting
changed. PR document type FI document is created and UMB key
is getting the hit with a very minimum amount. (0.01 Indian Rupees) . This is not happening regularly. But suddenly in one confirmation it is happening. The process order are created in
the system for 1 month say Start Date 01.01.2009 End Date
31.01.2009
This is happeing when confirmation is made in first day of next month
for previous month i.e. for process order of January 2009 (Start
Date 01.01.2009 End Date 31.01.2009 ) confirmation is made on the
01.02.2009. Document date is 01.02.2009, posting date is
31.01.2009.
The PR (Price Change) docuement is getting generated on 01.02.2009 with posting date on 01.02.2009.
At the mont end there is no manual Price Change thru MR21 transaction.
Regards,
Partha Pratim Bhar
Plz try with userexit
Customer specific enhancements when saving- CONFPP06
Confirmations: Actual Data Transfer - CONFPP07
Similar Messages
-
Automatic Price Change at the time of Confirmation of PP order
Dear Sir,
When Production Order is being confirmed (T Code COR6), the
price of the BOM material (Finished Goods with standatd price)is getting
changed. PR document type FI document is created and UMB key
is getting the hit with a very minimum amount. (0.01 Indian Rupees) . This is not happening regularly. But suddenly in one confirmation it is happening. The process order are created in
the system for 1 month say Start Date 01.01.2009 End Date
31.01.2009
This is happeing when confirmation is made in first day of next month
for previous month i.e. for process order of January 2009 (Start
Date 01.01.2009 End Date 31.01.2009 ) confirmation is made on the
01.02.2009. Document date is 01.02.2009, posting date is
31.01.2009.
The PR (Price Change) docuement is getting generated on 01.02.2009 with posting date on 01.02.2009.
At the mont end there is no manual Price Change thru MR21 transaction.
Regards,
Partha Pratim BharHi,
You need to check that material Standard Cost estimation has run or not for the next period. Normally Standard cost run can be run every period or once in 3 periods or once in a year. Based on this the standard cost estimate will update the material prices in the costing 2 view if any changes in the existing price. May be his could be the reason you may face the problem.
Regards,
V. Suresh -
Price change at the time of service entry
Dear all,
Please help me out to find how to change the price of service item at the time of service entry sheet. I am working on 4.6C and getting the price field not editable after accepting the items from the PO.
Please respond with the prrocess how to change the prize at service entry level. also plz let me if any config is there.
sachinHi,
Only if the price change indicator is set in the PO service item, the gross price
would be editable in the service entry sheets. Please check in ML90 the setting of the required field selection keys to it.
Please be informed that in case you use an unplanned scenario - with contract limits in the PO and selecting the services from the contract in ML81N - the indicator for allowing the price change in the SES must be selected on the limit tab in the PO item and also in the contract to the single service items. However you can not treat the contract service items separately - for example to get in one item the price changeable in another one not, this is unfortunately not possible ...
Regards,
Edit -
Alternative items to be selected at the time of confirmation
I maintain alternative items by using alt group in the bom.But while confirmation of parent material,the material which has the first priority is coming.but if i want to choose different material then what should i do?
first thing:
I dont want to touch bom as user dont have authorization for the same.
second thing:
can it is possible alt materials will be selected on the basis of stock avl in sto locI know that on the basis of priority ,i can select the required component for confirmation but please tell me how i can select material on the basis of stock available.because suppose in bom i maintained 110022 material as first prioriry and i want to select 110023 at the time of confirmation .
I know user can change the component 110022 to 110023 on confirmation screen manually .
also if we dont want user to change this manually .
Is there any solution that all alt items will appear on the screen and user can choose as per requirement. -
Goods receipt is automatically created at the time of confirming the transf
Hi,
we are following the confirmation control key inbound delivery process.
I am making an inbound delivery with refernce to the purchase order.
then i am making a putaway against the inbound delivery through LT0F and creating a transfer order against the inbound delivery.
Then i am confirming the transfer order through LT12, when i am confirming the transfer order the goods receipt is automatically created without manuallyy doing a PGR in inbound delivery.
Can any one let meknow how to avoid the creation of the auto GR at the time of confirming the putaway TO
SunilHi,
In LT0F check in the initial screen -->control data -->weather the adopt put away quantity field value is 4. If it is 4 then the GR will be posted automatically.
Regards,
Bharat. -
Goods receipt at the time of confirmation
Dear all,
At the time of confirmation only i want to do goods receipt in the goods movement screen. So please suggest me the configuration setting by which i can do GR at the time of order confirmation.
Thanks,
Aravind.Hi,
As others have mentioned, auto GR can be done in the below listed manner:
1. Maintain control key with auto GR. If you want only auto GR in last operation then create a new control key for which only auto GR is checked in SPRO T. Code: OP00
2. If you want auto GR only for few order types then for the respective order type create a production scheduling profile and assign that order type in production scheduling profile and in work scheduling view of material master maintain this production scheduling profile with auto GR checked in SPRO t. Code: OPKP.
Hope it will help you.
Regards,
Alok Tiwari -
Host name is changing all the time
Hi
The host name of my Mac is changing all the time
I recently bought a new camera and connected it
this may be the problem?
What should I do?There are several possible causes for this problem.
1. You have two simultaneous connections to the same local network: probably Ethernet and Wi-Fi. If applicable, disconnect the Ethernet cable or turn off Wi-Fi.
2. A Mac wakes from sleep due to network traffic. This is due to a bug in OS X that may only affect some models.
3. A device that gets its network address from the router wakes from sleep, and the address it was using before has been assigned to another device.
4. A third-party wireless router has incompatible settings or firmware. In that case, refer to the manufacturer or ISP for support. Restarting the router may help, temporarily.
5. See also this support article.
Rename the computer in the Sharing preference pane. -
Alternative item selection at the time of confirmation.
Hi, please suggest how to maintain alternative items and also how to choose alt items at the time of confirmation of specific material.
Hi,
Alternative item has to be maintained in respective BOMs.
Give the same item no in the BOM for the alternates.
Double click on one of the alternate item, the header data for the item will appear.
In the basic data Tab, enter the ALTITEM GRP value it can be any number or character.
CLick on the arrow button that will appear after entering the alternate item.
Give the Priority, Strategy & usage probability. BAsed on these values the alternate item is selected during BOM explosion.
The alternate item group value should be same for both the alternate items.
For further details refer
[Alternate Item|http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d2ba044af11d182b40000e829fbfe/frameset.htm] -
At the time of confirmation Costs are loaded to Production order
Dear All,
At the time of confirmation of the Production orders the costs are not
debited/loaded to the Production order. They are not
credited to the cost centers although all the necessay master data (Work
centers, Cost centers, cost rates ) is there in SAP.
Please help me..
Regards
janardhan>
Janardhan CH wrote:
> Dear All,
>
> At the time of confirmation of the Production orders the costs are not
> debited/loaded to the Production order. They are not
> credited to the cost centers although all the necessay master data (Work
> centers, Cost centers, cost rates ) is there in SAP.
>
> Please help me..
> Regards
> janardhan
Janardhan,
1. Check whether the operation is assigned with Costing Relevancy Indicator and has a control key relevant for costing.
2. Check whether in the routing the activity type is seen and it has some standard values maintained.
Regards,
Prasobh -
Help menu options change all the time - repair install always shows
After installing Acrobat X, I noticed the Help menu options change all the time. The repair install option is always present and sometimes the deactivate option is present but grreyed-out, somtimes it is enabled and most of the time it doesn't even show up. I have the full version purchased from a major online retailer.
I should add the following: The Sound control panel will not even let me click on the "Show volume in Menu Bar" check box.
I just now installed the latest Brother control panel (Leopard compatible) and it DOES appear in the menu bar. -
Help help please... I'm running Photoshop CS, on a Windows XP machine. After re-booting the machine after an unexpected power failure I have been told that the "Configuration appears to have changed since the time this product was activated. To continue using this product I must re-activate it". BUT the activation link informs me that they no longer support the product (neither online nor telephonically). So how can I re-activate this software?
Hello Helios & Eb29075,
+1. Please check log file for error message.+
+2. Check status of EM.+
+3. Please see:+
+How To Drop, Create And Recreate DB Control In A 10g Database [ID 278100.1]+
+Problem - emctl start dbconsole Fails with Error OC4J Configuration issue OC4J_DBConsole__ not found [ID 555218.1]).+
As you said above, yes, I did find OC4J config issue & EM Config issue and resolved them. But still I couldn't get my DBConsole started.
Yes, I was able to drop DBConsole<sid> service using 'emca' repository drop. But, when I started recreating repository for DBConsole service, I wasn't able to do it. I tried several times but in vain.
Thanks,
A.P. -
Issue at the time of creation of transfer order for inbound delivery
Hello,
I am facing one issue at the time of creation of transfer order for inbound delivery.
If I create inbound delivery for purchase order with account assignment as 'M' (Ind. cust. w/o KD-CO), inbound delivery is not updated. Also document flow for inbounde delivery s not updated. I can create N number of transfer orders for on inbound delivery. Need help to resolve issue.
If I create inbound delivery for purchase order with account assignment other than 'M' (Ind. cust. w/o KD-CO), inbound delivery and document flow is updated.
Thanks and Regards,
NikhilHi
In OMS2 t-code
for your material type and plant ,you have to mark value based and qunaity based updation mark
Regards
kailas Ugale -
Different batch no in prod order at the time of creation of prod order
Hi, we need different batch numbers in production order at the time of creation of production order. tried in system, i can able to create only one batch no at the time of creation of order. we need different batch no at the time of order creation and same no should be assigned at the time of GR from prod order. pls advise how to map this.
Dear,
Use the Exit EXIT_SAPLCOBT_001 under enhancement PPCO0001 where-in based on your requirement you can create batch for your order. You can use CALL FUNCTION 'VB_CREATE_BATCH' to create the batches as per your requirement.
Also make sure the automatic batch creation setting in Prodn Scheduling profile has been turned-off so that the batch is created only through the user-exit.
Refer this thread,
Re: Batch creation
Please try and revert back.
Regards,
R.Brahmankar -
Auto batch determination at the time of picking by transfer order
Hello,
Our problem is, at the time of creation of transfer order with reference to delivery, system can not pick up the batches automatically as per the SLED. We have to manually enter the batches as per the SLED. Could you please guide me step by step procedure of automatic batch determination as per SLED at the time of creation of transfer order with reference to out bound delivery? (Please state step by step procedure of automatic batch determination as per the SLED at the time of picking with transfer order)
Thanks
MilindHi,
As for remaining shelf life please check OSS note 33396, 72771. Additonally this may also help:
http://www.renet-web.net/2008/09/05/sap-batch-determination-made-easy/comment-page-1/
As for sorting according to SLED date please read OSS note 769036.
Regards,
Csaba -
Recording of temperature, power and speed at the time of confirmation
Hi experts,
My client requires to record the temperature,power and speed of the equipment while doing the phase wise confirmation. I'm planning to put inspection characteristics for the operations. I'm not going to use PI sheet.
Is this inspection characteristics assignment to record the parameters is correct?
Any other option to do this apart from PI sheet.
Anybody help me.
NarenDear ,
It will be better to capature those parametres as Inspection Characterstic before confirmation posting .
However , if you want to capture as activity through certail formula key and activity price , then you can identify them as Satndard Values as like Labour , Machine and Setup .
Go-to : OP7B "Parameters Overview"
Define your requirements Eg. For Power u2013 say ZELECT like that
(Short Key work/Keyword u2013 Electricity, Dimension " Energy", Std. Value Unit u2013 KWH)
Then Go-to : OP19 " Standard Value Key Formula : Overview "
Select SAP1 u2013 Normal Production and Copy as (F6) and Create new Activity Type Say eg. ZELE
Then Assign this new Parameter ZELECT and save (handle the transport request)
For Formula Definition :
Go-to : OP54 "Formula Definition"
Select SAP002 u2013 Prod.: Machine Time and Copy as (F6) and Create ur new Formula Say Eg. ZELECT
And replace SAP_02 with your Parameter u2013 ZELECT
Then itu2019ll look some thing like "ZELECT * SAP_09 / SAP_08 / SAP_11"
Assign The Standard Value Key " ZELE" to your Work Center-Basic Data Screen
Now Go-to Costing Tab Page assign your formula to your Predefined Activity Type for Power.
(Otherwise u2013 First Create Secondary Cost Element (T.Code KA06), Assign this Sec. Cost Element to your new Activity Type, then KP26 " Change Activity / Price Planning"
Assign Activity Type in Work Center Costing Tab & Assign Your Formula)
You can assign max. 6 Standard Values to your WC, I.e If you want to capture Power & Fuel Consumption for an Operation you can have both parameters set as per above procedure
Regards
JH
Maybe you are looking for
-
Reinstalling OS X on a blank hard drive. I've got some problems.
Hey all, So, I recently spilled some tea on my Macbook Pro. Long story short, took the hard drive out and installed it in a Windows Machine I was building because it was 1TB. Anyway, fast forward to when I get the keyboard replaced and everything wor
-
Stor.e TV not working (firmware needed if posible)
I recently bought a Store TV 1.5 tb and as it was not working for Ubuntu I formated it and made it fat 32. Now it's not working on my tv, when I plug it, in the background of the original menu appears but not the folders or any other option. If I pre
-
JUNIT: how to desgin this test so there would be one INSERT to db?
Hi there, How should I design this test: I would like to upload a files system and do INSERT to the db. once I have the info in the db I would like to READ it and check against some other files. so I have something like this: doInsert(); doRead(); te
-
Adding an S track for subtitles in the timeline
I have a Mac OS X 10.4 and am working with the Final Cut Pro 5 studio. I am trying to add subtitles and cannot figure out how to put in an S track that the manual says I need to have before I put in the text. Must I switch to DVD Studio Pro before I
-
Press Sync Button over and over!
I have a VZ Centro, most VersaMail 4.01 and am trying to use EAS push. Whenever Versamail is set to As Items Arrive, I get a message to Press the Sync Button. I press the sync, it goes through an initial sync (all items) and then a few minutes la