Problem in Assembly Processing in Project System

Hello All,
My Client want to implement Assembly Processing. We have configured the system as per SAP Standard. we are testing this in Quality System along with SD & PP Modules. we have template which contain Material WBS Process WBS & Other Cost WBS But we are getting all cost of material and process cost on one Material WBS after Production order confirmation. How can we divide this cost separately for Material & Process WBS.
As SAP Standard Process we maintained activities for different process also but when we tested this we are not clear about the use of these activities. We are not getting any cost or don't have any relation in any way for these activities.
Please Help me about this Assembly Process.
Thanks
Warm Regards
Sunil

1. Create a Inquiry in VA11 --OK
*2. Create Quaotation in VA21 wrf to Inquiry*--OK
3. Create a Sales order in VA01, while creating sales order, as soon as we assign the material component in SD line item a pop will come for entering std wbs, std ntw, network profile. once we enter this at bottom we can see that scheduling is carried out. Note: if we define material/std wbs/std ntw in CN08 then pop will not come. Now check for errors and save the sales order, at bottom we can see that project order is created. Note: Project number is same as sales order no:---OK
4. in Billing plan tab at item level we can see the milestones for new project.--In sales order i don't see any milestone or any type of setting. can you please tell me about this we are not able to execute milestone billing in our case.
Ans to Query: For Milestone billing to work you need to do the following settings in SAPSD
1.     Create Billing Plan in SD and assign the Billing Plan to Sales Document type you are using. Path: IMGSDBillingBilling Plan
2.     In the above node , do settings for Define Billing Plan Types, Define And Assign Date Categories, Maintain Date Proposals For Billing Plan Types, Assign Billing Plan Types To Sales Document Types, Assign Billing Plan Types To Item Categories.
By doing above settings you will get an additional tab u201CBilling Planu201D in Sales order where you can get the milestones generated for new project. For exiting project you can copy milestones to SD from project.
If you want Billing Plan at sales document item level, assign the billing plan type in Item category.
5. In Sales order we can see that billing lock is set against the milestones.---Not Found
Ans to Query: By doing the above settings as in slno 4, you can see the billing block against the milestone*6.Now open the project in Cj20n and go to network we can see sales order no with line item no.*---OK
7. Now verify the mile stones in the project.--Adding milestone but no effect in billing
*Ans to Query : you can see that milestone no in Sales order and Project will be same. Note: Subject to in your standard network you should have milestones, so that we you create a sales order new milestones will get generated wrt to milestones in Std network. So when project is created you can see mile stones are also created.*8 .check the requirement list in MD04 against the Finished product we can see that requirement is generated againt project wrt to sales order.---No requirement is displayed .
To generate the requirements. Check the settings in requirement class.
9. Run MRP in MDBT/MD02/MD01, based on procurement type in MM , PR's and Pld order will generated. Note: ALL PR's and PLD Orders are account assigned to WBS.---When we execute this MRP this is not picking requirement from project. BOM created by CS01. if we assign material to activity than this MRP is picking requirement from project.
10. Now do Pr>PO>GR>(ALL all accounted against project.--OK
11. Convert Pld order to Production order> release the order> Goods issues against production order.--OK
12. Confirm the Procution order wrt routing operation one by one in CO11N.--OK but we want sageregated cost for material cost and process cost to different WBS as we have material WBS and Process WBS.
Ans to Query: This is not possible because in Assembly order processing single account assignment is only possible for the finished products, and for that finished product routing is also account assigned to the WBS assigned to Production order. So operation cost comes and sits in same WBS. If at all you want to track separately you can  transfer the actual cost for process to process WBS in tcode:KB11N
Using KB11N tcode we can manual transfer cost from one WBS to another WBS.13. in cost element reports at projects we can see the cost breakup for all production activities as well as for material.--you mean CJI3 report 
*Ans to query: Yes you can see in CJI3 report or in SALR_870135452 report also_*14. settle the production order.----where to settle this production order? and how?
*Ans to Query: For assembly processing account assignment is u201CQu201D so automatically in production order we can see the settlement rule is set against the WBS. So the cost from production order is settled to WBS and subsequently from project to the respective receiver as per settlement rule in project.*
15. conform all activities in Project.----OK CN25 or CJ20N
In any of the above tcodes
16. Do billing in SD as when when mile stone reaches to post actual revenues.----OK
17. run RA in KKA2 and save the RA results--OK
18. Run settlement in CJ88 ---Not using any settlement
19. set the status of Project as Teco and Clsd.---OK
Please let me know if you need more clarifications
Regards
kishore
Edited by: Virendra Pal on Jun 1, 2011 11:53 AM
Please do not use bold and underline text message short cuts etc - in future your posts will be removed
Secondly all that you are mentioning is available in SAP Help or in the wiki

Similar Messages

  • Buget Exceed problem regarding material transfer in project system

    Hello Sir,
    I have a problem regarding budget in project system.
    when i do budget and release . and do any transaction
    with that budgeted wbs element in particular project.
    i get budget excced errors usally.
    however, budget remains more than exceeded buget.
    Let us touch with a example in brief, we have a buget for a L&T project 10 Lakh.
    Buget                                         Release                                          actual cost                                            total cost commitment
    10Lakh                                       10Lakh                                             8lakh                                                         1Lakh
    when i transfer a material from another project to this L&T project material worth is 50thousands.
    i get a errors for L&T project budget exceed with 40thousands.
    however in project budget remains 1Lakh remaining .
    why system shows errors for this material transfer worth rs 50thousands
    Please help me regarding this problem where is 1lakh budget
    with regards
    sanjay agrawal

    Hello sir,
    there is no any problem regarding budget supplement but if project sometimes
    remains 20lakh buget price remaining out of 50lakh.
    and need 1 lakh material price for transfer in project
    then why need to do budget supplement for 1 lakh if project
    remains 20lakh price rest.
    please guide me for above problems
    with regards
    sanjay agrawal

  • How can we explain the process from project system to final asset

    Dear masters,
    how can we explain from project system to final asset flow in the configuration level.
    thanks
    Moderator: Please, refer to basic SAP material

    Hi,
    Project & its related WBS will be initial cost collector (i.e invoices are booked against them). Once the status of Project/WBS is set to tech complet and AUC is assigned in the settlemnet rule. That particular asset record will recive values when we run the suttlemnets.
    This is an broad line view. Specific will depend on case to case.
    Thanks
    Vaibhav

  • Claim processing in Projects systems

    Hi,
    I am working on the external claim in PS and i want approval process to be defined the claims to get it processed in SAP.
    I want the aaprover to get the workflow based on the claim type.
    Has anybody worked on this?

    Hi,
    Please go through the below link for Processing Notifications using workflow.
    http://help.sap.com/saphelp_47x200/helpdata/en/bf/37503885c3bd03e10000009b38f8cf/frameset.htm
    for processing tasks using workflow go through below link.
    http://help.sap.com/saphelp_47x200/helpdata/en/17/553d3854126956e10000009b38f842/frameset.htm
    to undestand the wokflow triggering points please sit with you workflow consultant..he can explain you step by step hierarchy levels in approval chains.
    regards,
    hari

  • Weird Thread problem - Not getting processing time from system?

    I have an applet that displays an animation, and tasks are divided up into separate threads. After the main display is created, I create a thread that repaints the display every 10 milliseconds and one that does the actual animation. The odd thing is, even though it is in an infinite for loop, the message (see below) only comes up once (saying "Refresh 0"), and the applet doesn't refresh unless I minimize and maximize the window. Below is a modified code snippet:
    ...imports...
    public class AnimationApplet extends Applet
    AnimationApplet a;
    public void init(){
    a = this;
    createDisplay() //gets the container and adds a Jpanel with main animation, a button and a textfield.
    new AnimateThread().start()//calls animate() method which uses a timer to daw a series of lines
    new RefreshThread().start();}
    private class RefreshThread extends Thread{
    public void run()
    int count = 0;
    for(;;){
    JOptionPane.showMessageDialog(null, "Refresh " + count);
    tp.repaint() //refresh main panel
    a.validate()
    count++;
    sleep(10);}
    }If you need to see more code, I can provide it. Thanks in advance for the help!

    Nothing I'm trying is working. Someone please help!

  • Assembly processing

    Hi All
    I am doing assembly processing for project with varient configeration
    When I create and save sales order for a material taking quantity as 1 a project is being generated for SO with quantity 1 for a material
    when I put quantity more than one in SO say 2 , the project is bening generated with quantity for material as 1 ony.
    My requirment is the project should get generated with quantity 2 ( equal to SO quantity)
    any setting required for transferring quantity of material in SO to project ?
    waiting for reply
    shashank

    System uses execution factor for sales order quantity. Enter execution factor in standard network as '1' ie., the network, activities and materials are assigned for 1 no. of sales order quantity. if your sales order quantity changes to 2, then system will change the execution factor to 2 and so the material quantities in network.
    Try this.

  • Problem regarding SAP Project System & Material Management

    Hello Experts,
    please check our process as below:
    Order confirms than sales order and project will create
    material of BOM is assigned to any activity in project so these material (RM) will be procured and consumed
    assign activity for all work done on material to produce FG or SFG.
    confirm activity whenever any work done like fabrication done so confirm and its cost comes to WBS.
    than we have to subcontracting process so dispach SFG from this and receive after activity done by third party.
    than more work is done and confirm these activity. than after all work done we get FG in stock. than delivery from project.
    We are facing issue in above business process of our client as below:
    1. process of subcontracting using project system as we are not using production planning. how we get any SFG for subcontracting process.
    2. if we confirm all activities and consume all Raw Materials than how we will get finished good in our project stock for delivery.
    3. after delivery from project how sales order affects with regards to completeness of this sales document.
    Please help for this.
    Note: Remember we are not using PP cos customer require detailed report of these process and capacity planning etc.
    Thanks
    Sunil

    Hi Sunil,
    Assume this is my project structure & attached components. I will procure this components externally. After GRN, This components will be issued to network with 581 Q movement type.
    Now we need to assemble this raw material to produce our FG, As these SFG are in our project stock. What we need to do for assembly process through PS.
    Also throw some light over benefit of using PS-BOM interface ( CN33 ) for attaching material components.
    Project
    WBS
    Network
    Activity A
    Gears
    Qty - 1
    Activity B
    Blades
    Qty - 2
    Activity C
    Stand
    Qty - 1
    Activity D
    Connectors
    Qty - 1
    Regards
    Gaurav Ahuja    

  • Capacity check problem in Project system

    hi,
    i have some questions for the Capacity check problems in Project System.
    1. if one Person is assigned to diffierent Work Centers, for example,  person A is assigned to Work Center 01 under Plant 01, and Work Center 02 under Plant 02, how can i do the Capacity check?
       if i want to use A of Work Center 01 in the Project, the System will only check the Capacity of  01, or both of 01 and 02?
    2.  What is the Pooled Capacity?
    Rgds,
    Liang

    hi,
    1.Capacity check takes place at plant level itself..
    2.Pooled capacity:- This is created separately in [u wil find in PP] and this capacity can be used by different work centers.
    regards
    pushpa

  • Regarding the process flow of project system

    Dear Sapgurus,
    I am working new ps project in our client place . The process which i mentioned for a ps flow is sales enquiry,
    design approval, procurement, production, deliveryetc apart from this anything i mention so i request anybody to suggest the business process while starting a customer project and new project development.
    regards,
    muralidhar.t

    Dear Murali,
    Welcome to PS World.
    See link which is given by Venkat Sir.(It shows process)
    Its very tough to explain whole process.
    Plz refer this link.
    Deffntly it will help you.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/80/ea89395eb58c4f9d0c3e837cf0909d/frameset.htm
    PS cycle
    Re: Enterprise structure for PS
    Re: Why we use Project system?
    Regards
    Chandra

  • Business process of Purchasing, FI-AA, Project Systems, Invst Mgmt for BW

    Hi
    I am a BW consultant and I would like to know the business process like what-is-what regarding the modules of Purchasing, FI-AA (Asset Accounting), Project Systems, Investment Management, SRM from BW perspective like how much and what should I know.
    Help me by posting some material/documnets so that I can come to an idea regarding the business process of those modules that will help me to work in that application areas as a BW Consultant.
    Thanks in advance
    Sugandhi

    Hi Sugandhi,
    Take a look bi best practice - purchasing analysis
    http://help.sap.com/bp_biv235/BI_EN/html/bw.htm
    http://help.sap.com/bp_biv235/BI_EN/html/BW/PurchAnal.htm
    and sap help business content
    http://help.sap.com/saphelp_nw04/helpdata/en/ed/62073c44564d59e10000000a114084/frameset.htm
    (navigate left panel for infocube, query etc)
    Please go through this links:
    http://help.sap.com/saphelp_nw04/helpdata/en/e9/62073c44564d59e10000000a114084/frameset.htm
    http://help.sap.com/saphelp_ides/helpdata/en/fd/45beec9d6411d189b60000e829fbbd/content.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/9c/df293581dc1f79e10000009b38f889/frameset.htm
    http://help.sap.com/saphelp_bw33/helpdata/en/e9/62073c44564d59e10000000a114084/frameset.htm
    http://www.sap-img.com/sap-mm.htm
    http://www.sapgenie.com/abap/tables_mm.htm
    SRM:
    This is the SAP help link:
    http://help.sap.com/saphelp_nw04/helpdata/en/3a/7aeb3cad744026e10000000a11405a/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/bb/66073c52619459e10000000a114084/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/7a/68073c52619459e10000000a114084/frameset.htm
    Also check http://service.sap.com/bi -> business content -> supplier relationship management and http://service.sap.com/srm
    the connection/create source system should just same (for r/3, srm, scm with bi also), not sure you had this doc already
    http://help.sap.com/bp_biv335/BI_EN/BBLibrary/documentation/B84_BB_ConfigGuide_EN_DE.doc
    for portal
    https://www.sdn.sap.com/irj/sdn/developerareas/ep
    and search bi and portal integration in sdn library
    Keys for Integrating SAP BW 3.5 and SAP Enterprise Portal 6.0
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/6b1472a7-0301-0010-64bd-dc96509db6f7
    Hope these helps u...
    Regards,
    KK.

  • Display to projection system problem

    On several projection systems at school I hook up my MacBook with a VGA connection and it works fine. However, there are other projectors that give me difficulty. The display on the computer changes and both the monitor and the projector displays the information much larger than usual and I have to continually scroll back and forth to show the information. I have tried the F7 key. Is there something I might need to adjust before I make the connection to the projection?
    Can anyone help me?

    I would suggest checking the display settings in System Preferences when this happens. You should be able to adjust the settings there.

  • Problem with Project Systems authorizations

    Hi All,
    We are implementing project systems module and are facing several authorization issues. The SAP default values do not seem to work and there are several objects which showup as "not checked" in SU24 showup in the SU53. e.g. tcodes are CJ20n, CJI3. Are there any steps for activation / pre-requisites, etc?
    Thanks for your inputs
    Vijaya

    Hi
    There are chances that some of the transactions codes will call other tcodes while execution.
    in this case also CJ20N is calling many tcodes, those auth check would not be inserted as check points in SU24 , hence you should identify them in the testing phase or using the TCDCOUPLES table.
    You can check the calling & called transaction values in the table TCDCOUPLES in SE16, according to that you can build your SAP roles.

  • Material To be Valuated in Project System

    Hi All,
    We are implementing PS,MM,SD,FI &CO for a companay which works essentially on engineer to order scenario and using vlauated projec stock & actvity account assigned networks
    Inhouse production is through typical assembly processing process - Where input & output materials are transferred through BOM PS Transfer from WBS BOM.
    Input materials are issued to activity; work performed by work centers are entered by confirmation; at completion of work out put materials is 'Received from activity'. Both material issue and receipt are done wrt reservation.
    When this is done, as per standard process, the cost addition (and hence value addition) is to activity and thereby to WBS element. The output material is not valuated. All the cost(or values) become project value which will reflect in WIP calculation. WIP is calculated as month end process.
    At month end if the company wants to know the current asset from project and relevant stocks:
    = WIP of project + Inventory value of the mmaterials.
    Pl. note that only input materials i.e. raw materials and Bought out materials will have inventory value; the output material will not have any value.
    The process is alright and I think we are alos complying to Accounting stanadard for project system - directive from Institute of Chartered accounts - India.
    This process was first aceeptable to customer; but now they say -  the out put materials should be valuated. So that, when inventory value is taken - it is RM+BO and valuated semifinished +valuaed finished materials
    One big reason they say is that they have to show inventory value to the Banks.
    Now I need clarification in following points
    1. How to valuate the out put material when working only with project system. (apart from using user exit )
    2. If this is done, the project cost/WIP calculations will show ups amd downs - as goods receipt with valuated value will be with sign - this will reduced the cost. This will cause variuos problems - almost no standard SAP PS cost report will reflect the reality - WIP can not go up and down...This is illogical.
    3. Have you faced similar situation in implementation - that - Banks can not be conviced about this PSway of WIP calculation? Taking into consideration that project implementation is in India - an experienced reply can be very helpful
    Thanks and regards
    A.Saravanan

    Dear Pradeep,
    When we work with network/activity/wbs element, Finished material is assigned to activity with sign. This means GR can be done. Technically system treats lke by-product. This material will not be valuated with in put costs...since there is no logic...For our convention, one WBS element, one network or one activity can be used to book all related costs..but still GR will happen with valuation as per valuation variant in NW only. This is quite logical and correct.
    So...customer wants to know the cost of manufacturing a complex project assembly..then process under one WBS element..cost accumuated at that WBS element is cost of mfg. I have kept such finihed material std price at Rs.1. (Ideally it should be '0'.). Meaning material will not valuated.
    Now if customer wants to knwo the cost ...look at WBs element
    If needed, you can do unit costing and update the value in a suitable field in material master.
    Therefore, I have kept all the semifinished/finished material std price at Rs.1.
    This way..std functions of PS like RA, costforecasting are work properly.
    For WIP calculation, this is of standard method and WIP will be current asset of company..this will be acceptable to Banks...one concern I had..cross checked with a Banker.
    Another issue was sub-contracting. In India during S/C..we have Delivery challan and legal requirement of excise. We developed a program integrating dc, excise challan, transfer posting, goods issue against reservation and mateials assigned in activity. For user it will appear as one transcation, and system will propmt/list appropriate excise challan No. based on dc no & material as input...(I hope i remember right).
    Again here GR of seni/finished naterial was atRs.1. since Service cosst, matarial issue cost get booked at activty.
    Thanks and regards
    Saravanan.A

  • Ps assembly processing:WBS have not be created when saving the sales order

    In the ps assembly processing, I want to generate a network when I create a sales order.  So I did the following steps:
    1-Use the TCODE cj91 to create a standard WBS "E-000007.1".
    2-Use the TCODE cn01 to create a standard network "10000000" and assign the standard WBS "E-000007.1" to it.
    3-Use the TCODE cn08 to config the Network Parameters from Sales Order like below:
    Material number : 600000-000000-0009
    Order Type      : Z301
    Std network     : 10000000
    Class Type      : 020
    Network Profile : Z0001
    MRP Controller  : 001
    Std WBS element : E-000007.1
    4-Use the TCODE va01 to create a sales order and add an item with the material "600000-000000-0009" and save.
        When the SAP R/3 System is saving the sales order, a WBS ought to be created u2013 based on the assignment of the standard network to the standard project.But I could not found the WBS.I thought I have do all of steps and could not found the reason.
       So I need the experts give me some useful advice and reference to resolve the problem.Thank you.
    Regards
    Yoda

    Hi,
    Maintain strategy group in material master MRP tab....
    If problem still persist then check is there any credit block to that customer...if it is release it in VKM3....
    Once you release it will create automatically.
    Regards

  • Querry in Assembly Processing

    Hi,
    I have created standard WBS E-9818.Using this WBS, I have created standard Network E-9818.Then I have created material M-9818 & made assignment in CN08.
    After this when I try to create sales order using order type PS1, it is not creating sales order with no. 9818. But it is creating sales order with no. 12117.Also it creates project with no. E-2117.Ideally speaking it should create project with no.
    E-9818.
    Please let me know what could be the problem?
    Any pointers on this will be highly appreciated.Useful answers will be rewarded with good points.
    Regards
    Tushar

    Hi Tushar,
    What the System does is correct.U have created std WBS and assigned them to the activities in STD network.So when ever the Sales order is created,it can create various order types thru assembly processing, since network is an order type 20,it creates std network first thru which it picks up the std WBS to create operative WBS.
    So whatever may be your STD wbs id , as soon as a sales order is created ,a project will be created with the last four digits of the sales order as the project id and similarly for the WBS element.
    thanx,
    reward points if usefull.

Maybe you are looking for

  • Installation problems for Premier Pro CS6

    "Installer failed to initialize"  when trying to install download of Premier Pro CS6 on Windows 7, which  I purchased recently- Have space and have removed previous files relation to recent trial for Creative Cloud I tried recently. What can I do to

  • Server 2008R2 mapping to shared folders fails users of Windows 8.1 but seems OK on Windos 8.0 and no problems for Windows 7

    Having read what I could from the related questions, the answers still elude me.  This issue apparently is specific to Windows 8.1. First, a little background. 1:  The server is not on a domain,  The system runs Server 2008-R2 standard with all folde

  • Radio is not working for my Z3.

    I bought Z3 last month. I oftenly used Radio app. But it is not working last one week. I restarted. But its not working. Donno why.  Can anyone assist me? otherwise I need to go service center ? Please help me asap. Regards, Babu S- Chennai -Babu S f

  • Should I be worried?

    I am aware of 'a poorly bird of prey' (ill eagle) P2P downloading. I have NOT (knowlingly) downloaded anything illegal so I should be 'safe'. I even opted out of Fon as a precaution so nobody can use MY details to log onto a Fon spot (if I've been ha

  • Bookmarks from iCloud to MBA

    i have just changed my MBP to MBA. my bookmarks in iCloud are still showing on my mobile devices but are not appearing in safari on the MBA. is this possible?