Problem in returning materials issued against project

Hi Gurus,
I want to return some materials  issued against Network activity back to Stores.
I am trying to create a Reservation using MB21 & movement type 282 / 222, system is giving an error message stating that Manual reservations are not allowed for Order Category 20.I believe this is the standard way of returning the material and why system is giving this error message ?
What is the setting that is missing and what are the other ways of returning the materials issued against the Project ?
thanks in advance.
Vinodh

Hi,
  Yes you can create reservation manually using MB21 for WBS Element from using Movement type-221, this reservation is on free stock.
But if you want to create reservation using movement type 281, then you need to create automatic reservation in Network that is in CJ20N or CN22, it's not possible at all in SAP using MB1A as SAP Suggested.
BTW, there is an option available:
Goto SE16> enter the table> T158B>display>Execute and enter the transaction MB21-->Execute, if the Mvt types 281,282 are available in the table entries then it will allow, if not, it won't allow.
so try to maintain that table entries for 281 and 282 movement types.
After that have a look in to table-->T157H, repeat the same steps as above, your problem is resolved.
Rgds
Sudhir Reddy

Similar Messages

  • Goods issue against project resevation

    hi all
    one reservation created background in project system ,while issuing(migo mov type =281 q)  using that reservation one error msg is comming
    Document 0000000008   does not contain any selectable items
    regards
    vijay

    Display this reservation and take the order number and check the order status in CO03, if the status is closed u cant issue for the reservation i.e. the status will be like this CLSD MSPT PRC  CSER SETC
    Thanx & Reg
    Anil Malhotra

  • Goods Return to Store against Process Order

    Hi,
    Tell me how to do Goods Return to Store against Process Order
    For E.g.
    Process Order X having Material M1 with Requirement Qty 100 Kg as per BOM specification and Issue Qty using COR6 is also 100 Kg but due to less Consumption 20 Kg is required to be returned to store
    So how to have effect of returned 20 KG against Process Order
    Note : I have used MB1C option for Goods Receipt but it won't make any effect in Process Order
    i.e. Requirement Qty  -   100 KG
         Withdrawn Qty     -    100 KG
    But in MMBE it shows 20 KG after receipt from MB1C
    Kunal

    Hi Vivek,
    I tried as per your given direction but it won't worked
    What I required is for E.g.
    Process Order No 11111
    Material No           Mat-A   
    Batch No              Bat-A
    Storage Loc          PM01
    Requirement Qty which is coming from BOM                        120 KG
    Withdrawl Qty either using COR6 or MB1A (261 mov type)     120 KG
    Consider that Process Order is already confirmed and due to some reason All the materials issued against Process Order has to be returned to Store for another Process Order
    When I used MB1A and entered movement type 262 with storage location PM01 then click on To Order Button to enter Reference : Order and click on Tick Button
    It then displayed only those materials which is not yet issued and required to be issued and automatically Movement Type changed to 261
    Please guide
    Kunal

  • Problem while returning the subcontracting materials.

    Dear All,
    i have received finished material A (10 pcs) from subcontractor (BOM maintained B- 200 pcs and c- 300pcs to manufacture A).
    Due to quality rejection i am returning 1 pc of finished material "A" to the subcontractor. When i return through MIGO with 122 mvmt type system will display entire quantity ,ie 10 pcs, against the material document number.  Now i reduce the returned quantity of finished material as 1 pc, but subsequently BOM materials (components) are not getting reduced.
    please advise how to reduce the components propotionate with finished product while returning the subcontracting items.
    Eg : A received 10 pcs ( BOM- B=200& C= 300)
          returned 1 pc of A,  then system should show the components B =20 & C=30. but system shows B=200& C=300.

    Hi,
    As per your suggestions, system does not allow to do Component reversal 542 movement. How ever system will check the special stock provided to vendor 0. All the component from vendor side consumed and recived GR already for the components B and C.
    The following Error message occurs while doing 542 MVMT:
    Deficit of Stock w. vendor unr. 20,000 PC : B1 TEST O
    Message no. M7021
    Diagnosis
    Shortfall below the specified stock level or quantity amounting to 20,000 PC.
    System Response
    If the message is an error message (E), the above is not allowed.
    If the message is a warning message (W), the system will allow your input, but the warning is intended to prevent you entering a wrong quantity.
    Procedure
    In the case of a warning message, check the quantity entered.
    In the case of an error message, change the quantity or terminate processing.
    Other Possible solution,  I  have simulated
    Return delivery and refer material document number
    Manually change the Material A ( With 122 mvmt - qty as 1 ) With Reason for movement
    And Sub component as B ( 544 O + GI receipt subc.stck ) with qty 20, similarly Sub component C ( 544 O + GI receipt subc.stck ) with qty 30) 
    Finally you can check with MMBE ( Finished product A- 9 qty) MBLB - Stock provided to vendor Component B -20  and C-30 qty
    I hope this with return the Finished product and consumed subcomponents respectively.
    While doing Return delivery for against Material document system always with full qty and BOM qty only, We will manually change returnable qty to the vendor and Reason for the return in any business process flow.
    I hope this solution resolved your issues on Return process subcontracting
    Even after the Returned the goods  to the Vendor ( due to damaged - reason ) ( with 122 and 544 O+) . Later supplier finished his re -work for the returned goods / services , you can do it regular GR against PO number with as usual subcontracting receiving process ( 101 and 543 O-)
    Regards,
    Thiru
    Edited by: thiru on May 5, 2010 11:48 AM
    Edited by: thiru on May 5, 2010 11:49 AM
    Edited by: thiru on May 5, 2010 11:53 AM
    Edited by: thiru on May 5, 2010 11:55 AM
    Edited by: thiru on May 5, 2010 12:02 PM

  • Cost of materials Issued to be captured against a process order

    Dear Gurus,
    I Issue Some consumables for cleaning purpose before the start of an order. This consumables are Issued against manual reservations raised by production department. But We want the cost of these consumables to be billed to the process order batch (cost of the product). But I do not want to maintain thses materials in the BOM of the product.
    What is the best way to do it.
    Regards
    Sri.

    Dear
    User T.Code : MB1A and Movement Type : 261 and enter, then enter the production order and below you can enter teh mateirals that are to be issued. Once you post it the cost of the consumables are captured on this production order.
    While Creating a Reservation in MB21 your production people can create the reservation against the production order with the materials that are to be issued.
    Hope the above helps.
    Edited by: Addy on Apr 7, 2010 10:55 AM

  • Validation of Network Profile against Project Profile

    Hi,
    I would like to monitor the creation of Networks with regard to the Project Profile, based on the Network Profile, so that when a Network is created with Profile "ZCN00", for example,it could be saved only if  the Project Profile is "ZPS000" (taken from the Project Definition to which the Network is assigned).
    I have used Validation/Substitution for similar logic regarding WBS elements against Project definition, but I cannot use Validation/Substitution for Network Header for this purpose because the Project Profile is not accessible in the Data for this Validation.
    I have also tried Validation/Substitution in "Consistency check project structure" where all data is accessible - but validations here cannot be assigned in customizing to various profiles (Project/Network); as stated in thread "Validation for Proj. structure" in this forum, these can be activated using transactions CNC4, CNC5.
    This does not solve my problem because I need to PREVENT the creation of a Network in the "wrong" Project - and not to trace  the inconsistency AFTER the network has been created.
    Is there a way to use the Consistency check project structure for my need without any other means, or do I have to use one of the exits provided in that tool?
    Thanks in advance,
    Eytan.

    Dear Sam,
    Thank you for your reply.
    In our work processes, there is a main function who creates and manages the Project Structure, excluding Networks, and in many cases, certain people may work on several different projects where they create networks, so I cannot limit their authorization to specific profiles, be it Project definitions or networks.
    I know my issue can easily be solved by a simple development (like the Badi suggested in Virendra's message)- but I want to make sure I have covered the possibilities in the standard system - specifically VSR - before I go there.
    Regards,
    Eytan.

  • Goods Issue against Work Order assigned to WBS - Report

    We are doing Goods Issue against Work Order with movement 261, the data picked up from work order is not including
    the WBS element mentioned on the work order. Through this WBS element report is created through MB51, with total receipts, total issues, transfer postings etc made against WBS element, but without WBS element No. in material document,
    we cannot pull this report through MB51, as we see material document No.created against work order but not the WBS
    No. there, so this report cannot be pulled from MB51 through WBS element.
    Does anyone know of any other report that I can pull From WBS No. as all these material documents are hitting WBS with
    total receipts, total issues, transfer postings against the said WBS mentioned in the work order.
    Doing Good issue against WBS is no problem, as the material document saves the WBS No.

    >
    Justin zhang wrote:
    > 1. Try to see CN52N whether meet your business requirments
    >
    > 2. I use two steps approach investigating material documents for project WBS element:
    >
    >     a.  use IW39 list the work orders by selection criteria of WBS (this is PM order list).
    >     b.  use SAP std. ALV copy functions and past work order numbers into MB51selection criteria
    >
    >
    > I'm interested in std. t-codes if others can provide. Thanks.
    >
    > Edited by: Justin zhang on May 19, 2010 10:17 AM
    Thanks Justin, your IW39 solution worked, as it has posting date selection defined there
    which I cant find in CN52N. My solution was take details from MB51, then pull report IW39 within
    posting dates and then export the WBS elements against work order to excel and then copy
    the WBS elements in the MB51 report created.

  • Issue on Projected Income Tax (Payroll India)

    Hi Experts
    We have upgraded the system with SP_HR Component patch level 64 and configured SAP Note 1568264.
    We have an issues on Projected Income Tax.
    Scenario :
    Monthly sal : 25000/- and paid the same to employee in Apr, May 11.
    In the month of June employee has LOP for 2 days and paid 22000/- against June 11.
    Now system is calculating projected IT based on 22000/- for the remaining months i.e., 22000*10= 2,20,000/-.
    Showing projected income tax as 2,20,000+50000 = 2,70,000/- (should be 3,00,000/-)
    Please suggest the possible ways to resolve this.
    Appreciate your help.
    Thanks
    Venkat Babu Kurada

    Hi Experts,
    New issues rise Now....
    For New (mid month) joinee at the first month Exemption U/S 10 is calculated based on the Conveyance Allowance amount *12 months (or no. of remaining months for financial yr end), but in my client income tax Exemption U/S 10 based on the actual salary (not earned salary) from the first month onwards.
    For example :
    Employee X,
    Joined date 15.08.2011,
    Conveyance Allowance = 800 INR. Earned Conveyance Allowance for 15 days = 400 INR.
    While Start Payroll for the period 5th (August) 2011. The WT /130 Exemption U/S 10 = 3,200 (400*8). Based on this Conveyance Allowance The Exemption U/S 10 calculated, But I want to calculated the Exemption U/S 10 at first month (august 2011) based on follows,
    August month earned Conveyance Allowance = 400 INR + Actual Conveyance Allowance per month =800*7 =5,600.
    Exemption U/S 10 = 6,000 INR.
    Please give me some solution
    Thanks and regards
    Mohan .V

  • Problems with rendering a 16:9 project with Chapter markers to iDVD

    Hi there
    I'm having an issue where I'm trying to export a DVD for a client with chapter markers as it's required. Problem is when I put the project into iDVD the project squishes back to 4:3 ratio.
    One solution that was on here was to use the Quicktime Conversion to create a 16:9 video however when I use Quicktime conversion I lose the chapter markers
    I need to have both 16:9 ratio and Chapter Markers in the DVD how do I overcome this problem?

    Anamorphicizer didn't work.
    I can use Quicktime Pro cause I currently have Quicktime X on my computer (snow leopard) which doesn't have a Pro upgrade.
    Any myDVDedit is really confusing to use do I have to export the DVD into a VIDEO_TS file to fix it? I'm still puzzled

  • MM COnsigment stock: Unable to issue against reversation

    dear all ,
    we are trying to prototype a MM consigment stock process.
    we have done the following
    1. Purchase info record is created as consigment
    2. PO is created. while creating the PO, the net price is coming as Zero.
    3. Migo was possble with item category as K and movement type as 101
    4. Created a reversation
    5. finally tried to do a goods issue with special indicator as K
    we are getting error PO has zero price.
    we have tried all known settings and the net price in PO  is still coming as zero.
    kindly let us know where the issue could be . what setting need to be modified.
    regards

    Dear Friend,
    when the matl is in consignment sstores, it is not belongs to company. Vendor is the legal owner of the matls.
    you have to transfer from consignment stores to  company stock using 411-K mvt type( T-code= MB1B).
    *you can not do two transactions at single shot( i.e. both transfer posting and issue a matl against Resevastion)*
    In ur case upto 3rd step is OK.
    then,
    1.0 Transfer the matl to companys stock.
    2.0 Create a reservation against a cost center.
    3.0 issue a matl against ur reservation.
    OR
    **u can issue a matl directly to cost center using mvt 201-K in T- code= MB1A.**
    *By that time if u see the matl do. u wil see that stock changes from 101(K-) to 201(K+), but can not issue against reservation*
    It will solve ur problem.
    If u have any doubts, plse revert back.
    Reward if useful.
    Regards
    Viru

  • Problem with downloading an issue to an Android tablet

    We're experiencing a problem with downloading an issue to an Android tablet.
    Adobe Content Viewer on a Samsung Galaxy Tab 2 attempts to download an issue, but after about 30 seconds of downloading ACW stops and without any error message returns to the previous state showing again the Download button. The Internet connection is good. Everything also works perfectly on other tablets we tried - ASUS Transformer and a previuos generation of Galaxy Tab.
    Is there any common resolution for this problem?

    I may not be using the correct jargon,,,,when I click on Amazon's link for the AmazonApp store download, an Adobe box comes up, so I follow the cues I get on the screen.  I don't know what else to do....my 1st step..https:/www.amazon.com/app-email    you have chosen to open Amazon_Appstore-release.apk which is apk file from: https://amznadsi-a.akamaihd.net  what should Firefox do with this file?  Save File  I click on OK    Then a download box comes up, which I click on, then there is 'Finder' and 'Adobe Reader'.  Adobe reader is highlighted, so I click, then OK and I get a box "Amazon_Appstore-release(9).apk" is an application which was downloaded from the Internet.  Are you sure you want to open it?  Cancel  Open.  I click Open.  Then a box that says  Adobe Reader could not open 'Amazon_Appstore-release(9).apk' because it is either not a supported file type or because the file was damaged (for example, it was sent as an email attachment and wasn't correctly decoded.)  I am a novice with this stuff....I hope you can help me.  Thanks  Char

  • Partial Goods Issue against a Delivery Document

    Dear Xperts,
    I am having a scenario regarding standard Stock Transport Process with Delivery(Material Movement 641).
    My requirement is, when I will create a Stock Transport Order the Delivery document will automatically be created at the same time.This can be achieved thru customization.
    But the problem is , the material quantity in the delivery document will be same as the order quantity in PO.My question is :
    1. Can the user change the quantity in delivery which is automatically got created at the time of PO creation.
    2. If yes, then for the remaining order quantities , shall the system will automatically create another delivery?
    3. If no, can we do partial goods issue against that delivery if total material is not available at sending plant?If yes , how to configure?
    Means , In delivery my material qty is 10, can I do Post Goods Issue of leass than 10 qty & create a proforma invoice against that delivery and do the P.G.I. and Billing again against that delivery?
    Plz advice.
    Regards,
    Soumick

    Hi
    As per your scenario you can do the PGI (post goods issue ) for partial quantity only if u required later for reaming quantity when ever stock is available that time you can do again PGI by using the same delivery no for reaming quantity but for this
    In PO you have unchecked the Delivery  completed indicator with   this when ever complete goods are coming then only PO will
    be close up to that PO will be in open Status
    Regards
    Balaraju

  • Material issue against PR

    hello friends.
    i have a small querry.
    i have stock of raw material in storage location.
    my scenario is make to order.
    i have generated a sales order and then i have done planning of the final material.
    as the planning process is carried out hence all materials from top to bottom are planned.
    but as there is already raw material in stock, the pr that is generated should issue raw material from the stock.
    i do not want to purchase raw materail.
    is it possible to issue stock material against PR.
    thanks for the help .
    warm regards.

    Hi,
    Material cant be issued against PR. You can issue material against reservation and close the PR. It seems you are not using MRP.
    Regards

  • Problem while assigning multiple staffing to project role.

    Dear All,
    I am facing problem while assigning multiple staffing to project role.
    In the project role, we are doing staffing ( assigning BP). While assigning the BP's getting below errors.
    Resource assignments overlap
    Message no. DPR_BUPA_LINK004
    Diagnosis
    The validity period '10.02.2008'-'01.03.2008' for the assignment of project role Product Manager and ' Rakesh Pradhan' overlaps with the validity period of the assignment ''.
    However, the project role type does not allow several staffings to be edited at the same time in the project role.
    System Response
    The system does not allow this constellation of data when saving.
    Procedure
    Check and correct the start and finish dates of the staffings affected.
    Request you to advise in fiixng the issue.
    Thank you for your cooperation.
    Regards,
    Ranjan

    Hi Biplab,
    For multiple staffings in the same time frame, check the option of 'Edit in Parallel' in the Role Type settings in SPRO.
    Let me know if that helps.
    Regards,
    Vivek Pandey

  • Report for Material Issued against Service Orders But not Billed.

    Hi Experts,
    For CRM Service Orders Based on the Reservation number generated in CRM we will make the Goods issue document in ECC.
    My Question In CRM Do we have any standard report to see Material issued against CRM Service orders but not billed. i.e. Work in progress.
    Thanks in Advance,
    Abhinesh

    Hi Vivek,
    What I wanted to say that you won't get information from VAV about billing since as far as I know it doesn't contain any relevant table.
    You should try create a query using LIKP-LIPS-(joint type: left outer)-VBRK. This will connect deliveries to billing document, you can also get SO number. Please try this.
    (Sorrowully I don't know which logical database would be good for you)
    BR
    Csaba

Maybe you are looking for

  • What memory modules work in a TS-140?

    I want to add memory to my TS-140.  The product specs say that the server will take ECC UDIMM modules.  I am considering Hynix HMT31GR7CFR4C-PB T8 AE modules which are pc3-12800 ddr3-1600 SDRAM ECC, Registered, and Buffered.   Will these work? I alre

  • Z77A-GD65 with 3570k noobie needs some help.

    Hi Guys, First of all I'm very impressed by the looks of GD65, I just hope it will work as well as it looks-  So finally I should get my RAM tonight (4 x 4gb Sammy ECO ram).   I believe there might some issues with o/c the memory, which I believe was

  • B1DE 1.4: unknown error 2869

    I can't install B1DE 1.4, give me at the end of installation process an 'unknown error 2869'. I'm using Windows Vista, with Visual Studio VB 2005 AND Visual Studio C#, SapB1 2007. Thanks!

  • Can't drag applications to the trash

    I downloaded a beta test recently, now it's finished I have the folder sitting in my Applications folder, but it won't let me drag it out into the trash. I've logged in as an Administrator, changed my regular ID to have Admin status, none of it works

  • Videos do not play on my ipod

    the tv shows (chappelle's show season 2 and *******) play fine on itunes. but when i try to play them on my ipod the screen is just black and there is no sound playing. some of the episodes earlier in the season play, but with later episodes the erro