Problem in STO b/t plant with in Company code

Dear ALL,
        I have done all the configration for STO withing company in two plant(vednor & customer master for both the palnt & assign it also & also shipping point),but i am still getting the error "Shipping data for material is not maintain" while making the P.O.i am doing STO thru MM( By MVT 351).tell me the procedure for configration so that i can cross check.
thanks in advance.

Hai,
The essential things for STO are as follows,
1.Material which is to be transfer should be maintain in both the plants.
2.Sales view in MMR is must.
3.Shipping point is must.
4.Both the receiving plant & issuing plant should be created as a Vendor.
5.Both the receiving plant & issuing plant should be created as s Customer.
6.In VMR, the issuing plant is eneterd as a customer for receiving plant.
7.In VMR , the receiving plant is entered as acustomer for issuing plant.
8.In IMG - MM - Purchasing - Purchase order - Setup stock transport order - Define shipping data for plant - Customer no of respective plants should be entered. It is must for STO.
Check the above said details.

Similar Messages

  • How to create group bom for multiple plants with different company codes

    Dear all,
    In my current scenario we have 5 Company codes with a plant with each company. The same kind of materials exist in all the 5 plants, so what i want is when i create any BOM, that BOM has to extend in all the company codes, as with GROUP BOM i can able to extend the same in only one company code.
    So how to do this?
    Thanks in Advance
    Bhushan

    For that first extend all the materials to all the plants... In one plant create a BOM for the material..
    In all other polants in CS01,   click COpy from .. There you mention the matreial and the plant in which the BOm is alerady available..
    karthick

  • STO - Two plants within Different Company Codes

    Hello,
    Kindly help me out with this case, i want to create a STO for two plants within DIFFERENT company codes, so i've created all the required configuration and master data including creating the supplying plant as a vendor and the ordering plant as a customer, also all master data is maintained in both plants and i tried the scenario on the IDES system and it works okay so i know i'm on the right procedures. The problem is that i create the PO, but when i go to Transaction Code VL10B to create the delivery it gives me an error ( Delivery with no Line item not allowed ) even though there is more than enough stock in the storage location. Kindly help me out.

    17.01.2010     Stock                            10.500,000      0,000      10.300,000
    13.01.2010     Order     Totals record     100,000-     100,000      10.300,000
    13.01.2010     Deliv.     Totals record     100,000-     100,000      10.300,000
    17.01.2010     StLcSt     SLFR     10.500,000      0,000      10.300,000
    13.01.2010     Order     Totals record     100,000-     100,000      10.300,000
    13.01.2010     Deliv.     Totals record     100,000-     100,000      10.300,000
    17.01.2010     BtchSt     123     10.500,000      0,000      10.400,000
    13.01.2010     Deliv.     Totals record     100,000-     100,000      10.400,000
    17.01.2010     BStLoc     123       /SLFR     10.500,000      0,000      10.400,000
    13.01.2010     Deliv.     Totals record     100,000-     100,000      10.400,000
    This is the whole table.
    This is what i got. i believe that it is an availability check problem, i just can't see what is the solution.
    SLFR is the Storage location of the issuing plant.

  • STO from Plant to Plant in same Company Code

    Dear All ,
    Please give me brief idea about STO(with screen ) from Plant to Plant in same Company Code
    ganga

    Dear Ganga Mukerjee
    Welcome to SDN
    There are plenty of threads available on this topic in both SD general,Sales and MM forums
    Please make a search
    As this is your first qn i am giving here with some simple steps for STO from Plant to Plant in same Company Code via SD route
    INTRA COMPANY STO.
    1. There should be two plants in the given company code for intra STO to
    happen.
    2. Assign Purchasing org of the ordering to the supplying plant.
    3. Create a customer in the supplying sales area.
    4. Assign the customer to the ordering sales area.
    5. IMG > MM > Purchasing > PO > Setup STO > Define shipping data for plants
    here go to supplying plant and mention its own sales area.
    6. In the ordering plant assign the customer created in the supplying sales area
    and also the supplying sales area.
    7. Maintain checking rule as 01.
    8. Assign the delivery type NL supplying plant checking rule and PO Doc type
    UB.
    9. Assign document type UB supplying plant and ordering plant then decide up
    on either 1 step or 2 steps.
    10. Create PO with doc type UB.
    11. Go to VL10B give the PO No. and enter, select the line item and click back
    ground. (Where Del. Will be created in the back ground)
    12. Go to VL02N for picking and PGI.
    13. If 1 step no need of doing MIGO else for 2 steps do MIGO.
    Hence forth make search
    Regards
    Raja

  • Project stock exist in a plant and WBS but with different company code

    Hello,
    As I know I can not create a PO in company A, but was assigned to a WBS maintained in company code B. The system will check if the WBS getting the same company code with the PO, and pop up  the error message if the company code was differect.
    But seems the project stock could exists in a plant  but assign to  WBS was maintained with different company code. For example, A material stock was in plant A assigned to company code A, and it is also assigned to WBS belong to company code B.
    Any one know it is correct?
    Thanks!

    I knew crossing company code to assign WBS element to PO is not allowed since i got the error message, and I think it's reasonable, cause the expense from the project PO should post to the same company code through the WBS element.
    But why for  the inventory crossing company code is allowed?  The stock in plant A belong to company code A, was assigned to WBS element B belong to company code B. That means the inventory is in the GL balance of company A but under the profit center belong to company B.  How to understand it? I think it's wrong

  • Creating order with out Company code and plant - just for pricing -possible

    Hi gurus
    Just for creating sales order (let us say no delivery and no billing, client was not intrested in the initial setup) for just pricing thing, does we really need Company code and plant. with out that just with sales org setup(sale org+D.C) can I create an order to full fil the pricing scenario.
    Please I need help on this
    Thanks
    Kris

    hi kris,
            we cannot create a order with out company code and plant , due to the following reasons
          we do not require the company code to create the order , but we require the plant to create a material and use it in the sales order .and we require a company code to create a customer .
    the pricing procedure is determined depending upon the sales area(sales org+distribution channel +division).
    please reward the points if it is helpful
    Regards,
    Murali

  • STO not working for plants of same company code assigned to a Purchase Org

    We have two company code ( A & B ) assigned to a single Purchase Org .
    when we are trying to do STO of company code A , we are getting an error message like that
    The plant you have entered does not belong to the company code that was
    determined via the purchasing organization.
    Any suggestion please. we assigned all the plants to the Purchase Org .
    Thanks
    JJ

    Hi,
    While creating STO you are entering the plant.
    Please check whether that Plant is assigned to the Company code A Error message clearly tells you have assigned the Plant to the company code A
    G.Ganesh Kumar

  • Single excise registraction to two excise registration with same company code

    Dear all,
    Our customer is using single excise registraction now with three plants and one company code and doing STO between the plants with shipping (641/101). We have implemented SAP with the above scenario. (SAP ECC 6.4 implementation with TAXINN procedure)
    Now, the excise registraction is splitted into two, out of three plants, two plant comes under one excise registration and remaining one plant comes under another registration.still all the three plants are under the same company code only.
    Need your help on what are all the changes interms of process and configurations
    Earlier response will be highly appriciated
    Reg
    Sridharan

    HI Sridhar,
    You have to define customer, vendor option but without account aspect.
    Following are the steps in STO between a plant ( seperate Excisable units)
    You will create an STO ( Purchase order from Receiving plant)
    1: Create Delivery and excise invoice on the basis of performa invoice ( in performa invocie no accounting entry)  Excise register will be updated on the basis of this not account entry would be as below:
    Delivery: ( movement type 641)
    Stock at receiving plant Dr to
    Stock at Sending palnt
    You would be following standard cost incase of SFG and FG. so materail valuation would on same basis and there may be valuation difference.
    Excsie invoice generation:
    Excise Clearing account Dr To
    Excise Duty payable
    Excise Duty Cess Payable
    Excsie Duty hCess Payable
    At receiving palnt you would receive material through MIGO no account entry will be generated only physical receepi of material.
    Capture the excise in J1iex wrt to excsie challan.
    Hope the process will help you.
    Regards
    Pankaj

  • Form-16 ,if employee get transfered with same company code.

    Hi Friends,
    If an employee get ransfered from one personnel subarea to other personnel subarea with same company code, can we get Form-16 seperately for two different periods.
    Thanks in advance.
    Appreciate any help and points will surely be rewarded.
    Thanks & Regards,
    Nanditha

    Hi,
    Pricing configuration for STO: -
    In SPRO > MM > Purchasing > Conditions > Define Price Determination Process > Define Schema Determination > Determine Schema for Stock Transport Orders > Here assign Calculation Schema "RM2000" i.e. Stock Transfer Document to Schema Grp Pur. Org, STO Type (For e.g. UB) and Supplying Plant.
    Calculation Schema "RM2000" has condition type P101 which will pick up the MAP of supplying plant automatically during creation of STO in ME21N ("Conditions" Tab).
    You can create new freight / delivery cost conditions in M/06 for Margin and assign in pricing procedure "RM2000" in M/08 and also assign the Accrual Key to this and do the Account Determination for this Accrual Key in OBYC
    At the time of PGI, following accounting entry will get generated;
    Stock A/c - Dr - 110 INR (Receiving Plant)
    Stock A/c - Cr - 100 INR (Supplying Plant)
    Margin Account - Cr - 10 INR (Supplying Plant)

  • Single Purchase Order for different Plants of Different Company Codes

    Hi Experts,
    I have a scenario, My Client has 3 Company Codes (1000, 2000, 3000 )
    Company Code 1000 has 2-Plants    ( A001 and A002 )
    Company Code 2000 has 1-Plant      ( B001 )
    Comapny Code 3000 has  3-Plants   ( C001, C002, C003 )
    All these 3-Company codes has centralised purchase organisation.
    My Client requirement is to raise a single purchase order for external vendor, for all the plants A001, A002 which is in one company code and similarly in same Purchase Order for B001 plant which belongs to 2000 Company Code and Similarly for same purchase order for C001, C002, C003 plant which belongs to 3000 Company Code.
    1)Is it possible to raise a Single Purchase to External Vendor for plants of Different Company Codes ?
    2)Does it affect the accounting document ?
    3)How to inward and where to inward these goods ? with respect to plant wise ?
    Please Guide with Valuable inputs.
    Thanks in Advance
    Best Regards
    Javeed
    Best regards
    Javeed Ahamed

    1) How about Profit Centre ? We have Framed each Profit Centre with respect to Plant
    Why should there be a problem?
    2)In Case of Migo does we have to be careful and do stepwise MIGO with respect to different Plants ?
    of course people have to be careful when performing transactions.
    if you have multiple items in a PO then you can easily receive all items in one go. So people have to careful and need to check if they really received each of the PO items. Especially if people have authorization for many plants, then the user who is usually performing the receipts for plant A can easily post the receipts of plant B too.
    3) How to Process MIRO ? Can we process Partial MIRO"S with respect to Line-items of those particular Plants ?
    MIRO allows to post the invoice like it is send to you from your vendor. If it is just for a part of your PO then this is just a fact and MIRO allows to post this kind of invoices too.

  • PO created with wrong Company code

    Hi Gurus,
    I have Plant XXXX assigned to Company code 1111 and
             Plant YYYY assigned to Company code 2222
    One of the user has created PO with Plant XXXX and company code wrong as 2222.
    (we have warning message setup & not error message. So, it allowed user to create PO with wrong Company code and save)
    GR & IR both are already posted. I find the accounting document of these GR/IR show correct company code as XXXX-1111 (mostly would have taken correctly based on plant XXXX).
    These are service POs (non stock).
    Now user wants to change the company code in PO to 1111.
    I checked...and system simply allow to change to company code to correct one i.e 1111. It does not give any message.
    Could any one give me some additional info.. if it is right to do so? I am not too convinced at this moment.
    I was suggesting user to reverse GR, IR, delete PO and create new PO. Is that right?
    Thanks n advance for your input.
    Best Regards,
    Mohan

    Dear Mohan,
    U can change the company code in PO as it will not have any impact since the GR and IR is completed.
    Accounts are hit based on the valution area(valuation grouping code).
    Since the PO is already closed u can go ahead the change the same.
    Regards,
    AM Vahanan

  • Stock transfer order between 2 plants in same company code

    Dear All,
    We have the requirement, where in the stock tranfer order (between 2 plants in same company code) instead of Material valuation price, MAP/Standard (depends on Price Control) gets picked up from supplying plant ,user should be able to enter its own price while creating stock transfer order.
    For fullfilling this requirement, I have created new condition type(where i have changed condition category from internal price "G" to "H" - Basic Price)
    Instead of using condition type- P101 in the stock transfer pricing,I have used above created new condition type, in pricing procedure then also while doing the post good issue against the outbound delivery( move type-"641", moving average is getting picked up.
    Can you please tell,where is the setting where we can make the system to consider manual given price while creating the stock transfer order instead of picking moving average price.
    Its very Important requirement ,please Provide valuable Inputs else provide some alternative.
    Thanks & Regards
    Nitin Chhabra

    Stock Transfer Order between Plants in the same Company Cpde are not relevant for pricing, as there is no billing. Billing only takes place between company codes. As same company code it would be like selling something to yourself - it doesn't make sense.  The stock value in the receiving Plant depends on the price contol there. If standard price, then you must enter the price when creating the material or use material revaluation to change it. When you transfer the material from the issuing plant, the value there will be transferred. In case of standard price any difference is posted to stock transfer differences. If using MAP then the value will be transferred from the issuing Plant in full.
    If you use costing with standard price in main plant, then it is possible that you can transfer the cost from the main plant to the second plant, by using special procurement key for costing.
    Rgds
    Richard

  • Restrict PO creation for multiple plants for same company code

    Hi Gurus,
    We want to restrict PO creation for multiple plants in the same company code. Based on Standard SAP settings for Purchasing organization assignment with multiple Plant and multiple Plant assignment with single company code, this is happening. Is there a way that we can restrict by doing some customization change.
    Any thoughts or ideas will be highly appreciating.
    Thanks and Best regards,
    Karun Kumar

    Hi,
    Said functionality is not available in SAP standard.
    To avoid the same ,i can suggest implement release strategy for PO,and then higher authority / commercial team can check created PO,if multiple plants available in single po then they have the option of rejection for the same.
    Or else check BADI-ME_PROCESS_PO_CUST,take the help from abapor and apply the restriction to select multiple plant in PO.
    Hope this will resolve your query,
    Thanks & Regards,
    Sandesh Sawant

  • Issue with Cross-Company code transactions and Extended Withholding tax

    Hi Gurus,
    I am having an issue with Cross-company code transaction while posting expense with 2 different company codes.
    In the 2 company codes, one company code is setup for Withholding tax and other was not set.
    While posting in FB50, I am getting the below message and system does not allow to post the invoice.
    Company codes have different settings for withholding tax treatment
    Message no. F5786
    Diagnosis
    You are entering a document containing at least one vendor or customer item and which has line items in several company codes. The extended withholding tax treatment has been set to active in one of these company codes, but not in one of the other company codes.
    System Response
    You cannot enter this kind of document.
    Procedure
    Enter the transaction in two documents.
    For this I tried to test the transaction by activating of extended Withholding tax for both the company codes. Then the invoice is posting correctly now.
    The point is if I activate extended withholding tax for the Company code which is not using the setup, will it face any issues in other areas? and also kindly advice whether is this a right way to set up to fix the current problem.
    Thanks for the Support and early response will be appreciated.
    JBC.

    Hi Mamta,
    Thanks for the Response. I think you misunderstood my scenario.
    For Eg in FB60 with Co code 5065:
    I am debiting the Expenses for Co Code 1000(Witholding tax not active) and crediting the Bank Account of Co Code 5065(Withholding tax setup is done for this co code). When I tried to post with these line items I have getting the error.
    Posting        GL                   Co Code
    Dr          106520(Exp)            1000
    Cr          202020(Bank)           5065
    For this I tried by activating the Withholding tax for Co code 1000 which is not active before and post it. The system allows me to post the invoice.
    I want to know whether is this a right way to solve this issue and will it impact on any other areas by only activating the Withholding tax for a Co code?
    Thanks,
    Bapu

  • Subcontracting- with two company codes.

    Hi PP Gurus,
    We got two company codes say company code 1000 and company code 1100. We're having plants 4000 in company code 1000 and 5000 in company code 1100. Manufacturing of all SFG and FG take place at plant 5000 in company code 1100.
    Now the requirement is all Raw materials are supplied from plant 4000 in company code 1000 to plant 5000 in company code 1100.
    Client want all the RM cost to be captured in company code 1000 and plant 5000 will only invoice for Services that are utilized for manufacturing....
    How could we map this scenario? Either through making BOM and Routing in both plants 4000 and 5000. and in Routing of plant 4000 need to activate operation subcontracting and material to be supplied to plant 5000 and latter service cost to be captured through Service entry sheet. OR MRP area or Special prcurement key to be configured in plant 5000 to suffice the requirement?
    Please reply with your prompt comments.
    Thanks and Regards,
    Abu Arbab

    Hi,
    This you can handle through the special procurement. Both the plants you need to maintain the material master. In Plant 4000 is your supplying plant. In plant 4000 the raw materials you need to maintain as external procurement. Plant 5000 you need to maintain this materials as special procurement as withdrawal from alternate plant. Since your production plant is 5000, you need to maintain the BOM in this plant. In Plant 4000 you need not maintain the BOM. When you run MRP in plant 5000, the planned orders will be created in Plant 4000. This you can see in MD04 screen as planning plant as 5000. But the planned order number will be same in both the plants.
    Regards,
    V. Suresh

Maybe you are looking for

  • Message Statement Limitation in ABAP

    We have a requirement in displaying a filename which is of more than 50 characters using message statement when the program is running in the back ground when the file name gets written in the job log the file name which is after 50 characters gets t

  • How to get Last Day of a Previous Month

    Hi all, I need to get Last Day of the Previous Month. I am able to get Current Month Last Day using Calendar.getActualMaximum(Calendar.DATE) But I need previous Month's Last Day. Thanks Vamshi.

  • Can I use alert on chats in WEB- I

    HI team , Can I use alert on chats in WEB- I , as I want to show negative value in RED and +ve values in green , as this is not possible setting palate colure. Your help is welcome. Thanks Regards, Ashutosh D

  • Request Deletion in Cube

    Hello Experts    I deleted a request in the cube (Manage) as there was error in loading data,I changed the status to red and deleted it and started a new one.The new request sucessfully loaded the data but the issue is the deleted request is still th

  • UI Template replicating itself

    Anyone know why sometimes a UI template will replicate itself within itself? I have a several complex UI template with JavaScript and Styles defined inside of them. For some odd reason that I can't figure out, the template will exhibit the following