Process Component Interaction Model to Configuration

Hi,
I've developped several interfaces by using Process integration scenarios . Now I want to use a Process Component Interaction Model as the starting point. The documentation describes how to build the different models but I don't find anything on how to go from your Process Component interaction model all the way to a configured scenario.
I suppose, you drill down all the elements and create the different design objects but I would like to actually have some documentation guiding me through it the first time.
Is there anything out there ???
The help seems to be still geared towards the PIScenario of previous versions.
Also, has anyone found a good book regarding modeling in PI other than interface patterns and the B2B book... everything I find seems to be for older versions .
Thanks.
Thierry

Did you ever resolve this issue?  I am facing exactly the same issue and have the same question.

Similar Messages

  • I can't save Process Component Interaction Model

    Hello together,
    unfortunatly I have a big problem to save a process component interaction model. Sometimes it works and sometimes I get the error message (there is no special behaviour to get that error):
    "Save operation is not possible. Internal error: An item in the database has already been deleted."
    What item is deleted? What does that error message mean?
    Thanks for your ideas.
    Regards,
    Yvonne

    Make sure you're not trying to save to the cloud.  Have a look on here for this error and you'll see it's quite common
    It could be when your Mac is trying to sync with the cloud.  Turn this off and see if it fixes your issue
    Everytime I try to save a document in .pages it tells me: The file “Untitled.pages” couldn’t be opened.  All I want to do is save it.. not open it.. help! Any ideas??

  • Creating a Configuration Scenario from Process Component Interaction Model

    Dear All,
    I created a very simple SAP Pro Comp Interaction Model in ESR.
    It has two Process Components (PC1, PC2) with a Service Interface (SI1,SI2)
    and Operation (OP1,OP2) each.
    There is one message (MT1) flowing between these two Process Components.
    I have created and activated all ESR objects.
    Now I try to configure the same in ID.
    But I get an error in Model Configurator saying
    "Process component PC1 does not contain a reference to a process component from the Enterprise Services Repository"
    "Process component PC2 does not contain a reference to a process component from the Enterprise Services Repository"
    The first step of the Configurator ie. Select Model says "Not Configurable"
    What could the issue be? Has anyone configured a Pro Comp Interaction Model successfully?
    I am able to configure the SAP delivered Models perfectly well. Just an issue with custom models.
    Thanks and Regards,
    Ashwin

    Did you ever resolve this issue?  I am facing exactly the same issue and have the same question.

  • Process Component Architecture Modeling

    Hi,
    Is there any way to link process components of PCA Modeling in PI 710 to Software Component or to Software product? If not the case means what is the use of these models. Appreciate for your response.
    Thanks,
    Rao.Mallikarjuna

    You can model Process Component models till Message types details.
    Regards,
    Prateek

  • Process Component Assignment Not Possible

    Hello,
    i have created a process component within a process component interaction model. Unfortunately I'm not able to assign anything to the component. Hence it's lacking a namespace.
    Are there any special prerequisits for assigning a namespace to a process component?
    Thank you for any help in advance,
    Heiko
    see also: Does Model Configurator in ID works for ProComp Interaction model

    Hi,
    Just a quick thought:
    If your order is having status CRTD or REL (but without any confirmations, goods issue, settlements) then you can use the Read PP Master Data (Order header - Functions - Read PP Master Data) & this will re-read your routing & BOM. But for this to work for you, the routing should be updated with the assignments.
    So what you could do is start processing your order as late as possible, thereby you can re-read the BOM & Routing as the modifications take place.
    But if this is not possible in your scenario, then i am not aware of a BAPI or a FM which adds components to different operations in production order, you might evaluate writing a BDC program for the same. Anyways will update you if i manage to find a BAPI or a FM for this.
    Hope the above helps.
    Regards,
    Vivek

  • PI 7.1 Process Component

    Hi All:
    In PI 7.1, I am seeing one new option called Process Component in ID.
    Is there any documentation which explain what this obect is? I search sap help and sdn...but there it doesn't give any information about this object.
    Also anyone created Process Component Interaction Modle in ESR and imported successfully in ID?
    Thanks
    Farooq

    Hi Farooq,
    Check this :
    https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/media/uuid/40f1ed0e-278a-2a10-c0b9-e5c931049a46
    https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/b0243748-acbb-2a10-0fa7-ba7a353ae668
    regards
    Ganga

  • Does Model Configurator in ID works for ProComp Interaction model

    Hi All,
    I am trying to simulate a scenario for process modeling.
      In ESR,
        1) I created two Process Component Models
        2) One Process interaction model
        3) Integration scenario model on top of it.
        Then I am trying simulating directory objects through Model Configurator by selecting 'Pro Comp    interaction Model'.
        Then I selected my model designed in ESR, clicked on Model Configurator.
         System is showing the following Error.
        'PCIM Testmodel: Process component u2018XXXu2019 does not contain a reference to a process component from the Enterprise Services Repository'.
        And I read in the documentation that says
        "In the main menu bar of the Integration Directory, choose Tools  ® Use Model from Repository ().
         A wizard starts.
         The radio button Process Integration Scenario is under Type of ES Repository Model.
         Other model types are currently not supported by the model configurator.  "
    But if I try the same with standard ProComp Interaction Model'. It is not showing that error.
    Please suggest how to proceed.
    Regds,
    Suresh

    Thanks for the reply.
    That assignmetn part i ahd done it.
    After posting the question i had revisited my interface and i found that first i need to create 'Process Component', 'Business Object' etc.. under my namespace.
    But My SWCV version not allowing me to create those objects at all.
    Any special steps needs to be done while creating SWCV to be able to create those type of objects?
    Regds,
    Suresh

  • Integration Scenarios vs Process Component Modelling

    Hi Experts,
    Just wanted to know:
    1) How theoritically and technically, is 7.0's Integration Scenarios different from 7.1's Process modelling?
    2) For what kind of cases we go for Integartion Scenarios and for what kind of cases we model a PCM?
    3) What is "Deployment Unit" in PCM?
    Thanks
    Shailesh

    Hi,
    >>>1) How theoritically and technically, is 7.0's Integration Scenarios different from 7.1's Process modelling?
    Process Component modeling is ment for modeling SOA, where you create a Business Object, Service Interfaces, etc and this help to understand the business semantics of enterprise services in the business process platform. And you will not create Receiver Determination, Interfaces Determination out if that. Where as Integration Scenario is meant only for integration where you define Sender system, receiver system etc...
    >>>2) For what kind of cases we go for Integartion Scenarios and for what kind of cases we model a PCM?For normal integration between 2 or more systems you use Integration Scenario. But Process Component Model is for Service Provisioning.
    >>>3) What is "Deployment Unit" in PCM?
    All the related/dependent Process Components are tied together in one unti and this is called Deployment unit. It also describes the logical boundary of the  Process Component. Apart from this deployment units are the only installable units and this shows what types of interactions are needed between process components.
    Thanks,
    Prakash

  • Bill and Routing Interface concurrent program is not processing component

    Hi All,
    While running Bill and Routing Interface concurrent program,not processing the component item(Line Item) from bom_inventory_comps_interface,still it show process flag as 1. where as billing item(Header Item) is successfully done..i have tried with all the option by giving component sequence id and batch id still it is not processing component item..
    Is it recommendable to give bill sequence id and component sequence id in interface table using bom_inventory_component_s sequence..
    I will be very pleased if i listen from u guys... Plz help me in resolving this issue..
    My Header Insert Stmt..
    INSERT INTO apps.bom_bill_of_mtls_interface@system_link_visma
    (assembly_item_id, organization_id,
    alternate_bom_designator, last_update_date,
    last_updated_by, creation_date, created_by,
    revision, item_number, item_description,
    implementation_date, transaction_type,
    process_flag, assembly_type, batch_id
    VALUES (l_inv_item_id, l_org_id,
    NULL, SYSDATE,
    1318, SYSDATE, 1318,
    l_revision, l_item_num, l_description,
    SYSDATE, 'CREATE',
    1, 1, 10003535
    Component Insert stmt
    INSERT INTO apps.bom_inventory_comps_interface@system_link_visma
    (operation_seq_num, component_item_id,
    item_num, basis_type, component_quantity,
    auto_request_material, effectivity_date,
    disable_date, planning_factor,
    component_yield_factor,
    enforce_int_requirements,
    include_in_cost_rollup, wip_supply_type,
    supply_subinventory, supply_locator_id,
    check_atp, optional,
    mutually_exclusive_options,
    low_quantity, high_quantity,
    so_basis, shipping_allowed,
    include_on_ship_docs, required_to_ship,
    required_for_revenue, component_remarks,
    transaction_type, process_flag,
    assembly_item_id, component_item_number,
    batch_id,component_sequence_id
    VALUES (l_operation_seq, l_comp_item_id,
    cur2.item_sequence, l_basis, cur2.quantity,
    l_auto_request_mtls, cur2.from_date,
    cur2.TO_DATE, cur2.planning_factor,
    cur2.yield_factor,
    l_enforce_int_requirements,
    l_include_in_cost_rollup, l_supply_type,
    l_supply_subinventory, NULL,
    l_check_atp, l_optional,
    l_mutually_exclusive_options,
    cur2.minimum_quantity, cur2.maximum_quantity,
    l_sale_order_basis, l_shippable_flag,
    l_include_on_ship_docs, l_required_to_ship,
    l_required_for_revenue, cur2.comments,
    'CREATE', 1,
    l_inv_item_id, l_comp_item_num,
    10003535,apps.bom_inventory_components_s.nextval@system_link_visma
    For Subcomponent Insert Stmt
    INSERT INTO apps.bom_sub_comps_interface@system_link_visma
    (substitute_component_id,
    substitute_item_quantity,
    assembly_item_id, component_item_id,
    operation_seq_num, organization_id,
    substitute_comp_number,
    component_item_number,
    assembly_item_number,
    transaction_type, process_flag,
    enforce_int_requirements,
    effectivity_date,component_sequence_id,batch_id
    VALUES (l_sub_comp_item_id,
    cur3.quantity,
    l_inv_item_id, l_comp_item_id,
    cur2.operation_sequence, l_org_id,
    l_sub_comp_item_num,
    l_comp_item_num,
    l_item_num,
    'CREATE', 1,
    l_enforce_int_requirements,
    SYSDATE,apps.bom_inventory_components_s.currval@system_link_visma,10003535
    Thanks
    Raman Sharma
    Edited by: 929841 on May 4, 2012 12:28 AM
    Edited by: 929841 on May 4, 2012 2:58 AM

    You need to populate the organization_id or organization_code in bom_inventory_comps_interface.
    Here is a minimal insert
    INSERT INTO bom.bom_inventory_comps_interface
                (operation_seq_num, last_update_date, last_updated_by,
                 creation_date, created_by, process_flag, transaction_type,
                 bom_item_type,
                 effectivity_date, organization_code, assembly_item_number,
                 item_num, component_item_number, component_quantity
         VALUES (1                                                   -- op_seq_num
                 ,SYSDATE, 1433
                 ,SYSDATE, 1433, 1                                  -- process_flag
                 ,'Create',
                 4 -- bom_item_type 1 Model; 2 Option class; 3 Planning; 4 Standard; 5 Product family
                 ,SYSDATE - 1, 'PUB', 'SSGPARENT1'          -- assembly_item_number
                 ,10                                                     --item_num
                 , 'SSGCOMP1'                           -- component_item_number
                 , 10                                          --qty
                )Sandeep Gandhi

  • Process an Interactive Form in a function module or method

    Hello,
    If I process an interactive form in a report everthing works fine. But when I execute the same coding in a function module or method nothing works! The call of the function module fm_name returns sy-subrc = 1 (usage error).
    I believe that function call of 'FP_JOB_OPEN' cause the problems. I can't spool this job in an function module or method.
    What can I do for using interactive Forms in a method.
    If anybody had the same problem a piece of of coding will help.
    Thanks a lot in advance
    Roger
    CALL FUNCTION 'FP_FUNCTION_MODULE_NAME'
      EXPORTING
        i_name     = 'Z_EXPORT_FORM_01'
      IMPORTING
        e_funcname = fm_name.
    Set output parameters and open spool job
    fp_outputparams-nodialog = 'X'. " suppress printer dialog popup
    fp_outputparams-getpdf = 'X'. " launch print preview
    CALL FUNCTION 'FP_JOB_OPEN'
      CHANGING
        ie_outputparams = fp_outputparams
      EXCEPTIONS
        cancel          = 1
        usage_error     = 2
        system_error    = 3
        internal_error  = 4
        OTHERS          = 5.
    Set form language and country (->form locale)
    fp_docparams-langu     = 'E'.
    fp_docparams-country   = 'US'.
    fp_docparams-fillable  = 'X'.
    call the generated function module
    CALL FUNCTION fm_name
      EXPORTING
        /1bcdwb/docparams    = fp_docparams
        /vwk/z_tla_vw_export = wa_z_export
        it_vehicle           = lt_vehicle
        ddinit               = ddinit
        ddcomplaint          = ddcomplaint
        ddinformation        = ddinformation
        ddpraise             = ddpraise
        ddidea               = ddidea
      IMPORTING
        /1bcdwb/formoutput   = fp_formoutput
      EXCEPTIONS
        usage_error          = 1
        system_error         = 2
        internal_error       = 3
        OTHERS               = 4.

    Yes I did.
    I have written the code as given below. It is not working either. Can you please check my code.
    DATA:
          FM_NAME TYPE RS38L_FNAM,
          FP_DOCPARAMS      TYPE SFPDOCPARAMS,
          FP_OUTPUTPARAMS   TYPE SFPOUTPUTPARAMS.
    fp_outputparams-nodialog = 'X'.
    fp_outputparams-getpdf = 'X'.
    CALL FUNCTION 'FP_JOB_OPEN'
    CHANGING
    ie_outputparams = fp_outputparams
    EXCEPTIONS
    cancel = 1
    usage_error = 2
    system_error = 3
    internal_error = 4
    OTHERS = 5.
    Get the name of the generated function module
    CALL FUNCTION 'FP_FUNCTION_MODULE_NAME'
    EXPORTING
    i_name = 'ZHR_APPT'
    IMPORTING
    e_funcname = fm_name.
    Set form language and country (->form locale)
    fp_docparams-langu = 'E'.
    fp_docparams-country = 'US'.
    fp_docparams-fillable = 'X'.
    call the generated function module
    CALL FUNCTION FM_NAME
        EXPORTING
          /1BCDWB/DOCPARAMS        = FP_DOCPARAMS
          T_HR                     = wa_emphr1
       IMPORTING
        /1BCDWB/FORMOUTPUT       =
        EXCEPTIONS
          USAGE_ERROR           = 1
          SYSTEM_ERROR          = 2
          INTERNAL_ERROR           = 3.
    Thx,
    John

  • Please tell me the step by step process of HP Tape drive configuration.

    Dear all,
    we are using ECC5.0 and windows 2003 server and oracle 9i .Please tell me the step by step process of HP Tape drive configuration. I Think initSID.sap file in to change the parameter,but which parameter configure.Please suggest.
    Best Regards,
    Thiru

    Hello Thiru,
    Once the backup completes,tape willl be automatically ejected.
    I dont think there is any way by means of which you can see the data stored in the disk but yes what you can do is to run the backup with verify option
    This BRBACKUP command option verifies the backup after the files have been backed up
    Please refer to following for more info.
    http://help.sap.com/saphelp_nw70/helpdata/EN/55/c491f37407e74781bc0ebd96befba7/content.htm
    Rohit

  • Model Driven Configuration Management

    Hi,
    i'm a PhD student at the [VLBA Lab in Magdeburg|http://www.vlba-lab.de/] and i would like to share my thoughts about my research topic '[Model Driven Configuration Management|http://www.vlba-lab.de/en/Home/Research/Topics/ModelDrivenConfigurationManagement/index.html]' with you. Model-Driven Configuration Management (MDCM), means using MDE techniques to implement the requirements concerning the configuration of IT system landscape and IT infrastructures.
    Problem:
    While the capabilities of Model-Driven Engineering (MDE) have been realized in many parts of software development, MDE support for IT system landscapes and IT infrastructures is barely adequate. Although common frameworks for Enterprise Architecture Management (EAM) propose predefined artifacts and methods for this purpose, the transition between the design stage and the operating stage of software takes place manually. Time-consuming discovery procedures capture the current software configuration after the transition, store it in configuration databases and allow further analysis on the basis of reconstructed models.
    Objective:
    The identified gap between EAM and IT operations shall be closed by model-driven configuration management so that
       1. the deployment of software in an IT system landscape and
       2. the configuration of the underlying IT infrastructure can be accomplished automatically and traceably during both the initial transition and later migration.
    During my research i found similiar approaches for using Model-Driven Engineering techniques either for EAM or for IT operations, but not a combination of both and so my question is, if you have any expierences in using MDE for configuring your IT system landscape on the basis of EAM artifacts?
    Thanks,
    Sebastian

    Hi Sebastian;
    Your quest seems to be very interesting.
    Well I am not sure if you have SAP exprience. Well I am Technology consutant and may be I will try to make sence of your reserch from SAP point of view.
    What I understand from (Model Driven arch) MDE in SAP is a traction (program) called "SPRO" . It allows you to configure the already developed allications (in ABAP). This configuration are stored in Database and then allow further analysis. As you explained.
    Also a technology that might intrest you would be BC sets. It performs predefine recomended configurations for your applications and asks for your inputs if required.
    Regarding your specific area of requirement i.e. automation for IT infra configuration ; i generally feel that developers always get all the tools to get their job easily done...  But administrator never get their due share of attention for ease of use of their tools.

  • Scenario and Process Component List: Available on SAP Service Marketplace

    <b>Is the following useful to a BPX?</b>
    Warning: It is only available to those with a Service Marketplace logon.
    This was shared by Content Strategist: Scott Jones:
    The latest version of the Scenario and Process Component List on SAP Service Marketplace narrows the gap between the business view and the technical view of SAP's product portfolio. Customers can not only find out technical realization alternatives for SAP's business scenarios and processes, but also analyze which scenarios are possible with a given set of already implemented components. For planned upgrades, customers can analyze which scenarios have been enabled as well as which scenarios may no longer be available or require further upgrades of other components.
    All new features can also be reviewed in the "<a href="https://websmp101.sap-ag.de/~form/sapnet?_SHORTKEY=01100035870000682251&_SCENARIO=01100035870000000202&">what's new</a>!" section. Access the Scenario and Process Component List at SAP Service Marketplace (<a href="http://service.sap.com/scl">http://service.sap.com/scl</a>).

    Did you ever resolve this issue?  I am facing exactly the same issue and have the same question.

  • Having variations of same business process, How to model?

    Customer has several variations of the same business process. How to model them in Solution manager's project implementation tools? I actually created this same question in 'Business process expert' forum, so please read the whole story there and earn your points there.
    Having variations of same business process, How to model?
    Best regards,
    Kimmo

    Hi Kimmo,
    I wouldn't use process steps to refine processes. This is incompatible to SAP implementation content coming from BPR (Business Process Repository). But a good idea would be to copy the main business process e.g. "Sales order processing" into two new processes on the same level, e.g. "Sales order processing by manual input" (variation1) or "Sales order processing by incoming interface" (variation2). Then you can use the Compare Button on the variations to see if any changes have been on the main business process and copy them to the variations. This minimizes the effort to keep track of changes after creating the variations. When you run transaction SA_PROJECT_UPGRADE on that project these changes even get flagged. Mostly this function is used to upgrade against BPR or a template project but it works also for copies inside a project e.g. to model variations.
    Regards
    Andreas

  • Using Component Object Model+ (COM+) in webdynpro

    Dear friends,
    How can I use Component Object Model+ (COM) in webdynpro? Is it feasible to use COM to access SQL Server 2005 Database.
    Thanks and Regards,
    Tarani

    Hello Brian Tyler
    I followed your instruction but I ran into another problem ~
    I can't find the COM with the control
    on this website
    http://msdn.microsoft.com/library/default.asp?url=/library/en-us/shellcc/platform/shell/programmersg...
    I have found this section that I want to use:
    Modifying the Contents of the Taskbar
    Version 4.71 and later of Shell32.dll adds the capability to modify the contents of the taskbar. From an application, you can now add, remove, and activate taskbar buttons. Activating the item does not activate the window; it shows the item as pressed on the taskbar.
    The taskbar modification capabilities are implemented in a Component Object Model (COM) object (CLSID_TaskbarList ) that exposes the ITaskbarList interface (IID_ITaskbarList ). You must call the HrInit method to initialize the object. You can then use the methods of the ITaskbarList interface to modify the contents of the taskbar.
    but I can't seen to find it.
    Oh and I visited your blog, it is awesome, the nano car article is cool
    thanks for your help
    Jimmy

Maybe you are looking for

  • Show-stopper Connecting web performance test to remote DB2 server as data source

    Hi All, We are running TFS2010 on VS2010 Ultimate on 2003 server SP-2 with IE 8 for web applications. We are working on conducting load tests in web-service. Previously we did that using data source from MS SQL to connect our web performance tests. N

  • [XI 3.1 SP3] WinAD subgroup shown as user

    Strange things happen with configuring WinAD. The following: I have succesfully configurated WinAD and Single Sign On with BOXI Enterprise 3.1 SP3. But when I try to update a group it imports a subgroup as user of this group and not as subgroup. I am

  • Styleddocument problem with styling text

    Hello, I am looking to create syntax highlighting for a document. First I am just getting to grips with how it all works. I have reached a problem I hope someone will be able to help me understand.. The following is the code where I have the problem.

  • Using Hotspots as your internet

    Will a hotspot such as Verizon's work with the airport and time capsule backups

  • How to maintain the settlement profile for sales orders types

    Hi experts, When i try to create a Sales order it gives an error as maintain settlement profile  where can i maintain this settings...plz help me in this Thanks, Edited by: pandu123 on May 13, 2011 2:17 PM