Production cost

hi friends,
in the routing for finished material i have defined the base quantity as 1 and labour as 10 mins. there is no setup and production activities to be captured.
a labour activity is created and is entered in the work center costing view. the formula to that is given as sap003 which is labor*operation quantity /base quantity /operation splits.
i created a production order for quantity 100. after production  the production cost is showing as 7500.
now the labour minutes is 900mins. in activity price planning (kp26) i have defined as 10rs per minute.
can anyone tell me how did it arrive at 7500.
pls guide.
thanks
sita

Hi
Cost for any production order having say 2 operations is calculated as
Cost required to make 1 PC = (Total Cost of operation 10 / Price Unit) + (Total cost of operation 20 / Price Unit)....Be precise about units of activities
This is for 1 PC. If you have 10; multiply this with 10
Apart from above prices; it also checks components maintained via BOM
You relate above things with your scenario or give some more details. Also check the break up of costs from production order i.e. Goto > Costs and also see the SCE for this material
Rgds

Similar Messages

  • Old material overwritten by new material code in Product cost collector

    Hi SAP Gurus,
    How can I work around if a product cost collector with material XXX has been overwritten by a new material YYY when creating the KKF6N.
    Both material code having the same plant, same orde type,same production version but just different material code.
    When saving the preliminary costing for the product cost collector for material YYY, the system prompted me the order number 700022 which is already existing and created for material XXX.
    By right, this shd not be happened but indeed it did.
    Now when displaying the report S_ALR_87013127 - Order Selection, the report showed the new material YYY was created with order number 700022 but the content of the data was for old material XXX.
    Now my problem is how can I get back the product cost collector for material XXX as the original order number 700022 was meant for material XXX and not mat YYY.
    And also when executing backflush (MFBF) for old material XXX, the error msg prompted as 'content of order 700022: Mat YYY transferred to interface (IMSEG):Mat XXX due to this I can't backflush material XXX.
    Really appreciate your expertise on this urgently.
    many thanks!

    problem due to system bug, have to log to OSS for help.

  • Product Costing:External Processing

    Hi Gurus,
    My doubt is I am comparing standard cost estimates of production client with another client which is its copy. The product cost estimate of a material, the cost component 'External Processing' is showing value 700 in PN client and 1000 in the New client. The cost element for 'External Processing is 700000000H as primary cost element and another as secondary cost element. I tried checking the GL account report in FBL3N regarding the postings happened in the GL accounts.
    1. My question is why there is a variation of 700(of PN client) and 1000(in NEW client).
    2. The second question is, from where these values are flowing.How we can trace back the flow of values for this particular cost component of External Processing' of a material cost estimate?
    Is it anyway related with Exchange Rate differences? If so, how and where it is linked?
    I'll be really grateful for your answers.
    Looking forward for you reply soon.
    Thanks,
    Prithwi.

    Hi,
    I have checked the valuation variant 001. The startegy sequence is same only. There's no change in configuration settings as the new client is copy of production client only.
    I wanted to know, the 'External processing' data or values from which.postings. How it gets picked up and how we can check its origin?
    Thanks in advance for your help.
    Prithwi.

  • Product cost component

    Hello all,
    I am trying to create a report painter report which dsiplays all the cost components on the columns and materials along the rows. I have chosen structure KKBE library 7EE to accomplisg the task. However I cannot come up witht the report I want to.
    I have started doubting if the table and library even provides with the capability to achieve a report of such nature.
    Please advice me whether the library and structure that I am using is right? if not what is the best structure that can be used??
    What kind of reports can I make using structure KKBE?
    I have been suggested that ABAP report is the best option that we have. Can you please confirm that for me?
    I want to know what reason should I put before the management to effectively convince them that report Painter dosen't possess the capability and that ABAP needs to be used? (If that is truely the case)
    Points will be duely assigned for all helpfull answers.
    Thanks,
    NIK

    I tried defining the report however this is the error message I get when I try and execute the report.
    Can someone please advise on how to fix this probs. Above all, please explain in plain english what the message is all about.
    "Report contains more than one report object"
    Message no. KN089
    Diagnosis
    The report is for more than one report object. This causes performance problems. This is not supportedc in product costing in particular.
    Can't really understand what that means?
    Also can you tell me what characteristics do I need to pull to define the column for cost component lets say "Direct Depreciation". If you can tell me for 1 cost comp I can emulate the info to define the rest of the columns for diff cost comp.
    thanks
    NIK

  • How to calculate the Current APC (Acquisition and Production Cost)

    Hi,
    Please help me how to calculate the Current APC.
    The Current APC (Acquisition and Production Cost) is a calculated value based on Previous Year Acquisition balance plus any value changes up to the time of the report.
    The Asset History Report (RAGITT_ALV01) calculates the Current APC value &
    The Current APC can also be found in the Asset Explorer (transaction code AW01N) under Country Book 10/ Posted Values tab then the line “Acquisition Value” and column “Posted values”.
    I suppose that the calculation of Current APC (Acquisition and Production Cost) is getting done in the GET statements in the report RAGITT_ALV01, but unable to find the actual logic.
    Please help me.
    Thanks in advance,
    Satish

    Hi,
    you'll find the logic in fm FI_AA_VALUES_CALCULATE
    A.

  • How to add depreciation and interest in product costing?

    how to add depreciation and interest in standard cost estimate and actual costing in product costing ?

    Hi,
    WHy the admin and sales overhead will be deited to cost of product. The cost of product should include only the factory related direct cost and overhead cost .. not the sales and admin ovehead. exp. for those treat them as period expense and pass on the same to COPa and there those can be analysed there..
    I hope i am clear..
    Regards
    Prabhat

  • How to maintain One product cost collector for multiple materials and configuration setting

    Hi experts,
    my requirement is that i want to maintain one product cost collector for multiple materials ans also i want to know the configuration setting for the same.
    I have used KKF6N but it is not working in my case. I went through KKF6M also but there i found multiple cost collectors.
    please guide me in the same.
    Thanks in advance.

    Hi Shripad,
    you cannot assign same  Product cost collector to different material.
    Because you creating cost collector for material combination of material /production version,material /Bom Routing.
    so please create individual cost collector for every material.
    if you have any query kindly revert back.
    Please mark the answer as helpful if it is helpful to you.
    Because march 5 onwards scn has stopped awarding points to liked content.
    Starting now: No more points for likes on comments/replies
    Thanks & Regards
    Sandeep Kumar Praharaj

  • Error while creating product cost collector in REM ?

    HI, all SAP expert,
                 I have to run repetitive manufacturing .
    I create work center of category production line and use in rate routing of semifinished material.
    In mm02 -- mrp 4 view of semifinished material , i select rem profile , production version.
    Now I create product cost collector ( t-code kkf6n) for semi. material by giving order type (yrem), production version after enter it shows error
    Error in number management (notify your system administrator)
    in help it shows
    Error in number management (notify your system administrator)
    Message no. KO162
    Diagnosis
    A system error occurred in the number management.
    Procedure
    Please contact your systems analyst or the SAP hotline.
    Edited by: Nitin Nerkar on Sep 30, 2009 12:16 PM

    Dear Nitin,
    Check whether is the number range maintained properly for the order type RM01,check the config setting in T Code
    KOT2_PKOSA.
    This is related to CO Module.
    Check and revert back.
    Regards
    Mangalraj.S

  • Error while creating Product Cost Collector

    Hi SAP Gurus,
    While creating Product Cost Collector I am getting the following Error:
    Enter a distribution rule for Order without a validity limit
    Message no. KD059
    Diagnosis
    The settlement profile used requires you to define a distribution rule for Order. For period 009 2008, however, you have not created a distribution rule for Order.
    Procedure
    Create a distribution rule for Order without a validity limit, because, if the distribution rule does have a validity limit, the system always issues this message in the period following the last valid period.
    You can also use a different settlement profile that does not require such a distribution rule, or change the settlement rule used.
    Can any one help where exactly i need to maintain this.
    The settlement profile settings are fine.
    I am getting this error only after i have changed the scenario to Reproting point back flushing

    Dear Suryanarayana
    Please check the corresponding settlement profile for product orders.
    In most of the cases message KD059 means that no distribution rule is assigned to your production order.
    This is not an error, but the system design. In order to avoid message KD059 you will either have to enter settlements parameters and a distribution, or change settlement profile for valid receivers in transaction OKO7 from 'settlement required' to 'Can be settled'.
    I hope this helps resolve the issue for you. I wish you the best in your endeavours.
    Kind Regards,
    Brendan

  • Product Costing  - Message CK 318 ()

    Hi Experts,
    While executing product cost calculation for material YYY we had warning message CK318 - Cost estimate for material XXX contains errors -> Planned price). XXX is a component used in YYY and the message was issued because we did not have price for XXX. We are now able to proceed with standard cost release for YYY.
    As I remembered previously, if you have an error in lower level, the higher level material would have been costed with error too. Seems that this is no longer the case. 
    I am not sure if this has changed in standard system in ECC 6 or we have to change message control for this message from Warning (W) to Error (E) but it seems the system reaction is not logical to me.
    Thanks for shedding insights into this.
    Teck

    HI Teck,
    Can you go to OKKN, and quantity structure tab and check out the 'transfer active std cost meates if material costed with errors check box?
    Best Regards
    Vimal

  • Product costing erroe at the time of releasing the billing document in vf02

    Hi co experts
    while releasing billing document to accounting in T.Code VF02 it is showing error that no product costing estimate could be found
    messege number ke380
    i really appreciate for the early responce
    regards
    venkat
    Edited by: venkataswamy bathini on Mar 14, 2009 10:43 AM

    Hi
    i have estimated the cost in ck11n ,marked  and released in ck24.
    the std price will updating in meterial master.
    i tried the tranaction  in vfo2, but still getting same error
    this is the Diagnosis
    in copa the system tried to find a product cost estimate for product 44 in plant 1100 that uses costong variant dc08
    the system lokked for the cost estimate using costing keys dcb as defined in the copa customizing settings
    Regards
    venkat
    Edited by: venkataswamy bathini on Mar 14, 2009 12:36 PM

  • Product costing by sales order configuration steps

    hi
    plz send me product costing by sales order configuration steps.
    sir, i know manufacturing order configuration step but i do not sales order configuration.
    in the sales order also is same as manufacturing order like first we have to make planning cost , the planning cost should be updated to material master and next configure the actual cost.
    for first step- costing variant -okkn
    next -costing variant -opl1
    for sales order also same we need to update planning price first- what is costing variant
    for actual cost - what is costing variant
    plz tell me detail
    regards,
    sowmya
    Moderator: Please, read forum rules before posting

    Hi Sashikanth,
       Please send me the Configuration document for make to sales order.We are at Blue print stage need some docment for make to sales order.Plese send me the document it will will be very help full for me.
    My id is [email protected]
    Thanks in advance
    Regards,
    Nagaraju
    Edited by: nagaraju sami on Mar 9, 2008 11:58 AM

  • While product costing CK11N error

    While using CK11N I am getting following error:
    Sr.No.               Error Description                                                                                Msg No
    1>     No price could be determined for Material /Batch XXXXXXX/Plant XXXX                                                    465
    2>     Cost Component split costed with value zero                    240
    3>     No valid source of supply could be found.                         380
    4>     Object was not costed                                60     
    5>     Cost estimate for material XXXXXXX /Plant XXXX is incorrect                                 168          
    Please help me how to fix above problem.
    Thank you.

    Check following points,
    Probably material might be split valuated,Check price is maintained for all valuation types including header in MM60.
    Check price is maintained in info record.
    Check type of procurement in MRP2,it will be external procurement - F.
    Do product cost estimate using KKF6N.
    Check production version is maintained in MRP4 ?
    Check throughly all masters vendor,info record & material master.
    It will solve the issue.

  • Error: no product cost estimation possible, at the releasing for accounting

    Hi Guru,
    while releasing for account in billing document for the finished product.Shows Error as:"no product cost estimation not allowed". Thou I cheked configuration checking of costing key in COPA and costing variant of relevant one looks fine. Plz guide me further more configuration and basic settings needed in to solve this task.
    Thanking u in advance
    Murali.

    Pawan,
    Thanks for your quick reply.
    I have done those change also, still it is coming same as " No Product cost estimate was found". check  you costing key 100 in COPA configuration. i have checked costing key configuration , in that costing varinat PPC1, Costing Version 1, Period/Indicator as "Current Standard cost estimate Acc. to entry in Material Master" .
    How to fix this, guide me
    Sateesh

  • Acquisition:Acquis. and production costs' could not be found for area 01' in ABZON

    Hi  All
    I m getting one error 'Account 'Acquisition:Acquis. and production costs' could not be found for area 01' in ABZON. I know we have to maintain accounts using Tcode-AO85 but
    1) how to know the correct Account Determination.
    2) How to know the correct G/Ls to be maintained in AO85.
    Pls advice.
    Thnx in advance.
    Regards
    Pankaj

    Hi,
    In ABZON, if you are acquiring with existing asset then you cna have access to account determination / asset class from asset master. If you are also creating new asset then you will have access to asset class.
    In OAYZ, we assign account determination to asset class. and in AO85, we asign GL account to account determination.
    Hope this will help you.
    Thanks,

  • AIAB - Account Acquisition:Acquis. and production costs could not be found

    Hi Guys,
    I want to doing Settle Asset Under Construction with AIAB,
    when i doing Process distribution rules with target Asset on time-dependent it's Cost Center, it's no problem and success
    but if i doing Process distributin rules with target Asset on time-dependent is Internal Order, so i can't process and show error message : Account 'Acquisition:Acquis. and production costs' could not be found
    so can any body give me the solution, where is the problem ??
    Thank's
    Best Regards
    Ferry

    Hi,
    In AO90, check for the Account 'Acquisition:Acquis. and production costs' .
    Then for the GL account check the field status group.  May be Cost center might be mandatory.
    Regards,
    Sridevi

Maybe you are looking for

  • How to use CLIENT-CERT authentication?

    Hi, I would like to know how to use client authentication. I used a web application with CLIENT-CERT authentication. And I accessed to the application from browser, then I had the following error message: Incorrect or missing client certificate. I us

  • I synched my iphone and lost some purchased songs and albums. what happened and how do i get them back?

    just a minute ago i connected my iphone to itunes so that i could transfer some albums i've purchased recently. it started it's usual synching process and once it was finished i found i'd lost more than a few recently purchased albums. not sure why o

  • Safari madness

    It's kind of alarming reading about all these problems with Safari. For the first time since I've owned a Mac (7 months) I've started having some myself. We've all done the fixes but nothing seems fixed. I'm getting the color wheel often and doing fo

  • Cant update itunes but need to for new ios6

    Hey im an owner of a macbook pro from a few years ago and its still on version 10.5.8. Now I regretfully updates to ios6 on my iphone 4s and now cant sync with my itunes because my itunes cant be updated unless I have version 10.7 or newer os. Is the

  • Track Changes -- Author Color

    I have made one set of changes in a doc in blue.  I now want to add a second set of changes without eliminating or changing the first set.  Can I add the 2nd set of changes in a new color ...e.g. green, while still keeping the first set of changes in