Production Order GR with Planned Price
Dear All,
We are using following steps for production order=
1) Create BOM, for Semifinished material with Price control = "S"
2) Create Roting, with all Keys PP01, PP02 and PP03 with Material allocation to respective steps
3) Standard Cost Estimation using CK11N and CK24
4) Create Production order using CO10 with Material and WBS Element.
5) Material issue against Reservation. But the material may be changed after releasing prodction order first time. And Actual issue for the BOM material may be more or less in qty.
6) Final confirmation with completion of last phase confirmation of production order.
7) Production Order TECO
8) Prodction Order Settlement using KO88
Now my problem is while I am doing final confirmation the GR done is with Planned price (Based on BOM) + Subcontracting charges which it is set with production order while releasing it for the first time.
Kindly tell me is the system behaviour is correct or wrong?
We are expecting that GR should happen with the actual material issue price + Subcontracting charges only.
Please reply.
Thanks & Regards,
Vishal Kadia
Vishal,
This is for your information.
If you have production order of 1 EA- Starnadar Price =10 rs
Raw material cost=5
Activity Cost=2
Overhead Cost=2
So COM=9 rs
Suppose after production order creation plan cost is 9 rs, hence after confirmation there is no varience (plan vs actual) so actual cost is also the same 9 rs.
Now as you said if system will go for GR against actual cost, that will post in cost of good mfg account at the time of GR.
As per std SAP after GR also you can issue the material to that order, hence if you will go for more goods issue of new material against that order (unplanned issue) of rs 5 for the same order then the actual cost will again change (recalculated), but for that oredr material is allready GR with actual cost, then you will not able settle the cost of newwly issued material on that order.
So whatever the plan and acual cost GR will be done against std price maintioned in material master ( 10 rs)
This is my understanding.
Hopes that will clear your dought.
Tara
Similar Messages
-
Production order having no planned values
We are in Make to order scenario. The production order for the parent material is created with reference to a Sales Order. While costing the production order for the parent, total planned price is displayed as zero. we have maintained price control std price for all configurable materials(parent & child) with zero price being configurable materials.
We dont understand why the production order is having no price. BOM, routing, etc. are in place. What are the possible reasons as to why costing is having no value for the production order ?Dear Nikkitha,
Normally, the planned prices for the Production order are displayed as per the costing variant that apperas in the Production Order control tab (passes down from the order type). This has no relation with the sales order cost estimate which is used for Target price calculations.
Also, you can check when the Planned Prices of the Production order are calculated in the Transaction (OKZ3) for the order type.
Kind Regards
Umapathi G -
Sales order BOM with component price
Dear All,
In PP module is there any report sales order BOM with component price?
please help
regards,
Anwar Shaikh
SAP PP / QMHi Anwar,
Please see if the below link is helpful to your cause.
[Recalculate the price of the sales order;
Regards,
Abhay Kapase -
PP Production orders link with Profit Center
hi experts
we are working on Projects based scenario and Production is doing in the same way, we mentioned profit center in Project WBS element, but my requirement same profit profit center should be link to production order.
what are the settings need to be done please help
thanks in advance
SingDear Slng,
In my understanding if you have assigned a profit center in the material master under Costing1 view then it get's copied
automatically into the production order which can be seen under Assignment tab page of the production order.
This is the process when you create a production order from a planned order using CO41/CO41 or by creating a production
order manually using CO01.
Check and revert back.
Regards
Mangalraj.S -
User Exit for Production Order confirmation with CO15
Hi All,
what User Exit I should use when validating batch when we do Production Order confirmation with CO15.
Not when we create or release a Production Order.
Will reward,
mindaugas
Edited by: Mindaugas Kazlauskas on Jan 30, 2008 5:03 PMHi
The Follwing Userexits available:
Transaction Code - CO15 Enter Production order Confirmation
Enhancement/ Business Add-in Description
Enhancement
CONFPP01
PP order conf.: Determine customer specific default values
CONFPP02
PP order conf.: Customer specific input checks 1
CONFPP03
PP order conf.: Cust. specific check after op. selection
CONFPP04
PP order conf.: Customer specific input checks 2
CONFPP05
PP order conf.: Customer specific enhancements when saving
CONFPP06
PP Order Confirmations: Actual Data Transfer
CONFPP07
Single Screen Entry: Inclusion of User-Defined Subscreens
CONFPS01
PS confirmation: Determine customer specific default values
CONFPS02
PS confirmation: Customer specific input checks 1
CONFPS03
PS confirmation: Customer specific check after op. selection
CONFPS04
PS confirmation: Customer specific input checks 2
CONFPS05
PS confirmation: Customer specific enhancements when saving
CONF0001
Enhancements in order confirmation
CONFPI01
Process order conf.: Calculate cust.specific default values
CONFPI02
Process order confirmation: Customer spec. input checks 1
CONFPI03
Process order conf.: Cust. spec. check after op. selection
CONFPI04
Process order conf.: Customer specific input checks 2
CONFPI05
Process order conf.: Cust. spec. enhancements when saving
CONFPI06
Process order confirmation: Actual data transfer
CONFPM01
PM/SM order conf.: Determine cust. specific default values
CONFPM02
PM/SM order confirmation: Customer specific input checks 1
CONFPM03
PM/SM order conf.: Cust. spec. check after op. selection
CONFPM04
PM/SM order conf.: Customer specific input check 2
CONFPM05
PM/SM order conf.: Cust. specific enhancements when saving
If it is helpful rewards points.
Regards
Pratp.M -
Check in Production order qty with ref to Planned order
Dear all,
Please suggest me, when i am creating a productin order with ref to planned order , so the order qty should not exceed the planned order qty.
How can i control this , please give ur valuable inputs on the same.
regards
Ravi AroraDear
If you are not particualr to conver the planned order to production order through CO40 , then you can control with the help of
Enhancement : PPCO0007 (Exit when saving production order)
Functional Module : EXIT_SAPLCOZV_001
Include : ZXCO1U06
Compare the Order header Qty with the sales order Qty If the production order header qty is more do not allow the system to save the production order..
Otherwise please check those out for your requirement :
Planned Ord. to Production Order User Exit (PPCO0005)
EXIT / BADI for Tcode CO40
Regards
JH -
Production Order created from Planned order qty should not be changed
Dear PP Gurus,
IKindly give your valuable inputs on the below mentioned subject.
From MD04 planned order is converted to production order user should not be able to reduce the requirement quantity below Production Order quantity.
Thanks & regards,
Shanmugam BalamuruganHi,
This is common problem. to control this you need to develop an user exit . This exit will check the fixed lot size in material master and will compare with the quantity of production order. The exit will get fired at the time of order saving.
If any miss-match happens system will give an error message
Regards
Amit Parkhi -
Production order confirmation with BAPI
Dear PP friends,
I want to create a program to confirm production orders in mass at header level like CO15. To do it I am trying to use BAPI_PRODORDCONF_CREATE_HDR and it works fine for planned backflush.
However, I am not able to change data of goods movement (quantity, warehouse and batch). Is it possible?
What is the function of GOODSMOVEMENTS table?
I studied the following thread but I could not solve it.
Production Order Confirmation BAPI
Does anyone have suggestions?
Thanks in advance.
MarcosHi Caetano,
Thanks for your reply.
I tested BAPI_PRODORDCONF_GET_HDR_PROP and it proposes goods movements according with open quantity of the production order. In this case, would I have to adjust all movements with actual quantity?
Is possible to propose goods movements according with confirmed quantity?
Regards,
Marcos -
Purchase order report with basic price and Excise duty values
Hi All,
Is there any standard report in SAP to get the Purchase order basic price / qty and its Excise duty values ? Since we are including Excise duties for non - codified items (w/o material master and with cost center 'K') Purchase order and the ed values are added to the cost and the requirement is to see the split up (Basic priceEdEcs+Hcs)for these Purchase orders for the vendors. If there is no std report then please let me know how to link Purchase order table with this Condition value table in query to get the desired report.
Thanks in advance
BennyHi,
there is no standert report to fullfill this requierment
you have to create this report with the help of abaer
for that which tax code you are using its importnat thing
for po table EKPO
1. A524 (Normal supply point / Material) it will return condition record number for condition type.
2. KONP (Conditions (Item)) .
3. J_1IMTCHID (Combination of Material Number and Chapter ID).
4. J_1IEXCTAX (Tax calc. - Excise tax rates
5 get the IR no. from RBKP and RSEG, and get the relevant FI doc no. and goto BSET table
for IR number to get from table apply logic for doc type RE ,you will get fi number nad in refernce field you will get invoice number + fiscal year
Map this by refernig on po for which grn and invoice happen
Regards
Kailas Ugale -
Production order overlapping with purchase orders for outside process
I set up the overlap option in a router so we can send 50 pieces (total order quantity is 200) of material ahead to an outside heat treat operation. When we try to create the purchase order for the 50 to be sent out for heat treat two problems occur.
1. The quatity in the purchase order is for the entire order of 200, not 50.
2. We get a message "Date /23/2010 period D is not valid.
We currently do not use the functionality of splits and overlaps so if anyone can help or guide me to a good resource I would appreciate it.
Regards.
Gail
Edited by: Gail Weeks on Nov 12, 2010 4:19 PM
If anyone could help with this question I'd appreciate it. Thanks.Gail:
the next operation would be an external operation in your order ? That is, has some external Operation Control Key?
Then the PurReq for this operation is created at creation or release of the production order by the total operation quantity. Ovelapping allows you to reduce some total time in order, but I don think that can be applied for the purpose you describe. Let us know more details about your requirement.
Regards -
Production Order BOM with Variant Configurable Material
Hi,
I have a requirement to process the document items in the Production Order BOM for a variant configurable martial. I am not sure which Function Module will do this purpose. I checked the FM: CS_BOM_EXPL_MAT_V2 and does not seem to be working.
Can you please help me with a suitable Function Module or program that will process the Production Order BOM? Appreciate Your Help.
Thanks,
Kanan
Edited by: Kannan SA on Jul 6, 2011 8:59 PMWhat are you doing with the characteristics right now ?
If you want operations selected based on characteristic values, you need to have dependencies written just like you do (or in your case, will do) in your BOM components.
I understand the business-push to not do things 100% at the start and just "oh we'll add that part later" but I would really push back to get that part included initially. -
Production Order Issue with Qty conflict
Hi Friends,
i have a issue with a production order fro which we built the product and the finished goods is moved to storage location, i have status set on my Production order as REL PRT CNF DLV PRC GMPS MACM SETC. My order was for 1unit,In the quantities window , total qty shows as 1 pc and delivered as nothing (blank). Its not active were physically i can change , so how do i add the deliverd qty field by 1.And what could be the issue? PLS help Points will be rewarded.This Delivered field in CO02-Dates/Qtys tab will get updated automatically , when the order qty is delivered to stock.
We can not manually update that.
Have you checked whether the storage location stock has been increased ? In MMBE , you place the cursor on the stock qty and choose Environment - Production orders or Material Movements and check , whether a GR has been made against this order.
Regards,
Sheik -
Production Order Report with Cost
Hi,
I am trying to create a report using query to show the production order details, including the components item code (can be inventory or non-inventory), issued qty, component cost of each component and product cost.
Can anyone help?
Thanks.Hi,
Try this
SELECT T0.[DocNum], T0.[Status], T0.[DueDate], T0.[ItemCode], T3.[ItemName], T3.[ItemCode],
T3.[OnHand], T1.[BaseQty]*T2.Quantity 'Base Qty', T1.[PlannedQty]*T2.Quantity 'Planned Qty',
(Select sum(isnull(T4.LineTotal,0)) from IGE1 T4 where T4.BaseEntry = T1.DocEntry and T4.ItemCode= T1.ItemCode and T4.BaseType = '202')as 'Cost'
FROM [dbo].[OWOR] T0
INNER JOIN [dbo].[WOR1] T1 ON T0.DocEntry = T1.DocEntry
INNER JOIN [dbo].[ITT1] T2 ON T1.ItemCode = T2.Father
INNER JOIN [dbo].[OITM] T3 ON T2.Code = T3.ItemCode
WHERE T0.[ItemCode] = '[%0]' AND T0.[DocNum] = '[%1]'
Regards,
Bala -
Production Order Cancellation with "Period month/year is not open error"
Hello friends,
We have this scenario wherein we already "confirmed" Production Order booking for a specific operations which was booked for the month of Sept 2009 using TCODE: CO11 and our Financial transaction was also closed for the month of Sept 2009.
However, the said booking was incorrect and we need to cancel the said Production Order booking using CO13 and unfortunately we encountered Goods Movement Error Message - "Period 009/2009 is not open for account type M and GL 115700".
The cancellation of production order only took place on the month of Oct 2009 wherein our Sept 2009 Financial transactions were already closed.
May I ask how we can cancel the said Confirmed Production Order Booking without opening the Sept 2009 Financial Transaction and be able to process the transaction by taking effect the changes on the month of Oct 2009.
Thank you!
BongHI,
4. After all, I used OB52 and rewrited as below:
Var. 1000
A. +
From acct : blank
To acct: ZZZZZZZZZZ
From per.1: 1
Year: 2002
To period: 999
Year: 9999
From Per.2: 1
year: 2002
To period: 999
Year: 9999
AuGr: blank
It's the same with Acc: A,D,K,M,S
Check M once again and take a help of FI consultant
Regards
Kailas ugale
Edited by: kailasugale on Jan 18, 2012 3:52 PM -
Why user can not open Production Order form with readonly privilege?
hi guys,
today I got a problem when I assign the minimize privilege for a new user.
the user only want to query status about Production Order, so I assigned the privilege with readonly on Production Order, and disabled all others.
But when user logged on, and click on the 'Menu -> Production -> Production Order', there pops up an error message said 'To generate the document, first define the numbering series in the Administration module'.
Do I have to find some other privileges to assign for the user account?
thanks for your help.Thanks.
But there were 10 groups look like from 'Series - Group No. 1' to 'Series - Group No. 2', How did I know which one was assigned to Production Order?
Maybe you are looking for
-
How can i transfer ALL my apps and music back to itunes
idont know how to transfer all my apps and music back to my itunes after my friend wiped the computer out. HHHHHEEEEEEEELLLLLPPPPP
-
Please help. I cannot place a call on BB Z10
Hello, Please help. I have problem for placing any call on Blackberry Z10. It was okay until today. I think i did not make any changes for phone. I cannot make call on Blackberry and it ends as soon as i place a call. I normally receive call from som
-
Help with Error message in Flex 2.0 while trying to import from a library of classes
The following code is in a folder named saras. Inside saras is a file named saras.as and a library of classes named ASCB3Library. I downloaded this library after I purchased a book named ActionScript 3.0 CookBook. I have tried every way I know for a
-
Want to set up folders in Mail to store messages i want to keep. any ideas?
Want to set up folders in Mail to store messages i want to keep. any ideas? all i have is Inbox Sent Trash I want to add folders so i can access pdf/doc files i need ... thanks for the help! crip21
-
Why does ical go offline when I log out, and ask if I want to go online every time?
Version 5.0.3, lion 10.7.4, intel 2011 This is very annoying and I would like ical to just "recognize" that I am online, so I don't have to do anything with it. Anyone know the answer?