Production order stock
Dear All,
Any movement type is used for sale order stock to order stock.
Regards,
Devi.G
hi,
u need to do the same in 2 steps.
sales order to un ristricted and from unristricted to order
Similar Messages
-
Confirmation of production order - stock not updated
Dear all
On confirmation of production order,all dependent requirements as per bom (stock available at storage locations) should get updated ( as I set back flushing for all material stocks at material master level). But, when i do mb31, final product stock is updated, and bom stocks not getting updated.
what is the reason.please give solutionHi GB,
Please analysise the following :
1.COGI what is exact error u are getting.
2.Did u check the following options
1. In the routing, the backflush indicator is set in the component assignment.
2. In the material master record, the backflush indicator has the characteristic "Always backflush".
3. In the material master record, the backflush indicator has the characteristic "Work center decides", the indicator being set in the work center.
Use
3.MB31 is for GR of stock means it post the stock at FG storage loactication ok.
4.If u need to update in BOM stock , u have to do it by MB1C/MB1A with movement type 262.
5.Check the stock in MMBE whether u have maintained ornot.
Please check all those anf come back.
Regards
Jia -
Direct link between planned/production order & Stock transport order
Hello,
We have the following situation.
Plant A = ordering/receiving plant
Plant B = producing/selling plant
Material is stock material in plant A (reorder point planning). If required, plant A creates intercompany purchase order with plant B as vendor.
Standard SAP behaviour: MRP run will create planned order in plant B but there is no direct link between the intercompany purchase order and the planned order. It can as well be that this planned order combines several requirements.
Our requirement: Have a 1 to 1 relationship (and a direct link) between the intercompany purchase order and the planned order (and also with the production order which will be generated afterwards). The solution we think about: After creation of the purchase order, create firmed planned order (or immediately production order) by means of a bapi.
My question is whether there are standard SAP solutions for this?
Best regards
KurtWhen customer give order and then it creates sales order.
depends on material - I mean Finshed good or Comapny own product ,
If it is outside material ,it creates Purchase req and then Purchase order.
if it is company material ,it creates Planned order and then production order.
Check the transaction you will get better idea.
MD04
MD02
MDBT
LS24
LS26
MMBE
CO01
CO02
CO03
CS03
ME51N
ME52N
ME21N
ME22N
VA01
VA02
VA03
Reward Points if it is helpful
Thanks
Seshu -
Dear Experts ,
I have a requirement that i want to check production order wise stock in hand.its a bit urgent.
Can anybody just help me out by some Tcode or some tables by which i can get the required data.
Regards
SarfrazHi,
If the Stock is not referring to any special stock (sales order, Project etc..), it is not possible to get the production Order stock.
This is with referenve to the FG.
If you want to have the Stock for Components of the production order, then with reference to the Reservation no. you can findout the components..
Regards,
siva -
Creation of production order report
Dear,
Gurus !!!!!
I am working on production order report.
Could you give me some idea how to create a production order ,stock overview report and
work center reports.
How I see it .
Regards,
NitinDear Nitin,
use std report availble
1. production order COOIS
2. Stock overview MMBE, RWBE, MB5B, MB52
3. For work center use CR05/06/07/08/10/15/60/80
sree -
Table name& field name for production order & operation confirmation
Hi All,
I would like to know the table name and field name for the production order "confirmation" (CNF) and the operation confirmation (CNF).
Thanks and Regards,
PSSHi there,
CORU(R/3 Application development: PP Confirmations )
AFFW Goods movements with errors from confirmatio
AFRC Table of planned changes to conf.: Automatic
AFRD Default values for collective confirmation
AFRH Header information for confirmation pool
AFRP1 Table of planned changes to conf.: Automatic
AFRP2 Table of planned changes for confirmation: B
AFRP3 Table of planned changes for confirmation: C
AFRP4 Table of planned changes to confirmatn: Data
AFRU Order completion confirmations
AFWI Subsequently posted goods movements for conf
TAFWD CORU: Messages that are not interpreted as e
TCORD Table for field-dependent check routines
TCORU Parameters for order confirmations
TCORV Table with Routines for structureing variabl
TCORW Confirmation: Window Control
TPARU Control parallelized confirmation processes
TPRRU Control table for process chain for confirma
TPRRUT Text table for process control of confirmati
TRUGS User status caused by deviation
CO(R/3 Application development: PP Production orders )
AFBP CIM order: Batch print requests
AFFL Work order sequence
AFKO Order header data PP orders
AFPO Order item
AFVC Operation within an order
AFVU DB structure of the user fields of the opera
AFVV DB structure of the quantities/dates/values
FAPW Index of production-/issuing plant for produ
FTIND Missing parts index
ORDCOM Communication control Operation download
T024F Production scheduler
T399X Parameters dependent on order type
T441C Profile - availability check
T441CT Texts for Profile "Display Availability Chec
T490 Transactions PP - orders - order category
T496B CIM order: Assigning document types to refer
T496D CIM: Destination/lists/spool parameters per
T496F CIM order: Form description of the list
T496K CIM order: Entity table of possible table id
T496N CIM order: List descriptions
T496P Print PP documents: Determination of output
T496R Print PP shop papers: Report control
T496T Print PP shop papers: Transaction control
T496V PP Print: Default Value for Printing Online
T496Z CIM order: Table-controlled table access
TC32 Assigning subscreen to processing location
TC34 Allocating operation to object type for the
TC62 Sequence of detail screens when processing h
TCO01 Sequence/operations control in logicstics or
TCO03 CIM order: Texts for TCO01, Description of o
TCO04 Table for controlling the screen sequence gr
TCO05 CUA status depending on panel, trans. type,
TCO06 Exclusive functions for PP orders
TCO09 CIM order: Text IDs of objects in orders
TCO10 Valuation variant for order costing
TCO11 Control table for production orders - availa
TCO12 Control table production orders - stock dete
TCO36 PP orders: Control table for calling up pop-
TCO41 CIM order: Default values for generating ope
TCO43 PP-SFC order profile
TCO43T Description of production scheduler profile
TCO60 Sequence keys for input facility and verific
TCO61 Sequence key for PP orders
TCO62 Defining screen sequences for input facility
TCO63 Sequence of detail screens when maintaining
TCODB Database fields development class CO per ord
TCOF Profile for missing parts info system
TCOFF Profile for Missing Parts Info System: Displ
TCOFFT Texts for Missing Parts Info System: Display
TCOFG Profile for missing parts info system: crite
TCOFGT Texts for Missing Parts Info System: Criteri
TCOFK Texts for functions in milestones/trigger po
TCOFS Profile for Missing Parts Info System: Sort
TCOFST Texts for Missing Parts Info System: Sort Cr
TCOFT Texts for Missing Parts Info System
TCOKO Constants for PP orders
TCOKT Account assignment categories for order
TCOP Field selection profile
TCOPS Field selection profile
TCOPT Description of Profile for Field Selection
TDUMMY Dummy structure of a table for READ with VER
TRUG Reason for variances in completion confirmat
TRUGT Text describing the reason for a variance in
TXPR1 XPRA control - missing parts info system
Regards
Hemant G -
Production Order For Project with plant stock
Hi,
We have a scenario where in we are required to create a production order for a project.
But the material(raw material) is in a storage location and is a stock item. Even the header material is also a stock item and it to stored in the storage location.
But the order is to be created for Project and to be settled to the Project. Now the system is not allowing me to create the order.
The error is :
"Project does not allow make-to-order stock
Message no. CO746
Diagnosis
There is no project stock for the project.
To create a production order with reference to a WBS element the project must allow project stock to be maintained.
Procedure
You should select a project that allows project stock."
Now,
I don't want to have a project stock. How to go forward...
Regards
PavanHi,
What is the strategy you are using. If you are using strategy 20, then chnage it to 40.
Also maintain individual/collective indicator to "1" - individual in MRP-4 view. So that when the order is created, the stock will be reserved as Q-project stock.
thanks and regards
Murugesan -
Production order stays open after receipting into stock
Hello,
After I have receipted a production order into stock the production order stays open - should this not close the production order? Is the only way of closing it done by going into the order itself and changing the status to closed?
Many thanks,
KateHi Kate,
It has to be closed manually and only then will the final journal entry be created in case of variance etc.
Jesper -
In sale sorder based production order can i consume unrestirced stock
HI,
i am creating Production order using co08 with respect to sales order.the
( bom items)components to be cosumend for that production order should be sales order stock compulsory.
if i want to consume against sales order how can i consume stock which does not have sales order assignment. i think only through 231 movement type.
if there any possibe pls sugggest
regards
madan mohanHi madan,
Other than the way of converting the unrestricted stock to the sale order stock which is the normal course of working, you can also consume the unrestricted stock to the production order which has a assignment to the sale order by manually changing the assigment of the material to blank in the production order components. If you enter into the production order components u will be able to see a column called "Spec procurement" where in by default it will be '1' if the production order is w.r.t a sale order. you have to remove that and make it blank. then proceed with material availability check, if the unrestricted stock is avl for the material / storage location then the same will be commited to the production order.
reg
Kiki
award points if this is helps -
Reg.Stock transfer from Sale order into Production order
Dear All
We want to transfer the sale order stock in to production order.
What I have to do ? Pls help me.
Thanks
Rajakumar.KHi,
Could you please explain in details?
Other than the way of converting sale order stock which is the normal course of working, you can also consume the unrestricted stock to the production order which has a assignment to the sale order by manually changing the assigment of the material in the production order components. If you enter into the production order components u will be able to see a column called "Spec procurement" where in by default it will be '1' if the production order is w.r.t a sale order. Then proceed with material availability check.
Regards,
R.Brahmankar -
Budget error while issuing stock to the project based production order
Ours is project based Engineering company, we mfg euipments for the client which is part of the project.
We define separate WBS element for equipment to be manufacture & create reservation under this WBS element.
Secondly we follow production process through PP & define BOM for equipment which contains component rquired to mfg the equipment. To control cost(budget) component group wise we create separate sub WBS element for each component group(plates, motors etc) under above equipment WBS element
Kindly refer e.g.below
1. Equipment (Finished code) to be manufacture is attached on WBS MYC-210952-06-03
2. Production order(1003780) created with reference to above WBS element
3 Material procured under WBS MYC-210952-06-03-001
4. Stock available under WBS MYC-210952-06-03-001
We would like to issue material available under MYC-210952-06-03-001 to production order which is attached to WBS MYC-210952-06-03. (Tcode MB1A)
System allows to issue stock, but gives budget error.
Is it possible to transfer budget auto in the transaction MB1A itself from MYC-210952-06-03-001 to MYC-210952-06-03 or what is the best solution available for above situation.
Kindly confirm.
Thanks & regards
Sanjay KarnekarHi Sanjay,
You have consumed a budget at lower level WBS for material procurement. And at upper level you want to do stock transfer.
But while doing budget allocation you have distributed the budget from Upper level to lower level so there is no distributable value is avaialble at upper level for the amount of the materail stock you want to transfer.
In this either you have to keep your all budget values at upper level where your doing equipment aeembly and not distribute the budget further at lower level.
Now you alredy this so you cant do anything.
Now you have following option available with you. You have perform following activity by the given sequence.
Deactivate the Budget check by CJBW
Do your stock transfer
Do budget return by CJ38 from level WBS to upper level WBS
Now Activate the budget check by CJBV.
regards,
Pradeep -
Goods Issue (MB1A) for production order - no stock reduce happening in WM
Hi,
I try to do a Goods Issue with transaction MB1A for a production order, but no stock reduces happens within WM (HUM).
I did the following.
Created a Production order - CO01
Created a TR - LB01 - (assigned production order to the TR)
Created a HU for the materials. (HU02)
Created a Transfer order to storage type 914 with L_TO_CREATE_MOVE_SU.
At the end I want to do an goods Issue with MB1A. This seems not to work correctly. When I fill out the ordernumber and process the transaction a Delivery is created.The materials are already on 914, so it can be issued directly.
What can I do to solve this.
Thanks in advance.
Regards,
AlexanderPlease find out is there any accoun t assignment is there for the component in question.
pl got production order disply screen and goto --> material list
check is there any value on the filed account assignment. If that is the case then you need to have special stcok for that account.
If it is empty then check
are you entereing the correct storage location and plant.
if that is also fine then check whether the component is already issued, i.e. goto the component detailed screen and check wthere final issue tick is there for the component...or the componentb is deleted...
come back after these checks. -
Product costing valuated sales order stock
Hi all,
We are in complex mfg & currently re-vamping all the ERP SAP instances ( totalling 13 company codes into one single)
All 13 units( who use NON Valuated scenarios for cost object controlling) wil use valuated sales orders & projects. The old 13 companies will be trated as profit centers with transfer pricing functionality ( Multiple valuations)
My issue is to get a product cost for sales order in <b>profit center view</b> ( plan cost) exactly same as to the marked standard cost itemisation of the FERT material.
We mark & release the std cost in Jan & the client wants to have the same itemisation of the cost ( with same values) even if they create a sales order in 2nd or 3rd or last quarter. ( As you might be knowing that the sales order wil always cal;culate the values as per the current qty structure date. In Std SAP date control, there is nothing which allows us to cost exactly the same cost estimate as marked & released in JAn)
Could somebody pls give pointers as how to get this sales order plan cost itemisation exactly equal to prevously marked & released itemisation ?
We use the Std costing variant ( Costing Type = Profit center valuation) with Std date control.
Thanks in advance to all of you,
Warm Regards
DhirajHi,
If the sales order stock is valuated, you have immediate access to its value in Financial Accounting. The assigned accounts are debited and credited as a result of the valuated goods movements. From the viewpoint of MRP, the sales order stock is available for the sales order only.
If the sales order stock is not valuated, it is managed via a cost collector. The system does not carry out invoice verification postings for goods movements, and you cannot obtain an overview of how the stock is valuated until the end of the settlement period in Controlling.
Valuated sales order stocks have the following advantages:
The full costs are available at each manufacturing level.
All goods movements are immediately reflected in Financial Accounting
Assign points if helpful
Regards,
Saurabh -
Valuated Sales Order stock for Semi-Finished Products
Dear Gurus,
One of my client faced the issue that the semi-finished products is valuated-sales order. We are in Mill Industries, downstream (steel processing). The situation is:
1. We use configuration material for both finished and semi-finished products. Both are valuated at standard costs with valuated sales order stock.
2. Once the sales order is created, the cost estimates are created for both Finished, and semi-finished products.
3. The production orders is created for the semi-finished products. During production, several semi-fg and fg can be manufactured at the same time. We are using the co-products feature to cover that.
4. During the goods receipt of semi-finished products, instead of using the standard costs in sales order cost estimate, it use the planned costs in production orders which against our design.
I tried to use the user exit COPC002 and influence the standard costs. But it seems that the routine is not called for semi-fg at all. Anyone has any light on this?
Regards,Hi
I think you are talking about Special Stock "E"...ie) Sale Order Stock...
If my understanding is correct then,
If you go and see the Table T156....For the
Movement Type: 101,
Special stock Indicator : E,
Qty. Updation Checked,
Val. Updation Checked,
Movement Indicator : Against PO,
Consumption Indicator: Sales Order Stock.....combination....the transaction Event Key....GBB only has been Assigned....these settings you cannot change...
This linkage you can view in OLMW-----> Account Determination -
> Acc. Determination W/O Wizard -
>Account Grouping....also
Reward if useful
Regards
S.Baskaran
Edited by: baskaran srinivasan on Dec 20, 2007 12:18 PM -
Valuated Sales order stock with CO Production Order
Dear All,
Our clinet is manifatcuring cables and having 2 plants, for one plant we have configured PP module so we are arriving valuated sales order stock, for another plant we didnt configured PP module so we planned CO production order, but where as we are not meeting our ultimate goal i.e; valuated sales order stock.
So please guide me how to arrive valuated sales order stock with CO Production Order.
Thanks & Regards
Narasimham TValuated sales order stock is not dependent on PP, so you should be able to still to use it. The requirements class associated with the sales order item determines whether the item is valuated sales order stock and it also determines the valuation method. If you do not have Boms and routings in this plant you can still value the line item based on the material valuation in the material master. You can also value it based on a unit cost estimate that can be created seperately for the sales order item. Justt make the desired settings in the requirement class.
thanks,
Maybe you are looking for
-
I am building / deploying an image for Surface Pro 3. Out of the box the Surface Pro 3 has the power button on start screen next to search button. However when I deploy 8.1U1 Ent the button disappears. Reading http://winsupersite.com/windows-8/window
-
Migrate a List from SharePoint 2007 to SharePoint 2010
There's a SharePoint List in the 2007 server having some 32 SiteColumns. None of the columns are of type LookUp i.e., there is no dependency of any column over any other Lists. I just need to copy it as it is to 2010 server. Only problem is that it h
-
I keep being sent emails by Adobe tellign me that there is a special price available for Creative Cloud for existing users. When I try to sign up, I am told that I don't qualify. I have registered copies of Lightroom, Photoshiop Elements and Premie
-
(1) files, how to delete them
I have several files like "001.jpg" and "001 (1).jpg". I want to get rid of the (1) files, but I do not know how to do it, except by marking each one of them naually. I tried to use Terminal to issue an rm command, but I can't figure out how to do it
-
I have two Android tablets that are not connected to the internet (long story). I'd like to download Android Apps via my PC and copy them to my Android tablets. I do not want to use the Chrome APK extension for a variety of reasons. The apps I need a