Ok,
I have searched high and low for this type of information and Im surprised after all these years that no one has asked or requested this type of information?
I am a consultant, with my own version of Project 2013 to track how I run Projects.  This is the tool I use.  So this being the case it makes no sense for me to spend millions of dollars for Project Server.  I am just one person useing this
as my tool of choice.
My issues are:
I create and assign a task to a resource with a name and an email address.
I litterally have thousands of tasks with hundreds of assigned resources (People) with an email address.
I need to update weekly all my task!!!  The entire point of using Project 2013 as a tool!
However it appears Microsoft needs to make this very dificult to do. If I have to manually email all these people with task and manually ask them for an update, then manually update all these task then whats the point of even bothering using Micrsofts Project
2013?  It is useless.
I need a way to automate these updates without having a Server.
The Question no one seems to be asking is this?
Is there a way to update task through email, (Outlook), Why cant I send emails with a table of tasks assinged, request update in the task table, then the assigned resource sends me back the email with thier updates and I can automatically update my Project
Task?
Am I the only one who has asked this or thought of this?  Or are my expectations to high? I cant figure how Microsoft could ever expect a single user of Project even with only one project with 50 to 100 task listed to have to get on the phone or emal
every single person manually, and manually update every single task every single week? I have used other Project type apps and they all have a way of sending emails out to assigned people to get task updates automatically.  Only Project doesnt! 
Why?

Thanks Prasanna,
Really for the amount of money I have to pay for a Product that should have some way to update tasks.
Think about this for minute.  I believe Project 2007 was able to do this ,,,, that made sense.... 
Really ponder this question:  What is the purpose of Microsoft Project for a single user?  Does anyone ask these questions prior to development?
The reason for Project to exist is to TRACK TASK!  THATS IT! Why would anyone want to track any type of task, hundreds of task MANUALLY?  It does me no good for me to be the only one tracking task.  It does me no good for me to be the only
one looking at the task schedule.  Great, so IM THE ONLY ONE WHO KNOWS WHATS GOING ON? 
So I ask this question.
If this is the case then what is the point of tracking anything if it cant be shared or updated in some way or another?  Microsoft Project is useless as a single use product!
Here is the kicker....
I can purchase Outlook for a lot less, I can track any and all task, assign task to anyone with an email, I can assign and schedule task through Outlook and place an alert, set it as an appointment through the Calendar, change and assign start and end dates,
and get updates through email on any task, calendar, anything.... Why then would I waste ANYTIME OR MONEY ON A USELESS TASK TRACKING PRODUCT LIKE PROJECT?  It does not do anything?  Outlook does a thousand times more than Microsoft Project! 
Does that make any sense to anybody?  All Microsoft Project really is... is a stripped down Calendar/Task from Outlook with no ability to email, or communicate in any way shape or form with other people who are assigned the work.  What ends up happening
is Microsoft expects single users to purchase Project Server?  Are you crazy?  This is the single reason why Project does not sale!  If Microsoft would go back to sales metrics of Project 2007 they would see a decline till now that will reflect
this problem.  Its really a simple fix.  Sales would triple.  Until there is a solution it makes way more sense for me to use Outlook, schedule work task on others calendars and have them send me an update weekly through an automated spreadsheet
through Outlook.  From there all the reports exist in Excel.  Why do I need Project anymore?  BTW  I have been a MS Project user since its inception....  SO IM not new to it... what a terrible waste of time, resources, and lack of
vision for just a simple powerful addin that was removed after 2007.  Single users like myself will never purchase Project Server just so we can send emails with assigned task for an update,,, silly?

Similar Messages

  • Exchange 2013 Issue: Outlook 2010 auto populating the From Tab when forwarding email

    Exchange 2013 Issue: Outlook 2010 auto populating the From Tab when forwarding email        
    I am running Exchange 2013 and I have an end user who connects to it via Outlook 2010. All was going well till he went to forward an email and he noticed that the From button appeared and auto populated the sender's email address.
    I have clicked the Empty Auto Complete List in Outlook's Send messages... still displayed the From tab when forwarding.
    I recreated the profile in outlook... same thing.
    I created the profile with outlook 2013... same thing.
    There is only one user profile setup in Outlook.
    (I know the from tab usually appears when you have multiple profiles setup in Outlook and/or when you configure the "From" tab.)
    I opened the end user's email in Exch 2013's OWA... what was different here was when I clicked on the email and it opened, it did NOT have the Reply or Forward option... and it displayed as a "Draft" email.
    Does anyone have any ideas?

    So are you saying that the from button is filling the option with the original senders address (eg the person who sent the message to your user), or that it's filling in the your users address (in which case I don't understand what the issue is, since
    it IS going from your user)?

  • Project 2013- Trying a to move a task within the project and have it respect new predecessor rather than old one

    Ok, I am working on a rather large project schedule.
    Before having to upgrade to Project 2013, the file was used in Project 2007.
    Basically I am having a problem with moving tasks only to have them still respect their old predecessor instead of just the new one.
    Basically I have 4 tasks ( with start dates): Task A: 1st of month, Task B: 5th of month, Task C: 9th of month, Task D: 13th of month.
    I would want to move say Task D infront of Task B and have it go A/1st, D/5th, B/9th, C/13th. But all that happens is that the tasks change order but all the dates remain with their original tasks. This wasn't a problem before Project 2013.
    Is there any fix for this outside of having to unlink and relink every time I make  change?

    GarrettW23,
    You're right, it doesn't work the same in Project 2010 & later as it did in Project 2007 and earlier. The feature you desire is controlled by the option setting to autolink inserted or moved tasks. As far as I can tell there is a bug that was likely
    introduced when manual scheduling was added to Project 2010. Now, if the option is set, two links will be set up, the original link to the old predecessor and a new one to the new predecessor.
    I'm surprised this bug hasn't been fixed but I guess it's not something a lot of users have an issue with. Meanwhile, edit your links after drag and drop as Rod suggests.
    John

  • Excahgne 2013 outlook 2010 don't update folders from exchange server, from owa send and receive is ok

    I have exchange 2013 server, with database for each department last week we have power problem, servers down 
    after servers goes on line, i have database with dirty shutdown, cant mount it, then i do eseutil/p, then i mount it, then all users access there mails from outlook 2010 they can send and receive, except one user cant receive new mail to outlook but he can
    send mails from outlook (in outlook the folder last update 22april), from owa he receive anew mails and can send,
    i try to delete outlook profile and create it again i get folder has not yet been updated
    i try to repair exchange database again, but the same problem
    i try to move it to another database or another server but move fail
    if i use outlook online (remove use cached mode) its receive new mails.
    Any help?
    Thanks

    Hi,
    What’s the user impact? If the issue only occur on specific users, I suggest we firstly take the troubleshooting from the client side.
    If the issue occurs to all the users, it’s seems the Outlook sync issue with the CAS server, not like a database issue. Do you configure the NLB for the CAS server?
    Thanks,
    Simon Wu
    TechNet Community Support

  • Approving sharepoint workflow task from outlook

    I want to put approve reject buttons in email body for SharePoint Online Workflow.
     any body have idea how to do it?
    Kaps

    Hi,
    check the following, if this solution didn't work then you will need to check Nintex
    https://realworldsharepoint.wordpress.com/2012/06/27/lazy-approval-with-sharepoint-part-1-approve-task-via-email/
    https://realworldsharepoint.wordpress.com/2012/06/28/lazy-approval-with-sharepoint-approve-task-via-email-part-2/
    https://realworldsharepoint.wordpress.com/2012/06/28/lazy-approval-with-sharepoint-approve-task-via-email-part-3/
    Kind Regards,
    John Naguib
    Senior Consultant
    John Naguib Blog
    John Naguib Twitter
    Please remember to mark this as answered if it helped you

  • Unable to open SharePoint 2010 task from any Microsoft Office application - cannot open a new form (schema validation errors)

    I can’t get the Microsoft Office SharePoint Task integration to work with any SharePoint 2010 Workflows.  When any end user clicks the “Open this task…”
    button from outlook (or any other office application) a warning dialog appears stating that:
    “Outlook cannot open a new.
    The form contains schema validation errors.”
    The error details are:
    Element '{http://www.w3.org/1999/xhtml}div' is unexpected according to content model of parent element '{http://schemas.microsoft.com/office/infopath/2009/WSSList/dataFields}Body'.
    Some points to note:
    I can replicate this using on several computers running as different users. 
    I have full control over the site and the task I am trying to open. 
    When I navigate via the SharePoint site I can open the task. 
    The Info Path form that cannot be opened was automatically created by automatically SharePoint designer / InfoPath.  I have subsequently deleted the form and published
    the workflow (which created the InfoPath form again). 
    I am running Mircosoft Office Professional Plus 2010 version 14.0.5128.5000 (32-bit)
    One workaround is to remove the “Open this task…” button as per
    http://social.msdn.microsoft.com/Forums/en-US/sharepoint2010general/thread/eb273ee9-6a4b-409c-8eb0-5351bb113386/. This is not ideal and will be my last resort.
    Any suggestions and or thoughts appreciated.
    Thanks!

    Yes, I tried that.  It did not work for me.
    I have 4 site collections.  The main site collection is the only one that I receive the error.  
    When the user clicks on the email link  and opens the document for approval, they receive the following error when they click on "Open This Task". 
    Element '{http://www.w3.org/1999/xhtml}a is unexpected according to content model of
    parent element '{http://schemas.microsoft.com/office/infopath/2009/WSSList/dataFields}Body'.
    There is nothing wrong with the task list itself, just the link from the Office 2010 client. 
    I am wondering if there is a web config or other file on the server that is specific to the site collection??
    Tracey

  • Cannot open Sharepoint 2010 task with Outlook 2013

    Before I start, I have already gone through the "Unable to open Sharepoint 2010 task from any office application - cannot open new form (schema validation errors).  I have tried all the fixes listed in that thread to no avail.
    What I am wondering is if it there is something more complex happening because I have outlook 2013 but our SP server is 2010. 
    Can anyone tell me if there is a way to make this work?  I have tried everything that I have found and a lot more to try and resolve this, have been working on and off on this problem for more than 6 months.  Any help would be appreciated.

    Hi Matt,
    According to your description, the task cannot be open in Outlook 2013.
    The issue may be with any Multiple lines of text fields in Enhanced Rich text type in the SharePoint 2010 Task List or the associated task list for the workflow.
    I recommend to check for any Multiple lines of text fields(such as Description field) in the SharePoint 2010 Task List or the associated task list for the workflow, and change them to Plain text or Rich text instead.
    More information are provided in the link below:
    http://mysharepointkb.blogspot.in/2012/11/cannot-open-sharepoint-2010-approval.html
    If it cannot work, could you please provide more information in the ULS log?
    Please go to C:\Program Files\Common Files\Microsoft Shared\Web Server Extensions\14 to get the log.
    Best regards.
    Thanks

  • SharePoint 2013 Workflow created on SharePoint Designer gets canceled

    Just wanted to share my solution to a problem that I was having when creating a SharePoint 2013 Workflow that includes creating a task and assigning it to a group of people. After publishing the workflow and initiating it you get:
    Retrying last request. Next attempt scheduled in less than one minute.
    Microsoft.SharePoint.Client.ResourceNotFoundException: Cannot find resource for the request sp.utilities.utility.ExpandGroupsToPrincipals
    An unhandled exception occurred during the execution of the workflow instance.
       Exception details: System.ApplicationException: HTTP 404 {"error":{"code":"-1, Microsoft.SharePoint.Client.ResourceNotFoundException",
       "message":{"lang":"en-US","value":"Cannot find resource for the request sp.utilities.utility.ExpandGroupsToPrincipals."},
       "innererror":{"message":"Cannot find resource for the request sp.utilities.utility.ExpandGroupsToPrincipals.",
       "type":"Microsoft.SharePoint.Client.ResourceNotFoundException","stacktrace":" at
       Microsoft.SharePoint.Client.Rest.RestRequestProcessor.GetObjectFromPathRoot(Boolean mainRequestPath, EdmParserNode node, Boolean resourceEndpoint, MethodInformation& methodInfo)\u000d\u000a at
       Microsoft.SharePoint.Client.Rest.RestRequestProcessor.GetObjectFromPath(Boolean mainRequestPath, String path, String pathForErrorMessage)\u000d\u000a at
       Microsoft.SharePoint.Client.Rest.RestRequestProcessor.Process()\u000d\u000a at
       Microsoft.SharePoint.Client.Rest.RestRequestProcessor.ProcessRequest()\u000d\u000a at
       Microsoft.SharePoint.Client.Rest.RestService.ProcessQuery(Stream inputStream, IList`1 pendingDisposableContainer)"}}
       } {"Transfer-Encoding":["chunked"],"X-SharePointHealthScore":["0"],"SPClientServiceRequestDuration":["46"]
       ,"SPRequestGuid":["624f66f8-a70c-81db-bf0d-c042443f5435"],"request-id":["624f66f8-a70c-81db-bf0d-c042443f5435"],
       "X-FRAME-OPTIONS":["SAMEORIGIN"],"MicrosoftSharePointTeamServices":["15.0.0.4569"],"X-Content-Type-Options":["nosniff"],
       "X-MS-InvokeApp":["1; RequireReadOnly"],"Cache-Control":["max-age=0, private"],"Date":["Mon, 06 Apr 2015 22:17:23 GMT"],
       "Server":["Microsoft-IIS\/8.0"],"X-AspNet-Version":["4.0.30319"],"X-Powered-By":["ASP.NET"]} at
       Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context) at
        System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at
        System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager bookmarkManager, Location resultLocation)
    I was not able to find any answer anywhere, so my solution was:
    1. Simply upgrade SharePoint Server 2013 to the latest version which in turn updates Microsoft.Activities.Proxy.dll
    2. Clear the SharePoint Designer cache
      Workflow Error - Sharepoint Designer cannot display the item
       http://community.office365.com/en-us/f/154/t/74327.aspx
    I hope this is helpful to somebody
    Thanks

    Hi,
    I doubt its not possible.
    http://stackoverflow.com/questions/17925555/windows-workflow-4-appfabrix-1-1-suspended-workflow-will-not-resume
    http://social.msdn.microsoft.com/Forums/en-US/fd85c5f9-36dd-4be5-872f-9ba73b1eb0b8/appfabric-11-for-windows-server-versus-workflow-manager-10?forum=wfprerelease
    http://seroter.wordpress.com/2012/11/02/interview-series-four-questions-with-jrgen-willis/
    Please remember to click 'Mark as Answer' on the answer if it helps you

  • Project 2013 - entering work hours at a monthly level

    Hi all, 
    Any help with this 'hopefully small' problem will be hugely appreciated. It's not so much a problem, but
    me still being new to Project - sorry! As a summary of what I am working with:
    I have entered a list of tasks (all set to Manually Scheduled).
    I have entered a number of resources into the Resource List. 
    I have also assigned relevant resources to the tasks. 
    Using the Task Usage view, I would now like to begin entering Work hours for the resources assigned to the
    tasks. We are planning at a monthly level, so I know how many hours each resource is expecting to be spending on each task over each month. 
    I have set the Timescale of my Task Usage screen to a monthly scale, thinking that this would allow me to
    enter total hours for each month. As an example, one of the resources assigned to a task is set for 15 hours of Work in April. It all seems to look OK on input. 
    My problem is however, I would like the Start and Finish fields to reflect this, and span over the months
    in which the Task's resources will be doing work. It doesn't seem to pick up the month accurately. Although I have entered the 15 hours in the column labelled April, the Start and Finish dates have come out as 30/04/14 and 30/05/14 respectively. I was hoping
    the Start and Finish times of that row to be 01/04/14 and 30/04/14 respectively, but they are a month out of line, and has show the work to be happening over May, not April. Is there y way I can change this?
    I hope this makes sense as a question? Any help at all would be brilliant. Please do let me know if I've
    missed any detail and you need some more info. I'll also continue looking through the forums to check if this has already been asked. 
    p.s. I tried to upload an annotated image, but my account needs to be verified first. Do I need to do anything to request this? I didn't receive any usual 'verification' links in MS's email on opening this account.
    Thanks very much, 
    ac18

    Hi John, Julie,
    Thank you both very much for the help! Yes good spot, I did post it on both forums (http://www.msofficeforums.com/project/21190-project-2013-entering-work-hours-monthly-level.html) - it's been years since I've used forums of any kind, and it's great to see
    experts being active across multiple sites! 
    I have given both suggestions a try, but unfortunately am still not quite there yet. 
    John, although your tip seems to work OK, I think I was hoping to find a way for the Start and Finish times to automatically span across the Work hours I have entered. If I was to then enter another 5 hours, but this time for March, the Start-Finish dates
    should auto update to be 01/03/14 - 30/04/14. I understand now that this may require me to be on an Automatically Scheduled project? 
    Julie, your screen shot on the msofficeforums.com website is exactly what I am looking to achieve! I would like to enter month-level Work data, and that looks to be exactly that. I did try entering a zero in the month immediately after the last month that
    had hours in it, but Project seemed to simply ignore it, with no visible change to the dates. 
    I have done some further investigating, and there does seem to be something different happening with my Project version (it's Proj Prof 2013). I have access to another computer with Project 2010 installed on it, and this doesn't seem to cause an issue. Note,
    I did need to have set the tasks as Auto Scheduled. 
    Essentially, if I try and exactly replicate Julie's example on both versions with the following steps, I get slightly different results:
    Tasks set to Auto-Scheduled. 
    Set Project Start Date to 01/01/14
    Enter some resources. 
    Switch to Task Usage view. 
    Set the Timescales on the right hand side to: Bottom tier=Months, Middle tier=Quarters. 
    Enter a task. 
    Assign resources to the task. At this point, by default 8 hours worth of work appears for each assigned resource. In 2010, these hours appear in the January 14 column. But on my 2013 laptop however, these hours appear under the December 2013 column. Strange?
    Anyway, in both cases I clear these default hours by entering zeros in their places.
    I now enter 15 hours under April 2014 for one of the resources on the task.
    In 2010, the Start and Finish dates of the assigned resource's row update to 01/04/14 - 30/04/14.
    In 2013 however, the Start and Finish dates update to 30/04/14 - 30/05/14. 
    I have a feeling that this discrepancy is perhaps at the heart of my problem? Is there a setting with the application that I am not making?
    Thanks again, 
    Arjun

  • SP2013 and Project 2013 - project files open in read-only mode with no options to edit only Save As

    Hi all,
    Environment:
    SharePoint 2013 (15.0.4420.1017)  RTM
    Windows 8 - Project 2013 (15.0.4433.1506) 32Bit
    Issue details:
    When opening .mpp files stored within SharePoint they are opened successfully within Project 2013 however they are opened in Read-Only mode with no options to edit/check out only Save As.  The
    same outcome is experienced if you click the document link within SharePoint or you chose to edit from the document menu. 
    Opening the file through windows explorer also opens only in read-only mode.
    To date we’ve tested the following
    Windows 7 – Office 2010 = working as expected
    Windows 8 – Office 2010 = working as expected
    Windows 7 – Office 2013 = opening as read only, no prompt to edit
    Windows 8 – Office 2013 – opening as read only, no prompt to edit
    Current thinking is that it is an issue with either the SharePoint Office Documents Class ActiveX control or Project 2013 itself interacting with SharePoint 2013.
    We have tested this in multiple SP2013 environments with the same outcomes.
    The workaround therefore is to save locally and then upload again which is not ideal.
    Unable to find an exact issue match to this.
    Any help with this appreciated.

    Hi Dan,
    For us after investigating this further it was found that using the document menu to edit or checkout and then edit results in the project file being opened in read-only mode. 
    The same issue was present for Visio files.
    Using the FILES ribbon menu results in the document being opened in edit mode successfully in both Project and Visio.
    Please note that we found that this issue only exists within document libraries where checkout is required to edit which was our case.  If checkout is not required the document
    menu can also be used as expected.
    Cheers,
    Dan

  • IN UPDATE TASK

    Hi experts,
    I am calling a FM in update task from an enhancement for the transaction WRF_AL. Whenever I am creating new node and article list in that tcode, it is not calling the FM. But if am changing the FM call as a normal  one, it is getting into the FM.
    My requirement is to get into that FM whenever a new node is created/changed/deleted. It is happening when I am using a normal fuction call.
    Any pointers on this is highly appreciated.
    Regards,
    Sajith

    Hi,
    In the T code 'WRF_AL' already few nodes were created.
    1.when using IN UPDATE TASK
        if am changing already existing nodes, FM is getting called.
        If am creating new node, FM is not getting called.
    2. when using normal function call
        in both cases, its working fine.
    Regards,
    sajith

  • Update termination error while calling FM in Update task

    Hi Friends,
    I am calliing my Z Function Module in update task from my report, my function module contain reuse alv list display fm which should create a Spool in the spool list.
    When ever i am directly executing my Z function module i am getting spool in SP01, but when ever i am calling the Z Function Module in update task from my report i am getting a message as "Express document "Update was terminated" received from author.
    I want to call the Function module in update task and it should generate spools .
    Syntax:
    CALL FUNCTION 'ZLOK_TEST' IN UPDATE TASK.
    Commit work.
    Thanks Regards,
    Sandipan jena

    Hi sandipan jena,
    a function called in update task will not create a spool list if not told so to to. Only reports scheduled in a JOB will put the output into spool.
    Make sure you have no COMMIT WORK and no MESSAGE output when in UPDATE TASK. You can enter /h and in debugger switch on UPDATE debugging. This will lead you to any error occurring.
    You should analyze the errors you get. Mabe NEW-PAGE PRINT ON can help you.
    Regards
    Clemens

  • Update Tasks remain in status = init / started forever. Doest not process

    Hello Everyone,
    We have the FM ME_DB_UPDATE_INFORECORDS called in update task from one of our program
       CALL FUNCTION 'ME_DB_UPDATE_INFORECORDS' IN UPDATE TASK
          EXPORTING
            i_changedocument = c_upd
          TABLES
            db_eina_u        = li_eina
            db_eine_u        = li_eine.
        COMMIT WORK.
    But all these calls does not process. it queues up in SM13 and uses up all update WP and affects the whole system.
    The update records in SM 13 stays with status init or started with the enqueue locks. This results in unresolved table locks on the EINA table.
    The concerned program generates multiple of these update requests with results in piling up of unprocessed such update requests.

    Hello,
    I only suggested SM12 because you said "I feel there is an enqueue problem".
    I would just look for any locks, if you can reproduce the problem. It depends on the ones your method uses.
    Can you tell if the method has been run successfully for those In Process steps? If so, you could try a Complete Manually.
    regards
    Rick Bakker
    hanabi technology

  • BDOC Stored before update task error

    Hi Experts,
    I am using FM CRMXIF_PRODUCT_MATERIAL_SAVE to update one of the custom aatributes in COMMPR01.
    once i run this FM i see an entry of bdoc in SMw01 with the below error
    "BDOC stored before update task(intermediate state).
    I checked ST22 and i saw no dumps, i checked Sm13 and i didnt see any update tasks. Cananyone help me?
    Thanks!

    HI Divya,
    BDoc Message was not written to qRFC queue, yet. Search for update tasks in transaction
    SM13. The sender creates a BDoc message to post data to the receivers. The application
    calls the messaging flow.
    Detection:
    Check if there are any update terminations which occurred in the update task
    by using transaction SM13. Check if there are inbound messages related to
    that outbound message, double-click u2018Original BDocu2019 field to display the
    original inbound message. Typically the inbound message (s-BDoc in flow
    context SI1 or m-BDoc in flow context MI0) is already on a final state F02, i.e.
    the validation was successful but the asynchronous update failed. The
    original inbound message in final state might have been already reorganized.
    Solution:
    Solve the problem with the open update tasks and then execute them again
    in SM13. Check whether after succesful reexecution in SM13 the BDoc state
    has been changed.
    If not, or if you donu2019t find any open updates, but you do find a corresponding
    original message, proceed as following:
    · Variant 1: Try to reprocess the inbound message to check if the newly
    created outbound message has also status I04. If BDoc is processed, no
    retry of the failed BDoc is allowed. Set the message as deleted.
    Reprocessing the related inbound message is sometimes not possible,
    because the state is final. In this case copy the inbound message using
    transaction SMW19 and set the new state of the copied message to I01.
    Then you can reprocess it.
    · Variant 2: Use the solution from SAP notes 876855 (CRM 3.X) or 835761
    (CRM 4.0) to convert the inbound s-BDoc into an error state E09.
    Advantage is, that in this state the inbound message does not get
    reorganized. More important, it also allows you to restart the inbound
    processing after the error situation has been resolved. However, in that
    case you need to delete the already pending update tasks from the
    previous run in transaction SM13.
    When there are no open update tasks anymore, check whether the data
    changes according to the inbound BDoc message have actually been posted
    to the CRM online application tables. If the changes are present (i.e. a new
    application object was succesfully created), you should not use variant 2,
    because you might get a problem of posting the same data again (i.e. getting
    an "insert duplicate record" situation).
    For more info about error analysis. please refer to
    http://saptricks.com/wp-content/uploads/2010/05/BestPractice-BDoc-Analysis-V2.pdf
    Cheers, Satish

  • How to disable an out of the box disable User process task  from resource?

    How should I disable the out of the box disable User process task that is assigned to a particular resource? If I disable this disable User process task, when the user is provisioned to the same resource will I be able to stop this disable User process from running?
    My requirement: I need to disable the disable user process task from three resources x, y and z. Whenever a user is provisioned to one of these resources I should stop this disable user process task an out of the box process task from running. How can this be accomplished?? Please help me out on how to configureto remove the process task in the OIM Admin console to stop the process task.

    You can avoid the disable task from triggering by removing the Disable Process Or Access to Application from the task effect drop down in the process task. But this task is triggered once the user is disabled. But still I didn't understand the exact scenario.
    By the way the disable task is triggered when the user gets disabled and not when the user is provisioned.
    Edited by: vindla on Aug 1, 2011 10:26 PM

Maybe you are looking for

  • Name of table for   order  Vs item category

    Hi Experts What is  the  table  or  Function module   to  get  the  list   of   service  orders with  reference to   item categories  used in the line  item . Eg : List of  orders with   item  category "ZSR3" Here  my  input  will be  item category "

  • External monitor blurry image rMBP 2012

    Hey guys! I have 2012 rMPB which works perfectly and i am connecting it to my 22" Benq monitor via MiniDisplayPort to VGA connector (monitor only has VGA). Image on the external monitor is really bad, it looks blurry, not sharp enough and brightness

  • Word doc combination with multiple PDF files

    Any advice on how to combine a Word document with a number of PDF files that need to be embedded at various points in to the Word Document?

  • Insert picture then . . . nothing!

    Trying to start a doc with a pic. So far so good. Pic installed but then I could not add text below it as I desired. ALSO imported a doc with an illustration & it failed to show the graphic, just the text.

  • Trying to open the iTunes installer but nothing appears.

    Hello People. I've just downloaded the iTunes latest version (I have never tried to install any version of iTunes before) and basically the installer doesn't open. I try to execute the installer file and nothing appears, even an error message or some