Project 2013 - entering work hours at a monthly level

Hi all, 
Any help with this 'hopefully small' problem will be hugely appreciated. It's not so much a problem, but
me still being new to Project - sorry! As a summary of what I am working with:
I have entered a list of tasks (all set to Manually Scheduled).
I have entered a number of resources into the Resource List. 
I have also assigned relevant resources to the tasks. 
Using the Task Usage view, I would now like to begin entering Work hours for the resources assigned to the
tasks. We are planning at a monthly level, so I know how many hours each resource is expecting to be spending on each task over each month. 
I have set the Timescale of my Task Usage screen to a monthly scale, thinking that this would allow me to
enter total hours for each month. As an example, one of the resources assigned to a task is set for 15 hours of Work in April. It all seems to look OK on input. 
My problem is however, I would like the Start and Finish fields to reflect this, and span over the months
in which the Task's resources will be doing work. It doesn't seem to pick up the month accurately. Although I have entered the 15 hours in the column labelled April, the Start and Finish dates have come out as 30/04/14 and 30/05/14 respectively. I was hoping
the Start and Finish times of that row to be 01/04/14 and 30/04/14 respectively, but they are a month out of line, and has show the work to be happening over May, not April. Is there y way I can change this?
I hope this makes sense as a question? Any help at all would be brilliant. Please do let me know if I've
missed any detail and you need some more info. I'll also continue looking through the forums to check if this has already been asked. 
p.s. I tried to upload an annotated image, but my account needs to be verified first. Do I need to do anything to request this? I didn't receive any usual 'verification' links in MS's email on opening this account.
Thanks very much, 
ac18

Hi John, Julie,
Thank you both very much for the help! Yes good spot, I did post it on both forums (http://www.msofficeforums.com/project/21190-project-2013-entering-work-hours-monthly-level.html) - it's been years since I've used forums of any kind, and it's great to see
experts being active across multiple sites! 
I have given both suggestions a try, but unfortunately am still not quite there yet. 
John, although your tip seems to work OK, I think I was hoping to find a way for the Start and Finish times to automatically span across the Work hours I have entered. If I was to then enter another 5 hours, but this time for March, the Start-Finish dates
should auto update to be 01/03/14 - 30/04/14. I understand now that this may require me to be on an Automatically Scheduled project? 
Julie, your screen shot on the msofficeforums.com website is exactly what I am looking to achieve! I would like to enter month-level Work data, and that looks to be exactly that. I did try entering a zero in the month immediately after the last month that
had hours in it, but Project seemed to simply ignore it, with no visible change to the dates. 
I have done some further investigating, and there does seem to be something different happening with my Project version (it's Proj Prof 2013). I have access to another computer with Project 2010 installed on it, and this doesn't seem to cause an issue. Note,
I did need to have set the tasks as Auto Scheduled. 
Essentially, if I try and exactly replicate Julie's example on both versions with the following steps, I get slightly different results:
Tasks set to Auto-Scheduled. 
Set Project Start Date to 01/01/14
Enter some resources. 
Switch to Task Usage view. 
Set the Timescales on the right hand side to: Bottom tier=Months, Middle tier=Quarters. 
Enter a task. 
Assign resources to the task. At this point, by default 8 hours worth of work appears for each assigned resource. In 2010, these hours appear in the January 14 column. But on my 2013 laptop however, these hours appear under the December 2013 column. Strange?
Anyway, in both cases I clear these default hours by entering zeros in their places.
I now enter 15 hours under April 2014 for one of the resources on the task.
In 2010, the Start and Finish dates of the assigned resource's row update to 01/04/14 - 30/04/14.
In 2013 however, the Start and Finish dates update to 30/04/14 - 30/05/14. 
I have a feeling that this discrepancy is perhaps at the heart of my problem? Is there a setting with the application that I am not making?
Thanks again, 
Arjun

Similar Messages

  • Project 2013, check working hours when assign tasks

    It maybe a foolish question. But I am really a new guy to use PWA. Please help me.
    while I set a task and assign it to user A for 4 hours , can system shown a alert or some tag if A's planing_working hours will be over 8. 
    I know Professional can do like this, can it be shown in PWA? 
    And is there a button to check resource's working hours not over 8 hours per day when I write down plan in PWA?
    /Jou Chen

    Hi Jou Chen,
    There is no foolish question about Project, don't worry!
    1- In Project Pro, you have the overallocated symbol ("red guy") in the indicator column, but there is no such thing in PWA. That being said, you could insert in the PWA view definition (PWA, server settings, manage views) the "overallocated"
    column (choose an assignment view such as assignment summary since the overallocation is a assignment level). Then you could see overallocated assignments and filter/group your assignment along this field.
    2-There is no such button, but as adived above, you could use the overallocated column as a filter to identify overallocated assignments.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Hourly rate will not multiply with period working hours to give monthly Pay

    Dear All,
    Hourly rate 10.9 will not multiply with period working hours 173 to give monthly Pay. Thsi is for hourly employee, but they are paid monthly. Basic pay.
    Regards
    Emus

    At the moment, I am trying to maintain rate in infotype 0008. Please advise. Do you think that is why it is not calculating?
    Kindly help, as this very urgent now in my company.
    Regards
    Vincent

  • Query: Cannot extract resource working hours&price at phase level together

    Dear PP Guru,
    I am working on a query to satisfy business requirement: resource working hours - meaning "activity type quantity" (PLPO table field VGW01, 02, 03 ...) together with activity type price at phase level.
    I combined following tables together:
    PLPO --> CRCO --> CSSL --> COST
    Now the issue is: resource hours - meaning "activity type quantity" at phase level cannot be extracted. The reason is that "Object ID" - PLPO table ARBID field is only assigned to Operation level, not Phase level.
    My question are:
    1. I have to go for ABAP development to do such modification to extract resource hours at phase level?
    2. What is the reason that "Object ID" is not assigned at phase level but operation level in PLPO table? Shall I raise a question to SAP to get further detail?
    Many thanks in advance for your prompt feedback!
    Mengyu

    My guess is that the German Locale interfere with the English .Net3.5
    Some info on .net3.5 http://www.microsoft.com/en-us/download/details.aspx?id=22
    ---Additional
    information
    The following information may be relevant for administrators performing deployments of the .NET Framework on to operating systems using non-English locales. This package does not contain localized resources for non-English locales. By default, itdownloads and installs the
    language pack that matches the language of the customer’s operating system. This may not be desired behavior when managing deployments of the .NET Framework. To avoid the automatic download use the following command:
    dotnetfx35setup.exe /lang:enu
    Have you tried to switch to english locale and then install?
    This posting is provided "AS IS" with no warranties or guarantees and confers no rights. Whenever you see a helpful reply, click on Vote As Helpful & click on Proposed As Answer if a post answers your question.

  • Regarding working hours of a month

    Hi All,
    I have 3 page items (2 are date picker item & 3rd is text box item).
    Now when user insert date into 1st datepicker item as "06/16/2009" and into 2nd datepicker item as "07/15/2009", than into 3rd page item(which is text box) should automatically caluated as <b>22</b>. As 22 are the actual working days btw "06/16/2009 and 07/15/2009" excluding weekends.
    I did by calcuated into SQL Server 2005 Mgmt Studio something like this:-
    declare @fromdate datetime
    declare @todate datetime
    declare @day int
    declare @count int
    set @fromdate = '06/16/2009'
    set @todate = '07/15/2009'
    set @day = 0
    set @count = 0
    while ( @fromdate <= @todate )
         begin
              set @day = (select datepart(weekday, @fromdate))
              if (@day >=2 and @day <= 6)
              begin
                   set @count = @count + 1
              end
              set @fromdate = @fromdate + 1
         end
    SELECT @count
    and the output was <b>22</b> which was same as my req.
    Now my question is in what way I should go ahead into APEX such that 22 number is caluated by form itself, do I need to write pl/sql process or using JS?
    Which will be best and professional way?
    If any other way than plz do let me know.
    Thanks
    I appreciate your replies n suggestion.
    regards,
    Kumar

    SQL>CREATE OR REPLACE function WORKING_DAYS(
    s in date := to_date('06/16/2009','mm/dd/yyyy'),
    e in date := to_date('07/15/2009','mm/dd/yyyy')
    return number
    is
         t_hr number := 0;
            t_incr number := 0;
            t_cnt number := 0;
    begin
         loop
                    select decode(rtrim(to_char(s + t_cnt,'DAY')),'SATURDAY',0,'SUNDAY',0,1) into t_incr from dual;
                 t_hr := t_hr + t_incr;
                    t_cnt := t_cnt + 1;
                exit when t_cnt + trunc(s) = trunc(e) + 1;
         end loop;
    return t_hr;
    end;
    select WORKING_DAYS() from dual;
    WORKING_DAYS()
             22

  • Project 2013 free trial setup.exe module doesn't work

    Hi there,
    I installed the Project 2013 free trial and it opened with 7zip, but now the issue is the setup.exe.  When I click on it, I get an error message "The specified module could not be found".  What do I do from here?

    Hi There,
    There might be some wrong file association or a module missing. I would suggest you to uninstall both Project 2013 free trial and 7zip and then first install Project 2013 and check if it works.
    Once you are sure that Project 2013 trial works, you can install 7zip.
    Happy troubleshooting...
    Vikram Daruru - MSFT

  • How to update capacity util. level & Work hours in IT -8

    Dear Concern,
    There is a problem in updating capacity util. level & Work hours in IT -8 in the T -Code -PA30. It is still showing Capacity 0% & Work Hours -0 hr monthly. We have already  updated the same as 100% & 208 hr. monthly in Info Type-7 , inspite of then, the same has not been automatically updated in Infotype 8..
    Please advice how can we update Capacity Utilisation & Working hours in the Infotype 8 as  we have already updated it in the Infotype 7.
    Thx

    You cannot show a specific timespan, e.g., 8AM to 5PM, and hide the remaining hours. However, you can highlight the working hours of the day by implementing getWorkingStartTime and getWorkingEndTime on the Resource.
    You can specify the workingTimeColor attribute (optional, there is a default) on Gantt to set the working time color.

  • PWA 2013 - tasks.aspx - cannot enter actual work hours

    In Project Server 2013, after assigning tasks to a project member, the member can log on to the PWA and see all tasks which has been assigned to him. But the member is not able to enter actual work hours, the corresponding fields are disabled.
    Additional information: it's a project which has been migrated from PS2010 and the member I am talking about has the 'Administrator' role and the 'Team member' role

    what type of project tracking was defined for project as?  If the project was done as "Percent of Work COmplete" and it was migrated.  It will maintain that Tracking Method.
    Cheers!
    Michael Wharton, MVP, MBA, PMP, MCT, MCTS, MCSD, MCSE+I, MCDBA
    Website http://www.WhartonComputer.com
    Blog http://MyProjectExpert.com contains my field notes and SQL queries

  • Project server 2013 how to check work hours per hour per project

    Hi all,
    I would like to know how to check the total work hours for a project per month. For examples, I want to know all the work hours for all resources spent for the project A in August. Any idea?
    Thanks,
    Anna

    Hi Anna,
    If you don't want to write queries, I'd suggest you to simply open the project unchecking the option "load resources summary assignments" and go to the task usage view. Then display the project summary task and choose the monthly timeframe ("view"
    tab) for the timephased part of the screen (right part).
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • How to view man hours in MS Project 2013

    I have created a sample project plan in MS Project 2013 with 3 resources. Some tasks are running in parallel while others are one after another. I am using standard calendar which is 8 hours a days, 40 hour a week.
    How do I know man hours of my project plan? Is there some view available looking at which I can know the man hours of my project?

    Hi,
    assuming default settings, you should do two things:
    Add column Work to your view
    Display Project Summary task: tab Format, enable check box "Project Summary Task".
    This will give you total of hours (Work) for your project in line 0.
    Does that help?
    Barbara

  • Acrobat XI no longer works after installing Project 2013

    Hello All,
    This one is really odd and I can't find any documentation anywhere.  I have a client that has Office 2010 and Acrobat XI Standard.  I just installed Project 2013 on the machine and now right clicking on any Office file will not show the option
    to create PDF.  He can right-click on a Project file and create one but not on any other Office file.  I have never seen this before.  Any thoughts?
    Regards,
    Rob Battaglia

    Yes I have - no luck.  This system is using Office 2010 x64 and Project 2013 x64.  This all happened after installing Project.  The right click on a file works for Project just not for Office.  I did check to make sure the add-in was
    present for both Excel and Word - PDFMaker.dll is selected in both and the user can create PDF files from within Word and Excel - just not when right-clicking on the file in Windows Explorer.
    Regards,
    Rob Battaglia

  • Which sharepoint service applications & services are required for Project server 2013 to work fine.

    HI,
    Can any one help me,
    I am planning to install project server 2013,  what are the service applications and Services ( Manage services on server in central admin ) in sharepoint  are required for project server 2013 to work fine, so that i will run only  service
    application and services to increase server performance..i don't want to configure all service applications  when i  am configuring.
    Thanks in Advance..
    vijay kommireddi

    Hi Vijay,
    If you are installing Project Server on SharePoint farm, You need to start the service Project Application Service which would be available after you install project Server 2013.
    For Project Server Reporting you need to start Excel service and Secure Store service.
    http://technet.microsoft.com/en-us/library/ee662106(v=office.15).aspx
    Thanks,
    Phani

  • Re-installation of project 2013 trial doesn't work

    Hi,
    i had downloaded project 2013 trial version 2 days back, installed it and it was working fine.
    next day, i was facing some issues with laptop, so I uninstalled it.
    Now when I try to re-install using same exe, it is not working.
    It is only giving error as  - 'The installation of this package failed'.
    Pls help on how to re-install mpp. I need it urgently.

    My hunch is the "issues" you allude to are possibly the root cause.
    --rms www.rmschneider.com

  • Select which users doesn't logged their work yesterday on MS Project 2013

    We use MS Project 2013 to control people work report.
    I wanna make a SQL query that will catch all users that doesn't set their work yesterday on WebProject App.
    My intention on that is to alert them by e-mail about this.
    If the user doesn't logged his work for three or more days consecutive, his coordinator must be alerted too.
    Is there any configuration property on MS Project to do this ?
    Thanks! Bye

    Hi
    You may query the table MSP_EpmAssignmentByDay if the task updates are approved an published
    Sample query to check if the user has reported time for yesterday
    select resourcename,ResourceEmailAddress  from MSP_EpmResource
    where ResourceUID in ( select resourceuid from MSP_EpmAssignment where assignmentuid in (
    select assignmentuid from MSP_EpmAssignmentByDay where
    Convert(varchar(10),TimeByDay,101) = Convert(varchar(10),DATEADD(d,-1,getdate()),101) and AssignmentWork >0 and AssignmentActualWork =0))
    Note: This is a sample Query , you may modify it accordingly. you can query the table "MSP_TimesheetActual" in the same way if you want to look at the timesheet tables
    Refer Project Server SDK to get more information for Reporting Schema
    --Happy Troubleshooting
    Thanks --Ajith

  • MS Project 2013 - finding solution

    We are a company wishing to use Ms Project 2013 to help us in the management of our projects, and we prepared the purchase of the product by a 3-days training to learn the basics of the software.
    Most of the functions looked really helpful for us to do our cost control and monitoring activities, except for the point that we could NOT arrange the working hours properly, forbidding us to use those functions.
    Our company has two different working times depending on the weeks:
    One week, we work from Monday to Friday, with the following working hours: 7:30am – 5:30pm -> Total: 45 hours
    The second week we work from Monday to Saturday, with the following working hours: 7:30am – 5:00pm -> Total: 51 hours
    The only way we found to have the proper calendar was to:
    Set the default week from Monday to Saturday from 7:30am to 5:00pm
    Create a recurrent exception week from Monday to Friday, which occurs once every 2 weeks (for, like, 5 years to be sure) from 7:30am to 5:30pm
    Create a recurrent exception with the Saturday off which occurs once every two weeks
    The problem is, the weekly working hours is still fixed at 40hours/week. This value can be changed, but will stay the same all the time (while we need it to change from one week to another)
    Thus, all the costing, resources and planning calculations are biased by the fact that the software always count the weekly hours. It creates incoherent values on the number of days worked and resources use. For example, 1 day worked will count as
    8 hours, regardless the fact that the day worked is 8.5 or 9 hours as per the calendar. We can see it with the fact that if we allow a resource at 1$/hour, one day worked will be 8$, regardless the day.
    Those functionalities are the main reason why we would like to use MS Project, and for the moment, the only useful part of the software we have is a proper Gantt diagram due to this Weekly Hours problem. As we were about to purchase the product,
    we need to know if there is any way to have the software work properly with our working time before doing so.
    Thus, please, would it be possible to know:
    If there is any way to fix the problem easily so our teams can use the software ?
    If yes, could you please provide us instructions to create a proper calendar, so we can try it on our trial version ?
    Thank you for your help and support,
    With the hope that we could use your software for the development of our company.

    Hien,
    Let me expand a bit on Jan's right-to-the-point answer. Project has always had the limitation of a single definition for "hours per day", "hours per week", and "days per month", thus it is more challenging to set up a schedule
    with a varied work week such as the 9-80 sequence (9 days with a total of 80 hours). There are basically two ways to handle a varied work week. The first is to simply create the schedule as a normal 40 work week and not try to emulate the varied work week.
    This is the approach we took at the company where I worked a 9-80 schedule. In the long run this approach works quite well. The second approach is to enter all time related data in hours as Jan suggests. This may require some adjustment in thinking as some
    companies like to plan in terms of days, weeks or even months. If data is required in those units, there are a couple of choices, either some VBA can be used to generate the needed data and dump it into extra fields or the Project data can be exported to another
    application (e.g. Excel) where it can be reformatted as needed.
    And just for reference, I note you use the term "your software" which implies you believe you are attempting to communicate with someone from Microsoft. That is not the case. Those of us who respond on this forum are strictly volunteers. We do
    not work for nor do we have any direct ties to Microsoft.
    Hope this helps.
    John

Maybe you are looking for

  • Verity & non-English categories

    Hi there I've attached some test code, which demonstrates what I'm doing. It looks a bit long-winded - it's 60-odd lines - and I'd usually not post that much, but I kind of have to here. It's pretty simple, so I hope you don't get frightened away by

  • How to reclaim the space used for LOBSEGMENT, which is growing fast

    Hi, DB version 10.2.0.2 OS RHEL v4 Envi RAC on ASM On the production, in one of the schemas (PR_AA) on the tablespace PR_AA, i have 1) a table (Table1) which has 3 columns of CLOB datatype. Current size of this table is 65 GB. 2) Two LOBSEGMENTS 85GB

  • HT204074 If I have additional music on my second computer that I authorize with iTunes Match, How do I upload it to iCloud?

    If I have additional music on my second computer that I authorize with iTunes Match, How do I upload it to iCloud?

  • ResultSet.getString() != toString()

    We have a method which retrieves values from a result set by simply doing resultSet.getString(index). This works fine in all cases and the result retrieved is as if the proper type is retrieved and a toString() is done on it, except for Timestamps. F

  • New import error

    I've attempted to re-compile my objects and now there is a new error: IMP-00017: following statement failed with ORACLE error 29855: "CREATE INDEX "CITIES" ON "CITIES" ("LOCATION" ) INDEXTYPE IS "MDSYS"."SPAT" "IAL_INDEX"" IMP-00003: ORACLE error 298