Project Owner not allowed to see Gantt charts in Project Server 2013

Hi
A user of Project Server 2013 is unable to see the Gantt chart of his own project. It says in red letters (translated): "You are now allowed to access this page".
I cannot see any difference between this users account and rights and I have tried as a test user to create a project, but I am unable to reproduce this error.
Any suggestions?
Regards
Jakob

Hi,
One of the things I would suggest is to to Inactive the user and save and then Re-active the user and save in order to re-apply user permissions.
I am assuming the user has the correct permissions etc.
Hope this helps
Paul

Similar Messages

  • I have connection problems between the mini ipad and my powerbook g4, you are not allowed to see or share applications.

    I have connection problems between the mini ipad and my powerbook g4, you are not allowed to see or share applications.

    That is not possible.

  • Project Server 2013 - Approved Tasks not applied to Project Schedule

    Environment Details: Microsoft Project Server 2013 SP1
    When an Resource completes a tasks within the Task or Timesheet page at the end of each day, the tasks is routed to the Project Owner for approval. The Project Owner (Project Manager) approves the task. During this process no errors are displayed.
    When the Project Owner (Project Manager) goes into the Project Professional 2013 client to view how the project is progressing, and update the project completion date, the updates is not applied to the project. 
    This worked for some time, but has recently stopped working with no changes made to the environment. Any help would be great, as our project manager's are manually updating the tasks prior to approving them so they can report back on the project each week. 

    Hello ProjMgrMatt
    Sounds pretty serious, but I think something is missing somewhere.
    Make sure that the Status Manager field is the same as the Project Owner. 
    Check to queue to be sure that nothing is stuck and waiting.
    Create a new project, publish, submit, approve, etc and see if it still happens.
    Cheers!.
    Michael Wharton, MVP, MBA, PMP, MCT, MCTS, MCSD, MCSE+I, MCDBA
    Website http://www.WhartonComputer.com
    Blog http://MyProjectExpert.com contains my field notes and SQL queries

  • Project Server 2013 timesheets not showing up for approval

    We're using Project Server 2013 and entering timesheets. I'm a team manager who is set up as the timesheet approver for a few people, including Nicole.
    Nicole opens her timesheet and fills it in for the week.  She applies time to four Administrative tasks and two project tasks.
    Nicole submits her final timesheet for approval.  (We have also tried having her save it first, then to the final submission, with the same results.)
    I go to my approval screen and see the four Administrative tasks listed as separate lines.  I do not see the project tasks.
    I select the four Administrative tasks and approve them.  They disappear when the screen is submitted.
    In previous weeks, and with some other employees, I would immediately see a single line item that said "My Timesheet" for Nicole which I could then approve.  But recently this stopped, and I do not see her timesheet.
    If Nicole checks the status of the timesheet it says it's submitted to me.
    On my Approval page if I go to History, Timesheets this timesheet is not listed under "approved by me" nor is it under "my resources unsubmitted timesheets."  It's in limbo.
    The only fix is for Nicole to recall the timesheet and resubmit it.  Then it shows up on my Approval page.
    Any suggestions?
    -- Paul

    We resolved this. The solution was as follows:
    Go to PWA Settings, and under Security choose Manage Groups.
    Click the Team Members group.
    Scroll to the Categories section, and in the Selected Categories area highlight (select)
    My Tasks.
    Click the box to allow the permission called Adjust Timesheet which is under the grouping for Resource.
    Now don't ask me how or why that works.  It's not a setting that intuitively matches what's going on.  But it fixed it for us.
    By the way, we had a number of other timesheet issues (view failures, etc.) that were all cleared up when we installed the April 2014 Cumulative Update for Project Server 2013, as well as SharePoint 2013 SP1.  I highly recommend both.
    -- Paul
    Paul LoSacco, Web Presence Team, Omnicare

  • After Migrating to project server 2013 some of my Mpp are not opening in project professional

    After migrating to project server 2013 from 2010. my some of mpp are not opening in project professional. 
    project professional taking some time and then showing checkin error. There are no logs on project server to this issue.
    but you can see these project in project server 2013 without issue. I have also tried the EditLink function. but result is same project professional not able to open. Check in error.

    Hello,
    Can you try this:
    Open one of those Projects in PWA to edit in the browser
    make a slight change (new dummy task etc.)
    Save and Publish from the web
    Close and check in from the web
    Wait for the jobs to complete
    Open project professional
    try and open the same project again from there
    Paul
    Paul Mather | Twitter |
    http://pwmather.wordpress.com | CPS

  • Project Server 2013 - Cannot see project schedule in PWA

    Project Server 2013 and Project Pro 2013
    I have admin authority but for some of the projects loaded to the server, and published, i cannot see the Schedule option in the left frame. At least on project has this option available but several others do not. For the projects where I can't see the schedules:
    - Some of these projects were created with imported MPP files from Project 2010, and imported using the wizard,
    - Some were created with imported XML files from Project 2010, and imported using the wizard
    - Some were created with Project Pro 2013 and saved, published to the P13 server.
    Are there some obvious things that I should check as a new admin to this version of Project Server? I'm stumped.
    For all of the above projects (with the issue or not) I can succesfully see everything in Project Professional 2013, and everything seems to function normally in the publish process.

    Hi,
    the first thing to check would be the EPT (Enterprise Project Type) of those projects. Go to server settings, Enterprise Project Types, select the appropriate project type and ensure that the Schedule page is on the left side of the section "New Project
    Page/Project Detail Pages".
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, MCP |

  • Allow collaboration on un-published / checked-in project on Project Server 2013 and Project Online

    Hi All,
    Before a project is officially published specific resources in the project team need to be able to "collaborate" i.e. create tasks, change dates, etc. before the project is published. The complication is that we need this collaboration to happen
    on un-published / checked-in versions of the schedule. For example, the primary Project Manager adds tasks and makes changes to a published version of the schedule, saves and checks-in the project (doesn't publish), tells a secondary PM to go in and review
    the changes, the secondary PM should be able to see the changes the primary PM made, even though the schedule changes weren't published, be able to check-out the schedule, review what the primary PM did, make some more changes, save and check-in the schedule
    (again, without publishing it), and tell the primary PM to review. Then the primary PM could go, check-out the schedule, review it, save it, publish it, and check it in.
    Can Project Server 2013 or Project Online allow to do this? I looked into permissions and Server settings but I couldn't find anything that would indicate it is possible.
    Any help will be greatly appreciated!
    George

    Hi George,
    If you perform some tests, you'll see that even from PWA, the schedule can only be edited from the draft table. When you access the schedule in read only (as a team member for example), you see the published version, but as soon as you edit it (after clicking
    on the edit button assuming you have the appropriate permission), you'll open and update the draft version of the project.
    As far as I can remember (I don't have it in front of me now), you have a "line" in the schedule PDP (don't know how to call it in english) that will tell you if you are accessing either the draft or the publish version.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • PowerView In Project Server 2013 is not working

    Hi All,
    I am working on environment with Project Server 2013. In report part i am not able to see or view only power view reports.
    I am testing this with default report provided by Microsoft, where other reports (power pivot) are working fine.
    My power view report is not showing any error, it is simply gets opened as blank sheet.
    Quick replies and help will be appreciated. 
    Note: I have installed silver light latest version too.
    Thanks
    Abbas 

    I am also experiencing issues with this.  After the approval task is completed, the Workflow gets cancelled with the following message
    RequestorId: 60d96368-4cb4-b059-8086-604972a92e60. Details: System.Collections.Generic.KeyNotFoundException: The given key was not present in the dictionary. at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context)
    at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager
    bookmarkManager, Location resultLocation)
    All other desired workflow actions work as expected.  Emails are sent, project is moved from stage to stage, however as soon as the workflow approval task is completed, either Approved or Rejected, the Internal Status is changed to Canceled and the
    workflow fails.
    What is interesting is when the Approval task is completed, the approver will receive an email notification that the task was CANCELLED or DELETED....
    not COMPLETED, which is what would be expected.
    Has anyone seen this - any potential resolution?

  • Resource filter is not working on 'Timesheet Adjustment' page. in project server 2013

    Environment : Project Server 2013
    In Time-sheet approval page, Time sheet manager unable to filter the resource time-sheet.
    In time-sheet adjustment page time-sheet manager unable to filter the data as per resource.
    Please help to resolve the issue.

    Hi,
    As far as I know, this feature which exists since at least PS2007 was never reported as "buggy". Thus I think it is an issue due to which user filters on which timesheets, meaning a visibility setting. It is really hard to debug for you since I
    do not know exactly the steps you went through and your configuration. I would start by testing simple scenarios in a dev environment using delegation sessions to check from the timesheet manager point of view what he can see. It is also important to check
    the timesheet status.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Notification to Manager if task/Time sheet not approved in Project Server 2013

    is there any option if any user(Resource) updated his/her task & sent to his/her Manager for approval
    and Manager is not approved ( say in said timeline or days) then some notification should go to one step up (as Reporting Manager of that Manager who not approved task update & time sheet) in Project Server 2013?

    A solution could be to create email subscriptions on an SSRS report containing the non-approved task updates by manager.
    See reference here:
    http://bhushan.extreme-advice.com/email-subscriptions-for-ssrs-reports/
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, MCP |

  • Untrusted apps are not allowed to connect to or launch Window Server before login.

    I'm getting this with the Citrix Receiver uninstaller from the command line... but not on all Mountain Lion 10.8.5 systems.  Googling turns up a lot of ideas about a problem with the app or in pre/post-flight scripts, but since it works on some, I wonder.  What is the mechanism that generates this error?  I'm guessing there's some setting or condition that exists on one system that isn't true on the other.  How do I find out?
    Sep 25 10:55:21 palms sudo[74325]:  joliver : TTY=ttys000 ; PWD=/Users/joliver ; USER=root ; COMMAND=/Volumes/Citrix Receiver/Uninstall Citrix Receiver.app/Contents/MacOS/Uninstall Citrix Receiver --nogui
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: 3891612: (connect_and_check) Untrusted apps are not allowed to connect to or launch Window Server before login.
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: kCGErrorFailure: This user is not allowed access to the window system right now.
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: _RegisterApplication(), FAILED TO establish the default connection to the WindowServer, _CGSDefaultConnection() is NULL.
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: kCGErrorInvalidConnection: CGSGetEventPort: Invalid connection
    Sep 25 10:55:21 --- last message repeated 3 times ---
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: CGSRegisterConnectionNotifyProc called with invalid connection
    Sep 25 10:55:21 --- last message repeated 2 times ---
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: kCGErrorInvalidConnection: CGSGetDockRect: Invalid connection
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: CGSGetCurrentDisplayMode: Invalid display 0x00000000
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: kCGErrorInvalidConnection: CGSGetCurrentCursorLocation: Invalid connection
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: CGSGetDisplayBounds: Invalid display 0x00000000
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: kCGErrorInvalidConnection: CGSGetCurrentCursorLocation: Invalid connection
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: CGSGetDisplayBounds: Invalid display 0x00000000
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: kCGErrorInvalidConnection: CGSGetCurrentCursorLocation: Invalid connection
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: CGSGetDisplayBounds: Invalid display 0x00000000
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: kCGErrorInvalidConnection: CGSGetCurrentCursorLocation: Invalid connection
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: CGSGetDisplayBounds: Invalid display 0x00000000
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: kCGErrorInvalidConnection: CGSGetEventPort: Invalid connection
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: kCGErrorInvalidConnection: CGSSetConnectionProperty: Invalid connection
    Sep 25 10:55:21 palms Uninstall Citrix Receiver[74326]: kCGErrorInvalidConnection: Error enabling suspendResume handling

    Contact Wacom. Unless they have updated drivers there is no workaround.
    Update or remove Quicksilver.
    Repairing the Hard Drive and Permissions
    Boot from your OS X Installer disc. After the installer loads select your language and click on the Continue button. When the menu bar appears select Disk Utility from the Installer menu (Utilities menu for Tiger and Leopard.) After DU loads select your hard drive entry (mfgr.'s ID and drive size) from the the left side list. In the DU status area you will see an entry for the S.M.A.R.T. status of the hard drive. If it does not say "Verified" then the hard drive is failing or failed. (SMART status is not reported on external Firewire or USB drives.) If the drive is "Verified" then select your OS X volume from the list on the left (sub-entry below the drive entry,) click on the First Aid tab, then click on the Repair Disk button. If DU reports any errors that have been fixed, then re-run Repair Disk until no errors are reported. If no errors are reported click on the Repair Permissions button. Wait until the operation completes, then quit DU and return to the installer. Now restart normally.
    If DU reports errors it cannot fix, then you will need Disk Warrior and/or Tech Tool Pro to repair the drive. If you don't have either of them or if neither of them can fix the drive, then you will need to reformat the drive and reinstall OS X.

  • Send email is not working in share point desinger 2013 for project server 2013 workflow

    Hi,
      How to configure email for project server 2013. i have created workflow where i am sending email. It is not sending it.
     i have set outgoing mail setting. Tasks are created in my workflow but mail is not sending.
    Thank you for helping us.
    Thank You
    Vinay

    Hi,
      How to configure email for project server 2013. i have created workflow where i am sending email. It is not sending it.
     i have set outgoing mail setting. Tasks are created in my workflow but mail is not sending.
    Thank you for helping us.
    Thank You
    Vinay

  • Workflow in Project server 2013 online not going particular stage after Approval

    Hi All,
    i have created workflow using sharepoint designer 2013 for project server 2013 online. and i have also set the approver after the first stage. when i create a project using this workflow, project is created successfully and the approval task also go for
    a approval to specific user. and i have set the property that after approval it has to go on specific stage. but the problem is when user approve the task it shows approved but my stage in workflow is remain same. it is not going to any stage. 
    i don't know why this type of problem is occur. 
    FYI, i have created same workflow for Project server 2013 on premise(Which is installed in my server) and
    it is working fine but when i want to deploy this workflow in
    project server 2013 online its giving error.
    so please help me to solve this type of issue.
    Thanks

    I am also experiencing issues with this.  After the approval task is completed, the Workflow gets cancelled with the following message
    RequestorId: 60d96368-4cb4-b059-8086-604972a92e60. Details: System.Collections.Generic.KeyNotFoundException: The given key was not present in the dictionary. at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context)
    at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager
    bookmarkManager, Location resultLocation)
    All other desired workflow actions work as expected.  Emails are sent, project is moved from stage to stage, however as soon as the workflow approval task is completed, either Approved or Rejected, the Internal Status is changed to Canceled and the
    workflow fails.
    What is interesting is when the Approval task is completed, the approver will receive an email notification that the task was CANCELLED or DELETED....
    not COMPLETED, which is what would be expected.
    Has anyone seen this - any potential resolution?

  • Project Server 2013 - User cannot create or see his timesheet

    Hi everyone,
    One of my project server user has a little problem with his timesheet.
    When he try to create a timesheet, he has an error message :
    "Sorry ... We can not create the timesheet, because we have encounter a problem with Project Web App or with the data validations,
    especially resources who are users or work resources invalid. Please check
    your environment and try again."
    Or with timesheet which was create before encounter this error, he has this message :
    "Failed while loading the view. Press OK to reload this view with default parameters. Press Cancel to sélect an other view."
    I'd try to check every project where he is as a resource but I didn't found something wrong.
    Maybe it's because one of the custom field is required but other user have no problem to create and view their own timesheet.
    If you have any idea to help me.
    Thanks,
    Patmol

    Please be sure about the permission required for users. If your users are having permission then Check URl which is talking about your issue which is common in PWA 2013
    http://sharing-the-experience.blogspot.in/2013/10/project-server-2013-timesheetaspx-view.html
    http://blogs.technet.com/b/projectsupport/archive/2013/12/11/project-server-2013-error-loading-views-if-the-default-view-is-missing.aspx
    http://carldalton.tumblr.com/
    Hot fix is talking about issue and having Resolution http://support.microsoft.com/kb/2760261/pt
    Cause of the issue
    Run the Sql
    Profiler 
    The timesheet contained two tasks were the value of ASSN_ACT_WORK was NULL instead of 0.00000.
    This caused the System.InvalidCastException in the ULS log and the user error the view failed to load. 
    Remove this kind of entry then you will not face the issue 
    kirtesh

  • Project Server 2013 - OOB Report do not work - Overview report...

    Hi.
    I have followed all of the step to configure reporting as mentioned in text book " implementing and administering project server 2013'. However after configuring the secure store, excel services, analysis service and sql 2012 I am unable to see the
    OOB reports appear with information.
    I have built the OLAP cube in projects service application successfully, however when I try to run the report no information appears.
    What can I do to resolve?
    Thanks

    I assume that you have configured excel services,secure store and built OLAP cube correctly and you are also having data in your Project server.
    You can open cube report and excel report, then select row column or value according the need it will display data.
    If you are using report viewer and author group make sure account from which you are trying to open report will have sufficient access or you can check with service account.
    Also check when you open report, you select enable data which appears in the upper ribbon of the reports.
    If you still facing any issue please let us know,what exactly is the issue.
    kirtesh

Maybe you are looking for

  • How can I remove my iCloud Photo Albums from my iPhone 6 storage, but still use the iCloud Photo Sharing?

    I put all my photos from my iPod Touch 4 and my iPhone 4S in iCloud Photo Albums and Labeled them so that when I got the new iPhone 6 on iOS 8.1.2 I could have my previous photos on there for future use. Now I look on my iTunes app on my computer it

  • Recommended distortion method for matching two images

    I have two images of North America as separate layers that I'm trying to line up as closely as possible. One is a color image of the earth's surface while the other is a grayscale image representing the topography of the terrain. There are many obvio

  • Itunes.exe not valid win32 application

    i cannot install the new itunes update. because after i download the update my computer says that this is not a valid win32 application. how do i get rid of this and install the new update. i have tried all of the suggestions that are on the support

  • Package/procedure/function calls done with in a package

    Hi Experts, Can anybody suggest me the table/ a query to find the package/procedure/function calls (with in the same db or remote) done with in a package. It would be great if we can provide a tree like structure of the objects being called/used. btw

  • EDI IDOC error message

    Dear Team, may I kindly ask you to help me with regard to an error message I am getting for inbound idoc message type INVOIC. The message is "Field format is incorrect" and 'Field content is incorrect". Segment E1EDS01. I have tried various ways of f