Workflow in Project server 2013 online not going particular stage after Approval

Hi All,
i have created workflow using sharepoint designer 2013 for project server 2013 online. and i have also set the approver after the first stage. when i create a project using this workflow, project is created successfully and the approval task also go for
a approval to specific user. and i have set the property that after approval it has to go on specific stage. but the problem is when user approve the task it shows approved but my stage in workflow is remain same. it is not going to any stage. 
i don't know why this type of problem is occur. 
FYI, i have created same workflow for Project server 2013 on premise(Which is installed in my server) and
it is working fine but when i want to deploy this workflow in
project server 2013 online its giving error.
so please help me to solve this type of issue.
Thanks

I am also experiencing issues with this.  After the approval task is completed, the Workflow gets cancelled with the following message
RequestorId: 60d96368-4cb4-b059-8086-604972a92e60. Details: System.Collections.Generic.KeyNotFoundException: The given key was not present in the dictionary. at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context)
at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager
bookmarkManager, Location resultLocation)
All other desired workflow actions work as expected.  Emails are sent, project is moved from stage to stage, however as soon as the workflow approval task is completed, either Approved or Rejected, the Internal Status is changed to Canceled and the
workflow fails.
What is interesting is when the Approval task is completed, the approver will receive an email notification that the task was CANCELLED or DELETED....
not COMPLETED, which is what would be expected.
Has anyone seen this - any potential resolution?

Similar Messages

  • Can new PWA views be created whereby a filter can be set and associate to the view by default? (Project Server 2013 ONLINE)

    My main question is: Can new PWA views be created whereby a filter for that view can be set, and associate to the view by default? (Project Server 2013 ONLINE)? and can I have a filter set to filter on person logged on to...
    In previous versions of Project Server, when CREATING a PWA view, we were able to apply/ define a filter for that view.  Does not seem like it is the case in Project Server 2013 Online.  And if I remember, we could also use the URL Guid_view_id. 
    Please confirm; and / or tell me how-to.
    What I was hoping to do is the following... Given that our standard that we have adopted for reporting time is 'My Timesheets' (fyi, Single Mode Entry=ON), we have some resources who have others who do it on their behalf via 'My Tasks' (ie., accomplished
    by using the 'Assignment Owner' field, accordingly).  Therefore, when entering time on someone else's behalf within 'My Tasks', we like to present the user that is logged in only the tasks that they are are assigned to update on others' behlaf.
    I know that there is another more elegant approach to doing this which may be to use the Delegation feature. But since we are trying to stick to Sharepoint Security mode for now, this is not an option for the time being.
    Any help appreciated would be greatly appreciated.
    \Spiro Theopoulos PMP, MCITP. Montreal, QC (Canada)

    Hi Spiro,
    1- You still can define in Project Online a filter in the view settings, it is located just above the category setting. Here is a screenshot of the summary project center view:
    2- The view GUID is not anymore in the URL, since the URL triggers an action only on the webpart and not on the whole page. I agree this is annoying since it was great to send a URL with a specific view.
    3- Concerning the access to my timesheet versus my task, I'm not sure to get a full understanding but on a general way, it is much more easy to deal with those situation using categories which you cannot do with the SP permission mode.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Need to create a TASKS page with a filter default in PWA Project Server 2013 (Online)

    Never done this so, I am wondering How to go about or what I would need to create a simple PWA page like "Tasks" in Project Server 2013 online where it default to a filter that is set to not equal to the user that is logged on?
    \Spiro Theopoulos PMP, MCITP. Montreal, QC (Canada)

    Hi Spiro,
    The "my tasks" page or "my timesheet" are automatically filtered on the user currently connected. Unless you are using workarounds such as status manager or delegation, I see no way to bypass this.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Project Server Task Approvals not Going into Plan

    Hi,
    After approving a task, we are finding that it is not going into the plan - on our separate test environment, the same steps work ok.
    Any ideas?
    Thanks

    Hi,
    Could you please let me know, if the issue is happening for only one projects or all the projects.
    Also, Check for failure transactions.
    select
    ASSN_UID,
    * from pub.MSP_ASSIGNMENT_TRANSACTIONS
    where ASSN_TRANS_STATE_ENUM
    =4 and
    proj_uid like'Proj_Uid'
    Also let me know on which patch level you are on?
    Check if you have any projects affected with lost resource bug
    http://blogs.technet.com/b/projectsupport/archive/2014/02/06/project-server-2013-and-project-online-what-happened-to-my-resources.aspx
    SELECT DISTINCT A.PROJ_UID, P.PROJ_NAME
    FROM DRAFT.MSP_ASSIGNMENTS A
    LEFT JOIN DRAFT.MSP_PROJECT_RESOURCES PR ON A.RES_UID = PR.RES_UID AND A.PROJ_UID = PR.PROJ_UID
    INNER JOIN PUB.MSP_RESOURCES ER ON A.RES_UID = ER.RES_UID
    INNER JOIN DRAFT.MSP_PROJECTS P ON A.PROJ_UID = P.PROJ_UID
    WHERE PR.RES_UID IS NULL
    UNION
    SELECT DISTINCT C.PROJ_UID, P.PROJ_NAME
    FROM DRAFT.MSP_PROJECT_CALENDARS C
    LEFT JOIN DRAFT.MSP_PROJECT_RESOURCES PR ON C.CAL_UID = PR.RES_UID AND C.PROJ_UID = PR.PROJ_UID
    INNER JOIN PUB.MSP_RESOURCES ER ON C.CAL_UID = ER.RES_UID
    INNER JOIN DRAFT.MSP_PROJECTS P ON C.PROJ_UID = P.PROJ_UID
    WHERE PR.RES_UID IS NULL
    ORDER BY P.PROJ_NAME
    Thanks,
    Phani

  • Project Server 2013 timesheets not showing up for approval

    We're using Project Server 2013 and entering timesheets. I'm a team manager who is set up as the timesheet approver for a few people, including Nicole.
    Nicole opens her timesheet and fills it in for the week.  She applies time to four Administrative tasks and two project tasks.
    Nicole submits her final timesheet for approval.  (We have also tried having her save it first, then to the final submission, with the same results.)
    I go to my approval screen and see the four Administrative tasks listed as separate lines.  I do not see the project tasks.
    I select the four Administrative tasks and approve them.  They disappear when the screen is submitted.
    In previous weeks, and with some other employees, I would immediately see a single line item that said "My Timesheet" for Nicole which I could then approve.  But recently this stopped, and I do not see her timesheet.
    If Nicole checks the status of the timesheet it says it's submitted to me.
    On my Approval page if I go to History, Timesheets this timesheet is not listed under "approved by me" nor is it under "my resources unsubmitted timesheets."  It's in limbo.
    The only fix is for Nicole to recall the timesheet and resubmit it.  Then it shows up on my Approval page.
    Any suggestions?
    -- Paul

    We resolved this. The solution was as follows:
    Go to PWA Settings, and under Security choose Manage Groups.
    Click the Team Members group.
    Scroll to the Categories section, and in the Selected Categories area highlight (select)
    My Tasks.
    Click the box to allow the permission called Adjust Timesheet which is under the grouping for Resource.
    Now don't ask me how or why that works.  It's not a setting that intuitively matches what's going on.  But it fixed it for us.
    By the way, we had a number of other timesheet issues (view failures, etc.) that were all cleared up when we installed the April 2014 Cumulative Update for Project Server 2013, as well as SharePoint 2013 SP1.  I highly recommend both.
    -- Paul
    Paul LoSacco, Web Presence Team, Omnicare

  • PowerView In Project Server 2013 is not working

    Hi All,
    I am working on environment with Project Server 2013. In report part i am not able to see or view only power view reports.
    I am testing this with default report provided by Microsoft, where other reports (power pivot) are working fine.
    My power view report is not showing any error, it is simply gets opened as blank sheet.
    Quick replies and help will be appreciated. 
    Note: I have installed silver light latest version too.
    Thanks
    Abbas 

    I am also experiencing issues with this.  After the approval task is completed, the Workflow gets cancelled with the following message
    RequestorId: 60d96368-4cb4-b059-8086-604972a92e60. Details: System.Collections.Generic.KeyNotFoundException: The given key was not present in the dictionary. at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context)
    at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager
    bookmarkManager, Location resultLocation)
    All other desired workflow actions work as expected.  Emails are sent, project is moved from stage to stage, however as soon as the workflow approval task is completed, either Approved or Rejected, the Internal Status is changed to Canceled and the
    workflow fails.
    What is interesting is when the Approval task is completed, the approver will receive an email notification that the task was CANCELLED or DELETED....
    not COMPLETED, which is what would be expected.
    Has anyone seen this - any potential resolution?

  • Task Updates By Team Members In Project Server 2013 but not reflects in MSP 100% completed

    Hi,
    My problem is related to Project Server & Project Professional 2013
    My scenario is like that Project Manager publish the project plan, and respective team member get their task. And Team Member is updated the task,then send to  the Project Manager for approval. Project Manager is approved the task. But, while opening my
    project in MSP 2013, it is not synced means, in msp it is not showing task 100% completed.
    Please solve this problem, I am waiting for your response.
    Thanks
    Saikat 
    Consultant

    Hi Guillaume,
    I have tried your procedure, but not get any solution.
    Yes, two errors are showing while opening in MSP like:
    1) The following job type failed to complete, Job Type -Load. Could not load project. Please try after sometime.
    <detail><ServerExecutionFault xmlns="http://Microsoft.Office.Project.Interfaces/" xmlns:i="http://www.w3.org/2001/XMLSchema-instance"><Actor i:nil="true"/><LastError>1032</LastError><Message/><Source/><StackTrace/><TargetSite
    i:nil="true"/><ExceptionDetails><errinfo xmlns=""><general><class name="ProjectHasWriteLock"><error id="1030" name="ProjectHasWriteLock" uid="c9095c9e-cfbc-e411-940a-000c299e9fb7"/></class><class
    name="ProjectHasNoReadLock"><error id="1032" name="ProjectHasNoReadLock" uid="ca095c9e-cfbc-e411-940a-000c299e9fb7"/></class></general></errinfo></ExceptionDetails></ServerExecutionFault></detail>
    2) Second error are showing in Queue like "Skipped for Optimization" and "Failed But Not Blocking Corelation"
    Please give me the ultimate solution to solve this.
    Thanks and Regards
    Saikat
    Consultant.

  • Matching resources based on skill profile (Project Server 2013 Online and Project Pro 2013)

    Hey gang,
    Has anyone seen any reported bugs surronding the resource matching feautre in Project 2013 (On-Line)?
    I have done this before, so I know how this works.  In fact, I get different results when I try the Match button in Project Professional 2013 (on premise), versus when I try to use it via Build Team from Enterprise in PWA Project Details.  i.e.,
    when setting up the custom enterprise resource field for matching I have selecting the option to use this field for matching, then I populated my resources' profile with a value accrodingly.
    Also noted that I do not see the matching button when using the Build Team from Enterprise for Resource plans, is this normal?
    Thanks in advance,
    \Spiro Theopoulos PMP, MCITP. Montreal, QC (Canada)

    Hi Spiro,
    I didn't have a chance to test it. Nevertheless I can confirm that at least for PS2010, the "match" feature was not available for the resource plan "build team". In my point of view, that makes sense since the resource plan is not intended to micro-manage
    activities but more for planning generic skills demand.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • Exchange Server 2013 Database not showing in ECP after removal of Exchange Server 2010

    I recently complete the migration of my Exchange 2010 server to Exchange 2013. I then proceeded to uninstall the 2010 server using setup.com /m:uninstall. At the end of the process I received an error that it did not complete the uninstall.
    I checked the server and Exchanged 2010 was removed. When I checked ECP on 2013 it still showed the old 2010 server listed. I used ADSI edit and manually removed the old sever.
    Now when I log into 2013 ECP I only see the one serve but when I go into databases, none are listed. I check under the server itself and it shows the database that it is using but it is not listed under the database tab.
    If I do a search under the database tab I can find it and adds it to the list. I can then open and view details.
    My issue is, after I log out and then back in, I have to run the search to find the database again. In ideas on how to have it show up in the list like it did  before I removed the 2010 Exchange server?
    Thank you,

    Hi,
    From your description, I recommend you verify the following things for troubleshooting:
    1. Please make sure that AD replication is completely by checking the user object's homeMDB attribute. This value should contain the DN value of the Exchange Server 2013 mailbox database.
    2. Wait 30 minutes for the cache on the Exchange Server 2013 Client Access Server to clear or restart the MSExchangeOWAAppPool on the Exchange Server 2013 Client Access Server.
    For more information, here is a kb for your reference.
    Exchange 2013 Redirects to Exchange 2010 for OWA and ECP
    http://support.microsoft.com/kb/2931385
    Hope it helps.
    Best regards,
    Amy Wang
    TechNet Community Support

  • How should we be going about creating and saving and/ or exporting our ODC files using Excel 2013 for use in Project Server 2013 Online?

    Hi I need your guidance on how I should go about setting up my Excel 2013 reports so that others in our Project Online 2013 environment can access and updates these reports of mine.
    My questions are as follows:
    I presume I need to create and save my ODC files in a PWA > Data Connections folder.  I have English and French users in our environment.  Do I need save them twice?  Once in the French and again in the English Data Connections folder?
     Likewise for the Excel file? 
    How should I go about creating my ODC files within Excel?  By default, the ODC files are being created on my PC's > My Documents > My Data Sources folder.  I presume I need to get them saved or exported to the PWA > Data Connections
    folder. So, How should I be going about creating and saving and/ or exporting the ODC files???
    FYI...My oData Feeds that I wish to use and join in this particular Excel file are as follows:
    https://cascades.sharepoint.com/sites/pwa/_api/projectdata/AssignmentTimephasedData01T00:00:00'
    https://cascades.sharepoint.com/sites/pwa/_api/projectdata/Projects()?$select=ProjectId,ProjectName,CAS_Classification,CAS_PCO,CAS_IT_Department,CAS_Program,CAS_SubProgram
    https://cascades.sharepoint.com/sites/pwa/_api/projectdata/TimeSet()?select=TimeByDay,TimeDayOfTheWeek$filter=TimeByDay ge datetime'2014-10-19T00:00:00'
    https://cascades.sharepoint.com/sites/pwa/_api/projectdata/Resources()?$select=ResourceId,ResourceName,Programs,Supplier,Source,Role,CostType
    Thanks in advance,
    \Spiro Theopoulos PMP, MCITP. Montreal, QC (Canada)

    Thank you Guilaume.  May I ask you to help clarify a bit more for me?  If I have to do it for both languages (the reports and ODC files), do I simply copy the same ODC files from e.g., the English to French folder in PWA (Odc files)?  Or does
    that defeat the purpose?  Or, do I need to create a new set of oData Feed Connection files with a French version of Excel 2013 and save them to the French Data Connections folder in PWA?  Do I need to have a French version of Excel 2013 to create
    French ODC files and ultimately French based reports and/ or vice versa?
    I did notice that the following oData metadata command from within a browser produces different results (ie., English versus French metadata returned) depending on who runs it (i.e., French or English user, etc).  As you can see I am a bit confused.
     Any help you can provide would be greatly appreciated.
    https://XXXXX.sharepoint.com/sites/pwa/_api/projectdata/$metadata
    \Spiro Theopoulos PMP, MCITP. Montreal, QC (Canada)

  • Help needed Regarding Project Server - 2013 Workflow

    Hi All,
    I am new to Project server 2013 Workflow, hence please help me regarding this. Pardon me if this question is too trivial. 
    I have created a project type associated with a workflow and my workflow is as follows :
    So I am not doing anything here, I am just testing the workflow as mentioned by technet site : http://technet.microsoft.com/en-us/library/dn458865(v=office.15).aspx
    But it is mentioned that, after a minute or 2, the workflow state will change, also they have mentioned to press the Submit button.
    But in my case, the workflow is not moving to next stage [It just says 'The workflow is still processing - which never changes after hours] or I am getting the submit button (Submit button is disabled on the ribbon). Below is the state of my workflow :
    PS : I have made the user added to Portfolio managers group as well. But still I am having this same issue. 
    The Workflow manager is installed properly, and it is working fine in case of List workflow. I am facing the issue only wrt Site workflow for Project server 2013.
    Please help me to solve this issue.
    Thanks,
    shanky

    Hi Kiran,
    I am now facing issue while assigning a task to a person in the workflow.
    I am having a person named say 'John' , who is included in Project Manager as well as Portfolio Manager.
    And I am using a workflow as :
    Stage : Conceptual
    Assign a task to John (Task outcome to Variable: Outcome5 | Task ID to Variable: TaskID3 )
    Transition to stage
    Go to Approval
    But this is again giving issue as :
    Workflow Internal status : Cancelled
    Details: System.ApplicationException: HTTP 401 {"error":{"code":"-2147024891, System.UnauthorizedAccessException","message":{"lang":"en-US","value":"Access denied. You do not have
    permission to perform this action or access this resource."}}}
    PS : I have used the same Sharepoint admin account for 'Account Name' in ‘User Profile Sync' , Is this causing the issue? Please let me know.
    Thanks,
    Shanky

  • The Stage Gate Workflow get suspended in project server 2013

    Hi,
    Getting following error when i am trying to create an stage gate project/workflow in project server 2013. The submit button in
    the ribbon gets disabled and when i see the workflow status it is suspended. and getting following error message. 
    RequestorId: d5f04432-bd27-3da1-0000-000000000000. Details: RequestorId: d5f04432-bd27-3da1-0000-000000000000. Details: An unhandled
    exception occurred during the execution of the workflow instance. Exception details: System.ApplicationException: HTTP 401 {"x-ms-diagnostics":["3001000;reason=\"There has been an error authenticating the request.\";category=\"invalid_client\""],"SPRequestGuid":["d5f04432-bd27-3da1-bc57-8ce72d9f5e43"],"request-id":["d5f04432-bd27-3da1-bc57-8ce72d9f5e43"],"X-FRAME-OPTIONS":["SAMEORIGIN"],"SPRequestDuration":["153"],"SPIisLatency":["0"],"Server":["Microsoft-IIS\/8.0"],"WWW-Authenticate":["Bearer
    realm=\"2a5d48f2-f71d-4589-a6ae-ab6c0d30fafd\",client_id=\"00000003-0000-0ff1-ce00-000000000000\",trusted_issuers=\"00000005-0000-0000-c000-000000000000@*,[email protected]0d30fafd\"","NTLM"],"X-Powered-By":["ASP.NET"],"MicrosoftSharePointTeamServices":["15.0.0.4481"],"X-Content-Type-Options":["nosniff"],"X-MS-InvokeApp":["1;
    RequireReadOnly"],"Date":["Thu, 04 Jul 2013 11:20:43 GMT"]} at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context) at System.Activities.CodeActivity.InternalExecute(ActivityInstance
    instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager bookmarkManager, Location resultLocation)
    Could anyone help me to fix this issue and reason why the Stage gate workflow isgetting suspended.
    Thanks,
    Sunitha

    Check your User Profiles and make sure that the user's domain is correct. We've seen workflows suspend with 401 errors when the User Profile Service syncs with AD and pulls the wrong domain name - for
    example if your FQDN is corp.company.com and the user logs in with company\username, UPS might have corp\username instead. Hence a 401 error...
    Here is a link that includes the steps to fix this:
    http://social.technet.microsoft.com/wiki/contents/articles/18060.sharepoint-20xx-what-if-the-domain-netbios-name-is-different-than-the-fqdn-of-the-domain-with-user-profile.aspx
    Neall

  • Issue while installing Ms Project Server 2013 on MS Server 2012 R2 with Sharepoint Server 2013

    Hello MS Support Team,
    I installed SQL server 2012 & Sharepoint server 2013 and after that the MS project Server 2013 is not installing on the same server -- pls hv a look the enclosed screenshot. sent at [email protected] and guide me to resolve it on priority.
    A windows poped up - Installation Error - This Project requires MS Sharepont Enterprise edition... (Which is not available on the MSDN Server)..only standard edition available.
    Please reply asap @ [email protected] - Call @ 0120471384
    Kind Regards,
    Vinay Bhardwaj
    Network System Administrator - GREC (IN)
    Rockwell Automation | A-66, Sector 64 | Noida | India
    LISTEN. THINK. SOLVE
    IP : 71384 | E : [email protected] | W : www.rockwellautomation.com

    Hi Siriosus,
    Indeed you do need Sharepoint Server 2013
    Enterprise for Project Server 2013.
    See article below where it is mentionned:
    Project Server 2013 requires the Enterprise edition of SharePoint Server 2013. Prior versions of SharePoint Server and SharePoint Foundation 2013 are not supported.
    http://technet.microsoft.com/en-us/library/ee662114(v=office.15).aspx
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • Project Server 2013 Work Flow

    Hi All,
    We planed to have as simple workflow for project, which will go through initiation, planning , execution and monitoring and closure. Is there any easy way to configure this or we need to develop the workflow using visual studio.
    Thanks in advance, taj

    Hi Taj,
    With PS2013, it is now possible to build workflow using SharePoint Designer that requires less/no code than with Visual Studio with PS2010.
    See some interesting links below to start over:
    http://blogs.office.com/2012/09/18/demand-management-now-with-sharepoint-designer/
    http://msdn.microsoft.com/en-us/library/office/ee767694(v=office.15).aspx
    http://msprojectnow.com/Blog/tabid/142/entryid/617/Designing-and-Deploying-workflows-with-Project-Server-2013.aspx
    Hope this helps.
    Guillaume Rouyre - MBA, MCP, MCTS

  • Send email is not working in share point desinger 2013 for project server 2013 workflow

    Hi,
      How to configure email for project server 2013. i have created workflow where i am sending email. It is not sending it.
     i have set outgoing mail setting. Tasks are created in my workflow but mail is not sending.
    Thank you for helping us.
    Thank You
    Vinay

    Hi,
      How to configure email for project server 2013. i have created workflow where i am sending email. It is not sending it.
     i have set outgoing mail setting. Tasks are created in my workflow but mail is not sending.
    Thank you for helping us.
    Thank You
    Vinay

Maybe you are looking for

  • Unable to find Idoc in XI

    Hi, Idoc -> XI -> File I am trying to send an Idoc (ZANSO_MT) from R/3 side to XI. Status of the message is green in we05 in R/3 but I am unable to find it in XI. I have checked in idx5, we05. All the RFC connections are working fine with authorizati

  • Quick tutorial of using methods of class

    Hi, I have never use methods of class before. Is there anyone can give me a quick tutorial how to do it? To be more specific – I need convert field 'DAUER' into the required format using one of the following methods of class 'CL_HR_T510_PSRCL': •    

  • Webcam not working with maverick os

    I there an update available to fix this issue? Thanks

  • Loading data including Smart Lists data using ODI Planning KM

    Hi all, a question regarding ODI loading Smart Lists Data... Can somebody confirm if we can load data from a source file which has the smart lists labels, instead of the smart list values id (ex: YES instead of 1)? i suppose Planning will do the conv

  • Two problems with Preview

    I received some .pdf images of book pages that needed to be rotated to be readable. After I saved the properly-rotated pages and closed the document I couldn't re-open it unless I quit Preview and opened it again. All I would get was blank pages. My