Project System for ABAPers

Dear All,
Can you please explain me the importance of Project system in an ABAPer's perspective? In which phases of Project system, does an abaper come into picture?
regards,
Surya

Hi,
As an ABAPer, it does not matter which module you are working in as long as you know the business flow of that module, what are the main tables, how the module is integrated with other modules etc.
I am working in PS module. Here i have done custom reports / tables / FMs, user-exits, work-flows and many more things. Also, since it is integrated with SD / FI / HR / MM etc, i have to work in those module also and code related to some custom integration scenarios between these modules and PS module.
The question you are asking is vague. What ABAPer can do in any module can only be answered on case by case basis depending on what the requirement is.
I hope i clarify your doubt. Let me know if you have further question.
Regards,
RS

Similar Messages

  • Settlements in project System for public sector.

    We are having a unique requirements for Project system.
    A Capital project will be mostly funded by Federal agency. However the capital project will end as an asset. eg, Roads, bridges etc.
    1. We want to acumulate all expenses and settle it to AUC ( IM ) and later settle as an asset. ( currently possible )
    2. However, based on the billings done to Fed agencies, the revenue is also to be identified in the project. ( should not be condisered for settlement, as it will reduce the Asset value ).
    We tried to seggregate the cost and revenues by source structures namely 10 and 20 for Cost and revenues respectively. In the settlement rule we move the cost up from WBS element to Project level. From project we move to AUC and finally to AMR.
    Our requirement is to just settle the expenses to AMR and leave the Revenues in the the project itself. However the gives a hard error that the revenue settlement should also be settled. The other option we thought about, was to settle to a cost center, but it is not advisable as the revenue will put back  the budget of that cost center/fund center.
    So my questions is .
    1. Can part settlement happen ? ( Meaning move only costs ) ?
    2. In private sector, it is possible because expenses are Cost element 1 and Revenues are 11 ( not selected for settlement except PA settlement ). However in public sector expenses and revenues are treated as Cost element 1. so how to circumvent this issue ?
    Any help or direction will be much appreciated..
    regards,
    Venkat Kota.

    I am already using the source structure to split the cost and revenues. I am also using the same settlement profile for all the requirements.
    1. lower WBS to Higher WBS.
    2. Higher WBS to AUC
    3. AUC to AMR.
    So i am not sure how i can maintain 2 settlement profiles for one project ?

  • Project System  for Construction of Apartments

    Has  any  hands on  how the Project system works in construction of Apartments. If any body has, please share me their views how the leasing of the land should be done, how the  project should be structured, how the sales of the apartments have to be done how the revenue would be booked.etc. Quick views would really appreciated.
    Regards.
    VaraPrasad

    A lot of answers can be derieved from how they are managing it today
    1) whether they want to manage every single land that they buy and sell
    or they just want to know how the company on the whole is doing
    2) whether they buy stock in bulk to supply to subcontractors or they just buy it project by project or land by land for development
    3) Are dates important whether there are financial implications if there is delay in terms of development , do they stand to loose and how they want to integrate schedule to cost and progress , how they want their profits to be realised will lead to the answer you need
    4)Company asset and production resource tools will have to be looked at.
    Regards,
    Anshvinder

  • Cost plannin in Project Systems

    Hello SAP PS Gurus,
    I am working on implementing SAP project systems for the client
    that I am currently with.
    I am having problems in cost planning for my WBS elemented related activity. for example when i confirm an activity my actuals are getting updated in the actuals column whereas my planned isnt getting updated even though i have done my planning through KP26 and also through CJR2. please advice what is the right way to do planning or assign costs for activities.
    i dont know if i am missing something.
    your feedback as soon as possible would really be appreciated.
    Thank you
    Pranita

    Hello
    Check this link on Project Planning Board.
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/4c/225cff46e611d189470000e829fbbd/frameset.htm
    Reg
    *assign points if useful

  • Project System: Plan Version

    Anyone know how many plan version can I have in Project System for 1 project in same year?
    Edited by: ytai on May 25, 2010 11:20 AM

    Hi,
    You can define up to 10 versions (0 to 9). Please, search basic SAP material on help.sap.com
    Regards,
    Eli

  • Project system implemention

    Dear expert,
    I want end to end  configuration  document of project system. kindly help me, please send document with all screen shot , i hope that will be very helpful for me , i have clear all logic of  porject system  i don't know which is first step i can start configuration of project system .
    Thanks & Regards.
    shailesh.

    Dear Expert,
      you have send it PDF  document which  already i have but i want  like u know all detail of project system , for example Project Coding Mask  why we use the project coding mask what is behind logic which i want .......... if any  that kind of document  please send it . because if any seating of project system how i can show this right or wrong .
    if any detail in project system document  please send it.
    Thanks & regards
    Shailesh.

  • Difference between SAP cProjects and SAP Project System

    Hi,
    SAP already has a solution PS ( Project System ) for managing the projects in an Organization.
    When there is a solution already existing then why did SAP come up with a new solution cProjects ?
    Can any help me in understanding the main differences and advantages between cProjects and PS ?
    Thanks and Best Regards,
    Priyatham

    Hi.
    I have copied an SAP text below which sets PS, cProjects, (x)RPM and PPM into context.
    In the ninties, the Project System was developed within SAP R/3 to provide a powerful application with full integration into logistics and financials.
    Target groups were industries such as engineering and construction, automotive, high tech or utilities with focus on project manufacturing or large maintenance projects.
    Later on, the need for more flexible and easy-to-use tools supporting the new process methodologies, phased-based approaches, quality gates, and so on, emerged. SAP developed Collaboration Projects and Collaboration Folders (cProjects Suite), which takes these new requirements into account and provides extensive features to collaborate with internal and external partners using a HTML-like interface and Web Application Server technology.
    Thus, cProjects was able to address to a broader range of industries, such as service providers, offering a high degree of visibility and flexibility to support various scenarios from product development to consulting projects. Nevertheless, cProjects is seen as a complementary product to Project System, not as ist successor!
    It always depends on the scenario that a customer wants to cover, which application is the best choice.
    As another matter of fact, combinations of both are also possible.
    In addition to this, the new generation of composite applications was born and SAP xApp for Resource and Portfolio Management provides excellent capabilities to align operational project management with strategic portfolio management.
    The latest developments bring all these three applications tighter together and offers a comprehensive solution for project and portfolio management by covering logistical, financial and human resource aspects and addressing the needs of all stakeholders throughout the entire organisation.
    However, xRPM capabilities are not only restricted to project portfolios but can be leveraged to control all kind of portfolio items.
    Regards / Anders

  • Changing the data in DataSource in R/3 System for Project System

    Can we change the data of DataSource which is extracted from R/3 sYSTEM for Project System Module?

    Hello Rajesh,
    You can modify it in PSA. Or write the routines or rules logic as per your requirement.
    Could you please elaborate more on what kind of changes you are interested for.
    San.

  • Report Painter Drilldown on Cost Element for Project Systems

    I am currently working on a report for Project Systems. I am trying to copy the functionality of the Internal Order summary (60I2-001) into report group 6P3. I was able to copy the whole layout and also the values of 6oI2-001 into a copy of 6PP4-001 but when I double click on "Balance" it is bringin up the ALV report that 6PP4-001 is using. I would like to call another report which looks like 6LS0-001 but contains Project System info made in report painter when I double click on Balance. Is this possible? Please let me know how.

    Hi Avinash,
    See my replies below.
    1 a & B: You are planning Qty on NWA and capturing costs - labor & Equipment on NWA elements.
    When  you are having elaborated to NWA-Element level, split your total work on each NWA-element and post labor cost. Thus you will have planned Vs actual costs at one place.
    coming to equipment cost - are you capturing using PO through GR?.
    2.a : Option1- create a separate WBS elements for materials and plan cost at WBS level. That value would be your total planned cost of material procurement as estimated. Under this WBS elements create NWAs and assign the materials. With this set up you can assign material and procure so that will have actual costs coming from GR.
    Option 2: Create a one General Cost activity and assign the total planned cost of material on this NWA.
    When you assign the material components, diligently you have to reduce the equivalent amount from the general costs activity. Also note that on component screen, you have to check box "Cost relevant" so that material cost will add to Cost NWA. Let the different materials  have their own valuation class and have default CEs accordingly. that would not be big issue.
    Please discuss with your MM team to get more information. Also my suggestion is to leave blank CE field in configuration.
    The option2 is very cumbersome and high risk but one have to be very cautious to reduce the value from Cost NWA in order to sustain the planned material costs whenever they added.
    3. I have answered the relevance of Cost relevance check box in above.
    Hope above makes sense.
    Thanks,
    Sudhakar

  • Milestone payment for vendor in project system

    Dear sapient
    As per our client requirement vendor payment is based on the basis of milestone i.e activity based. As per the contract agreement payment is made on the basis of certain percentage as mention below.
    1st payment 5% of total order value (with out tax)
    2nd payment 10% of total order value  (with out tax)
    3rd payment 65% of total order value (Including tax 100 % )
    4th payment 20% of total order value (with out tax)
    Is there any standard or workaround functionality available in sap for vendor payment in project system ?
    Regards
    Soraj

    Thnx for reply
    As per our requirement payment is based on completion of work. can i use payment term on the basis of completion of work/activity not on due date basis?

  • Technical spec for Project systems report

    Hi all,
    My requirement is to create technical spec's on this Project Systems monthly and yearly budget and actual tracking with drill down capability
    And the char and KF are:-
    Char
    Project Definition
    WBS Element
    Cost Element
    Vendor
    Purchase Order No.
    Purchase Order Item
    Requester
    Created On
    PO Description
    Final Delivery
    KF
    PO Value
    Value - Quantity Delivered
    Amount Invoiced
    To be invoiced - Value
    To be Delivered - Value
    Can anyone help me that which standard query is suitable for this requirement.

    Hi,
    Check the below business content queries:
    0PM_MC01_Q0001     Budget Comparison (Actual Costs) 
    0PM_MC01_Q0002     Budget Comparison (Planned Costs)
    0PM_C06_Q0002       Budget Proposal (Periodic)
    0PM_C06_Q0003       Budget Proposal (Objects)
    Check this might be useful:
    http://help.sap.com/saphelp_nw2004s/helpdata/en/e8/858f40f5767d17e10000000a1550b0/frameset.htm
    Hope this helps.......
    Rgs,
    Ravikanth

  • Pricing Schema for Project System

    Dear Sappers,
    I'm configuring Pricing Schema for Project System(PS) module.
    The requirement is, the schema will be in such a way that it supports both excise, CST, VAT and service tax.
    In PS module the user raises a Purchase Order having procurement of material as well as taking service from Vendor.For this in PO he will maintain both material as well as service.
    I'm configuring the Pricing schema in MM - Purchasing - Condition.
    My question is for materials procurement, everything is working fine.But for service respect to activity number I want to maintain service tax and other cess in condition record.
    But to maintain service tax & other cess for activity number, I want the access sequence of sevice to be in Purchasing.I've taken the standard table for Plant, Vendor, Purchase Organinzation and activity number combination from External Service management and making a new access sequence in MM - Purchasing.All fields are coming but for Activity number, it not taking the document structure and showing error.
    How to overcome this??
    Any suggestions will be highly appreciated.
    Warm Regards
    PKB

    Hi Pankaj,
    Thanks for your suggestions.
    As per you reply, the access sequence is already maintain in External Service Management.But I want to bring the same combination Plant, Vendor, Purchase Organizartion and Activity number that is Table 97 to MM - Purchasing - Conditions- Access Sequence.
    I've tried to do it, but when I'm creating in MM - Purchasing, all document structure is copying except activity number.What I analyse the error is due to application area.Activity number is MS (External Service Management) area but i'm trying to do in M(Purchasing)
    Even though when I enter manually MS for the access sequence system is not taking.
    Suggest me.
    Warm Regards
    PKB
    Edited by: Pranaya Barik on Dec 11, 2009 12:09 PM

  • Release strategy & EBAN for project systems, purchasing

    Hi
    We have 2 different scenarios for which we use same account assignment category "Z".
    1) Purchase Requisitions for capital expenses (Account assignment category "Z") - this is part of project systems requisition attached to WBS elements
    2) Purchase Requisitions for expensed items (Account assignment category "Z")
    I have configured release strategy with classification with following characteristics
    1) plant
    2) cost centers
    3) total amount in PR
    4) account assignment category
    all 4 characteristics are same in both areas (capital and expensed)of purchase requisitions, account assignment category Z decides whether it is capital purchase or expense related purchases. Z uses order number that is internally tied to WBS element.
    my question is - if some one has similar scenario then what is the best solution to handle invocation of release strategy.
    how release strategy can be determine, do I need to use user exit and if yes what best user exit is available.
    EBAN fields, I have researched and I cant use fields like "requisitioner" for determining release strategy.
    I would like to invoke different release strategy for capital projects and different release strategy for expensed items in PR. there is a workflow attached to this later.
    Please reply
    Thanks and regards
    Umesh

    Umesh,
    Well, there needs to be some way to differentiate the 2 types of purchase requisitions for you to use 2 different release strategies.
    I am not sure if you have the option of using a different document type to differentiate the 2 requisitions. I would definitely look at this possibility and include the document type (CEBAN-BSART) as a characteristic in the release strategy.
    Other options would be to look at using the purchasing group (CEBAN-EKGRP) or the requirements tracking number (CEBAN-BEDNR) as characteristics in your release strategy.
    Hope this helps.
    H Narayan

  • Str Loc Mandatory Setting for Project System PR

    Hi
    How can i make mandatory setting for a PR getting generated by project system thro the trans CJ20N.
    Since its not an mandatory field the PR s from project based are not hv str loc in PR.
    Also we are not able to edit the same. All the fileds are in PR in ME52N in grey colour whr the PR s from project based.
    Vijay

    if your material is not inventory managed, then you cannot have a storage location in the PR.
    If it is inventory managed, then you can set the defautl storage location in material master MRP view field Storage location EP

  • Planning Profile for Project System

    Dear All,
    In planning Profile (T Code OPSB) for Project System we can find  RElem.f.billing plan ..field, in this field which cost element we have to assign wheather it is sales revenue or secondary cost element cat.31 or else..plz adives me..
    Thanks and regards

    Mr. Sridhar,
    Thanks for ur reply, here my querry is, i have types of sales revenues like domestic, export, industrial etc.. there is only option is there to maintain revenue cost element, so which revenue cost element i have to maintain in planning profile.
    Regards
    Ramesh

Maybe you are looking for

  • How do I setup a quadrature applicati

    on to reload a zero on the z pulse while counting up AND reload the stripe count of my encoder (i.e 720) while counting down. I understand how the reload mechanism works in one direction but what about bi-directional??? I am using Traditional NI-DAQ

  • Non Cumulative Key Figure help

    Hi All, I am in need of setting up a non-cumulative key figure in a cube.  When I load from my ODS everything is ok, however during a delta process, this field at times gets summarized when in fact it should be static or in an overwite mode.  Can som

  • Dreamweaver layout issue

    Hello, I have an issue on the layout of my website ( récupération de données ). As I work on Dreamweaver, I think the problem comes from there. Need help !

  • Trouble with Mac mail. Cannot receive email

    I've had this problem before and have previously been able to resolve. I didn't make any changes to my computer and suddenly my email stopped arriving on my mac. I am receiving fine on my iPhone and iPad. Looked around a little and I see that there i

  • PPC Update 10.4.7 and Preview went nuts

    After I updated to 10.4.7 (PPC), some PDF look awful, with black squares in some fonts, like in this picture: http://photos1.blogger.com/blogger/4305/893/1600/Picture%201.png With Japanese PDFs is worse, since all the Japanese font looks like that. O