Projected Sales..

need ur help to define the logic...need to derive the projetced sales in report....calculation is
Projetced Sales = Actual Sales * (Number of Days in Month/Remaining Number of days)
say for example,
on 04-Jun-2007
projetced sales = 10 * (30/28)
my question how to get the days in the calculated key figures...
1.formula variables...
Populate the formula variable "A" with number of days in a month using customer exit. and number of days remaing with one more variable "B" using customer exit.....
please cofirm whether this approach will work or not...

Hi Raman,
  Your  logic is correct and it will work perfectly.
Jaya

Similar Messages

  • Price determination in case of Project sales

    Hi All,
    I  am creating a Project and creating a quotation through transaction DP82 using document type AP in
    which I have assigned item category AGN.
    In quotation my assigned pricing procedure gets reflected in the quotation condition screen.
    But when I am creating delivery with CNS0 and doing billing with reference to delivery I find that my pricing
    getting determined directly in the billing document and neglecting the quotation. I have  also tried to create
    the billing document through the reference of quotation by maintaining the relevant copy control of Sales to
    Billing document. But I am creating with reference to quotation then I am getting message u201CItem is not
    relevant for billingu201D.
    I want my pricing should determine from quotation
    I have done the following things
    1 Created ZAP doc. From AP u2013 (Project quotation)
    2. Assigned item category ZAGN ,which has been copied  from AGN
    3.Item category determination (Assigned ZAGN to ZAP)
    4. Maintained copy control from sales doc to billing doc (i.e. ZAP to F2)
    5.I have also assigned pricing procedure key u201Cpu201D to the billing document.
    Basically this issue is related to SD-PS integration from projects (WBS) to billing document.
    Regards
    Rahul

    Hi,
    Check Pricing update at item level, in copying control.
    In case this is set at B, make sure you set it at G. This will allow you to copy pricing from preceding document (quotation or order, etc.)
    So, goto copying control, choose your respective doc. types, and at item level, check the pricing box for settings.
    Cheers.

  • Easy cost planning in Project & sales pricing

    Dear All
    When i was trying to create easy cost planning from project, I am uable to get the costing variant. I have done basic settings.But the same is not working properly
    Kindly advise me how do i do this?
    I need to create easy cost planning from project and from project i need to create salespricing through DP91. I have assigned DIP profile in project profile.
    Please advise
    Regards
    Deepu Pillai

    Hi,
    Yes, that is the key that determines how a cost estimate is performed and valuated.
    Depending on the object being costed, either the functions of either unit costing or product costing can be used.To calculate the costs of producing a material, you create a product cost estimate with or without a quantity structure
    In a cost estimate with a quantity structure, the costing variant determines the following:
    1. Which dates are valid for the cost estimate itself and for exploding and valuating the quantity
        structure.
    2. How the BOMs and routings are selected to create the quantity structure
    3. Which prices are selected to valuate the quantity structure
    4. How overhead is calculated
    You create a unit cost estimate to cost the following objects:
    1.Materials (cost estimate without quantity structure)
    2.Materials (additive cost estimate)
    3.Production orders in Controlling
    4.Internal orders
    5.WBS elements
    6.Base planning objects
    7.Cost object IDs
    8.Sales documents
    In unit costing, the costing variant determines which prices are selected to valuate the individual costing items and how overhead is calculated.
    Costing variants are also used to calculate costs for Production orders,Networks,Maintenance orders,
    Run schedule headers,Process orders,Sales document items,Appropriation requests,Ad hoc cost estimates.
    A costing variant is linked to the control parameters like Costing type,Valuation variant,
    Date control (in costing with and without quantity structure).
    For config of Costing Variant,
    Go to SPRO- Project system-Costs-Planned Costs-Costing-Define Costing Variants
    Hope this helps.
    Regards
    Tushar

  • Project Sales Order Integration

    Hi,
    I have a question on Oracle Project and Sales Order integration.
    In the sales order form, there is a place to enter project and task information. What is the significance and how can we bring this information into Project itself?

    Hi
    1) Shipping functionality is supported for Sale Order, for Project Contracts and for Project Management (Deliverables). If you need to track shipping for a project, you will need to enable Project Manufacturing, no mater which of above three modules is implemented.
    By the way, shipping integration for all those modules support the outbound deliverables, meanning items you need to ship from your own inventory facility to a customer or other third party. You mentioned a case for tracking items shipped from a third party vendor. You may need to look at the purchasing side and not the sale order for that.
    2) If you implement Project Manufacturing, there is a process caleed Cost Collector, which interface the inventory and WIP transactions into PA Interface Table. From there you have to run the PRC: Transaction Import process to bring into Oracle Projects the expenditure Items.
    3) I can explain the accounting, but I'm not sure which scenarios you will be implementing, and which module are you going to define the accounting. Please be more specific, and detail the release number your are implementing.
    Dina

  • Project & Sales order Closure before delivery complete

    Hello All,
    My client want to close the projects and sales order to close before meeting complete delivery lets take example:
    customer orders 100 quantity of an item and we have delivered 90 quantity than suddenly customer change the requirement to close this order. so our concern is to close this Sales order and project. we don't want to use option:
    1. we don't want to change the quantity in sales order and project to 90. this will effect in auditing.
    2. remaining quantity will be shown as delivery.
    Please suggest us to close the sales order & Project without affect in Auditing or any other account.
    thanks
    Sunil

    Hello Kishore,
    we have MTO scenario and our issue is to close the sales order, Project & Production order before deliver the complete quantity means when suddenly a customer close the order and our material related to that sales order or project is in process than how we can settle the sales order and project
    Example:  i have got order of 100 quantity regarding the sales order & we have issued the RM quantity to Production order. More over we have consumed 80 quantity and post in finished stock and other remaining 20 quantity is in process means that can be two type of process:
    first is material which we issued is in process and the status of the production order PCNF.
    Second the material is not in process and status of the production order is PCNF. when suddenly customer close the order.
    my question is if we face these type of condition how we should settle or close the sales order, project & production order.
    Please suggest for this case.
    Thanks
    Sunil

  • Idoc for Project/SALES ORDER

    Hi Friends,
    is it handy to create an Idoc for exporting project data and the belonging sales order data to extract it in one file?
    Thanks in advance
    Jimbob

    Hi Senthil,
    You can use the output determination technique for this,
    so when ever it got created this out put will be trigered and configure your partner profile also in the similar way.
    Regards,
    sasi

  • Project Sale order Pick Transaction

    Hi,
    The client implemented PJM and PJC.
    In some of our scnerios the sales order pick transactions is getting cost collected.
    As per my understanding, Project releated sales order will pick inventory item from project locator while shipping. So the item should be in the Project locator to do the shipping. if the item is in inventory some other locator then it should be moved to project locator(Project Transfer). then the sales order will pick the item for shipping. So the project transfer will get collected not the sale order pick transactions.
    can someone help to me understand at what scneario sale order pick transaction will get cost collected for projects.
    Thanks
    Govind

    Hi
    Your understanding is correct.
    However, if user is picking the item direclty from a common locator or another project locator, I would expect to see such transactions being cost collected.
    Dina

  • Sale Order Status Change after delivery of materials from projects

    have ETO sccenario which consists of all modules such as SD,PS.PP etc. Materials will be procured from external vendors & manufactured inhouse through project systems. After delivery of materials from project systems, billing & invoicing will be done at sales level.
    On delivery of materials from projects, sale order status remain open. Request you to look into the matter & suggest about status change of sale order after delivery / billing.
    Regards,
    Ranjan

    Hi,
    In sale order, WBSE is assigned. Delivery of materials are through cns0. then subsequently picking / packing / billing will happen at sales level. Billing is of delivery related. Please suggest to fix the issue.
    Thanks & Regards,
    Biplab Ranjan

  • Sale Order Status after dellivery of materials from Projects

    Hi,
    I have ETO sccenario which consists of all modules such as SD,PS.PP etc. Materials will be procured from external vendors & manufactured inhouse through project systems. After delivery of materials from project systems, billing & invoicing will be done at sales level.
    On delivery of materials from projects, sale order status remain open. Request you to look into the matter & suggest about status change of sale order after delivery / billing.
    Thank you in advance.
    Regards,
    Ranjan

    Hi,
    In sale order, WBSE is assigned. Delivery of materials are through cns0. then subsequently picking / packing / billing will happen at sales level. Billing is of delivery related. Please suggest to fix the issue.
    Thanks & Regards,
    Biplab Ranjan

  • Can we have Cost of Manufactuirng sent to Projects while Inventory issue of these items to be through Sales Order Shipping. Can we do that?

    I want to send the cost of manufactured items to a Project/Task .
    Still I want to issue these items from inventory using a Sales Order (Sales Shipping).
    Billing shall be from the Project.
    Can we do the above cycle?
    In another scenario, what if I want to bill from the Sales Order?Dina Rotem@

    Hi,
    You will have to enable project manufacturing if you want to collect manufacturing cost on a project. Once you create a project, add this project to a project manufacturing organization through a PJM responsibility. Once you associate project and PJM org you will be able to put the PJM organization in the sales order line created on a Project sales order in Oracle OM. Also, mention the project number in that sales order.
    Once this sales order is shipped, run the cost collection program and it will bring in the manufacturing costs to project.
    Hope it helps
    Regards
    Kaushal

  • Multiple Sales Employee in Projects

    Dear All.
    Can someone explain how to assign multiple sales employee in the project sales order against a single project.
    EX:
    Project - ABC-12
    Sales Employee- A,B
    Is there any special settings to be made in SPRO
    Thanking you
    Regards,
    Mercy

    Dear Mr.Virendar
    Thank you for your reply,
    can you please tell me the reason as to why
    if I create two project sales order  for the same project ,each  sales order having different partners
    and I run the Settlement ,in the ZSA01 report the revenue is reflected only against one of the partners and against only one sales order number.BOTH the sales order numbers and both the sales employee are not reflecting in this report.However the reveue is reflected against the project.
    Example:
    Project : AEEEEE-1
    SALES ORDER : A - INVOICED VALUE  - AED 50000   SALES EMPLOYEE - BOB
                               B -  INVOICED VALUE - AED 25000   SALES EMPLOYEE - TOM
    IN THE ZSA01 REPORT
    IT IS REFLECTED AS
    WBS
    AEEEEE-1 - 75000
    SALES ORDER  - B - 75000
    SALES EMPLOYEE - TOM
    HERE iF you see the order no A and employee no BOB is not reflecting.
    Can you please help me on this issue
    Thanking you,
    Regards,
    Mercy

  • Sales order cost issue

    Hi All,
    I need help with the production issue.There are 2 sales orders which have cost recognized in one of the month
    but they are not posting to WIP.Can anyone explain me the reason for this problem.
    Thanks in advance.
    Edited by: Reema Sen on Jun 10, 2009 2:19 AM

    Hi,
    You will have to enable project manufacturing if you want to collect manufacturing cost on a project. Once you create a project, add this project to a project manufacturing organization through a PJM responsibility. Once you associate project and PJM org you will be able to put the PJM organization in the sales order line created on a Project sales order in Oracle OM. Also, mention the project number in that sales order.
    Once this sales order is shipped, run the cost collection program and it will bring in the manufacturing costs to project.
    Hope it helps
    Regards
    Kaushal

  • User status transfer for sales orders from ECC to CRM

    Hi,
    We use business process with CRM sales orders that are transfer to ERP.
    Users can change user status in the sales orders in ERP.
    How we can replicate custom user status from ECC Sales Order to CRM Sales Order?
    What is the steps to do this for CRM 7.0?
    Denis

    Hi,
    We are creating quotation ZPQT in CRM which is then get replicated to ECC on saving it on “Accepted” status. In ECC we then create sales order of type ZPOR. Sales order gets replicated in CRM and also updates document flow. This sales order is called as “Project Sales Order”. PS team assigns WBS element to this order and does billing later on. Upon billing document is created sales order status in ECC changes to “Completed”. This is system status. But the issue is status of order ZPOR is CRM remains in status “Inprocess”. We want it to change to “Completed”.
    We have similar scenario with order type ZOR. In this order after delivery and billing ECC assigns status “Completed” to sale order and same gets replicated to CRM.
    In CRM for user status Completed we have assigned system status as FINI. Both ZPOR and ZOR has same status profile assigned at header and item level.
    Our concern is if status is changing back in CRM for ZOR then why not for ZPOR. What is stopping system to do so?

  • Quantity of sales order in Milestone wise billing

    Hi
    i have a sales order and its assigned to Project. Its a project sales order and we are doing milestone billing.
    only one line item in sales order. Now my question is we dont give quantity in the sales order line item and now the slaes order is saved and the quantity filed is grayed out.
    Why is it happening. Any speciff setting we mainitain for Project related sales order for milestone billing plan???
    Please guide me
    Thanks a lot in advance
    Regards
    SURYA

    need inputs...................
    regards
    SURYA

  • Transfer project/ SO stock between 2 storage locations of same plant

    HI,
    We have a requirement in which the we have to transfer  project/sales order stock between 2 storage locations of the same plant.

    Transfer between storage location.
       311 Q - Project Stock
       311 E - Sales Order Stock
    Transfer between storage location to own stock
       411 Q - Project stock to own
       411 E - Sales Order to own

Maybe you are looking for

  • How to go about cancelling mis-advertised BT Infin...

    Hi all, A couple of months ago I made the mistake of signing up to BT Infinity. I signed up because it was listed as being an unlimited service and that I would get a connection speed of about 35 MBit. I've since had several speed drops to effectivel

  • Setting up your system

    Hey guys, Been using Premiere Pro CS5 since it came out but I've run into a problem.  I purchased a Sony HVR-A1U and I'm trying to capture footage by connecting DV/HDV to 9-pin firewire and I also have a G-RAID Drive that has 9 to 9-pin firewire runn

  • ESS  Quick Links

    1)Does anyone know how to change the description of a Quick Link in Homepage Framework from "Quick LInk Services" to "Quick Link" 2) Is it possible to make the text which says "Quick Link Services" completely disappear. 3) if I want to make the link

  • Restoring my itunes library

    I hope someone can help me with my problem. Recently my computer crashed and through the manufacturer I had to reinstall all my software, so in the process I lost everything in my itunes library. All of my music is still on my ipod but not in my itun

  • Virtual machine class.....

    Anyone ever see this before? Assertion failed: offset < fFileSize, file ../../../src/share/native/sun/awt/fon t/fontmanager/fontobjects/fontObject.cpp, line 256 abnormal program termination I get it whenever I try to run my Java Swing based applicati